About this file

This is a Project Manual and Hazardous Building Materials Survey Report prepared for the Iowa Department of Administrative Services (IDAS) regarding the WRC Decentralization Phase 5 tunnel abandonment project at Woodward Resource Center in Woodward, Iowa. The project, identified as IDAS Project #9279.50 and SH Project #2240007040, involves the demolition of utilities in tunnels, rerouting of water lines, and filling of tunnels with grout. The survey was conducted on October 10-11, 2024, and issued for construction on April 24, 2026. The project manual includes comprehensive specifications across multiple divisions including demolition, concrete work, waterproofing, plumbing, HVAC, and electrical work, with professional engineering certifications provided by licensed Professional Engineers Matthew A. Mettemeyer (License #20396), John D. Baumhover (License #25737), and Kevin J. Bruxvoort (License #19927). Construction is anticipated to begin July 6, 2026, and conclude June 30, 2028.

The hazardous building materials survey identified substantial asbestos-containing materials (ACM) throughout the tunnel system, with 50 samples collected and analyzed, resulting in 44 samples testing positive for asbestos content exceeding 1 percent. The identified ACM includes thermal system insulation (TSI) on pipes ranging from 1 to 16 inches in diameter, with asbestos content ranging from 7 percent to 80 percent, predominantly consisting of chrysotile and amosite varieties in quantities totaling approximately 11,000 linear feet and 200 mechanical fittings. No lead-based paint was identified during the inspection, and no other hazardous building materials were detected. The report recommends retention of a State of Iowa certified abatement contractor for proper removal and disposal in accordance with NESHAP and OSHA regulations, with notification required to the Iowa Department of Natural Resources at least 10 business days prior to abatement activities. Contractors must exercise caution during construction activities and comply with federal, state, and local regulations regarding hazardous materials handling and disposal.

View the file

Other files

File Type Posted
RFB927950-01 - Drawings.pdf PDF
RFB927950-01 - Bid Form.pdf PDF
RFB927950-01 - Notice to Bidders.pdf PDF
RFB927950-01 - Addendum #1.pdf PDF
1390845-event.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PAGE

INTENTIONALLY

LEFT BLANK

IDAS - WRC Decentralization Ph

5- Tunnel Abandonment

IDAS Project # 9279.50

SH Project # 2240007040

Issued for Construction

04-24-2026

Certifications Page

00 0105 - 1

SECTION 00 0105

CERTIFICATIONS PAGE

STATE OF IOWA

I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

Signature Date

Printed or typed name: Matthew A. Mettemeyer

License Number: 20396

My license renewal date is: 12-31-2026

Pages, Sheets, or Divisions covered by this Seal:

Divisions 02, 03, and 07

I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

Signature Date

Printed or typed name: John D. Baumhover License Number: 25737 My license renewal date is: 12-31-2026 Pages, Sheets, or Divisions covered by this Seal: Division 22 and 23

I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

Signature Date

Printed or typed name: Kevin J. Bruxvoort License Number: 19927 My license renewal date is: 12-31-2027 Pages, Sheets, or Divisions covered by this Seal: Division

04/27/2026

04/27/2026

04/27/2026

PROJECT 9279.50 TABLE OF CONTENTS 00 0110 - 1

SECTION 00 0110

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS

1.01 DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

A. 00 0101 Project Title Page B. 00 0105 Certifications Page

C. 00 0110 Table of Contents D. 00 0115 List of Drawing Sheets E. 00 0116 Bid Submittal Checklist F. 00 1113 Notice to Bidders

G. 00 2113 Instructions to Bidders H. 00 2113.01 IMPACS Electronic Procurement System Instructions I. 00 2113.02 Sample Contractor Certificate of Insurance J. 00 3113 Preliminary Schedule K. 00 3126 Existing Hazardous Material Information

L. 00 3143 Permit Application M. 00 4116 Bid Form N. 00 4116.01 Non Discrimination Clause Information O. 00 4116.02 Targeted Small Business Information

P. 00 4313 Bid Security Forms Q. 00 5200 Agreement Form R. 00 6000 Payment Bond and Performance Bond Forms

SPECIFICATIONS

1.02 DIVISION 01 – GENERAL REQUIREMENTS

A. 01 1200 Contract Summary B. 01 2500 Substitution Procedures C. 01 2600 Contract Modification Procedures D. 01 2900 Payment Procedures

E. 01 3100 Project Management and Coordination F. 01 3100.01 Web Based Construction Management G. 01 3200 Construction Progress Documentation H. 01 3300 Submittal Procedures I. 01 4000 Quality Requirements

J. 01 5000 Temporary Facilities and Controls K. 01 6000 Product Requirements L. 01 7300 Execution M. 01 7700 Closeout Procedures

N. 01 9000 Asbestos Abatement Specification

1.03 DIVISION 02 – EXISTING CONDITIONS

A. 02 4100 Demolition

PROJECT 9279.50 TABLE OF CONTENTS 00 0110 - 2

1.04 DIVISION 03 – CONCRETE

A. 03 3000 Cast-In-Place Concrete

1.05 DIVISION 07 – THERMAL AND MOISTURE PROTECTION

A. 07 1300 Sheet Waterproofing

1.06 DIVISION 22 – PLUMBING

A. 22 0500 Common Work Results for Plumbing B. 22 0523 General-Duty Valves for Plumbing Piping

C. 22 0529 Hangers and Supports for Plumbing Piping and Equipment D. 22 0700 Plumbing Insulation E. 22 1116 Domestic Water Piping

1.07 DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

A. 23 0500 Common Work Results for HVAC B. 23 1113 Facility Fuel-Oil Piping C. 23 2213 Steam and Condensate Heating Piping

1.08 DIVISION 26 – ELECTRICAL

A. 26 0505 Selective Demolition for Electrical

END OF SECTION

4503 East 50th Street, Suite 800, Des Moines, Iowa 50317

515.981.4528 | oneatlas.com

L I M I T E D H A Z A R D O U S B U I L D I N G M A T E R I A L S S U R V E Y

PREPARED FOR:

Iowa Department of Administrative Services 109 SE 13th Street

Des Moines, Iowa 50319

PROJECT LOCATION:

Woodward Resource Center – Phase 4 Decentralization Project #9279 Tunnel System

1251 334th Street Woodward, Iowa

Project Date: October 10 and 11, 2024

Report Date: December 2, 2024

Atlas Project ID: 204BS07475

PREPARED BY:

Atlas Technical Consultants LLC 4503 East 50th Street, Suite 800

Des Moines, IA 50317 i

December 2, 2024

Ms. Jennifer Kleene Iowa Department of Administrative Services 109 SE 13th Street Des Moines, IA 50319

Re: Hazardous Building Materials Survey Report – Tunnel System

Woodward Resource Center – Phase 4 Decentralization Project #9279 1251 334th Street Woodward, Iowa 50276

Atlas Project Number: 204BS07475

Atlas is pleased to submit the attached Hazardous Building Materials Survey Report for the above-referenced site. This report includes procedures, methodologies and analytical laboratory results.

