About this file
This is a Request for Bid (RFB #927940-02) issued by the Iowa Department of Administrative Services for the Woodward Resource Center Campus Fiber Upgrades project, managed through the IDAS procurement system by Shive-Hattery Inc. The project involves comprehensive fiber network infrastructure replacement and installation of new single mode fiber and fiber hardware at the Woodward Resource Center in Woodward, Iowa. The scope includes upgrades to communications infrastructure across multiple campus buildings, with a detailed project manual specifying technical requirements for rough carpentry, firestopping, joint sealants, hollow metal doors and frames, door hardware, gypsum board assemblies, interior painting, HVAC systems, and extensive electrical work including conduit, boxes, wiring devices, interior lighting, and communications backbone cabling. The bid submission deadline is 2:00 PM on June 5, 2025, through the IMPACS Electronic Procurement System. An optional pre-bid meeting is scheduled for May 22, 2025, at 10:00 AM at the Woodward Resource Center. Construction is scheduled to commence on July 7, 2025, and conclude by March 31, 2026, following a project schedule spanning multiple phases across various campus locations.
Bidders must provide a Bid Security bond representing 5% of their total bid amount. The project is exempt from Iowa Sales Tax, and Davis Bacon Wages will not apply. No specific set-aside designations for disadvantaged enterprises are mentioned, though bidders must comply with affirmative action and equal employment opportunity provisions. The procurement does not specify explicit budget ranges in available documentation, though the 5% bond requirement indicates substantial financial scope. Michael Bradbury serves as the designated issuing officer for additional project information. The project specifications include detailed performance standards, reference standards, material requirements, and execution procedures across 26 specification sections covering construction disciplines from structural work through advanced communications systems, indicating a technically complex project requiring expertise in telecommunications infrastructure, fiber optic installation, and campus-based technology integration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PAGE
INTENTIONALLY
LEFT BLANK
JHerman Text Box 109 SE 13th Street Des Moines, IA 50319
JHerman Cloud
JHerman Text Box amount varies based on paragraph 10.2.2 of the ConsensusDocs 802 contract jkleene Typewritten Text Project XXXX.XX jkleene
DRAFT
(Number varies by project)
Location 7/21/2025 7/28/2025 8/4/2025 8/11/2025 8/18/2025 8/25/2025 9/1/2025 9/8/2025 9/15/2025 9/22/2025 9/29/2025 10/6/2025 10/13/2025 10/20/2025 10/27/2025 11/3/2025 11/10/2025 11/17/2025 11/24/2025 12/1/2025 12/8/2025 12/15/2025 12/22/2025 12/29/2025 1/5/2026 1/12/2026 1/19/2026 1/26/2026 2/2/2026 2/9/2026 2/16/2026 2/23/2026 3/2/2026 3/9/2026 3/16/2026 3/23/2026 3/30/2026
Fiber Main
Cottages
Admin
Med center
Linden court
Maple, Elm
Westwood
Larches
Myers Hall
Hemlock
Chapel
E Home
Laundry
Supply Depot
Distribution Center
Water Treatment
Power House
Detail Shop
Oak Hall
Birches
Campus Switch Over
D R
A F T
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
IDAS - WRC Campus Fiber
Upgrades
IDAS Project # 9279.40
SH Project # 2240007040
Issued for Construction 04-25-2025
Rough Carpentry 06 1000 - 1
SECTION 06 1000
ROUGH CARPENTRY
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Nonstructural dimension lumber framing.
B. Sheathing.
C. Fire retardant treated wood materials.
D. Communications and electrical room mounting boards.
E. Concealed wood blocking, nailers, and supports.
1.2 REFERENCE STANDARDS
A. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware; 2023.
B. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials;
2023d.
C. AWPA U1 - Use Category System: User Specification for Treated Wood; 2024.
D. PS 1 - Structural Plywood; 2023.
E. PS 2 - Performance Standard for Wood Structural Panels; 2018.
F. PS 20 - American Softwood Lumber Standard; 2021.
G. SPIB (GR) - Standard Grading Rules; 2021.
1.3 DELIVERY, STORAGE, AND HANDLING
A. General: Cover wood products to protect against moisture. Support stacked products to prevent deformation and to allow air circulation.
B. Fire Retardant Treated Wood: Prevent exposure to precipitation during shipping, storage, and installation.
PART 2 PRODUCTS
2.1 GENERAL REQUIREMENTS
A. Dimension Lumber: Comply with PS 20 and requirements of specified grading agencies.
1. If no species is specified, provide species graded by the agency specified; if no grading agency is specified, provide lumber graded by grading agency meeting the specified requirements.
2. Grading Agency: Grading agency whose rules are approved by the Board of Review, American Lumber Standard Committee at www.alsc.org, and who provides grading service for the species and grade specified; provide lumber stamped with grade mark unless otherwise indicated.
IDAS - WRC Campus Fiber Upgrades
IDAS Project # 9279.40 SH Project # 2240007040
06 1000 - 2
Issued for Construction 04-25-2025
2.2 DIMENSION LUMBER FOR CONCEALED APPLICATIONS
A. Grading Agency: Southern Pine Inspection Bureau, Inc; SPIB (GR).
B. Sizes: Nominal sizes as indicated on drawings, S4S.
C. Moisture Content: S-dry or MC19.
D. Miscellaneous Framing, Blocking, Nailers, Grounds, and Furring:
1. Lumber: S4S, No. 2 or Standard Grade.
2. Boards: Standard or No. 3.
3. Fire Retardant Treated.
2.3 CONSTRUCTION PANELS
A. Communications and Electrical Room Mounting Boards: PS 1 A-D plywood, or medium density fiberboard; 3/4 inch (19 mm) thick; flame spread index of 25 or less, smoke developed index of 450 or less, when tested in accordance with ASTM E84.
B. Other Applications:
1. Fire Retardant Treated.
2.4 ACCESSORIES
A. Fasteners and Anchors:
1. Metal and Finish: Hot-dipped galvanized steel complying with ASTM A153/A153M for high humidity and preservative-treated wood locations, unfinished steel elsewhere.
2. Drywall Screws: Bugle head, hardened steel, power driven type, length three times thickness of sheathing.
3. Anchors: Toggle bolt type for anchorage to hollow masonry.
2.5 FACTORY WOOD TREATMENT
A. Treated Lumber and Plywood: Comply with requirements of AWPA U1 - Use Category System for wood treatments determined by use categories, expected service conditions, and specific applications.
1. Fire-Retardant Treated Wood: Mark each piece of wood with producer's stamp indicating compliance with specified requirements.
