RFB927940-02 - WRC Campus Fiber Upgrades - Bid Issuance 2 - Drawings.pdf
PDF 7 MB Posted
- Attached to
- Woodward Resource Center Campus Fiber Upgrades
- Solicitation number
- RFB927940-02
- Issued by
- Clinton County, Iowa
About this file
This is a set of architectural and engineering drawings for the Woodward Resource Center Campus Fiber Upgrades project issued by the Iowa Department of Administrative Services (Project #224000704, RFB #927940-02). The project encompasses a comprehensive fiber optic network infrastructure upgrade across the WRC campus located at 1251 334th Street, Woodward, Iowa 50276. The scope includes installation of single mode fiber optic cable, conduit systems, handholes, and related telecommunications infrastructure connecting multiple campus buildings including the Medical Center, Birches, Administration Building, various cottages, and auxiliary facilities. The drawings, prepared by Shive-Hattery Inc. and issued for construction on April 25, 2025 (Bid Issuance #2), show detailed utility plans, electrical site plans, fiber routing schematics, and technical specifications across civil, architectural, electrical, and mechanical disciplines. Construction is scheduled to begin July 7, 2025, with completion anticipated by March 31, 2026. A pre-bid meeting was offered on May 22, 2025, at 10:00 AM at the facility, and electronic bid submissions through IMPACS were required by 2:00 PM on June 5, 2025.
The project specifications require bidders to provide a 5% bid security bond and demonstrate expertise in fiber optic installation, conduit systems, and utility coordination. The work involves extensive site preparation including utility locating, potholing, trench excavation, conduit installation at minimum 24-inch depth, concrete paving restoration, and landscaping restoration. Key technical requirements include compliance with Iowa Statewide Urban Design and Specifications (SUDAS), National Electrical Code standards, OSHA requirements, and proper fire-sealing of all wall and floor penetrations. The contractor bears full responsibility for utility coordination, traffic control, site restoration, and settlement monitoring for one year post-completion. All materials must be new and listed by nationally recognized testing laboratories. The project is exempt from Iowa Sales Tax and Davis Bacon Wages do not apply. Specific pricing and funding amounts are not detailed in the drawing set; however, the requirement for substantial bid security and the comprehensive scope of work across a multi-building campus indicate a significant project value.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E n te r O ff ic e N u m b e r in G lo b a l P a ra m e te rs E n te r O ff ic e N u m b e r in G lo b a l P a ra m e te rs P h o n e
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
SHEET INDEX CERTIFICATIONS
H
BA D E FC G H
W R
C C
A M
P U
S F
IB
E
R U
P G
R A
D E
S
.4
/2
/2
:2
:3
P
M
A u to d e s k D o c s
/I A
D A
S
W R
C P ro je c ts
/4
-M
E P
-R .r v t
WRC CAMPUS FIBER UPGRADES (#9279.40)
Iowa Department of Administrative Services 1251 334th St, Woodward, IA 50276
00-G000
Io w a D e p a rt m e n t o f
A d m in is tr a ti v e S e rv ic e s th
S t, W o o d w a rd
IA
P R
O J E
C T
N U
M B
E R
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
IS
S U
E D
A T
E
-0
-2
SHEET NUMBER DISPATCH SHEET INDEX
CIVIL
00-C001 CIVIL GENERAL INFORMATION
00-C300 OVERALL UTILITY PLAN
00-C301 UTILITY PLAN
00-C302 UTILITY PLAN
00-C303 UTILITY PLAN
00-C304 UTILITY PLAN
00-C305 UTILITY PLAN
00-C306 UTILITY PLAN
00-C307 UTILITY PLAN
00-C308 UTILITY PLAN
00-C309 UTILITY PLAN
ARCHITECTURAL
00-A101 BASEMENT FLOOR PLAN
ELECTRICAL
00-EF000 GENERAL ELECTRICAL INFORMATION
00-EF100 OVERALL ELECTRCIAL FIBER SITE PLAN
00-EF101 WEST ELECTRICAL SITE PLAN
00-EF102 COTTAGE ELECTRICAL SITE PLAN
00-EF103 NORTH ELECTRICAL SITE PLAN
00-EF104 NORTH SITE FIBER OPTIC BACKBONE - MEDICAL CENTER & BIRCHES
00-EF105 NORTH SITE ELECTRICAL - COTTAGES FIBER UPDATES
00-EF106 WEST SITE ELECTRICAL - ADMINISTRATION BUILDING FIBER UPDATES
00-EF400 ELECTRICAL DETAILS
00-EF500 RISER DIAGRAM
SHEET NUMBER GENERAL INFORMATION INDEX
00-G000 COVER SHEET
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
{{t:s;r:y;o:"Electrical";w:140;h:25;}}
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Kevin J. Bruxvoort
Odd
19927
ELECTRICAL ENGINEER
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
{{t:s;r:y;o:"Civil";w:140;h:25;}}
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Kyle A. Lawson
Odd
26414
CIVIL ENGINEER
I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL
SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR UNDER
MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY
LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA.
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
PRINTED OR TYPED NAME
SIGNATURE
MY LICENSE RENEWAL DATE IS JUNE 30,
DATE
ARCHITECT
LICENSE NUMBER
{{t:s;r:y;o:"Architect";w:140;h:25;}}
Cameron L. Manley
Odd
06716
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
{{t:s;r:y;o:"Mechanical";w:140;h:25;}}
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
John D. Baumhover
25737
MECHANICAL ENGINEER
DISPATCH SHEET INDEXSHEET NUMBER
SHEET NUMBER GENERAL INFORMATION INDEX
Mechanical items
A Sheet
G Sheet; EF Sheets
C Sheets
4-25-2025
4-25-2025
4-25-2025
4-25-2025
BID ISSUANCE # 2
BI
D
IS
SU
AN
C
E
BI
D
IS
SU
AN
C
E
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Kevin J. Bruxvoort
Odd
19927
ELECTRICAL ENGINEER
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
LICENSE NUMBER
Kyle A. Lawson
Odd
26414
CIVIL ENGINEER
I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL
SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR UNDER
MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY
LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA.
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
PRINTED OR TYPED NAME
SIGNATURE
MY LICENSE RENEWAL DATE IS JUNE 30,
DATE
ARCHITECT
LICENSE NUMBER
Cameron L. Manley
Odd
06716
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
LICENSE NUMBER
John D. Baumhover
25737
MECHANICAL ENGINEER
Mechanical items
A Sheet
G Sheet; EF Sheets
C Sheets
4-25-2025
4-25-2025
4-25-2025
4-25-2025
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
C
LI
EN
T
PR
O
JE
C
T N
U M
BE
R
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\W
O O
DW
AR
D
FI
BE
R O
PT
IC
\C
CI
VI
L
G
EN
ER
AL
IN
FO
RM
AT
IO
N.
dw g
4/
/2
:2 3:
A
M
00-C001
C
IV
IL
G
EN
ER
AL
IN
FO
R
M
AT
IO
N
BD
D
C R
B
C O
N
ST
R U
C
TI
O N
-0 4-
40 ---
---W R
C C
AM
PU
S
FI
BE
R
U
PG
R
AD
ES
.4 0)
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
4T H
S T.
W O
O D
W
AR
D , I
A
GENERAL NOTES
1. THE LOCATIONS OF UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS PLOTTED ON THE
DRAWINGS ARE APPROXIMATE ONLY AND WERE OBTAINED FROM RECORDS MADE AVAILABLE TO
SHIVE-HATTERY, INC. THERE MAY BE OTHER EXISTING UTILITY MAINS, STRUCTURES AND SERVICE
CONNECTIONS NOT KNOWN TO SHIVE-HATTERY, INC. AND NOT SHOWN ON THE DRAWINGS. THE
VERIFICATION OF EXISTENCE OF AND THE DETERMINATION OF THE EXACT LOCATION OF UTILITY
MAINS, STRUCTURES AND SERVICE CONNECTIONS SHALL BE THE RESPONSIBILITY OF THE
CONSTRUCTION CONTRACTOR(S).
2. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL UNCOVER EXISTING UTILITIES AT CRITICAL
LOCATIONS TO VERIFY EXACT HORIZONTAL AND VERTICAL LOCATION.
3. THE FACILITY WILL COMPLETE PRIVATE UTILITY LOCATES OF KNOWN FACILITY UTILITIES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE ALL LOCATES AND CONFIRM THEY ARE COMPLETED
PRIOR TO THE START OF CONSTRUCTION.
4. IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION, REQUIRES VERBAL NOTICE TO IOWA ONE-CALL BY CALLING 811 OR 1-800-292-8989 NOT LESS THAN 48 HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS AND HOLIDAYS.
5. NOTIFY UTILITY COMPANIES WHOSE FACILITIES ARE SHOWN ON THE PLANS OR KNOWN TO BE WITHIN
THE CONSTRUCTION LIMITS OF THE SCHEDULE PRIOR TO EACH STAGE OF CONSTRUCTION.
6. UNLESS OTHERWISE SPECIFIED, ALL WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE MOST
RECENT EDITION OF IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS).
7. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL CITY/COUNTY/STATE REGULATIONS/CODES AND
OSHA STANDARDS.
8. THE MEANS OF THE WORK AND THE SAFETY OF THE CONTRACTOR'S EMPLOYEES ARE SOLELY THE
RESPONSIBILITY OF THE CONTRACTOR.
9. NO WORK SHALL BE PERFORMED BEYOND THE PROJECT LIMITS WITHOUT PRIOR AUTHORIZATION
FROM THE OWNER'S REPRESENTATIVE.
10. PROTECT EXISTING UTILITIES DURING CONSTRUCTION.
11. MAINTAIN POSITIVE DRAINAGE ON THE SITE THROUGHOUT THE PROJECT DURATION.
12. SITE CLEAN-UP SHALL BE PERFORMED ON A DAILY BASIS. DRIVES, ROADWAYS, ETC. SHALL BE KEPT
CLEAN AT ALL TIMES.
13. ALL OPEN EXCAVATIONS SHALL BE PROTECTED.
14. REPAIR OR REPLACE DAMAGED SITE FEATURES (WALLS, PAVEMENT, UTILITIES, FENCES, ETC.) TO
REMAIN AT NO ADDITIONAL EXPENSE TO THE STATE.
15. ANY WORK REQUIRED TO COMPLETE THE SCOPE OF THIS PROJECT BUT NOT SPECIFICALLY CALLED OUT SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. NO ADDITIONAL COMPENSATION TO BE
ALLOWED FOR THE COMPLETION OF THIS WORK.
16. WORK WHICH DOES NOT CONFORM TO THE REQUIREMENTS OF THE CONTRACT WILL BE CONSIDERED
UNACCEPTABLE. UNACCEPTABLE WORK, WHETHER THE RESULT OF POOR WORKMANSHIP, USE OF
DEFECTIVE MATERIALS, DAMAGE THROUGH CARELESSNESS OR ANY OTHER CAUSE FOUND TO EXIST
PRIOR TO THE FINAL ACCEPTANCE OF THE WORK SHALL BE REMOVED AND REPLACED IN AN
ACCEPTABLE MANNER AS REQUIRED BY THE OWNER'S REPRESENTATIVE AT THE CONTRACTOR'S
EXPENSE. WORK DONE CONTRARY TO THE INSTRUCTIONS OF THE OWNER'S REPRESENTATIVE, WORK
DONE BEYOND THE LINES SHOWN ON THE PLANS OR ANY EXTRA WORK DONE WITHOUT WRITTEN
AUTHORIZATION WILL NOT BE PAID FOR.
17. THE CONTRACTOR SHALL MATCH EXISTING GRADES AT THE CONSTRUCTION LIMITS.
18. STAGING LOCATIONS AND CONSTRUCTION ACCESS ROUTES FOR CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE COORDINATED WITH AND APPROVED BY THE FACILITY AND CONSTRUCTION
MANAGER.
19. THE CONTRACTOR SHALL PROVIDE EROSION CONTROL MEASURES NECESSARY TO PROTECT AGAINST SILTATION, EROSION AND DUST POLLUTION ON THE PROJECT SITE AND ANY OFF-SITE BORROW OR DISPOSAL AREAS USED FOR THIS PROJECT. COMPLY WITH SOIL EROSION CONTROL REQUIREMENTS
OF IOWA CODE, FEDERAL REGULATIONS AND LOCAL ORDINANCES.
20. CONTROL DUST SPREADING FROM ALL WORK AND STAGING AREAS.
21. CONTRACTOR TO COORDINATE ANY SITE, UTILITY OR GRADE ADJUSTMENTS WITH THE CONSTRUCTION
MANAGER PRIOR TO PROCEEDING WITH THE WORK.
22. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF WORK OF ALL
SUBCONTRACTOR(S) INVOLVED ON THE PROJECT.
CONSTRUCTION STAGING NOTES
1. CONTRACTOR SHALL COORDINATE ALL STAGING AREAS WITH THE FACILITY AND CONSTRUCTION
MANAGER.
2. CONTRACTOR SHALL REPLACE ALL PAVEMENT DAMAGED BY CONSTRUCTION ACTIVITIES AT THE END OF CONSTRUCTION. CONTRACTOR TO PROVIDE PHOTO DOCUMENTATION OF EXISTING CONDITIONS
PRIOR TO BEGINNING WORK.
3. CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS NOT TO BE PAVED TO THEIR ORIGINAL
CONDITION AT THE END OF CONSTRUCTION. CONTRACTOR TO PROVIDE PHOTO DOCUMENTATION
PRIOR TO BEGINNING WORK.
4. CONTRACTOR SHALL PROVIDE BARRICADES, FENCING OR OTHER DEVICES TO KEEP UNAUTHORIZED
PERSONNEL OUT OF PROJECT SITE.
TRAFFIC AND PEDESTRIAN CONTROL NOTES
1. CONTRACTOR IS ALLOWED TO CLOSE DOWN LIMITED PARKING AND DRIVES DURING CONSTRUCTION.
ACCESS TO ADJACENT BUILDINGS, DRIVES, PARKING, AND SIDEWALKS ARE TO BE MAINTAINED THROUGHOUT CONSTRUCTION. PHASING OF UTILITY CONSTRUCTION AND ROAD PATCHING WILL BE REQUIRED TO MAINTAIN VEHICULAR AND PEDESTRIAN TRAFFIC TO ALL BUILDINGS AND SHALL BE
COORDINATED WITH SCHEDULES OF OTHER TRADES, CONTRACTORS, AND UTILITY COMPANIES.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL TRAFFIC DURING CONSTRUCTION AND PROVIDE ADEQUATE TRAFFIC AND PEDESTRIAN CONTROL AND SIGNAGE. AT A MINIMUM CONTRACTOR TO PROVIDE
TYPE 4 BARRICADES AT EACH END OF CLOSED ROADS AND DRIVES.
3. CONTRACTOR TO INSTALL AND MAINTAIN CONSTRUCTION FENCE AROUND ALL AREAS OF ACTIVE CONSTRUCTION. CONTRACTOR SHALL ASSUME PEDESTRIAN TRAFFIC WILL BE IN THE AREA THROUGHOUT
THE PROJECT DURATION.