Atlas appreciates the opportunity to perform these services for the Iowa Department of Administrative Services (IDAS), and we look forward to working with you in the future. If you need any assistance with the implementation of the recommendations contained in this report, please feel free to give us a call at (515) 981-4528 and we will respond promptly to your needs.

Sincerely, ATLAS TECHNICAL CONSULTANTS LLC

Eric Brown Steve Hudson, MS, CIH Iowa Inspector Senior Project Manager

(515) 981-4528 (402) 670-3842

T A B L E O F C O N T E N T S

LETTER OF TRANSMITTAL ............................................................................................... i

1.0 SCOPE OF SERVICES

2.0 GENERAL SITE CONDITIONS

3.0 ASBESTOS SURVEY

3.1 Regulation Review

3.2 Homogeneous Areas

3.3 Sampling Strategy

3.4 Laboratory Analytical Results

3.5 Suspect Asbestos-Containing Materials

4.0 LEAD PAINT CHIP TESTING

4.1 Inspection

4.2 Lead Paint Testing

5.0 HAZARDOUS MATERIALS ASSESSMENT

6.0 CONCLUSIONS

6.1 Asbestos

6.2 Lead

6.3 Hazardous Building Materials

7.0 ASSUMPTIONS AND LIMITATIONS

APPENDICES

APPENDIX A: Asbestos Analytical Report and Chain of Custody

APPENDIX B: Asbestos Photo Log

APPENDIX C: Inspector Accreditations

Hazardous Building Materials Survey Report – Tunnel System

Woodward Rescource Center Phase 4 Decentralization Project #9279

December 2, 2024 Project No. 204BS07475

H A Z A R D O U S B U I L D I N G M A T E R I A L S

S U R V E Y R E P O R T

Woodward Resource Center – Tunnel System Phase 4 Decentralization Project #9279

1251 334th Street Woodward, Iowa

Atlas Project Number: 204BS07475

1.0 SCOPE OF SERVICES

The purpose of this project was to perform a survey to identify hazardous building materials at the above-referenced property.

Atlas provided a representative asbestos survey in accordance with the referenced agreement and as outlined below:

1. Review any existing hazardous building material survey reports relating to the site, if available.

2. Identify suspect asbestos-containing materials (ACM), surface coatings potentially containing lead paint, and hazardous building materials throughout the tunnel system.

3. Collect and analyze bulk samples of suspect asbestos containing materials and collect paint chip samples from representative surface coatings potentially containing lead-based or lead-containing paint.

4. Provide laboratory analysis of collected samples.

5. Provide a report of findings with copies and interpretation of analytical results and identifying the locations of asbestos-containing materials, lead paint, and hazardous building materials.

2.0 GENERAL SITE CONDITIONS

The survey was conducted in the tunnel system at the Woodward Resource Center located at 1251 334th Street in Woodward, Iowa.

3.0 ASBESTOS SURVEY

On October 10 and 11, 2024, the Tunnel System was inspected for ACMs by inspector Eric Brown of Atlas. Mr. Brown has completed the requisite training for asbestos accreditation as inspectors at a state approved training provider under TSCA Title II. Mr. Brown’s State of Iowa Inspector number is 24-11418.

The Tunnel System was visually inspected for the presence of suspect ACMs. Materials that were hidden, not accessible, or when sampled would damage the integrity of the structure, were not sampled as part of this survey. Materials visibly identified as non-asbestos (fibrous glass, foam rubber, wood, etc.) were not sampled. The asbestos survey consisted of three basic steps: 1) a visual inspection of the proposed work areas; 2) a determination of homogeneous areas with suspect surfacing, thermal system insulation, and miscellaneous materials; and 3) sampling accessible, friable and non-friable, suspect materials.

3.1 Regulation Review

The United States Environmental Protection Agency (USEPA) qualifies ACM as materials with an asbestos content greater than 1%. The following definitions are taken from Section 61.141 of Subpart M, Part 61 of Title 40: Protection of Environment of the Code of Federal Regulations

(CFR).

• “Category I non-friable ACM” is defined as asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products containing more than 1% asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy (PLM).

• “Category II non-friable ACM” is defined as any material, excluding Category I non-friable ACM, containing more than 1% asbestos as determined using the methods specified in appendix E, subpart E, 40 CFR part 763, section 1, PLM that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.

• “Friable asbestos material” is defined as any material containing more than 1% asbestos as determined using the methods specified in appendix E, subpart E, 40 CFR part 763, section 1, PLM that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. If the asbestos content is less than 10% as determined by a method other than point counting by PLM, verify the asbestos content by point counting using PLM.

3.2 Homogeneous Areas

Prior to sampling, homogeneous areas were identified in order to facilitate a sampling strategy. A homogeneous sampling area can be described as one or more areas with suspect material similar in appearance and texture that have the same installation date and function. The actual number of samples collected from each homogeneous sampling area may vary, dependent upon material type and the professional judgment of the inspector.

3.3 Sampling Strategy

The sampling strategy incorporated Asbestos Hazard Emergency Response Acts (AHERA) requirements, quantities of suspect material, and the inspector’s judgment to aid in the identification of suspect asbestos-containing materials. If the analytical results indicated that all the samples collected per homogeneous area did not contain asbestos, then the homogeneous area (material) was considered non-asbestos-containing. However, if the analytical results of one or more of the samples collected per homogeneous area indicated that asbestos was present in quantities greater than one percent asbestos (as defined by EPA), all of the homogeneous area (material) was treated as an asbestos-containing material regardless of any other analytical results. Materials which were visually determined to be non-asbestos (i.e. fibrous glass, foam rubber, etc.) by the accredited inspector were not required to be sampled. Actual collection of a bulk asbestos sample involves physically removing approximately one square inch (1 in2) of material and placing it in an airtight sample container. Sample containers were marked with a unique identification number, which was documented in the field notes.

3.4 Laboratory Analytical Results

A total of 50 samples were collected from building materials suspected of containing asbestos. The samples were submitted under chain of custody to EMSL Analytical, Inc. (EMSL) located at 200 Route 130 North in Cinnaminson, New Jersey, for analysis by polarized light microscopy (PLM) with dispersion staining techniques per the USEPA Method for the Determination of Asbestos in Bulk Building Materials (600/R-93-116). The percentage of asbestos, if applicable, was established by microscopic visual estimation. EMSL is an accredited laboratory by the National Voluntary Laboratory Accreditation Plan (NVLAP) No. 101048-0. Any material that contains greater than one percent (>1%) asbestos is considered an ACM and must be handled according to Occupational Safety and Health Administration (OSHA), USEPA, and all applicable state and local regulations.

Laboratory test results are provided in Appendix A.