B. Fire Retardant Treatment:
1. Interior Type A: AWPA U1, Use Category UCFA, Commodity Specification H, low temperature (low hygroscopic) type, chemically treated and pressure impregnated;
capable of providing a maximum flame spread index of 25 when tested in accordance with ASTM E84, with no evidence of significant combustion when test is extended for an additional 20 minutes.
a. Kiln dry wood after treatment to a maximum moisture content of 19 percent for lumber and 15 percent for plywood.
b. Interior rough carpentry items are to be fire retardant treated.
c. Treat rough carpentry items as indicated.
Rough Carpentry
06 1000 - 3
d. Do not use treated wood in applications exposed to weather or where the wood may become wet.
PART 3 EXECUTION
3.1 INSTALLATION - GENERAL
A. Select material sizes to minimize waste.
B. Reuse scrap to the greatest extent possible; clearly separate scrap for use on site as accessory components, including: shims, bracing, and blocking.
C. Where treated wood is used on interior, provide temporary ventilation during and immediately after installation sufficient to remove indoor air contaminants.
3.2 BLOCKING, NAILERS, AND SUPPORTS
A. Provide framing and blocking members as indicated or as required to support finishes, fixtures, specialty items, and trim.
B. In walls, provide blocking attached to studs as backing and support for wall-mounted items, unless item can be securely fastened to two or more studs or other method of support is explicitly indicated.
C. Provide the following specific nonstructural framing and blocking:
1. Wall brackets.
2. Wall-mounted door stops.
3. Wall paneling and trim.
4. Blocking at wall openings.
3.3 INSTALLATION OF CONSTRUCTION PANELS
A. Communications and Electrical Room Mounting Boards: Secure with screws to studs with edges over firm bearing; space fasteners at maximum 24 inches (610 mm) on center on all edges and into studs in field of board.
1. At fire-rated walls, install board over wall board indicated as part of the fire-rated assembly.
2. Where boards are indicated as full floor-to-ceiling height, install with long edge of board parallel to studs.
3. Install adjacent boards without gaps.
3.4 TOLERANCES
A. Framing Members: 1/4 inch (6 mm) from true position, maximum.
B. Variation from Plane, Other than Floors: 1/4 inch in 10 feet (2 mm/m) maximum, and 1/4 inch in 30 feet (7 mm in 10 m) maximum.
3.5 CLEANING
A. Comply with applicable regulations.
B. Do not burn scrap on project site.
C. Do not burn scraps that have been pressure treated.
06 1000 - 4
D. Do not send materials treated with pentachlorophenol, CCA, or ACA to co-generation facilities or “waste-to-energy” facilities.
E. Do not leave wood, shavings, sawdust, etc. on the ground or buried in fill.
F. Prevent sawdust and wood shavings from entering the storm drainage system.
END OF SECTION
IDAS Project # 9279.40
SH Project # 2240007040
Issued for Construction 04-25-2025
Firestopping 07 8400 - 1
SECTION 07 8400
FIRESTOPPING
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Firestopping of joints and penetrations in fire-resistance-rated and smoke-resistant assemblies, whether indicated on drawings or not, and other openings indicated.
1.2 REFERENCE STANDARDS
A. ASTM E814 - Standard Test Method for Fire Tests of Penetration Firestop Systems; 2023a.
B. ASTM E1966 - Standard Test Method for Fire-Resistive Joint Systems; 2015 (Reapproved 2019).
C. ASTM E2837 - Standard Test Method for Determining the Fire Resistance of Continuity Head-of-Wall Joint Systems Installed between Rated Wall Assemblies and Nonrated Horizontal Assemblies; 2023a.
D. ASTM G21 - Standard Practice for Determining Resistance of Synthetic Polymeric Materials to Fungi; 2015, with Editorial Revision (2021).
E. ITS (DIR) - Directory of Listed Products; Current Edition.
F. FM (AG) - FM Approval Guide; Current Edition.
G. UL 2079 - Standard for Tests for Fire Resistance of Building Joint Systems; Current Edition, Including All Revisions.
H. UL (FRD) - Fire Resistance Directory; Current Edition.
1.3 SUBMITTALS
A. Schedule of Firestopping: List each type of penetration, fire rating of the penetrated assembly, and firestopping test or design number.
B. Product Data: Provide data on product characteristics, performance ratings, and limitations.
1.4 QUALITY ASSURANCE
A. Fire Testing: Provide firestopping assemblies of designs that provide the scheduled fire ratings when tested in accordance with methods indicated.
1. Listing in UL (FRD), FM (AG), or ITS (DIR) will be considered as constituting an acceptable test report.
2. Valid evaluation report published by ICC Evaluation Service, Inc. (ICC-ES) at www.icc-es.org will be considered as constituting an acceptable test report.
1.5 FIELD CONDITIONS
A. Comply with firestopping manufacturer's recommendations for temperature and conditions during and after installation; maintain minimum temperature before, during, and for three days after installation of materials.
B. Provide ventilation in areas where solvent-cured materials are being installed.
Firestopping 07 8400 - 2
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Firestopping Manufacturers:
1. 3M Fire Protection Products: www.3m.com/firestop/#sle.
2. Hilti, Inc: www.hilti.com/#sle.
3. RectorSeal, a CSW Industrials Company; Metacaulk 150+ General Purpose Firestop Sealant: www.rectorseal.com/firestop-solutions/#sle.
4. Specified Technologies Inc: www.stifirestop.com/#sle.
5. Architect pre-approved equivalent.
2.2 MATERIALS
A. Mold and Mildew Resistance: Provide firestopping materials with mold and mildew resistance rating of zero(0) in accordance with ASTM G21.
B. Primers, Sleeves, Forms, Insulation, Packing, Stuffing, and Accessories: Provide type of materials as required for tested firestopping assembly.
C. Fire Ratings: Refer to drawings for required systems and ratings.
2.3 FIRESTOPPING ASSEMBLY REQUIREMENTS
A. Head-of-Wall (HW) Joint System Firestopping at Joints Between Fire-Rated Wall Assemblies and Non-Rated Horizontal Assemblies: Use system that has been tested according to ASTM E2837 to have fire resistance F Rating equal to required fire rating of wall assembly.
B. Floor-to-Floor (FF), Floor-to-Wall (FW), Head-of-Wall (HW), and Wall-to-Wall (WW) Joints, Except Perimeter, Where Both Are Fire-Rated: Use system that has been tested according to ASTM E1966 or UL 2079 to have fire resistance F Rating equal to required fire rating of the assembly in which the joint occurs.
C. Through Penetration Firestopping: Use system that has been tested according to ASTM E814 to have fire resistance F Rating equal to required fire rating of penetrated assembly.