4. OWNER/CONSTRUCTION MANAGER TO INSTALL TEMPORARY GRANULAR SURFACING AND CHAIN LINK
FENCE AND GATES AROUND PROPOSED CONSTRUCTION STAGING AREAS. CONTRACTORS TO
COORDINATE WITH CONSTRUCTION MANAGER ON PORTIONS OF STAGING AREA THAT ARE REQUIRED FOR
THEIR SCOPE OF WORK AND COORDINATE WITH ALL OTHER CONTRACTORS AND TRADES ONSITE.
5. PEDESTRIAN ACCESS MUST BE MAINTAINED TO ALL BUILDINGS THROUGHOUT CONSTRUCTION.
PEDESTRIAN ACCESS MUST BE MAINTAINED AT ALL TIMES BETWEEN COTTAGES, GYM/SCHOOL, AND KITCHEN BUILDINGS. COORDINATE WITH FACILITY AND CONSTRUCTION MANAGER ON PHASING AND SHUT DOWN OF ALL DRIVES AND SIDEWALKS. TEMPORARY GRANULAR PATCHES WILL BE REQUIRED FOR ANY DRIVES AND SIDEWALKS WHICH ARE NOT PATCHED WITH CONCRETE IN A TIMELY MANNER TO LIMIT
DISRUPTIONS TO CAMPUS TRAFFIC AND PEDESTRIAN FLOW.
THE MOST RECENT EDITION OF THE IOWA STATEWIDE URBAN DESIGN
SPECIFICATIONS FOR PUBLIC IMPROVEMENTS SHALL APPLY TO ALL
WORK PERFORMED ON THIS PROJECT EXCEPT AS MODIFIED HEREIN.
DEMOLITION NOTES
1. CONTRACTOR SHALL REPLACE AT NO COST TO THE OWNER ALL DAMAGED STREETS, DRIVES,
SIDEWALKS, CURB AND GUTTER, SIGNS, PAVEMENT MARKINGS, LIGHTS, FENCES AND ALL OTHER SURFACE
STRUCTURES NOT SCHEDULED TO BE REMOVED DURING THE COURSE OF THE WORK.
2. ALL LANDSCAPING INCLUDING TREES, SHRUBS, PERENNIALS NOT CALLED OUT TO BE REMOVED OR APPROVED FOR REMOVAL BY CONSTRUCTION MANAGER SHALL BE PROTECTED AND REPLACED AT NO COST TO THE OWNER IF DAMAGED DURING CONSTRUCTION. REPLACE TREES WITH (1) EQUIVALENT TREE UP TO 6" CALIPER AND (1) ADDITIONAL TREE FOR EVERY 6" CALIPER BEYOND THAT. ALL PLANTS THAT ARE
DESTROYED OR DAMAGED SHALL BE REPLACED WITH NEW PLANTS OF THE EQUIVALENT TYPE.
3. WHERE A SECTION OF PAVEMENT, CURB AND GUTTER, OR SIDEWALK IS CUT OR OTHERWISE
DAMAGED BY THE CONTRACTOR, THE ENTIRE SECTION SHALL BE REMOVED AND REPLACED. PAVEMENT, CURBS, GUTTERS, AND SIDEWALKS SHALL BE REMOVED TO THE NEAREST JOINT A MINIMUM OF TWO FEET BEYOND THE EDGE OF ALL EXCAVATIONS. CONTRACTOR SHALL DOCUMENT (OR PHOTO) ALL CRACKED
PCC PAVEMENT OR DAMAGED HMA PAVEMENT PRIOR TO CONSTRUCTION. IF NEW CRACKS IN PCC
PAVEMENT DEVELOP OR HMA PAVEMENT IS DAMAGED DUE TO THE CONSTRUCTION TRAFFIC (EXTENDS BEYOND CONSTRUCTION LIMITS), CONTRACTOR SHALL REPLACE DAMAGED AREA AT NO ADDITIONAL COST
TO OWNER.
EXCAVATION NOTES
1. EXCAVATE TRENCH AND PROVIDE PIPE BEDDING AND BACKFILL MATERIAL PER IOWA SUDAS
SPECIFICATIONS.
2. STRIP, STOCKPILE, AND RESPREAD A MINIMUM OF 6” OF TOPSOIL IN ALL SOD AREAS DISTURBED BY CONSTRUCTION. DISTURBED AREAS SHALL BE LEFT IN SMOOTH CONDITIONS READY FOR FINAL SEEDBED PREPARATION BY FACILITY. GRADE ALL DISTURBED AREAS TO DRAIN AS PONDING OF WATER WILL NOT BE
ACCEPTABLE.
3. CONTRACTOR IS RESPONSIBLE FOR ALL TRENCH AND FILL SETTLEMENT FOR THE PROJECT'S ONE
YEAR WARRANTY PERIOD. CONTRACTOR SHALL PROVIDE ADDITIONAL FILL MATERIAL FOR ALL
SETTLEMENT AREAS AFTER SITE RESTORATION HAS BEEN COMPLETED. FACILITY WILL BE RESPONSIBLE
FOR RESEEDING.
4. OWNER WILL PROVIDE AN EXCESS SOIL AND UTILITY SPOILS DISPOSAL SITE AVAILABLE ONSITE.
CONTRACTORS WILL BE RESPONSIBLE FOR STRIPPING AND RESPREADING TOPSOIL AND LEAVING THE WASTE SITE IN A SMOOTHLY GRADED CONDITION AT THE END OF CONSTRUCTION. ONLY CLEAN SOIL MATERIAL AND GRANULAR MATERIAL LESS THAN 1.5" DIAMETER WILL BE ALLOWED TO BE PLACED ONSITE.
ALL DEBRIS AND LARGER ROCK OR CONCRETE WASTE SHALL BE DISPOSED OF OFFSITE. POTHOLE MUD
DISPOSAL WILL NOT BE PERMITTED ONSITE AND SHOULD BE DISPOSED OF OFFSITE.
UTILITY NOTES
1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH IOWA SUDAS STANDARD SPECIFICATIONS AND
IOWA DOT SPECIFICATIONS AND STANDARD ROAD PLANS, AND ROAD DESIGN DETAILS, UNLESS
OTHERWISE NOTED ON THE DRAWINGS.
2. ALL OPEN EXCAVATIONS SHALL BE PROTECTED WITH SAFETY FENCE, BARRIERS OR BARRICADES IN
ACCORDANCE WITH OSHA.
3. CONTRACTOR TO IMPLEMENT TEMPORARY SHORING OR SUPPORT AT ALL UTILITY CROSSINGS AS REQUIRED BY CONTRACTORS MEANS AND METHODS. ALL DAMAGE TO EXISTING UTILITIES SHALL BE
REPAIRED AT NO ADDITIONAL COST TO THE OWNER.
PAVEMENT GENERAL NOTES
1. EXISTING ASPHALT PAVEMENT SHALL BE REMOVED AS REQUIRED FOR UTILITY INSTALLATION AND REPLACED WITH PCC PAVEMENT UNLESS PRIOR APPROVAL IS PROVIDED BY ENGINEER TO REPLACE WITH
ASPHALT PATCHES.
2. ALL SLOPES IN PAVEMENT SHALL BE UNIFORM TO AVOID PONDING. ANY PONDING ON PAVEMENT PATCHES OR ADJACENT TO PATCHES WILL BE CONSIDERED UNACCEPTABLE AND SHALL BE REPLACED.
3. SALVAGE ALL SIGNS WITHIN THE CONSTRUCTION LIMITS AND REINSTALL IN THE SAME LOCATION AND CONDITION AFTER CONSTRUCTION. ANY STREET SIGNS OR POLES DAMAGED DURING THE COURSE OF
WORK TO BE REMOVED AND REPLACED AT NO ADDITIONAL COST TO THE OWNER.