3.5 Suspect Asbestos-Containing Materials

The following table contains a list of suspect asbestos containing materials sampled:

T A B L E 1 : S U S P E C T A S B E S T O S M A T E R I A L S

Material Location Sample Number

TSI Largest Pipe 16” Diameter Run Intersection with Birches/Oak/Power Plant T-1

TSI Largest Pipe 16” Diameter Run Intersection w/medical T-2

TSI Largest Pipe 16” Diameter Run Intersection of Orchard & Cedar T-3

TSI 6” diameter pipe run Intersection with Birches/Oak/Power Plant T-4

TSI 6” diameter pipe run Intersection w/medical T-5

TSI 6” diameter pipe run Intersection of Orchard & Cedar T-6

TSI-Aircell Intersection w/medical T-7

TSI Largest Pipe 16” Diameter Elbow Intersection of Orchard & Cedar T-8

TSI Largest Pipe 16” Diameter Elbow Intersection of Orchard & Cedar T-9

TSI Largest Pipe 16” Diameter Elbow Intersection of Orchard & Cedar T-10

TSI Unmarked pipe located above hot water pipe

Intersection of Orchard & Cedar T-11

TSI High Pressure Steam Elbow Tunnel Intersection with Myers T-12

TSI Hot Water Elbow 200 ft from welder’s access hatch T-13

TSI Hot Water Elbow 200 ft from welder’s access hatch T-14

TSI Hot Water Elbow 200 ft from welder’s access hatch T-15

TSI – Unmarked Pipe Run 200 ft from welder’s access hatch T-16

TSI - Aircell Intersection with Myers branch tunnel T-17

TSI High Pressure Steam Elbow Larches Tunnel End T-18

TSI Hot Water Elbow Larches Tunnel End T-19

TSI – Aircell Myers Tunnel End T-20

TSI Hot Water Run Under street by admin T-21

TSI – Return Steam Run Under street by admin T-22

TSI- 2” Head height mystery pipe run E-home Branch T-23

T A B L E 1 : S U S P E C T A S B E S T O S M A T E R I A L S

Material Location Sample Number

TSI- 2” Head height mystery Elbow E-home Branch T-24

TSI – 4” Pipe Elbow E-home Branch T-25

TSI – 4” Pipe Run E-home Branch T-26

TSI – 2” top pipe run Maple Branch T-27

TSI – 6” top pipe run Maple Branch T-28

TSI – 2” middle pipe run near wall Maple Branch T-29

TSI – 1” bottom pipe run Maple Branch T-30

TSI – 2” bottom pipe run near wall Maple Branch T-31

TSI – Aircelll Run Medical Branch T-32

TSI – 2” pipe run Medical Branch T-33

TSI – Larger diameter Aircelll Run Medical Branch T-34

TSI – Smaller diameter Aircelll Run Medical Branch T-35

TSI- Steam pipe Elbow Medical Branch T-36

TSI- Middle pipe Elbow Medical Branch T-37

4” diameter pipe Elbow Medical Branch T-38

Unmarked pipe adjacent to Hot water Pipe 75ft from “strange” air stack T-39

TSI – Sealant Birches Branch T-40

TSI – Aircelll 2nd pipe from wall Birches Branch T-41

2.5” pipe furthest from wall - TSI Birches Branch T-42

Low Pressure Pipe - TSI Birches Branch T-43

2.5” High Pressure Pipe - TSI Birches Branch T-44

TSI-Hot water pipe Oak Hall Branch T-45

TSI-High Pressure Steam Oak Hall Branch T-46

TSI – Low Pressure Steam Oak Hall Branch T-47

TSI – Low Pressure Steam Oak Hall Branch T-48

TSI-High Pressure Steam Oak Hall Branch T-49

TSI – Hot water Elbow Oak Hall Branch T-50

The following table is a summary of the suspect asbestos-containing materials that have been determined, through laboratory analysis, to contain asbestos:

T A B L E 2 : A S B E S T O S - C O N T A I N I N G M A T E R I A L S

Sample Number

Material Location Approx.

Quantity

Asbestos Content

T-1

TSI Low Pressure Steam 16” Diameter Run

Intersection with Birches/Oak/Power Plant

4,000 LF

40% - 65% Chrysotile T-2 Intersection w/medical

T-3 Intersection of Orchard & Cedar

T-4 TSI High Pressure Steam

6” diameter pipe run Intersection with

Birches/Oak/Power Plant

4,000 LF

70% Chrysotile

Sample Number

Material Location Approx.

Quantity

Asbestos Content

T-5 Intersection w/medical 22% Amosite

10% Chrysotile

T-6 Intersection of Orchard & Cedar 28% Amosite 7% Chrysotile

T-7 TSI – Aircell Intersection w/medical 50 LF 65% Chrysotile

T-8 TSI Low Pressure Steam

16” Diameter Elbow Intersection of Orchard & Cedar 4 MF

60% to 70% Chrysotile

T-9

T-10

T-11 TSI Unmarked Pipe located above Hot Water Pipe

Intersection of Orchard & Cedar 1,000 LF 40% Chrysotile

T-12 TSI High Pressure Steam

Elbow Tunnel Intersection with Myers 2 MF 70% Chrysotile

T-13

TSI Hot Water Elbow 200 ft from welder’s access hatch 4 MF 60% to 65% Chrysotile T-14

T-15

T-16 TSI – Unmarked Pipe

Run 200 ft from welder’s access hatch 1,000 LF 35% Chrysotile

T-17 TSI - Aircell Intersection with Myers branch tunnel 400 LF 70% Chrysotile

T-18 TSI High Pressure Steam

Elbow Larches End 50 MF 65% Chrysotile

T-19 TSI Hot Water Elbow Larches End 2 MF 60% Chrysotile

T-20 TSI - Aircell Myers End 400 LF 80% Chrysotile

T-23 TSI- 2” Head Height Unmarked Pipe Run

E-home Branch 250 LF 50% Chrysotile

T-24 TSI- 2” Head Height

Unmarked Elbow E-home Branch 4 MF

7% Amosite 55% Chrysotile

T-25 TSI – 4” Pipe Elbow E-home Branch 4 MF 60%

Chrysotile

T-26 TSI – 4” Pipe Run E-home Branch 250 LF 22% Amosite 7% Chrysotile

T-27 TSI – 2” Top Pipe Run Maple Branch 160 LF 10% Amosite

17% Chrysotile

T-28 TSI – 6” Top Pipe Run Maple Branch 160 LF 15% Amosite

20% Chrysotile

T-29 TSI – 2” Middle Pipe Run near Wall Maple Branch 160 LF

30% Amosite 20% Chrysotile

Sample Number

Material Location Approx.