PART 3 EXECUTION
2.4 PREPARATION
A. Clean substrate surfaces of dirt, dust, grease, oil, loose material, or other materials that could adversely affect bond of firestopping material.
B. Remove incompatible materials that could adversely affect bond.
2.5 INSTALLATION
A. Install materials in manner described in fire test report and in accordance with manufacturer's instructions, completely closing openings.
B. Do not cover installed firestopping until inspected by Owner's Independent Testing Agency.
C. Do not cover installed firestopping until inspected by authorities having jurisdiction.
D. Install labeling required by code.
Firestopping
07 8400 - 3
2.6 CLEANING
A. Clean adjacent surfaces of firestopping materials.
IDAS Project # 9279.40
SH Project # 2240007040
Issued for Construction 04-25-2025
Joint Sealants 07 9000 - 1
SECTION 07 9000
JOINT SEALANTS
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
1. Exterior and interior sealants.
2. Joint accessories.
1.2 REFERENCES
A. ASTM International Inc.
1. ASTM C 510 - Standard Test Method for Staining and Color Change of Single- or Multicomponent Joint Sealants.
2. ASTM C 719 - Standard Test Method for Adhesion and Cohesion of Elastomeric Joint Sealants Under Cyclic Movement (Hockman Cycle).
3. ASTM C 794 - Standard Test Method for Adhesion-in-Peel of Elastomeric Joint Sealants.
4. ASTM C 920 - Standard Specification for Elastomeric Joint Sealants.
5. ASTM C 1193 - Standard Guide for Use of Joint Sealants.
6. ASTM C 1247 - Standard Test Method for Durability of Sealants Exposed to Continuous Immersion in Liquids.
7. ASTM C 1248 - Standard Test Method for Staining of Porous Substrate by Joint Sealants.
8. ASTM C 1311 - Standard Specification for Solvent Release Sealants.
9. ASTM D 2203 - Standard Test Method for Staining from Sealants.
1.3 SUBMITTALS
A. Product Data:
1. Materials list of items proposed to be provided under this Section;
2. Manufacturer's specifications and other data needed to prove compliance with the specified requirements;
B. Samples:
1. Submit standard cured color samples for each sealant type illustrating selected colors.
2. Include instructions for removing existing sealants and preparing joints for new sealant.
C. Manufacturer's Certificate:
1. Certify products are suitable for intended use and products meet or exceed specified requirements.
2. Certify applicator is approved by manufacturer.
1.4 QUALITY ASSURANCE
A. Perform work in accordance with the following:
1. Building Joints: ASTM C 1193.
07 9000 - 2
1.5 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum ten years documented experience.
B. Applicator Qualifications:
1. Company specializing in performing work of this section with minimum three years documented experience, minimum three successfully completed projects of similar scope and complexity, and approved by manufacturer.
2. Designate one individual as project foreman who shall be on site at all times during installation.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Accept materials on site in manufacturers unopened original packaging. Inspect for damage.
B. Store primers and sealants in cool dry location with ambient temperature range of 60 to 80 degrees F (15 to 27 degrees C).
1.7 ENVIRONMENTAL REQUIREMENTS
A. Do not install primers or sealants when atmospheric temperatures or joint surface temperatures are less than 40 degrees F (4 degrees C).
1.8 SCHEDULING
A. Ensure sealants are cured before covering with any other materials.
1.9 WARRANTY
A. Manufacturer's standard warranty covering sealant materials.
B. Applicator's standard warranty covering workmanship.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Tremco Sealant/Weatherproofing Division of RPM International, Inc.
B. Dow Corning Corporation.
C. Sonneborn Building Products Division, Rexnord Chemical Products, Inc. (Master Builders).
D. Approved pre-approved equivalent.
2.2 SILICONE SEALANTS
A. Single Component Silicone: Dow Corning 795 Silicone Building Sealant (design basis), color as selected, at exterior and interior perimeter of windows.
2.3 POLYURETHANE SEALANTS
A. Single Component Non-Sag Polyurethane: Sonneborn Building Products Sonolastic NP 1 (MasterSeal NP 1) (design basis) , color as selected, at locations other than exterior and interior perimeter of windows.
Joint Sealants
07 9000 - 3
2.4 ACCESSORIES
A. Joint Cleaner: Non-corrosive and non-staining type, recommended by sealant manufacturer;
compatible with joint forming materials.
B. Primer: Non-staining type, recommended by sealant manufacturer to suit application.
C. Joint Backing: Closed-cell round foam rod compatible with sealant; oversized 25 to 50 percent larger than joint width; recommended by sealant manufacturer to suit application
D. Bond Breaker: Pressure sensitive tape recommended by sealant manufacturer to suit application.
E. Masking tape: Non-staining, non-absorbent tape product compatible with joint sealants and adjacent joint surfaces.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify substrate surfaces and joint openings are ready to receive work.
1. Verify joint surfaces are clean and dry.
2. Ensure concrete surfaces are fully cured.
B. Report unsatisfactory conditions in writing to the Architect;
C. Do not proceed until unsatisfactory conditions are corrected.
3.2 PREPARATION
A. Prepare joints in accordance with ASTM C 1193 and manufacturer's instructions.
B. Clean joint surfaces to remove dirt, dust, oils, wax, paints, and other contamination capable of affecting primer and sealant bond.
C. Protect elements surrounding the Work of this section from damage or disfiguration. Apply masking tape to adjacent surfaces when required to prevent damage to finishes from sealant installation.
3.3 EXISTING WORK
A. Mechanically remove existing sealant.
B. Clean joint surfaces of residual sealant and other contaminates capable of affecting sealant bond to joint surface.
C. Allow joint surfaces to dry before installing new sealants.
3.4 SEALANT INSTALLATION
A. Install primer and sealants in accordance with ASTM C 1193 and manufacturer's instructions.
B. Install joint backing to maintain the following joint ratios:
1. Joints up to 1/2 inch (13 mm) Wide: 1:1 width to depth ratio.
2. Joints Greater than 1/2 inch (13 mm) Wide: 2:1 width to depth ratio; maximum 1/2 inch joint depth.
C. Install bond breaker where joint backing is not used.
D. Apply primer where required for sealant adhesion.
07 9000 - 4
E. Install sealants immediately after joint preparation.
F. Install sealant free of air pockets, foreign embedded matter, ridges, and sags.
G. Joining Silicone and Polyurethane Sealants:
1. Install polyurethane sealants first.
2. Join silicone sealant to polyurethane in accordance with manufacturer's instructions.
H. Tool exposed joint surface concave.
3.5 CLEANING
A. Remove masking tape.
B. Clean adjacent surfaces soiled by sealant installation.
IDAS Project # 9279.40
SH Project # 2240007040
Issued for Construction 04-25-2025
HOLLOW METAL DOORS AND
FRAMES
08 1113 - 1
SECTION 08 1113
HOLLOW METAL DOORS AND FRAMES
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Non-fire-rated hollow metal doors and frames.