4. USE TYPE "A" COMPACTION ON SUBGRADE AND SUBBASE, TYPE "A" COMPACTION PER IOWA DOT
STANDARD SPECIFICATION FOR HIGHWAY AND BRIDGE CONSTRUCTION.
5. IN THE EVENT THAT PAVEMENT PATCHES ON ROADS AND SIDEWALKS CANNOT BE COMPLETED
BEFORE THE COLD WEATHER SEASON BEGINS, CONTRACTOR MAY INSTALL TEMPORARY ROCK PATCHES IN AREAS WHERE PAVEMENT HAS BEEN REMOVED RATHER THAN COMPLETE PAVEMENT PATCHES IN LESS THAN IDEAL WEATHER CONDITIONS. TEMPORARY ROCK PATCHES SHALL BE A MINIMUM OF 8” DEEP AND
COMPACTED. CONTRACTOR TO MAINTAIN TEMPORARY ROCK PATCHES THROUGHOUT THE WINTER
SEASON INCLUDING SUPPLEMENTING WITH ADDITIONAL ROCK AS REQUIRED AND INSTALL PERMANENT
PAVEMENT PATCHES AS SHOWN IN PLANS IN ACCEPTABLE WEATHER CONDITIONS.
6. ALL EXISTING PAINT STRIPING WHICH IS REMOVED AS PART OF THE PROJECT SHALL BE REPLACED TO MATCH EXISTING STRIPING AND SYMBOLS. IF PARTIAL PAINT STRIPES ARE REMOVED, THE ENTIRE STRIPE SHALL BE REPLACED. ALL STRIPING AND MATERIAL SHALL BE INSTALLED ACCORDING TO SUDAS
REQUIREMENTS.
SURFACE RESTORATION NOTES
1. SCARIFY AREAS TO RECEIVE TOPSOIL TO A MINIMUM DEPTH OF 6". REMOVE ALL STONES, WOOD AND OTHER DEBRIS LARGER THAN 2" FROM AREAS TO RECEIVE TOPSOIL. DO NOT COMPACT TOPSOIL.
2. FINISH GRADE ALL AREAS DISTURBED BY THEIR OWN WORK TO WITHIN +/- 0.10 FEET OF EXISTING GRADES AND LEAVE IN A CONDITION REQUIRING MINOR SEED BED PREPARATION AND HARROWING PRIOR
TO SEEDING OPERATIONS BY OTHERS.
3. EXISTING FACILITIES (CURBS, PAVEMENT, UTILITIES, ETC.) THAT ARE TO REMAIN AND DAMAGED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE
TO THE OWNER.
SITE WORK TECHNICAL SPECIFICATIONS
THE MOST RECENT EDITION OF THE IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) AND IOWA DOT SPECIFICATIONS SHALL APPLY TO ALL SITE WORK PERFORMED ON THIS PROJECT EXCEPT AS MODIFIED HEREIN. MEASUREMENT AND PAYMENT SECTIONS AND ADDITIONAL COMPENSATION REFERENCES SHALL NOT APPLY TO THIS PROJECT AS IT IS A LUMP SUM BID .
CONTRACTOR SHALL SUBMIT SHOP DRAWING SUBMITTALS FOR ALL PROPOSED PRODUCTS.
A. CONCRETE PAVING:
CONCRETE: MATERIALS AND MIXING FOR ALL CONCRETE WORK, UNLESS OTHERWISE SPECIFIED, SHALL CONFORM TO IOWA DOT SPECIFICATIONS, SECTIONS 2301.03 THROUGH 2301.06, 2301.13 AND 2301.28 FOR AIR-ENTRAINED TYPE C-4 MIX WITH TYPE I CEMENT
FLY ASH (CONTRACTOR'S OPTION) - ASTM C618, TYPE C, NOT TO EXCEED 15% OF CEMENTITIOUS MATERIAL.
COARSE AGGREGATE DURABILITY SHALL BE CLASS III, 3/4" MAX.
COMPRESSIVE STRENGTH: 2800 PSI @ 7 DAYS AND 4000 PSI @ 28 DAYS
SLUMP: 3" ± 1".
AIR CONTENT: 7.0% ± 1.0%
WATER/CEMENT RATIO: NOT TO EXCEED 0.53
FINISH: MATCH EXISTING FINISH FOR ROADWAY AND SIDEWALK PATCHING.
TESTING - ONE SET OF TEST CYLINDERS REQUIRED FOR EACH 100 C.Y. OR PORTION THEREOF, OF CONCRETE POURED PER WORK LOCATION. CONCRETE TESTING TO BE DONE AND PAID FOR BY OWNER. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL
REQUIRED TESTING AND GEOTECHNICAL WORK WITH CONSTRUCTION MANAGER.
SURFACE CURING: CONTRACTOR SHALL APPLY WHITE PIGMENT LIQUID CURING COMPOUND IN A FINE SPRAY TO FORM CONTINUOUS UNIFORM FILM AFTER FINISHING AND SURFACE MOISTURE HAS DISAPPEARED, OR WITHIN 30 MINUTES AFTER FORMS ARE REQUIRED.
SUBMIT CONCRETE MIX DESIGN FOR APPROVAL.
COLD WEATHER CONCRETE: WHEN THE ATMOSPHERIC AIR TEMPERATURE MAY BE EXPECTED TO DROP BELOW 40°F AT THE TIME CONCRETE IS DELIVERED TO THE WORK SITE, DURING PLACEMENT, OR AT ANY TIME DURING CURING PERIOD, CONCRETE SHALL BE MIXED, PLACED, AND PROTECTED IN ACCORDANCE WITH ACI STANDARD 306, "RECOMMENDED PRACTICE FOR COLD WEATHER CONCRETING." IT IS THE OWNERS PREFERENCE TO AVOID COLD WEATHER CONCRETE FOR THIS PROJECT AND PROVIDE TEMPORARY
GRANULAR SURFACING FOR SIDEWALK AND PAVING AS REQUIRED.
B. PAVEMENT JOINTING
PROVIDE IDOT TYPE 'RD' JOINTS TO TIE INTO ALL ABUTTING PAVEMENT.
PROVIDE IDOT TYPE 'DW' JOINTS AT END OF DAY PAVING INCLUDING ALL COLD JOINTS.
PROVIDE IDOT TYPE 'C' JOINTS TO MATCH EXISTING SPACING OR AT MAXIMUM SPACING OF 12' UNLESS OTHERWISE APPROVED BY
ENGINEER.
PROVIDE IDOT TYPE 'L-1' JOINTS FOR ALL LONGITUDINAL JOINTS.
INSTALL SIDEWALK EXPANSION JOINTS TO MATCH EXISTING CONDITIONS AND AS DIRECTED BY THE ENGINEER.
SIDEWALK REPLACEMENTS WHICH ARE ADJACENT TO STRUCTURAL STOOPS OR TUNNEL CAPS SHALL BE TIED TO EXISTING FROST FREE STRUCTURES WITH 24" LONG #4 TIE BARS EMBEDDED A MINIMUM OF 9" INTO THE EXISTING STRUCTURE TO PREVENT
SETTLEMENT AND FROST HEAVE.
SAW CUTTING TO BE COMPLETED A MAXIMUM OF 24 HOURS FROM CONCRETE PLACEMENT. RANDOM CRACKING CAUSED BY DELAYED
SAW CUTTING MAY REQUIRE REMOVAL AND REPLACEMENT.
ALL PAVEMENT JOINTS SHALL BE SEALED ACCORDING TO IOWA DOT SPECIFICATIONS.
C. PAVEMENT REINFORCING STEEL: PAVING REINFORCEMENT SHALL BE ASTM A615 GRADE 60 AND SHALL HAVE A PROTECTIVE COATING OF EPOXY APPLIED BY ELECTROSTATIC SPRAY METHOD IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM A775.