Quantity

Asbestos Content

T-30 TSI – 1” Bottom pipe run Maple Branch 160 LF 33% Amosite

20% Chrysotile

T-31 TSI – 2” Bottom pipe run near wall Maple Branch 160 LF

33% Amosite 20% Chrysotile

T-32 TSI – Aircell Run Medical Branch 50 LF 65%

Chrysotile

T-33 TSI – 2” pipe run Medical Branch 50 LF 38%

Chrysotile

T-34 TSI – Larger diameter

Aircell Run Medical Branch 50 LF

70% Chrysotile

T-35 TSI – Smaller diameter

Aircell Run Medical Branch 50 LF

60% Chrysotile

T-36 TSI- Steam pipe Elbow Medical Branch 3 MF 65%

Chrysotile

T-37 TSI- Middle pipe Elbow Medical Branch 3 MF 12%

Chrysotile

T-38 4” diameter pipe Elbow Medical Branch 3 MF 7%

Chrysotile

T-39 Unmarked pipe adjacent to Hot water Pipe 75ft from strange air stack 100 LF

55% Chrysotile

T-41 TSI – Aircell 2nd pipe from wall Birches Branch 300 LF

65% Chrysotile

T-42 2.5” pipe furthest from wall - TSI Birches Branch 300 LF

40% Chrysotile

T-43 TSI – Low Pressure Pipe Birches Branch 300 LF 26% Amosite

10% Chrysotile

T-44 2.5” High Pressure Pipe -

TSI

Birches Branch 2 MF

60% Chrysotile

T-46 TSI – High Pressure

Steam Oak Hall Branch 650 LF

30% Amosite 15% Chrysotile

T-47 TSI – Low Pressure

Steam Oak Hall Branch 650 LF

25% Chrysotile

T-48 TSI – Low Pressure

Steam Oak Hall Branch 650 LF

25% Chrysotile 10%

Crocidolite

T-49 TSI-High Pressure Steam Oak Hall Branch 650 LF 60%

Chrysotile

T-50 TSI – Hot water Elbow Oak Hall Branch 2 MF 65%

Chrysotile

SF = Square Feet, LF = Linear Feet; MF = Mechanical Fitting

4.0 LEAD PAINT CHIP TESTING

Atlas collected paint chip samples from representative surface coatings that may be impacted by renovation activities.

Surface coatings that were collected were considered to be representative of materials in a homogeneous area if:

1. They exhibited similar physical characteristics (suspect materials alike in appearance, substrate, color, and time of application were tested as homogenous areas)

2. The application of the tested surface could be associated to an application of an unsampled surface.

Atlas did not identify any suspect lead containing surface coatings and therefore paint chip samples were not collected.

The USEPA has defined LBP as “paint or other surface coatings that contain lead in excess of 0.5 percent by weight (>0.5%)”. Results less than 0.5% by weight indicate that lead is not present at or above the USEPA regulatory level; however, lead may be present in lower concentrations above the laboratory detection limit in other surfaces tested and these are classified as lead-containing paint (LCP). Negative results do not mean that lead is not present.

4.1 Inspection

The disturbance and disposal of materials with surface coatings that contain lead paint are regulated by the USEPA, OSHA and the State of Iowa. The Resource Conservation and Recovery Act (RCRA) provides the USEPA with the authority to regulate the waste status of demolition or renovation debris, including lead-containing materials. Specific notification and testing requirements must be addressed prior to transporting, treating, storing, or disposing of hazardous wastes.

Construction work covered by 29 CFR 1926.62 includes any repair, renovation or other activities that disturb in-place, lead-containing materials, but does not include routine cleaning and repainting where there is insignificant damage, wear or corrosion of existing lead-containing coatings or substrates. Unless adequately protected, employee exposures to lead must not exceed airborne concentrations >50 micrograms per cubic meter (g/m3) averaged over an 8-hour period.

Occupational exposure to lead occurring in the course of construction work, including maintenance activities, painting, alteration and repairs is subject to the OSHA Lead standard (29 CFR 1926.62). The lead standard applies to any detectable concentration of lead in paint, as even small concentrations of lead can result in unacceptable employee exposures depending upon the method of removal and other workplace conditions.

The disposal of lead-based paint waste, as well as paint waste containing other heavy metals, is regulated by the USEPA and State of Iowa. Wastes generated by industrial businesses, commercial businesses, and government institutions are subject to regulation. Commercial business owners and removal contractors are required to determine if paint waste generated from nonresidential structures (such as public and commercial buildings, warehouses, bridges, water towers, and transmission towers) contains heavy metals that would cause the debris to be considered a hazardous waste. Disposal options and applicable management requirements for collected debris will be based upon whether the waste stream is considered a hazardous waste and the amount of debris generated. Removal contractors and building owners need to include these factors when preparing and responding to bid specifications. Specific notification and testing requirements must be addressed prior to transporting, treating, storing, or disposing of hazardous wastes. Lead-containing wastes are considered hazardous waste under RCRA if Toxicity Characteristic Leachate Procedure (TCLP) results exceed 5 milligrams per liter (mg/L). The USEPA has made exceptions for the handling and disposal of lead wastes generated from residential housing.

Specific notification and testing requirements must be addressed prior to transporting, treating, storing, or disposing of hazardous wastes. Lead-containing wastes are considered hazardous waste under RCRA if Toxicity Characteristic Leachate Procedure (TCLP) results exceed 5 milligrams per liter (mg/L). The USEPA has made exceptions for the handling and disposal of lead wastes generated from residential housing.

The above overview is not intended to be inclusive of all potentially pertinent regulatory information. The relevant USEPA, OSHA and State of Iowa regulations should be consulted prior to undertaking activities involving the demolition, renovation or maintenance of surface coatings that contain lead.

4.2 Lead Paint Testing

The following surface coatings were collected as part of the lead paint testing:

bolded = lead-based paint

This evaluation report can help the Owner develop a plan for renovating the building by having concentrations of lead in the paint identified. It is our understanding that the information in this report will be provided to the contractors so that appropriate precautions can be made to minimize worker exposure to lead. If surface coatings with lead containing paint are handled improperly, exposure could occur to workers and future occupants of the facility.

5.0 HAZARDOUS MATERIALS ASSESSMENT

Atlas completed a visual inspection of areas throughout the tunnel system in an attempt to identify hazardous wastes or universal wastes that may be impacted by planned renovation activities.

T A B L E 3 : L E A D P A I N T S U M M A R Y

Sample Number

Sample Location

Representative Material Paint Color

Lead Concentration (% by weight)

No suspect lead containing surface coatings were identified

The survey included a visual inspection of: light fixtures and other equipment for the presence of Polychlorinated Biphenyls (PCBs); light bulbs, thermostats, switches, and other equipment for the presence of mercury; refrigerants, batteries, and devices with potential radioactive materials.

T A B L E 4 : H A Z A R D O U S B U I L D I N G M A T E R I A L S

Category Material Estimated Quantity

Batteries

Lead Acid NA

Nickel Cadmium NA

Lithium-Ion NA

Mercury

Thermostats NA

Fluorescent Light Tubes NA

High Intensity Discharge Bulbs NA

Strobes NA

Poly-Chlorinated Biphenyl (PCBs) Light Ballasts NA

Transformers NA

Low Level Radioactive Sources (LLR) Tritium Exit Signs NA

Smoke Detectors NA

Chlorofluorocarbons (CFCs) or Hydro Chlorofluorocarbons (HCFCs)

Refrigerator/Cooler NA

Freezer NA

Water Fountain NA

6.0 CONCLUSIONS

6.1 Asbestos

The NESHAP and OSHA regulations govern the removal of ACM. Atlas recommends that a State of Iowa certified abatement contractor be retained to properly abate and dispose of ACM identified in Table 1 above and in accordance with local, state, and federal regulations.

The owner and/or operator are responsible for NESHAP regulatory compliance regarding he proper removal, handling, and disposal of ACM containing >1% asbestos prior to renovation or demolition. Also, per state regulations, please be aware that the owner and/or operator must submit a notification to the Iowa Department of Natural Resources (IDNR) 10-buisness days prior to asbestos abatement at certain quantity thresholds and prior to renovation/demolition activities.