1.2 ABBREVIATIONS AND ACRONYMS
A. ANSI: American National Standards Institute.
B. HMMA: Hollow Metal Manufacturers Association.
C. NAAMM: National Association of Architectural Metal Manufacturers.
D. NFPA: National Fire Protection Association.
E. SDI: Steel Door Institute.
F. UL: Underwriters Laboratories.
1.3 REFERENCE STANDARDS
A. ADA Standards - Americans with Disabilities Act (ADA) Standards for Accessible Design 2010.
B. ANSI/SDI A250.4 - Test Procedure and Acceptance Criteria for Physical Endurance for Steel Doors, Frames and Frame Anchors 2018.
C. ANSI/SDI A250.6 - Recommended Practice for Hardware Reinforcing on Standard Steel Doors and Frames 2015.
D. ANSI/SDI A250.8 - Specifications for Standard Steel Doors and Frames (SDI-100) 2017.
E. ANSI/SDI A250.10 - Test Procedure and Acceptance Criteria for Prime Painted Steel Surfaces for Steel Doors and Frames 2020.
F. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware 2016a.
G. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process 2020.
H. ASTM A1008/A1008M - Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Required Hardness, Solution Hardened, and Bake Hardenable 2021a.
I. ASTM A1011/A1011M - Standard Specification for Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength 2018a.
J. BHMA A156.115 - Hardware Preparation In Steel Doors And Steel Frames 2016.
K. ICC A117.1 - Accessible and Usable Buildings and Facilities 2017.
L. ITS (DIR) - Directory of Listed Products current edition.
M. NAAMM HMMA 830 - Hardware Selection for Hollow Metal Doors and Frames 2002.
N. NAAMM HMMA 831 - Hardware Locations for Hollow Metal Doors and Frames 2011.
HOLLOW METAL DOORS AND
08 1113 - 2
O. NAAMM HMMA 840 - Guide Specifications for Receipt, Storage and Installation of Hollow Metal Doors and Frames 2007.
P. NAAMM HMMA 861 - Guide Specifications for Commercial Hollow Metal Doors and Frames 2014.
Q. NFPA 80 - Standard for Fire Doors and Other Opening Protectives 2022.
R. NFPA 105 - Standard for Smoke Door Assemblies and Other Opening Protectives 2022.
S. NFPA 252 - Standard Methods of Fire Tests of Door Assemblies 2022.
T. SDI 117 - Manufacturing Tolerances for Standard Steel Doors and Frames 2013.
U. UL (DIR) - Online Certifications Directory Current Edition.
V. UL 10C - Standard for Positive Pressure Fire Tests of Door Assemblies Current Edition, Including All Revisions.
W. UL 1784 - Standard for Air Leakage Tests of Door Assemblies Current Edition, Including All Revisions.
1.4 SUBMITTALS
A. Product Data: Materials and details of design and construction, hardware locations, reinforcement type and locations, anchorage and fastening methods, and finishes.
B. Shop Drawings: Details of each opening, showing elevations, glazing, frame profiles, anchorage, connections, and identifying location of different finishes, if any.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Comply with NAAMM HMMA 840 or ANSI/SDI A250.8 (SDI-100) in accordance with specified requirements.
B. Deliver hollow metal work palletized, wrapped, or crated to provide protection during transit and Project-site storage. Do not use non-vented plastic.
C. Store hollow metal work under cover at Project site. Place in stacks of five units maximum in a vertical position with heads up, spaced by blocking, on minimum 4-inch (102 mm) high wood blocking. Do not store in manner that traps excess humidity.
1. Provide minimum 1/4 inch (6 mm) space between each stacked door to permit air circulation.
1.6 PROJECT CONDITIONS
A. Field Measurements: Verify actual dimensions of openings by field measurements before fabrication.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Ceco Door, an Assa Abloy Group company: www.assaabloydss.com/#sle.
2. Curries, an Assa Abloy Group company: www.assaabloydss.com/#sle.
HOLLOW METAL DOORS AND
FRAMES
08 1113 - 3
3. Republic Doors, an Allegion brand: www.republicdoor.com/#sle.
4. Steelcraft, an Allegion brand: www.allegion.com/#sle.
5. Architect pre-approved equivalent.
2.2 PERFORMANCE REQUIREMENTS
A. Requirements for Hollow Metal Doors and Frames:
1. Steel Sheet: Comply with one or more of the following requirements; galvannealed steel complying with ASTM A653/A653M, cold-rolled steel complying with ASTM A1008/A1008M, or hot-rolled pickled and oiled (HRPO) steel complying with ASTM A1011/A1011M, commercial steel (CS) Type B, for each.
2. Accessibility: Comply with ICC A117.1 and ADA Standards.
3. Door Top Closures: Flush end closure channel, with top and door faces aligned.
4. Door Edge Profile: Manufacturers standard for application indicated.
5. Typical Door Face Sheets: Flush.
6. Hardware Preparations, Selections and Locations: Comply with NAAMM HMMA 830 and NAAMM HMMA 831 or BHMA A156.115 and ANSI/SDI A250.8 (SDI-100) in accordance with specified requirements.
7. Frame Anchors: ASTM A 591/A 591M, Commercial Steel (CS), 40z (12G) coating designation; mill phosphatized.
B. Combined Requirements: If a particular door and frame unit is indicated to comply with more than one type of requirement, comply with the specified requirements for each type; for instance, an exterior door that is also indicated as being sound-rated must comply with the requirements specified for exterior doors and for sound-rated doors; where two requirements conflict, comply with the most stringent.
2.3 HOLLOW METAL DOORS
A. Door Finish: Factory primed and field finished.
B. Interior Doors, Non-Fire-Rated:
1. Based on SDI Standards: ANSI/SDI A250.9 (SDI-100)
a. Level 2 - Heavy-Duty
b. Physical Performance Level B 500,000 cycles; in accordance with ANSI/SDI A250.4.
c. Model 2, seamless design, continuously welded seam dressed smooth.
d. Door Face Metal Thickness: 18-gauge, 0.042 inch (1.0 mm), minimum.
2. Door Core Material: Manufacturer's standard core material/construction and in compliance with requirements.
3. Door Thickness: 1-3/4 inches (44.5 mm), nominal.
2.4 HOLLOW METAL FRAMES
A. Comply with standards and/or custom guidelines as indicated for corresponding door in accordance with applicable door frame requirements.