D. GRANULAR SURFACING
MATERIALS AND INSTALLATION TO MEET IDOT SPECIFICATIONS 4120, CLASS A ROADSTONE.
E. TRENCH EXCAVATION AND BACKFILL
BEDDING AND BACKFILL MATERIAL: SHALL COMPLY WITH IOWA SUDAS SECTION 3010.
BACKFILL COMPACTION REQUIREMENTS:
1. UNDER AND WITHIN FIVE (5) FEET OF PAVEMENT, SIDEWALKS, GRANULAR SURFACING, OR OTHER SURFACE IMPROVEMENTS
SHALL BE COMPACTED TO A MINIMUM 95% OF MAXIMUM STANDARD PROCTOR DENSITY.
2. UNDER LANDSCAPING AND LAWN AREAS SHALL BE COMPACTED TO A MINIMUM OF 90% OF MAXIMUM STANDARD PROCTOR
DENSITY.
COMPACTION TESTING SHALL BE COMPLETED ON A FREQUENCY OF ONE TEST PER 100 LINEAR FEET AT APPROXIMATELY EVERY OTHER 8" LIFT OR AT ALTERNATIVE LOCATIONS AND FREQUENCIES AS RECOMMENDED BY TESTING AGENCY. COMPACTION TESTING TO BE DONE BY AN INDEPENDENT TESTING LABORATORY AND PAID FOR BY OWNER. CONTRACTOR SHALL COORDINATE AND SCHEDULE
ALL REQUIRED TESTING AND GEOTECHNICAL WORK WITH CONSTRUCTION MANAGER.
CONTRACTOR IS RESPONSIBLE FOR ALL DEWATERING WHICH MAYBE REQUIRED INCIDENTAL TO THE CONDUIT INSTALLATION.
BI
D
IS
SU
AN
C
E
6"
12"12" 12"12"
12"
24" 24"
24"
6"
6"
12"
18"
18"
18"
30"
30"
36"
36"
36"
36"
36"
36"
6"6"
12" 24"
6"
6"
12"
12" 12"
12"
12"
18"
18"
18"
18"
18"
18" 18"
18"
24"
24"
24"
24"
24"
24"
30"
30"
30"
30"
30"
36" 36"
36"
54"
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K:
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\W
O O
DW
AR
D
FI
BE
R O
PT
IC
\C
UT
IL
IT
Y
PL
AN
.d wg 4/
/2
:2
3:
A M
00-C300
O
VE
R
AL
L U
TI
LI
TY
PL
AN
BD
D
C R
B
C O
N
ST
R U
C
TI
O N
-0 4-
40 ---
---W R
C C
AM
PU
S
FI
BE
R
U
PG
R
AD
ES
.4 0)
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
4T H
S T.
W O
O D
W
AR
D , I
A
C302
C306
C303
C307
C309
C308
C304 C305
C301
NORTH
POTHOLING NOTES:
1. EXACT LOCATION AND DEPTHS OF EXISTING UTILITIES ARE UNKNOWN. IT IS RECOMMENDED THAT
THE CONTRACTOR POTHOLE TO LOCATE EXISTING UTILITIES AND CRITICAL CROSSINGS AT A
MINIMUM THE UTILITY CROSSING LOCATIONS SHOWN AND AT ADDITIONAL LOCATIONS REQUIRED BY
CONSTRUCTION
2. IT IS RECOMMENDED THAT THE CONTRACTOR LOCATE ALL TUNNEL CROSSINGS TO VERIFY TUNNEL
DEPTHS.
3. ONSITE POTHOLING MUD DISPOSAL WILL NOT BE ALLOWED. CONTRACTOR TO PROPERLY DISPOSE
OF ALL WASTE MUD OFFSITE ACCORDING TO ALL REGULATIONS
GENERAL CONDUIT NOTES:
1. CONTRACTOR SHALL COORDINATE EXACT BUILDING ENTRANCE LOCATIONS WITH ELECTRICAL
PLANS AND AS REQUIRED BY EXISTING CONDITIONS AND ACCESS REQUIREMENTS - COORDINATE ALL LOCATION ADJUSTMENTS WITH CONSTRUCTION MANAGER FOR APPROVAL PRIOR TO ANY FIELD
ADJUSTMENTS BEING MADE.
2. CONFIRM EXACT BUILDING ENTRANCE LOCATIONS WITH CONSTRUCTION MANAGER PRIOR TO ANY
CONSTRUCTION AND CONDUIT PLACEMENT
3. GENERAL PULL BOX/HANDHOLE LOCATIONS ARE SHOWN ON DRAWINGS AND SHALL BE CONFIRMED AND ADJUSTED BY CONTRACTOR AS REQUIRED BY CONSTRUCTION MEANS AND METHODS. CONFIRM
EXACT PULL BOX LOCATIONS WITH CONSTRUCTION MANAGER PRIOR TO INSTALLATION.
BI
D
IS
SU
AN
C
E
12" 24"
6"
12"
12"
18"
18"
18"
24"
24"
24"
24"
24"
24"
30"
30"
30"36"
36"
STORM MH
RIM = 1045.45
STORM MH
RIM = 1045.55
STORM INT
RIM = 1044.76
STORM INT (BEEHIVE)
RIM = 1045.22
RETAINING WALL
(CONCRETE)
RETAINING WALL
W/ HANDRAIL
(CONCRETE)
RETAINING WALL
W/ HANDRAIL
(CONCRETE)
MH
RIM = 1057.67
MH
RIM = 1057.04
STORM INT
RIM = 1058.52
CONCRETE
PAD
VAULT ACCESS
(UNKNOWN)
CONCRETE
PAD
LOADING RAMP
(CONCRETE)
CONCRETE
PAD
STAIRWELL
STAIRS W/
HANDRAIL
LOADING DOCK
(CONCRETE)
LOADING RAMPS
(CONCRETE)
CONCRETE
PAD
STAIRWELL
VAULT ACCESS
(UNDERGROUND
FUEL TANKS)
BU
IL
DI
NG
BUILDING
BUILD
ING
BU
ILD
IN
G
BUILD
ING
GRAVEL
G R
AV
EL
G
RA
VE
L
STORM INT (BEEHIVE)
RIM = 1045.25
ASPHALT
CO
NC
RE
TE
G R
AV
EL
CONCRETE
PAD (DETERIORATED)
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CO
NC
RE
TE
CONCRETE
SAN MH
RIM = 1056.81
CONCRETE
BU
ILD
IN
G
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
DE
W
AL
K
SI
DE
W
AL
K
SI
DE
W
AL
KSI
D
EW
AL
K
C
ED
AR
S
TR
EE
T
GRAVEL
GRAVEL
CO
NC
RE
TE
MH
RIM = 1050.11
MH
RIM = 1050.05
MH
RIM = 1050.18
CONCRETE
PAD
CHAINLINK
FENCE
CONCRETE
PAD
SI
DE
W
AL
K
SIDEWALK
ACCESS VAULT
(STEEL)
CONCRETE
PAD
CHAINLINK FENCE
ACCESS VAULT
(STEEL)
GATE
BIRCHES
POWER
HOUSE
DETAIL
SHOP
BU
IL
DI
NG
BUILDING
BU
ILD
IN
G
GRAVEL
G R
AV
EL
GRAVEL
G
RA
VE
L
ASPHALT
APPROXIM
ATE LO
CATIO
N
(PER RECORD DRAWING)
APPROXIM
ATE LO
CATIO
N
(P
ER R
ECORD D
RAWIN
G)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
CO
NC
RE
TE
G R
AV
EL
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CO
NC
RE
TE
CONCRETE
AP
PR
OXI
MAT
E
LO
CAT
IO
N
(P
ER
R
EC
ORD D
RAW
IN
G)
AP
PR
O
XI
M
AT
E
LO
C
AT
IO
N
(P
ER
R
EC
O R
D D
R
AW
IN
G
)APPROXIMATE LOCATION
(PER RECORD DRAWING)
AP
PR
O
XI
M
AT
E
LO
C
AT
IO
N
(P
ER
R
EC
O R
D D
R
AW
IN
G
APPROXIMATE LOCATION
(PER RECORD DRAWING)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
AP
PR
O
XI
M
AT
E
LO
C
AT
IO
N
(P
ER
R
EC
O R
D D
R
AW
IN
G
AP
PR
O
XI
M
AT
E
LO
CA
TI
O N
(P
ER
R
EC
O
RD
D
RA
W
IN
G
CONCRETE
SAN MH
RIM = 1056.81
STORM MH
RIM = 1045.45
STORM MH
RIM = 1045.55
RETAINING WALL