6.2 Lead

No suspect lead containing surface coatings were identified.

Contractors should use caution during construction-related activities as concealed surface coatings containing lead paints that were not previously tested may be encountered. If materials not sampled during this investigation are later identified to contain regulated quantities of lead concentrations, then they should be removed, controlled and/or disposed in accordance with federal, state and local regulations, prior to disturbance. OSHA considers any detectable level of lead as LCP and disturbance of these surface coatings is subject to the training and work practices in OSHA 29 CFR 1926.62 “Lead in Construction”.

6.3 Hazardous Building Materials

No hazardous buildings materials were identified.

7.0 ASSUMPTIONS AND LIMITATIONS

The results, findings, conclusions, and recommendations expressed in this report are based solely on conditions noted during the October 10 and 11, 2024, hazardous building materials survey of the Woodward Resource Center – Tunnel System in Woodward, Iowa.

Atlas did not perform destructive sampling -- it was not within Atlas’s scope of work to remove surface materials to investigate portions of the structure or materials that may lay beneath the surface -- thus, any materials that could not be visually identified on the surface were not inspected and would not be noted in this report. Atlas’s selection of sample locations and frequency of sampling was based on the inspector’s assumption that like materials in the same area are homogeneous in content.

The report is designed to aid the building owner, architect, construction manager, general contractor, and potential abatement contractor in locating hazardous building materials. Under no circumstances is the report to be utilized as a bidding document or as a project specification document since it does not have all the components required to serve as a Project Design document or an Abatement Work plan.

Our professional services have been performed, our findings obtained, and our conclusions and recommendations prepared in accordance with customary principles and practices in the fields of environmental science and engineering. This statement is in lieu of other statements either expressed or implied. This report does not warrant against future operations or conditions, nor does it warrant against operations or conditions present of a type or at a location not investigated.

This report is intended for the sole use of IDAS. The scope of services performed in execution of this evaluation may not be appropriate to satisfy the needs of other users, and use or re-use of this document or the findings, conclusions, or recommendations is at the risk of said user.

Atlas recommendations are based in part on federal, state, local regulations, and guidelines. Atlas does not undertake responsibility for reporting to any local, state, or federal public agencies of conditions at the site that may present a potential danger to public health or safety. Atlas recommends that the Client comply with regulations and response actions in accordance with federal, state, and local regulations.

APPENDIX A

ASBESTOS ANALYTICAL RESULTS AND CHAIN OF CUSTODY

EMSL Analytical, Inc.

200 Route 130 North Cinnaminson, NJ 08077

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

042421269EMSL Order:

Customer ID: ATC55

Customer PO:

Project ID:

Attention: Phone:Eric Brown (402) 697-9747

Fax:Atlas Technical (402) 597-8532

Received Date:11117 Mockingbird Drive 10/14/2024 8:50 AM

Analysis Date:Omaha, NE 68137 10/15/2024

Collected Date: 10/10/2024

Project: 204BS07475 / Woodward Tunnel Survey

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

T-1

042421269-0001

40% ChrysotileNon-fibrous (Other)60%White

Fibrous

Homogeneous

Tunnel - Intersection w Birches/Oak/Power

Plant - TSI - Largest

16" dia. Pipe Run

T-2-TSI

042421269-0002

65% ChrysotileNon-fibrous (Other)35%White

Fibrous

Homogeneous

Tunnel - Intersection w Medical - TSI - LP

Steam Pipe 16" dia.

T-2-Wrap

042421269-0002A

None DetectedNon-fibrous (Other)10%Cellulose90%Brown

Fibrous

Homogeneous

Tunnel - Intersection w Medical - TSI - LP

Steam Pipe 16" dia.

T-3

042421269-0003

65% ChrysotileNon-fibrous (Other)35%White

Fibrous

Homogeneous

Tunnel - Intersection of Orchard & Cedar -

TSI - LP Steam Pipe

Run

T-4

042421269-0004

70% ChrysotileNon-fibrous (Other)30%Gray

Fibrous

Homogeneous

Tunnel - Intersection w Birches/Oak/Power

- TSI - 6" next to

Largest Pipe Run

T-5-TSI

042421269-0005

22%

10%

Amosite

Chrysotile

Non-fibrous (Other)68%Gray

Fibrous

Homogeneous

Tunnel - Intersection w Medical - TSI - 6" next to LP Steam

Pipe Run

T-5-Wrap

042421269-0005A

None DetectedNon-fibrous (Other)10%Cellulose90%Brown

Fibrous

Homogeneous

Tunnel - Intersection w Medical - TSI - 6" next to LP Steam

Pipe Run

T-6

042421269-0006

28%

7%

Amosite

Chrysotile

Non-fibrous (Other)65%Gray

Fibrous

Homogeneous

Tunnel - Intersection of Orchard & Cedar -

TSI - 6" next to LP

Steam Pipe Run

T-7

042421269-0007

65% ChrysotileNon-fibrous (Other)5%Cellulose30%White

Fibrous

Homogeneous

Tunnel - Intersection w Medical - TSI -

Airocell

T-8

042421269-0008

70% ChrysotileNon-fibrous (Other)30%Gray

Fibrous

Homogeneous

Tunnel - Intersection of Orchard & Cedar -

TSI - Elbow - LP

Steam Pipe

T-9-TSI Elbow

042421269-0009

60% ChrysotileNon-fibrous (Other)40%Gray

Fibrous

Homogeneous

Tunnel - Intersection of Orchard & Cedar -

TSI - Elbow - LP

Steam Pipe

T-9-Wrap

042421269-0009A

<1% ChrysotileNon-fibrous (Other)10%Cellulose90%Gray

Fibrous

Heterogeneous

Tunnel - Intersection of Orchard & Cedar -

TSI - Elbow - LP

Steam Pipe

Result includes a small amount of inseparable attached material

T-10

042421269-0010

60% ChrysotileNon-fibrous (Other)40%Gray

Fibrous

Homogeneous

Tunnel - Intersection of Orchard & Cedar -

TSI - Elbow - LP

Steam Pipe

Initial report from: 10/15/2024 16:28:29

Page 1 of 5ASB_PLM_0008_0002 - 2.31 Printed: 10/15/2024 4:28 PM

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

042421269EMSL Order:

Customer ID: ATC55

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

T-11

042421269-0011

40% ChrysotileNon-fibrous (Other)60%White

Fibrous

Homogeneous

Tunnel - Intersection of Orchard & Cedar -

TSI - Unknown Pipe above Hot Water

T-12

042421269-0012

70% ChrysotileNon-fibrous (Other)30%Gray

Fibrous

Homogeneous

Tunnel - Intersection w Myers - TSI - Elbow

HP Steam Pipe

T-13

042421269-0013

60% ChrysotileNon-fibrous (Other)40%Gray

Fibrous

Homogeneous

Tunnel - 200ft from

Welders Access

Hatch - TSI - Hot

Water Elbow

T-14

042421269-0014

60% ChrysotileNon-fibrous (Other)40%Brown

Fibrous

Homogeneous

Tunnel - 200ft from

Welders Access

Hatch - TSI - Hot

Water Elbow

T-15-TSI

042421269-0015

65% ChrysotileNon-fibrous (Other)35%Gray

Fibrous

Homogeneous

Tunnel - 200ft from

Welders Access

Hatch - TSI - Hot

Water Elbow

T-15-Wrap

042421269-0015A

None DetectedNon-fibrous (Other)10%Cellulose90%Tan/White

Fibrous

Homogeneous

Tunnel - 200ft from

Welders Access

Hatch - TSI - Hot

Water Elbow

T-16

042421269-0016

35% ChrysotileNon-fibrous (Other)65%Brown/White

Fibrous

Homogeneous

Tunnel - 200ft from

Welders Access

Hatch - TSI - Mystery

Pipe Run

T-17

042421269-0017

70% ChrysotileNon-fibrous (Other)5%Cellulose25%White

Fibrous

Homogeneous

Tunnel - Intersection w Branch Myers

Tunne; - TSI - Airocell

T-18-TSI Elbow

042421269-0018

65% ChrysotileNon-fibrous (Other)35%Gray

Fibrous

Homogeneous

Tunnel - Larches End

- TSI - Elbow HP

Steam

T-18-Wrap

042421269-0018A

None DetectedNon-fibrous (Other)20%Cellulose80%Tan/White

Fibrous

Homogeneous

Tunnel - Larches End

- TSI - Elbow HP

Steam

T-19

042421269-0019

60% ChrysotileNon-fibrous (Other)40%Gray

Fibrous

Homogeneous

Tunnel - Larches End

- TSI - Hot Water

Elbow

T-20

042421269-0020

80% ChrysotileNon-fibrous (Other)20%White

Fibrous

Homogeneous

Tunnel - Myers End -

TSI - Airocell

T-21-TSI

042421269-0021

None DetectedNon-fibrous (Other)5%Glass95%Brown/Gray

Fibrous

Homogeneous

Tunnel - under Street by Admin - TSI - Hot

Water Run

T-21-TSI 2

042421269-0021A

None DetectedNon-fibrous (Other)5%Cellulose95%White

Fibrous

Homogeneous

Tunnel - under Street by Admin - TSI - Hot

Water Run

T-21-Wrap

042421269-0021B

None DetectedNon-fibrous (Other)10%Cellulose90%Tan/White

Fibrous

Homogeneous

Tunnel - under Street by Admin - TSI - Hot

Water Run

T-22

042421269-0022

None DetectedNon-fibrous (Other)5%Glass95%Yellow

Fibrous

Homogeneous

Tunnel - under Street by Admin - TSI -

Return Steam Run

T-23-TSI

042421269-0023

50% ChrysotileNon-fibrous (Other)50%Brown/Black

Fibrous

Homogeneous

Tunnel - E-Home

Branch - TSI -

Mystery Pipe Run - 2"

Height

Page 2 of 5ASB_PLM_0008_0002 - 2.31 Printed: 10/15/2024 4:28 PM

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

042421269EMSL Order:

Customer ID: ATC55

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

T-23-TSI 2

042421269-0023A

None DetectedNon-fibrous (Other)10%Cellulose

Synthetic

70%

20%

Brown

Fibrous

Homogeneous

Tunnel - E-Home

Branch - TSI -

Mystery Pipe Run - 2"

Height

T-24

042421269-0024

7%

55%

Amosite

Chrysotile

Non-fibrous (Other)33%Cellulose5%Gray

Fibrous

Homogeneous

Tunnel - E-Home

Branch - Mystery Pipe

- 2" Elbow

T-25-TSI Elbow

042421269-0025

60% ChrysotileNon-fibrous (Other)40%Gray

Fibrous

Homogeneous

Tunnel - E-Home

Branch - TSI - Elbow -

4" Pipe

T-25-Wrap

042421269-0025A

None DetectedNon-fibrous (Other)10%Cellulose90%Tan

Fibrous

Homogeneous

Tunnel - E-Home

Branch - TSI - Elbow -

4" Pipe

T-26-TSI

042421269-0026

22%

7%

Amosite

Chrysotile

Non-fibrous (Other)71%White

Fibrous

Homogeneous

Tunnel - E-Home

Branch - TSI - Run -

4" Pipe

T-26-Wrap

042421269-0026A

None DetectedNon-fibrous (Other)5%Cellulose95%Tan

Fibrous

Homogeneous

Tunnel - E-Home

Branch - TSI - Run -

4" Pipe

T-27

042421269-0027

10%

17%

Amosite

Chrysotile

Non-fibrous (Other)73%White

Fibrous

Homogeneous

Tunnel - Maple

Branch - TSI - Run -

2" Top Pipe

T-28

042421269-0028

15%

20%

Amosite

Chrysotile

Non-fibrous (Other)65%White

Fibrous

Homogeneous

Tunnel - Maple

Branch - TSI - Run -

6" Top Pipe

T-29-TSI

042421269-0029

30%

20%

Amosite

Chrysotile

Non-fibrous (Other)50%White

Fibrous

Homogeneous

Tunnel - Maple

Branch - TSI - 2"

Middle Shelf Run against Wall

T-29-Wrap

042421269-0029A

<1%

<1%

Amosite

Chrysotile

Non-fibrous (Other)10%Cellulose90%Tan/White

Fibrous

Heterogeneous

Tunnel - Maple

Branch - TSI - 2"

Middle Shelf Run against Wall

Result includes a small amount of inseparable attached material

T-30

042421269-0030

33%

20%

Amosite

Chrysotile

Non-fibrous (Other)47%White

Fibrous

Homogeneous

Tunnel - Maple

Branch - TSI - Run -

1" Bottom Shelf

T-31

042421269-0031

33%

20%

Amosite

Chrysotile

Non-fibrous (Other)47%White

Fibrous

Homogeneous

Tunnel - Maple

Branch - TSI - Run -

2" Bottom Shelf against Wall

T-32-TSI

042421269-0032

65% ChrysotileNon-fibrous (Other)5%Cellulose30%Gray

Fibrous

Homogeneous

Tunnel - Medical

Branch - TSI - Airocell

Run

T-32-Wrap

042421269-0032A

None DetectedNon-fibrous (Other)5%Cellulose95%Tan

Fibrous

Homogeneous

Tunnel - Medical

Branch - TSI - Airocell

Run

T-33

042421269-0033

38% ChrysotileNon-fibrous (Other)56%Cellulose6%White

Fibrous

Homogeneous

Tunnel - Medical

Branch - TSI - 2" Pipe

Run

T-34-TSI

042421269-0034

70% ChrysotileNon-fibrous (Other)5%Cellulose25%White

Fibrous

Homogeneous

Tunnel - Medical

Branch - TSI - Larger

Diameter Airocell Run

T-34-Wrap

042421269-0034A

None DetectedNon-fibrous (Other)5%Cellulose95%Tan

Fibrous

Homogeneous

Tunnel - Medical

Branch - TSI - Larger

Diameter Airocell Run

Page 3 of 5ASB_PLM_0008_0002 - 2.31 Printed: 10/15/2024 4:28 PM

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

042421269EMSL Order:

Customer ID: ATC55

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

T-35

042421269-0035

60% ChrysotileNon-fibrous (Other)5%Cellulose35%White

Fibrous

Homogeneous

Tunnel - Medical

Branch - TSI - Small

Diameter Airocell Run

T-36

042421269-0036

65% ChrysotileNon-fibrous (Other)35%White

Fibrous

Homogeneous

Tunnel - Medical

Branch - Steam Pipe

Elbow

T-37

042421269-0037

12% ChrysotileNon-fibrous (Other)43%Cellulose

Min. Wool

5%

40%

Brown/Gray

Fibrous

Homogeneous

Tunnel - Medical

Branch - Middle Pipe

Elbow

T-38

042421269-0038

7% ChrysotileNon-fibrous (Other)53%Min. Wool40%Gray

Fibrous

Homogeneous

Tunnel - Medical

Branch - 4" Pipe

Diameter Elbow

T-39

042421269-0039

55% ChrysotileNon-fibrous (Other)45%Tan/White

Fibrous

Homogeneous

Tunnel - 75 fom

Strange Air Stack -

Mystery Pipe adj to

HW near Wall

T-40

042421269-0040

None DetectedNon-fibrous (Other)100%Tan/White

Non-Fibrous

Homogeneous

Tunnel - Birches

Branch - TSI -

Sealant

T-41-TSI Aerocell

042421269-0041

65% ChrysotileNon-fibrous (Other)5%Cellulose30%White

Fibrous

Homogeneous

Tunnel - Birches

Branch - TSI - Airocell

Run 2nd Pipe from

Wall

T-41-TSI Aerocell 2

042421269-0041A

None DetectedNon-fibrous (Other)5%Cellulose95%Brown

Fibrous

Homogeneous

Tunnel - Birches

Branch - TSI - Airocell

Run 2nd Pipe from

Wall

T-42-TSI Aerocell

042421269-0042

40% ChrysotileNon-fibrous (Other)5%Cellulose55%White

Fibrous

Homogeneous

Tunnel - Birches

Branch - TSI - Airocell

Run 2.5 Pipe furthest from High Pressure

Wall

T-42-Wrap

042421269-0042A

None DetectedNon-fibrous (Other)5%Cellulose95%Tan

Fibrous

Homogeneous

Tunnel - Birches

Branch - TSI - Airocell

Run 2.5 Pipe furthest from High Pressure

Wall

T-43-TSI

042421269-0043

26%

10%

Amosite

Chrysotile

Non-fibrous (Other)64%Tan

Fibrous

Homogeneous

Tunnel - Birches

Branch - TSI Run -

Lower Pressure Pipe

T-43-Wrap

042421269-0043A

None DetectedNon-fibrous (Other)20%Cellulose80%Gray

Fibrous

Homogeneous

Tunnel - Birches

Branch - TSI Run -

Lower Pressure Pipe

T-44

042421269-0044

60% ChrysotileNon-fibrous (Other)40%White

Fibrous

Homogeneous

Tunnel - Birches

Branch - TSI - 2.5 in

High Pressure Elbow

T-45-TSI

042421269-0045

None DetectedNon-fibrous (Other)30%Cellulose70%Tan/White

Fibrous

Homogeneous

Tunnel - Oak Hall

Branch - Hot Water

Pipe TSI Run

T-45-TSI 2

042421269-0045A

None DetectedNon-fibrous (Other)5%Glass95%Yellow

Fibrous

Homogeneous

Tunnel - Oak Hall

Branch - Hot Water

Pipe TSI Run

T-46-TSI

042421269-0046

30%

15%

Amosite

Chrysotile

Non-fibrous (Other)55%White

Fibrous

Homogeneous

Tunnel - Oak Hall

Branch - High

Pressure Steam TSI

Run

Page 4 of 5ASB_PLM_0008_0002 - 2.31 Printed: 10/15/2024 4:28 PM

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

042421269EMSL Order:

Customer ID: ATC55

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

T-46-Wrap

042421269-0046A

<1%

<1%

Amosite

Chrysotile

Non-fibrous (Other)20%Cellulose80%Tan/White

Fibrous

Heterogeneous

Tunnel - Oak Hall

Branch - High

Pressure Steam TSI

Run

Result includes a small amount of inseparable attached material

T-47

042421269-0047

25% ChrysotileNon-fibrous (Other)40%Cellulose35%White

Fibrous

Homogeneous

Tunnel - Oak Hall

Branch - Low

Pressure Steam TSI

Run

T-48

042421269-0048

25%

10%

Chrysotile

Crocidolite

Non-fibrous (Other)65%White

Fibrous

Homogeneous

Tunnel - Oak Hall

Branch - Low

Pressure Steam TSI

Run

T-49-TSI

042421269-0049

60% ChrysotileNon-fibrous (Other)40%White

Fibrous

Homogeneous

Tunnel - Oak Hall

Branch - High

Pressure Steam Run

TSI

T-49-Wrap

042421269-0049A

<1% ChrysotileNon-fibrous (Other)20%Cellulose80%Tan/White

Fibrous

Heterogeneous

Tunnel - Oak Hall

Branch - High

Pressure Steam Run

TSI

Result includes a small amount of inseparable attached material

T-50

042421269-0050

65% ChrysotileNon-fibrous (Other)35%Gray

Fibrous

Homogeneous

Tunnel - Oak Hall

Branch - Hot Water

Elbow TSI

Analyst(s)

Brett Polumbo (69) Samantha Rundstrom, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA LAP, LLC-IHLAP Lab 100194, PA ID# 68-00367, LA #04127

Page 5 of 5ASB_PLM_0008_0002 - 2.31 Printed: 10/15/2024 4:28 PM

OrderID: 042421269

APPENDIX B

ASBESTOS PHOTO LOG

Photograph Log

Tunnels

1251 334th Street

Atlas Technical Consultants, LLC

4503 East 50th Street, Suite 800, Des Moines, IA 50317

(515) 981-4528

Project No. 204BS07475

View of the Powerhouse Tunnel Entrance. 1

View of the Asbestos Containing Low Pressure Pipe.

(T-1, 2, & 3, 40% - 65% Chrysotile)

Des Moines, IA 50317

View of the Asbestos Containing High Pressure TSI. (T-4, 70% Chrysotile) 3

View of the Asbestos Containing High Pressure Pipe.

(T-5, & 6, 22% - 28% Amosite & 7% - 10% Chrysotile) 4

Des Moines, IA 50317

View of the Asbestos Containing TSI Airocell.

(T-7, 17, 20, 32, 34, 35, 41, & 42, 40% - 80% Chrysotile) 5

View of the Asbestos Containing High Pressure TSI Elbow.

(T-8, 9, & 10, 60% - 70% Chrysotile)

Des Moines, IA 50317

View of the Asbestos Containing Pipe (above Hot Water at Orchard and Cedar

Intersection). (T-11, 40% Chrysotile) 7

View of the Asbestos Containing Hot Water Elbows.