B. Frame Finish: Factory primed and field finished.
08 1113 - 4
C. Interior Door Frames, Non-Fire Rated: Full profile/continuously welded type.
1. Frame Metal Thickness: 16 gauge, 0.053 inch ( 1.3 mm), minimum.
D. Frames Wider than 48 inches: Reinforce with steel channel fitted tightly into frame head, flush with top.
2.5 FINISHES
A. Primer: Rust-inhibiting, complying with ANSI/SDI A250.10, door manufacturer's standard.
2.6 ACCESSORIES
A. Mechanical Fasteners for Concealed Metal-to-Metal Connections: Self-drilling, self-tapping, steel with electroplated zinc finish.
B. Exposed Fasteners: Provide countersunk, flat- or oval-head screws and bolts for exposed fasteners unless otherwise indicated.
C. Inserts, Bolts, and Fasteners: Hot-dip galvanized according to ASTM A153/A153M.
D. Powder-Actuated Fasteners in Concrete: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with clips or other accessory devices for attaching hollow metal frames of type indicated.
E. Frame Anchors
1. Jamb Anchors:
a. Stud-Wall Type: Designed to engage stud, welded to back of frames; not less than
0.042 inch (1.0 mm) thick.
b. Provide number and spacing of jamb anchors as follows:
1) Fire ratings may require additional anchors.
2) Stud-Wall Type: Locate anchors not more than 18 inches (457 mm) from top and bottom of frame. Space anchors not more than 32 inches (813 mm) o.c.
and as follows:
(a) Three anchors per jamb up to 60 inches (1524 mm) high.
(b) Four anchors per jamb from 60 to 90 inches (1524 to 2286 mm) high.
(c) Five anchors per jamb from 90 to 96 inches (2286 to 2438 mm) high.
(d) Five anchors per jamb plus 1 additional anchor per jamb for each 24 inches
(610 mm) or fraction thereof above 96 inches (2438 mm) high.
(e) Two anchors per head for frames above 42 inches (1066 mm) wide and mounted in metal-stud partitions.
2. Floor Anchors: Formed from same material as frames, not less than 0.042 inch (1.0 mm) thick, and as follows:
a. Attachment: Weld anchors to bottom of jambs and mullions with at least four spot welds per anchor.
b. Monolithic Concrete Slabs: Clip-type anchors, with two holes to receive fasteners.
F. Silencers: Resilient rubber, fitted into drilled hole; provide three on strike side of single door, three on center mullion of pairs, and two on head of pairs without center mullions.
G. Temporary Frame Spreaders: Provide for factory- or shop-assembled frames.
HOLLOW METAL DOORS AND
FRAMES
08 1113 - 5
2.7 FABRICATION
A. Fabricate hollow metal work to be rigid and free of defects, warp, or buckle. Accurately form metal to required sizes and profiles, with minimum radius for thickness of metal. Where practical, fit and assemble units in manufacturer's plant. To ensure proper assembly at Project site, clearly identify work that cannot be permanently factory assembled before shipment.
B. Tolerances: Fabricate hollow metal work to tolerances indicated in SDI 117.
C. Hardware Preparation: Factory prepare hollow metal work to receive templated mortised hardware; include cutouts, reinforcement, mortising, drilling, and tapping according to the Door Hardware Schedule and templates furnished as specified in Section 08 7100.
1. Reinforce doors and frames to receive non-templated, mortised and surface-mounted door hardware.
2. Comply with applicable requirements in ANSI/SDI A250.6 and ANSI/DHI A115 Series specifications for preparation of hollow metal work for hardware.
3. Coordinate locations of conduit and wiring boxes for electrical connections with Division 26 and Division 28 Sections.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify existing conditions before starting work.
B. Verify that opening sizes and tolerances are acceptable.
C. Verify that finished walls are in plane to ensure proper door alignment.
D. Examine rough-in for embedded and built-in anchors to verify actual locations before frame installation.
E. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work.
F. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Remove welded-in shipping spreaders installed at factory. Restore exposed finish by grinding, filling, and dressing, as required to make repaired area smooth, flush, and invisible on exposed faces.
B. Prior to installation, adjust and securely brace welded hollow metal frames for squareness, alignment, twist, and plumbness to the requirements listed in Tolerances article below.
C. Drill and tap doors and frames to receive non-templated, mortised, and surface-mounted door hardware.
3.3 INSTALLATION
A. Install doors and frames in accordance with manufacturer's instructions and related requirements of specified door and frame standards or custom guidelines indicated.
B. Smoke-Control Doors: Install doors according to NFPA 105.
C. Coordinate frame anchor placement with wall construction.
08 1113 - 6
D. Install door hardware as specified in Section 08 7100.
1. Comply with recommended practice for hardware placement of doors and frames in accordance with ANSI/SDI A250.6 or NAAMM HMMA 861.
E. Coordinate installation of electrical connections to electrical hardware items.
F. Hollow Metal Frames: Install hollow metal frames of size and profile indicated. Comply with
ANSI/SDI A250.11.
1. Set frames accurately in position, plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is complete, remove temporary braces, leaving surfaces smooth and undamaged.
a. Check plumbness, squareness, and twist of frames as walls are constructed. Shim as necessary to comply with installation tolerances.
2. Floor Anchors: Provide floor anchors for each jamb and mullion that extends to floor, and secure with post-installed expansion anchors.
G. Hollow Metal Doors: Fit hollow metal doors accurately in frames, within clearances specified below. Shim as necessary.
1. Non-Fire-Rated Standard Steel Doors:
a. Jambs and Head: 1/8 inch (3 mm) plus or minus 1/16 inch (1.6 mm).
b. Between Bottom of Door and Top of Threshold: Maximum 3/8 inch (9.5 mm).
c. Between Bottom of Door and Top of Finish Floor (No Threshold): Maximum 3/4 inch
(19 mm).
2. Smoke-Control Doors: Install doors according to NFPA 105.
3.4 TOLERANCES
A. Clearances Between Door and Frame: Comply with related requirements of specified frame standards or custom guidelines indicated in accordance with SDI 117 or NAAMM HMMA 861.
B. Maximum Diagonal Distortion: 1/16 inch (1.6 mm) measured with straight edge, corner to corner.
C. Squareness: Plus or minus 1/16 inch (1.6 mm), measured at door rabbet on a line 90 degrees from jamb perpendicular to frame head.
D. Alignment: Plus or minus 1/16 inch (1.6 mm), measured at jambs on a horizontal line parallel to plane of wall.
E. Twist: Plus or minus 1/16 inch (1.6 mm), measured at opposite face corners of jambs on parallel lines, and perpendicular to plane of wall.