W/ HANDRAIL
(CONCRETE)
MH
RIM = 1057.67
MH
RIM = 1057.04
MH
RIM = 1058.72
CONCRETE
PAD
CONCRETE
PAD
VAULT ACCESS
(UNKNOWN)
CONCRETE
PAD
LOADING RAMP
(CONCRETE)
CONCRETE
PAD
CONCRETE
PAD
CONCRETE
PAD
STAIRWELL
STAIRS W/
HANDRAIL
LOADING DOCK
(CONCRETE)
LOADING RAMPS
(CONCRETE)
CONCRETE
PAD
STAIRWELL
RETAINING WALL
W/ HANDRAIL
(CONCRETE)
CONCRETE
EDGING
STORM INT (BEEHIVE)
RIM = 1045.25
CONCRETE
PAD (DETERIORATED)
ABANDONED
8"
ABANDONED
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
PER MAPPING (1983)
CAPPED (1983)
PER
MAPPING
(DRONE LOCATE)
C301 C304
C301 C304
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
HANDHOLE (TYP)
HANDHOLE (TYP)
HANDHOLE (TYP)
UTILITY CROSSING
FIBER OPTIC CONDUIT -
SEE ELECTRICAL (TYP)
UTILITY CROSSING
UTILITY CROSSING
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
TUNNEL CROSSING
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K:
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\W
O O
DW
AR
D
FI
BE
R O
PT
IC
\C
UT
IL
IT
Y
PL
AN
.d wg 4/
/2
:2
3:
A M
00-C301
U
TI
LI
TY
P
LA
N
BD
D
C R
B
C O
N
ST
R U
C
TI
O N
-0 4-
40 ---
---W R
C C
AM
PU
S
FI
BE
R
U
PG
R
AD
ES
.4 0)
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
4T H
S T.
W O
O D
W
AR
D , I
A
NORTH
BI
D
IS
SU
AN
C
E
12"
12" 12"
12"
12"
24"
24"
24"
6"
6"
12"
18"
18"
18"
30"
30"
36"
36"
36"
36"
36"
36"
BUILDING
GRAVEL
CONCRETE
CONCRETE
CONCRETE
GRAVEL
UNKNOWN
RED PIPE
CONCRETE
VAULT ACCESS
(UNKNOWN)
CONCRETE
PAD
VAULT ACCESS
(UNKNOWN)
VAULT ACCESS
(ELECTRIC)
CONCRETE
PAD
GAZEBO ON
CONCRETE PAD
STORM MH
RIM = 1073.96
SIDEWALK
SIDEWALK
SIDEWALK
SID
EW
ALK
SID
EW
ALK
SI
D
EW
AL
K
SI
D
EW
AL
K
18" RCP
IE = 1067.68
SIDEWALK
SI
D
EW
AL
K
SIDEWALK
SIDEWALK
SIDEWALK
SID
EW
ALK
SIDEW
ALK
SIDEWALK
SID
EW
ALK
SID
EW
ALK
SID
EWALK
ASH AVENUE
ASH AVENUE
MAGNOLIA DRIVE
MAGNOLIA DRIVE
MAGNOLIA
D
RIVE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
MH
RIM = 1074.61
MH
RIM = 1071.82
MH
RIM = 1075.02
MH
RIM = 1078.48
MH
RIM = 1073.03
MH
RIM = 1076.29
SWINGSET
BLOCK RETAINING
WALL
PARKING AREA
PARKIN
G AREA
CONCRETE
CHAINLINK
FENCE
STAIRWELL
(BELOW GROUND)
CONCRETE
CHAINLINK
FENCE
CONCRETE
SI
D
EW
AL
K
STAIRWELL
(BELOW GROUND)
STAIRS
ACCESS VAULT
(STEEL)
ACCESS VAULT
(STEEL)
ACCESS VAULT
(STEEL)
ACCESS VAULT
(STEEL)
LOADING RAMP
W/ HANDRAIL
PARKING AREA
PARKIN
G AREA
SID
EW
ALK
ADMINISTRATION
BUILDING
HEMLOCK
CHAPEL/CAMPUS
CENTER
ACCESS VAULT
(STEEL)
CONCRETE
CONCRETE
CONCRETE
SIDEWALK
SIDEWALK
SIDEWALK
SID
EW
ALK
SID
EW
ALK
SI
D
EW
AL
K
SI
D
EW
AL
K
AP
PR
OXI
MAT
E
LO
CAT
IO
N
(P
ER
R
EC
ORD D
RAW
IN
G)
APPROXIMATE LOCATION
(PER RECORD DRAW
ING)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
AP
PR
O
XI
M
AT
E
LO
CA
TI
O N
(P
ER
R
EC
O
RD
D
RA
W
IN
G
APPROXIM
ATE
LO
CATIO
N
(P
ER R
ECORD D
RAW
IN
G)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
APPROXIM
ATE LO
CATIO
N
(P
ER R
ECORD D
RAW
IN
G)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
6" `W
ATER M
AIN (P
ER RECORD
DRAWINGS AND FACILTY)
6" W
AT
ER
M
AI
N (P
ER
R
EC
O
R D
D R
AW
IN
G
VAULT ACCESS
(UNKNOWN)
CONCRETE
PAD
VAULT ACCESS
(UNKNOWN)
VAULT ACCESS
(ELECTRIC)
CONCRETE
PAD
GAZEBO ON
CONCRETE PAD
STORM MH
RIM = 1073.96
VAULT ACCESS
(UNKNOWN)
10"
ABANDONED
ABANDONED ABANDONED
8"
ABANDONED
FLAG POLE 25"
ABANDONED
ABANDONED
2"
2" POLY SERVICE
(PER 2013 MAPPING)
2013 WATER MAIN
REPLACEMENT:
TAP AND TEE
LOCATION
MARKED AS FIBER.
COULD BE ELECTRIC.
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LO
CATE)
(DRONE LO
CATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
CAPPED. HIT 2024
(PER FACILITY)
DRONE LOCATE HAS
A MARK HERE BUT NO
INDICATION FROM
ANY OTHER MAPS
WHERE THIS GOES
(D
RO
NE
LO
CA
TE
CAPPED 3" OR 4" 2022
(PER FACILITY)
FROM FACILITY
MEETING
WATER
MAIN - 2023
PROPOSED WATER
MAIN - 2023
FLOOR DRAIN
(PLUGGED)
FLOOR DRAIN
(PLUGGED)
UNKNOWN 6" DIP THRU LEFT
SIDE OF TUNNEL AND FLOOR
UNKNOWN 3" DIP THRU LEFT
SIDE OF TUNNEL AND FLOOR
(DRONE LO
CATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
VALVE - PER FACILITY
(DRONE LOCATE)
WATER (PER
FACILITY MAPPING)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LO
CATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LO
CATE
(DRONE LO
CATE)
(D
RO
NE
LO
CA
TE
PER RECORD
DRAWINGS
C
C
C302 C306
C302 C306
UTILITY CROSSING
C302
C
C
UTILITY CROSSING
TUNNEL CROSSING
UTILITY CROSSING
TUNNEL CROSSING
UTILITY CROSSING
INSTALL FIBER OPTIC LINE
OUTSIDE OF DRIPLINE OF TREE
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
HANDHOLE (TYP)
UTILITY CROSSING
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONDUIT -
SEE ELECTRICAL (TYP)
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
TUNNEL CROSSING
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K:
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\W
O O
DW
AR
D
FI
BE
R O
PT
IC
\C
UT
IL
IT
Y
PL
AN
.d wg 4/
/2
:2
3:
A M
00-C302
U
TI
LI
TY
P
LA
N
BD
D
C R
B
C O
N
ST
R U
C
TI
O N
-0 4-
40 ---
---W R
C C
AM
PU
S
FI
BE
R
U
PG
R
AD
ES
.4 0)
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
4T H
S T.