(T-13, 14, 15, & 19, 60% - 65% Chrysotile) 8

Des Moines, IA 50317

View of the Asbestos Containing High Pressure Elbow.

(T-12 & 18, 65% & 70% Chrysotile)

View of the Asbestos Containing 2” Pipe Run. (T-23, 50% Chrysotile)

Des Moines, IA 50317

View of the Asbestos Containing 2” Elbow. (T-24, 7% Amosite & 55% Chrysotile)

View of the Asbestos Containing 4” Elbow. (T-25, 60% Chrysotile) 12

Des Moines, IA 50317

View of the Asbestos Containing 4” Pipe Run in E Home Branch.

(T-26, 22% Amosite & 7% Chrysotile) 13

View of the Asbestos Containing 2” Pipe Run in Maple Branch.

(T-27, 10% Amosite & 17% Chrysotile) 14

Des Moines, IA 50317

View of the Asbestos Containing High Pressure Pipe in Maple Branch.

(T-28, 15% Amosite & 20% Chrysotile)

View of the Asbestos Containing 2” Pipe on Middle Shelf in Maple Branch.

(T-29, 30% Amosite & 20% Chrysotile)

Des Moines, IA 50317

View of the Asbestos Containing 1” Pipe on Bottom Shelf in Maple Branch.

(T-30, 33% Amosite & 20% Chrysotile) 17

View of the Asbestos Containing 2” Pipe on Bottom Shelf in Maple Branch.

(T-31, 33% Amosite & 20% Chrysotile)

Des Moines, IA 50317

View of the Asbestos Containing 2” Pipe Run in Medical Branch.

(T-33, 38% Chrysotile)

View of the Asbestos Containing Steam Pipe Elbow in Medical Branch.

(T-36, 65% Chrysotile)

Des Moines, IA 50317

View of the Asbestos Containing Middle Pipe Elbow in Medical Branch.

(T-37, 12% Chrysotile)

View of the Asbestos Containing 4” Pipe Elbow in Medical Branch.

(T-38, 7% Chrysotile) 22

Des Moines, IA 50317

View of the Asbestos Containing Pipe Insulation. (T-39, 55% Chrysotile) 23

View of the Asbestos Containing Low Pressure Pipe in Birches Branch.

(T-43, 26% Amosite & 10% Chrysotile)

Des Moines, IA 50317

View of the Asbestos Containing High Pressure Pipe Elbow. (T-44, 60% Chrysotile) 25

View of the Asbestos Containing High Pressure Pipe in Oak Hall Branch.

(T-46 & 49, 30% Amosite & 15% Chrysotile, & 60% Chrysotile)

Des Moines, IA 50317

View of the Asbestos Containing Low Pressure Pipe in Oak Hall.

(T-47 & 48, 25% Chrysotile, & 25% Chrysotile and 10 % Crocidolite) 27

View of the Asbestos Containing Hot Water Pipe Elbow in Oak Hall Branch.

(T-50, 65% Chrysotile)

APPENDIX C

INSPECTOR ACCREDITATIONS

HAZARDOUS BUILDING MATERIALS

SURVEY

CHILLER BUILDING

WRC CAMPUS UTILITY DECENTRALIZATION PHASE 5

PROJECT 9279.50

1251 334TH STREET

WOODWARD, IOWA

204BS07475

PREPARED FOR:

Iowa Department of Administrative Services 109 SE 13th Street Des Moines, IA 50319

PREPARED BY:

Atlas Technical Consultants LLC 11117 Mockingbird Drive Omaha, NE 68137 May 5, 2026

Page | i

Omaha, NE 68137

(402) 697-9747 | oneatlas.com

April 21, 2026

Ms. Jennifer Kleene

Iowa Department of Administrative Services

109 SE 13th Street

Des Moines, IA 50319

Subject: Hazardous Building Materials Survey

Chiller Building

WRC Campus Utility Decentralization Phase 5 Project 9279.50

1251 334th Street

Atlas No: 204BS07475

Dear Ms. Kleene:

Atlas Technical Consultants LLC (Atlas) is pleased to submit the attached Hazardous Building

Materials Survey Report conducted at the above-referenced site. This report includes procedures, methodologies and analytical laboratory results.

Atlas appreciates the opportunity to perform these services for the Iowa Department of

Administrative Services (IDAS) and we look forward to working with you in the future. If you need any assistance with the implementation of the recommendations contained in this report, please feel free to contact the us and we will respond promptly to your needs.

Respectfully submitted, Atlas Technical Consultants LLC

Phillip Thomas, OHST, CHMM Steve Hudson, CIH Iowa Asbestos Inspector Sr. Project Manager

Atlas No. 204BS07475 Page | ii

T A B L E O F C O N T E N T S

LETTER OF TRANSMITTAL .................................................................................... i

1.0 SCOPE OF SERVICES

2.0 GENERAL SITE CONDITIONS

3.0 ASBESTOS SURVEY

3.1 Regulation Review

3.2 Homogeneous Areas

3.3 Sampling Strategy

3.4 Laboratory Analytical Results

3.5 Suspect Asbestos-Containing Materials

3.5 Asbestos-Containing Materials

4.0 LEAD PAINT TESTING

4.1 Regulation Review

4.2 Summary of Findings

5.0 HAZARDOUS BUIDLING MATERIALS

6.0 CONCLUSIONS

6.1 Asbestos

6.2 Lead

6.3 Hazardous Materials

7.0 LIMITATIONS

APPENDICES

APPENDIX A: Laboratory Analytical Report

APPENDIX B: Lead Analytical Report and Chain of Custody

APPENDIX C: Drawings with Sample Locations

APPENDIX D: Asbestos Containing Materials Photo Log

APPENDIX E: Staff and Company Accreditations

Page | 1

Hazardous Building Materials Survey

Chiller Building WRC Campus Utility Decentralization Phase 5 Project 9279.50

1251 334th Street

Atlas No.: 204BS07475

1.0 SCOPE OF SERVICES

The purpose of this project was to perform a Limited Hazardous Building Materials (HBM) Survey of the above-referenced property prior to proposed renovation and demolition activities.

2.0 GENERAL SITE CONDITIONS

The survey was conducted at the Chiller Building as part of the WRC Campus Utility Decentralization Phase 5 Project 9279.50 located at 1251 334th Street in Woodward, Iowa. The survey area was conducted to identify asbestos containing materials (ACM) and lead containing paint as part of proposed renovation/demolition activities.

3.0 ASBESTOS SURVEY

On September 25, 2025 and April 1, 2026, the Chiller Building was inspected for ACM by Mr. Eric Brown and Mr. Steve Hudson of Atlas. Mr. Brown and Mr. Hudson have completed the requisite training for asbestos accreditation as an inspector at a state approved training provider under TSCA Title II. Mr.

Brown’s and Mr. Hudson’s State of Iowa Inspector numbers are 24-11418 and 26-15559.

Atlas conducted an asbestos survey of the identified building as required by United States Environmental Protection Agency (USEPA) regulation 40 Code of Federal Regulations (CFR) Part 61, the asbestos National Emissions Standards for Hazardous Air Pollutants (NESHAP)…