F. Plumbness: Plus or minus 1/16 inch (1.6 mm), measured at jambs at floor.
3.5 ADJUSTING
A. Adjust for smooth and balanced door movement.
B. Final Adjustments: Check and readjust operating hardware items immediately before final inspection. Leave work in complete and proper operating condition. Remove and replace defective work, including hollow metal work that is warped, bowed, or otherwise unacceptable.
HOLLOW METAL DOORS AND
FRAMES
08 1113 - 7
3.6 SCHEDULE
1. Refer to Door and Frame Schedule on the drawings.
IDAS Project # 9279.40
SH Project # 2240007040
Issued for Construction 04-25-2025
Door Hardware 08 7100 - 1
SECTION 08 7100
DOOR HARDWARE
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Hardware for hollow metal doors.
1.2 REFERENCE STANDARDS
A. ADA Standards - 2010 ADA Standards for Accessible Design; 2010.
B. BHMA A156.1 - Standard for Butts and Hinges; 2021.
C. BHMA A156.4 - Door Closers and Pivots; 2024.
D. BHMA A156.8 - Door Controls - Overhead Stops and Holders; 2021.
E. BHMA A156.18 - Standard for Materials and Finishes; 2020.
F. BHMA A156.115 - Hardware Preparation in Steel Doors and Frames; 2016.
G. DHI (LOCS) - Recommended Locations for Architectural Hardware for Standard Steel Doors and Frames; 2004.
H. ICC A117.1 - Accessible and Usable Buildings and Facilities; 2017.
I. NFPA 101 - Life Safety Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
J. NFPA 105 - Standard for Smoke Door Assemblies and Other Opening Protectives; 2022.
1.3 ADMINISTRATIVE REQUIREMENTS
A. Coordinate the manufacture, fabrication, and installation of products that door hardware is installed on.
1.4 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements for submittal procedures.
B. Product Data: Manufacturer's catalog literature for each type of hardware, marked to clearly show products to be furnished for this project, and includes construction details, material descriptions, finishes, and dimensions and profiles of individual components.
C. Shop Drawings - Door Hardware Schedule: Submit detailed listing that includes each item of hardware to be installed on each door. Use door numbering scheme as included in Contract Documents.
1. Prepared by or under supervision of Architectural Hardware Consultant (AHC).
2. Provide complete description for each door listed.
D. Manufacturer's Installation Instructions: Indicate special procedures and perimeter conditions requiring special attention.
E. Maintenance Data: Include data on operating hardware, lubrication requirements, and inspection procedures related to preventative maintenance.
1. Submit manufacturer's parts lists and templates.
08 7100 - 2
1.5 DELIVERY, STORAGE, AND HANDLING
A. Package hardware items individually; label and identify each package with door opening code to match door hardware schedule.
1.6 WARRANTY
A. Manufacturer's Warranty: Provide warranty against defects in material and workmanship for period indicated. Complete forms in Owner's name and register with manufacturer.
1. Closers: Five years, minimum.
2. Exit Devices: Three years, minimum.
3. Other Hardware: Two years, minimum.
PART 2 PRODUCTS
2.1 DESIGN AND PERFORMANCE CRITERIA
A. Provide specified door hardware as required to make doors fully functional, compliant with applicable codes, and secure to extent indicated.
B. Provide individual items of single type, of same model, and by same manufacturer.
C. Provide door hardware products that comply with the following requirements:
1. Applicable provisions of federal, state, and local codes.
2. Accessibility: ADA Standards and ICC A117.1.
3. Applicable provisions of NFPA 101.
4. Hardware Preparation for Steel Doors and Steel Frames: BHMA A156.115.
D. Fasteners:
1. Provide fasteners of proper type, size, quantity, and finish that comply with commercially recognized standards for proposed applications.
a. Aluminum fasteners are not permitted.
b. Provide phillips flat-head screws with heads finished to match door surface hardware unless otherwise indicated.
2.2 HINGES
A. Manufacturers:
1. McKinney; an Assa Abloy Group company: www.assaabloydss.com/#sle.
2. Bommer Industries, Inc: www.bommer.com/#sle.
3. Hager Companies: www.hagerco.com/#sle.
4. Stanley, dormakaba Group: www.stanleyhardwarefordoors.com/#sle.
5. Architect pre-approved equivalent.
B. Hinges: Comply with BHMA A156.1, Grade 1.
1. Provide hinges on every swinging door.
2. Provide following quantity of butt hinges for each door:
Door Hardware
08 7100 - 3
a. Doors From 60 inches (1.5 m) High up to 90 inches (2.3 m) High: Three hinges.
3. Hinge Size: Provide the following, unless otherwise indicated, with hinge widths sized for door thickness and clearances required:
a. Widths up to 3'-0": 4-1/2" heavy weight as specified.
b. Widths from 3'-1" to 4'-0": 5" heavy weight as specified.
2.3 MORTISE LOCKS
A. Locks to be provided by Owner.
2.4 CLOSERS
A. Manufacturers; Surface Mounted:
1. Corbin Russwin, Norton, Rixson, Sargent, or Yale; an Assa Abloy Group company: www.assaabloydss.com/#sle.
2. DORMA USA, Inc; 7400 Series, 8600 Series, 8900 Series, and TS93: www.dorma.com/#sle.
3. Hager Companies: www.hagerco.com/#sle.
4. LCN, an Allegion brand: www.allegion.com/us/#sle.
5. Stanley, dormakaba Group: www.stanleyhardwarefordoors.com/#sle.
6. Architect pre-approved equivalent.
B. Closers: Comply with BHMA A156.4, Grade 1.
1. Type: Surface mounted to door.
2.5 OVERHEAD STOPS AND HOLDERS
A. Manufacturers:
1. Rixson or Sargent; an Assa Abloy Group company: www.assaabloydss.com/#sle.
2. DORMA USA, Inc; 900 Series: www.dorma.com/#sle.
3. Glynn-Johnson, an Allegion brand: www.allegion.com/us/#sle.
4. Architect pre-approved equivalent.
B. Overhead Stops and Holders (Door Checks): Comply with BHMA A156.8, Grade 1.
1. Provide stop for every swinging door, unless otherwise indicated.
2.6 KICK PLATES
A. Manufacturers:
1. Hiawatha, Inc, an Activar Construction Products Group company: www.activarcpg.com/hiawatha/#sle.
2. Ives, an Allegion brand: www.allegion.com/us/#sle.
3. Standard Metal Hardware Manufacturing Ltd; Door Plates: www.smhardware.com/#sle.
4. Architect pre-approved equivalent.
B. Kick Plates: Provide along bottom edge of push side of every door with closer, except aluminum storefront and glass entry doors, unless otherwise indicated.