W O
O D
W
AR
D , I
A
NORTH
BI
D
IS
SU
AN
C
E
SIDEWALK SIDEWALK
SIDEWALK
SI
D
EW
AL
K
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
ASH AVENUE
ASH AVENUE
PARKING LOT
(CONCRETE)
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
BASKETBALL COURTS
(CONCRETE)
CONCRETECONCRETE
MH
RIM = 1058.75
STORM INT
RIM = 1056.40
MH
RIM = 1056.09
STORM INT
RIM = 1055.61
MONUMENT
SIGN
STORM MH
RIM = 1063.51
STORM INT
RIM = 1064.01
MH
RIM = 1062.91
STORM INT
RIM = 1060.54 MH
RIM = 1060.23
CONCRETE
ACCESS VAULT
(STEEL)ACCESS VAULT
(STEEL)
ACCESS VAULT
(STEEL)
CONCRETE
GARBAGE RECEPTACLE
(ON CONCRETE)
GAZEBO
BRICK
PAVING
CONCRETE RETAINING
WALL
STAIRS
PARKING LOT
(CONCRETE)
GRAVEL
SIDEWALK
SIDEWALK
SIDEWALK
O R
C H
AR
D
R O
AD
8"
8"
4"
10"
10"
ABANDONED
ABANDONED
6"
6"
6"
ABANDONED
ABANDONED
ABANDONED
10" 10"
10"
10"
48"
4"
ABANDONED
ABANDONED
6" VALVE
6" VALVE
2013 WATER MAIN REPLACEMENT:
2013- WATER MAIN REPLACEMENT:
BORE & ENCASE 8" WATER MAIN
UNDER TUNNEL (OR THROUGH
THE FOOTINGS IF PRESENT)
2013 WATER MAIN
REPLACEMENT: BORE & ENCASE
6" WATER MAIN UNDER TUNNEL:
6" VALVE
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LO
CATE
(DRONE LOCATE)
PER 2013 MAPPING,
HYDRANT WAS NOT
REMOVED DUE TO
UNKNOWN CROSS
CONNECTIONS
(DRONE LOCATE)
ELECTRICAL
CONDUIT CROSSING
10" DIP UTILITY CROSSING
ACROSS FLOOR
(DRONE LOCATE)
PER 2013 MAP
UNKNOWN 3" PIPE
THRU GROUND
AND WALL
UNKNOWN 8" DIP UTILITY (WATER)
UNKNOWN 10" DIP THRU
LEFT WALL AND FLOOR
4" DIP
6" DIP UTILITY LEFT WALL
THRU FLOOR
(DRONE LOCATE)
(DRONE LOCATE) (DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
PER RECORD
DRAWINGS
PER RECORD
DRAWINGS
PER RECORD
DRAWINGS
(DRONE LOCATE)
(DRONE LOCATE)
CONCRETE
PAD
STAIRS
SANITARY MH
1063.47 RIM
1052.68 IE 8" CLAY (N)
1052.77 IE 8" CLAY (SE)
NO VISUAL FLOW
SANITARY MH
1063.64 RIM
1054.69 IE 8" CLAY (S)
1053.73 IE 8" CLAY (NW)
NO VISUAL FLOW
C
C
C
C
C303 C307
C
C
C303 C307
C
C
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONDUIT-
SEE ELECTRICAL (TYP)
HANDHOLE
HANDHOLE
HANDHOLE (TYP)
UTILITY CROSSING
UTILITY CROSSING
TUNNEL CROSSING
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K:
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\W
O O
DW
AR
D
FI
BE
R O
PT
IC
\C
UT
IL
IT
Y
PL
AN
.d wg 4/
/2
:2
3:
A M
00-C303
U
TI
LI
TY
P
LA
N
BD
D
C R
B
C O
N
ST
R U
C
TI
O N
-0 4-
40 ---
---W R
C C
AM
PU
S
FI
BE
R
U
PG
R
AD
ES
.4 0)
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
4T H
S T.
W O
O D
W
AR
D , I
A
NORTH
BI
D
IS
SU
AN
C
E
12" 24"
MH
RIM = 1057.40
VAULT ACCESS
(UNKNOWN)
VAULT ACCESS
(UNKNOWN)
CONCRETE
PAD
STAIRWELL
W/ HANDRAIL
BUILDING
BU
IL
DI
NG
BUILDING
BUILDING
GRAVEL
CO
NC
RE
TE
CONCRETE
CE
DA
R
ST
RE
ET
SIDEWALK
SIDEWALK
SID
EW
ALK
SID
EW
ALK
SID
EW
ALK
SIDEWALK
SIDEWALK
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
DE
W
AL
K
SI
DE
W
AL
K
SI
DE
W
AL
K
SI
D
EW
AL
K
SI
D
EW
AL
K
SI
DE
W
AL
K
SI
D
EW
AL
K
ASH AVENUE
ASH AVENUE
CEDAR S
TR
EET
N AVENUE
GRAVEL
GRAVEL
PARKING LOT
(CONCRETE)
CONCRETE
CONCRETE
CONCRETE
C O
N C
R
ET
ECONCRETE
MH
RIM = 1070.98
MH
RIM = 1060.98
MH
RIM = 1060.82
STORM INT
RIM = 1058.74
MH
RIM = 1058.79
MH
RIM = 1058.58
MH
RIM = 1057.74
STORM INT
RIM = 1056.81
MH
RIM = 1058.08
MH
RIM = 1055.56
MH
RIM = 1060.68
CONCRETE
CHAINLINK
FENCE
CONCRETE
CONCRETE
GAZEBO
(ON CONCRETE PAD)
CONCRETE
CONCRETE
CONCRETE
GENERATOR
STAIRWELL
ACCESS VAULT
(STEEL)
ACCESS VAULT
(STEEL)
ACCESS VAULT
(STEEL)
ACCESS VAULT
(STEEL)
ACCESS VAULT
(STEEL)ACCESS VAULT
(STEEL)
STAIRS
PARKING LOT
(CONCRETE)
SHED / OUTBUILDING
CONCRETE
CONCRETECONCRETE
SHED / OUTBUILDING
CONCRETE
PAD
INTAKE FANS
STAIRWELL
(BELOW GROUND)
LOADING RAMP
SHED / OUTBUILDING
ACCESS VAULT
(STEEL)
SI
DE
W
AL
K
GRAVEL
CONCRETE
SIDEWALK
PHONE BOOTH
(FAUX)
HANDRAIL HELICOPTER PAD
RETAINING WALL
(CONCRETE)
CHILLER
BUILDING
DISPATCH
GARAGE
LAUNDRY
SUPPLY
DEPOT
54"
BUILDING
BU
IL
DI
NG
C O
N C
R
ET
E
GRAVEL
GRAVEL
APPROXIM
ATE
LO
CATIO
N
(P
ER R
ECORD D
RAW
IN
G)
APPROXIM
ATE LO
CATIO
N
(P
ER R
ECORD D
RAWIN
G)
AP
PR
OX
IM
AT
E
LO
CA
TI
ON
(P
ER
R
EC
OR
D
DR
AW
IN
G)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
APPROXIM
ATE LO
CATIO
N
(P
ER R
ECORD D
RAW
IN
G)APPROXIMATE LOCATION
(PER RECORD DRAWING)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
CO