1. Size: 30" high by 2 inch (51 mm) less door width (LDW) on push side of door.
08 7100 - 4
2.7 SILENCERS
A. Manufacturers:
1. Ives, an Allegion brand: www.allegion.com/us/#sle.
2. Rockwood; an Assa Abloy Group company: www.assaabloydss.com/#sle.
3. Architect pre-approved equivalent.
B. Silencers: Provide at equal locations on door frame to mute sound of door's impact upon closing.
1. Single Door: Provide three on strike jamb of frame.
2. Pair of Doors: Provide two on head of frame, one for each door at latch side.
3. Material: Rubber, black color.
2.8 FINISHES
A. Finishes: Provide door hardware of same finish, unless otherwise indicated.
1. Primary Finish: 626; satin chromium plated over nickel, with brass or bronze base material (former US equivalent US26D); BHMA A156.18.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify that doors and frames are ready to receive this work; labeled, fire-rated doors and frames are properly installed, and dimensions are as indicated on shop drawings.
B. Verify that electric power is available to power operated devices and of correct characteristics.
3.2 INSTALLATION
A. Install hardware in accordance with manufacturer's instructions and applicable codes.
B. Install hardware for smoke and draft control doors in accordance with NFPA 105.
C. Use templates provided by hardware item manufacturer.
D. Do not install surface mounted items until application of finishes to substrate are fully completed.
E. Door Hardware Mounting Heights: Distance from finished floor to center line of hardware item. As indicated in following list; unless noted otherwise in Door Hardware Schedule or on drawings.
1. For Steel Doors and Frames: Install in compliance with DHI (LOCS) recommendations.
2. Mounting heights in compliance with ADA Standards:
3.3 FIELD QUALITY CONTROL
A. Perform field inspection and testing under provisions of Section 01 4000 - Quality Requirements.
B. Provide an Architectural Hardware Consultant (AHC) to inspect installation and certify that hardware and installation has been furnished and installed in accordance with manufacturer's instructions and as specified.
Door Hardware
08 7100 - 5
3.4 ADJUSTING
A. Adjust hardware for smooth operation.
B. Adjust gasketing for complete, continuous seal; replace if unable to make complete seal.
3.5 CLEANING
A. Clean finished hardware in accordance with manufacturer's written instructions after final adjustments have been made.
B. Clean adjacent surfaces soiled by hardware installation.
C. Replace items that cannot be cleaned to manufacturer's level of finish quality at no additional cost.
3.6 PROTECTION
A. Do not permit adjacent work to damage hardware or finish.
IDAS Project # 9279.40
SH Project # 2240007040
Issued for Construction 04-25-2025
GYPSUM BOARD ASSEMBLIES
09 2116 - 1
SECTION 09 2116
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Performance criteria for gypsum board assemblies.
B. Metal stud wall framing.
C. Metal channel ceiling framing.
D. Gypsum wallboard.
E. Joint treatment and accessories.
1.2 REFERENCE STANDARDS
A. AISI S100 - North American Specification for the Design of Cold-Formed Steel Structural Members 2016, with Supplement (2018).
B. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process 2020.
C. ASTM C475/C475M - Standard Specification for Joint Compound and Joint Tape for Finishing Gypsum Board 2017.
D. ASTM C645 - Standard Specification for Nonstructural Steel Framing Members 2018.
E. ASTM C754 - Standard Specification for Installation of Steel Framing Members to Receive Screw-Attached Gypsum Panel Products 2020.
F. ASTM C840 - Standard Specification for Application and Finishing of Gypsum Board 2020.
G. ASTM C954 - Standard Specification for Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Steel Studs From 0.033 in. (0.84 mm) to 0.112 in.
(2.84 mm) in Thickness 2018.
H. ASTM C1002 - Standard Specification for Steel Self-Piercing Tapping Screws for Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel Studs 2020.
I. ASTM C1047 - Standard Specification for Accessories for Gypsum Wallboard and Gypsum Veneer Base 2019.
J. ASTM C1396/C1396M - Standard Specification for Gypsum Board 2017.
K. ASTM D3273 - Standard Test Method for Resistance to Growth of Mold on the Surface of Interior Coatings in an Environmental Chamber 2016.
L. GA-216 - Application and Finishing of Gypsum Panel Products 2018.
1.3 SUBMITTALS
A. Product Data: Provide data on metal framing, gypsum board, accessories, and joint finishing system.
B. Product Data: Provide manufacturer's data on partition head to structure connectors, showing compliance with requirements.
09 2116 - 2
2.1 GYPSUM BOARD ASSEMBLIES
A. Provide completed assemblies complying with ASTM C840 and GA-216.
B. Fire-Resistance-Rated Assemblies: Provide completed assemblies complying with applicable code.
1. UL Assembly Numbers: Provide construction equivalent to that listed for the particular assembly in the current UL (FRD).
2.2 METAL FRAMING MATERIALS
A. Non-structural Framing System Components: AISI S220; galvanized sheet steel, of size and properties necessary to comply with ASTM C754 for the spacing indicated, with maximum deflection of wall framing of L/120 at 5 psf (L/120 at 240 Pa).
1. Studs: C-shaped with knurled or embossed faces.
2. Runners: U shaped, sized to match studs.
3. Ceiling Channels: C-shaped.
B. Shaft Wall Studs and Accessories: AISI S220; galvanized sheet steel, of size and properties necessary to comply with ASTM C754 and specified perfornance requirements.
C. Partition Head to Structure Connections: Provide mechanical anchorage devices that accommodate deflection using slotted holes, screws, and anti-friction bushings, preventing rotation of studs while maintaining structural performance of partition.
1. Structural Performance: Maintain lateral load resistance and vertical movement capacity required by applicable code, when evaluated in accordance with AISI S100.
2. Material: ASTM A653/A653M steel sheet, SS Grade 50/340, with G60/Z180 hot-dipped galvanized coating.
3. Provide mechanical anchorage devices as described above that accommodate deflection while maintaining the fire-resistance rating of the wall assembly.
a. Products:
1) ClarkDietrich; BlazeFrame RipTrak: www.clarkdietrich.com/#sle.
2) FireTrak Corporation; Posi Klip: www.fire-trak.com/#sle.
3) Metal-Lite, Inc; The System: www.metal-lite.net/#sle.
4) Architect pre-approved equivalent.
2.3 BOARD MATERIALS
A. Manufacturers - Gypsum-Based Board:
1. American Gypsum Company: www.americangypsum.com/#sle.
2. Georgia-Pacific Gypsum: www.gpgypsum.com/#sle.
3. National Gypsum Company: www.nationalgypsum.com/#sle.
4. USG Corporation: www.usg.com/#sle.
5. Architect pre-approved equivalent.
GYPSUM BOARD ASSEMBLIES
09 2116 - 3
B. Gypsum Wallboard: Paper-faced gypsum panels as defined in ASTM C1396/C1396M; sizes to minimize joints in place; ends square cut.
1. Application: Use for vertical surfaces, unless otherwise indicated.
2. Mold Resistance: Score of 10, when tested in accordance with ASTM D3273.
a. Mold resistant board is required at all locations.
3. At Assemblies Indicated with Fire-Resistance Rating: Use type required by indicated tested assembly; if no tested assembly is indicated, use Type X board, UL or WH listed.
4. Thickness:
a. Vertical Surfaces: 5/8 inch (16 mm).
b. Ceilings: 5/8 inch (16 mm).
C. Backing Board for Non-Wet areas: Water-resistant gypsum backing board as defined in ASTM C1396/C1396M; sizes to minimize joints in place; ends square cut.
1. Application: Vertical surfaces in all mechanical spaces.
2. Mold resistance: Score of 10, when tested in accordance with ASTM D3273.
3. Type: X.
4. Thickness: 5/8 inch (16 mm).
5. Edges: Tapered.
6. Products:
a. Georgia-Pacific Gypsum; DensArmor Plus; www.gpgypsum.com/#sle.
b. Gold Bond Building Products, LLC provided by National Gypsum company; Gold
Bond XP Fire-Shield Gypsum Board; www.goldbondbuilding.com/#sle.
c. Architect pre-approved equivalent.
D. Shaftwall and Coreboard: Type X; 1 inch thick by 24 inches wide, beveled long edges, ends square cut.
1. Glass Mat Faced Type: Glass mat shaftliner gypsum panel or glass mat coreboard gypsum panel as defined in ASTM C1638/C1658M; water-resistant faces.
2. Mold Resistance: Score of 10, when tested in accordance with ASTM D3273.
3. Glass Mat Faced Products:
a. Georgia-Pacific Gypsum; DensGlass Shaftliner (mold-resistant);
www.gpgypsum.com/#sle.
b. Gold Bond Building Products, LLC provided by National Gypsum Company; Gold
Bond eXP Shaftliner; www.goldbondbuilding.com/#sle.
c. Architect pre-approved equivalent.
2.4 GYPSUM WALLBOARD ACCESSORIES
A. Finishing Accessories: ASTM C1047, extruded aluminum alloy (6063 T5) or galvanized steel sheet ASTM A924/A924M G90, unless noted otherwise.
1. Types: As detailed or required for finished appearance.
09 2116 - 4
2. Special Shapes: In addition to conventional corner bead and control joints, provide U-bead at exposed panel edges.
B. Joint Materials: ASTM C475/C475M and as recommended by gypsum board manufacturer for project conditions.
C. Screws for Fastening of Gypsum Panel Products to Cold-Formed Steel Studs Less than 0.033 inches (0.84 mm) in Thickness and Wood Members: ASTM C1002; self-piercing tapping screws, corrosion-resistant.
D. Screws for Fastening of Gypsum Panel Products to Steel Members from 0.033 to 0.112 inch (0.84 to 2.84 mm) in Thickness: ASTM C954; steel drill screws, corrosion-resistant.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify that project conditions are appropriate for work of this section to commence.
3.2 SHAFT WALL INSTALLATION
A. Shaft Wall Framing: Install in accordance with manufacturer's installation instructions.
B. Shaft Wall Liner: Cut panels to accurate dimensions and install sequentially between special friction studs.
3.3 FRAMING INSTALLATION
A. Metal Framing: Install in accordance with ASTM C754 and manufacturer's instructions.
B. Suspended Ceilings: Space framing and furring members at 16 inches on center (at 400 mm on center).
1. Level ceiling system to a tolerance of 1/1200.
2. Laterally brace enter suspension system.
C. Studs: Space studs at 16 inches on center (at 406 mm on center).
1. Extend partition framing to structure in all locations.
2. Partitions Terminating at Structure: Attach top runner to structure, maintain clearance between top of studs and structure, and connect studs to track using specified mechanical devices in accordance with manufacturer's instructions; verify free movement of top of stud connections; do not leave studs unattached to track.
D. Openings: Reinforce openings as required for weight of doors or operable panels, using not less than double studs at jambs.
3.4 BOARD INSTALLATION
A. Comply with ASTM C840, GA-216, and manufacturer's instructions. Install to minimize butt end joints, especially in highly visible locations.
B. Single-Layer Nonrated: Install gypsum board in most economical direction, with ends and edges occurring over firm bearing.
C. Fire-Resistance-Rated Construction: Install gypsum board in strict compliance with requirements of assembly listing.
D. Installation on Metal Framing: Use screws for attachment of gypsum board.
GYPSUM BOARD ASSEMBLIES
09 2116 - 5
3.5 INSTALLATION OF TRIM AND ACCESSORIES
A. Control Joints: Place control joints consistent with lines of building spaces and as indicated.
1. Space control joints in accordance with ASTM C840 at specific locations indicated on drawings or approved by Architect.
B. Corner Beads: Install at external corners, using longest practical lengths.
C. Edge Trim: Install at locations where gypsum board abuts dissimilar materials.
3.6 JOINT TREATMENT
A. Paper Faced Gypsum Board: Use paper joint tape, embed with drying type joint compound and finish with drying type joint compound.
B. Finish gypsum board in accordance with levels defined in ASTM C840, as follows:
1. Level 4: Walls and ceilings to receive paint finish or wall coverings, unless otherwise indicated.
2. Level 1: Fire-resistance-rated wall areas above finished ceilings, whether or not accessible in the completed construction.
C. Tape, fill, and sand exposed joints, edges, and corners to produce smooth surface ready to receive finishes.
1. Feather coats of joint compound so that camber is maximum 1/32 inch (0.8 mm).
3.7 TOLERANCES
A. Maximum Variation of Finished Gypsum Board Surface from True Flatness: 1/8 inch in 10 feet (3 mm in 3 m) in any direction.
IDAS Project # 9279.40
SH Project # 2240007040
Issued for Construction 04-25-2025
INTERIOR PAINTING
09 9123 - 1
SECTION 09 9123
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Surface preparation.
B. Field application of paints.
C. Scope: Finish new wall, new door and frame, and other surfaces as indicated.
D. Do Not Paint or Finish the Following Items:
1. Items…