NC
RE
TE
CONCRETE
APPROXIMATE LOCATION
(PER RECORD DRAWING)
APPROXIMATE LOCATION
(PER RECORD DRAWING)
6" WATER MAIN
APPROXIMATE LOCATION
(PER RECORD DRAWING)
8" WATER MAIN
APPROXIMATE LOCATION
(PER RECORD DRAWING)
8" W
ATER M
AIN
APPROXIM
ATE LOCATIO
N
(PER RECORD DRAWING)
MH
RIM = 1056.88
MH
RIM = 1057.21
MH
RIM = 1056.84
MH
RIM = 1057.40
STAIRWELL
W/ HANDRAIL
CONCRETE
PAD
VAULT ACCESS
(UNKNOWN)
ABANDONED
24"
24"
24"
ABANDONED
ABANDONED
6" 6" 4"
ABANDONED
ABANDONED
8"
6"
6"
6"
6"
8" 8"
8"
8" 8"
ABANDONED
ABANDONED
6"
6"
4" 4"
6"
6" 6"
6"
ABANDONED
4"4"
6"
ABANDONED
6"
6"
4"
LIFT
STATION
8" VALVE
(PER 2013)
2013 WATER MAIN REPLACEMENT:
DID NOT REMOVE OLD HYDRANT
BECAUSE OLD MAIN IS STILL LIVE DUE
TO UNKNOWN CROSS-CONNECTION(S)
8" VALVE (PER 2013)
CAP
2" POLY SERVICE
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
PER 2013 MAPPING,
HYDRANT WAS NOT
REMOVED DUE TO
UNKNOWN CROSS
CONNECTIONS PER 2013 MAPPING, HYDRANT
WAS NOT REMOVED DUE TO
UNKNOWN CROSS
CONNECTIONS
POSSIBLE VALVE (PER
FACILITY MEETING)
TEE (2023 - PER
FACILITY)
UNKNOWN UTILITY
CROSSES UTILITY - 4" DIP
UNKNOWN
UTILITY GOING
INTO GROUND
UNKNOWN 3" PIPE
THRU GROUND
AND WALL
(DRONE LOCATE) (DRONE LOCATE)
PER RECORD
DRAWINGS
PER RECORD
DRAWINGS
PER RECORD
(DRONE LOCATE)
(DRONE LOCATE)
PER RECORD
DRAWINGS
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LO
CATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
CONCRETE
STAIRS
STAIRWELL
(BELOW GROUND)
SANITARY MH
1064.60 RIM
1051.64 IE 8" CLAY (N)
1051.60 IE 8' CLAY (S)
1061.69 IE 2" DIP (S)
NO VISUAL FLOW
CASTING NOT LEVEL
SANITARY CLEANOUT
1060.39 RIM
1054.28 IE WELL
NO DIRECTION FOUND
SANITARY CLEANOUT
1060.48 RIM
1054.38 IE WELL
NO DIRECTION FOUND
STAIRWELL AND
DOORWAY CENTERED
AT BUILDING IN STAIRWAY
(BELOW GROUND)
STAIRWELL TO
DOORWAY
(ABOVE AND
BELOW GROUND)
STAIRWELL TO
DOORWAY 1.5 FROM
BUILDING CORNER
TO EDGE OF DOOR
(BELOW GROUND)
RAMP AND
DORRWAY
(ABOVE GROUND)
STAIRWELL
(BELOW GROUND) STAIRWELL
(BELOW GROUND)
STAIRWELL TO
DOORWAY 1.5 FROM
BUILDING CORNER TO
EDGE OF DOOR
(BELOW GROUND)
DOORWAY AT GRADE
1.25 SOUTH OF BUILDING
CORNER TO EDGE OF DOOR
C
C
C308
C301 C304
C
C
C
C
C304C304 C308
C
C
C301 C304
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
TUNNEL
CROSSING
UTILITY CROSSING
FIBER OPTIC CONDUIT -
SEE ELECTRICAL (TYP)
UTILITY CROSSING
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
TUNNEL CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
HANDHOLE (TYP)
TUNNEL CROSSING
UTILITY CROSSING
HANDHOLE (TYP)
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K:
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\W
O O
DW
AR
D
FI
BE
R O
PT
IC
\C
UT
IL
IT
Y
PL
AN
.d wg 4/
/2
:2
4:
A M
00-C304
U
TI
LI
TY
P
LA
N
C O
N
ST
R U
C
TI
O N
-0 4-
40 ---
---W R
C C
AM
PU
S
FI
BE
R
U
PG
R
AD
ES
.4 0)
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
4T H
S T.
W O
O D
W
AR
D , I
A
NORTH
BI
D
IS
SU
AN
C
E
12"
12"
18"
18"
30"
30"
36"
MH
RIM = 1056.92
STORM MH
RIM = 1059.49
STORM MH
RIM = 1060.86
MH
RIM = 1057.20
CONCRETE PAD
SUPPORT FOOTINGS
(ON CONCRETE)
VAULT ACCESS
(UNKNOWN)
GRA
VE
L
GRA
VE
L
STORM INT (BEEHIVE)
RIM = 1045.25
WATER
TOWER
WATER
TOWER
CONCRETE
PAD
CE
DA
R
ST
RE
ET
SI
DE
W
AL
K
GRAVEL
GRAVEL
GRAVEL
GRAVEL
GRAVEL
GRAVEL
GRAV
EL
GRAV
EL
GRAVEL
GRAV
EL
CHAINLINK FENCE
CHAINLINK FENCE
MH
RIM = 1052.48
MH
RIM = 1058.04
MH
RIM = 1056.79
MH
RIM = 1056.04
MH
RIM = 1052.61
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
C O
N C
R
ET
E
CONCRETE
CONCRETE
CONCRETE
CONCRETE PADS
CONCRETE
BOX CULVERTS
IE =
GENERATOR
STAIRWELL
CONCRETE
PAD
CONCRETE
GRAVEL
MORTON
BUILDING
DISTRIBUTION
CENTER
SUPPLY
DEPOT
GRA
VE
L
GRA
VE
L
WATER
TOWER
WATER
TOWER
APPROXIM
ATE LOCATIO
N
(PER RECORD DRAWING)
APPROXIM
ATE LO
CATIO
N
(P
ER R
ECORD D
RAWIN
G)
APPROXIM
ATE LOCATIO
N
(PER RECORD DRAWING)
APPROXIM
ATE LO
CATIO
N
(P
ER R
ECORD D
RAWIN
G)
AP
PR
OX
IM
AT
E
LO
CA
TI
ON
(P
ER
R
EC
OR
D
DR
AW
IN
G)
APPROXIM
ATE LOCATIO
N
(PER RECORD DRAWING)
APPROXIM
ATE LOCATIO
N
(PER RECORD DRAWING)
AP
PR
OXI
MAT
E
LO
CAT
IO
N
(P
ER
R
EC
ORD D
RAW
IN
G)
AP
PR
O
XI
M
AT
E
LO
C
AT
IO
N
(P
ER
R
EC
O R
D D
R
AW
IN
G
APPROXIMATE LOCATION
(PER RECORD DRAWING)
8" W
ATER MAIN
APPROXIMATE LOCATION
(PER RECORD DRAW
ING)
" S
UMP D
RAIN
(P
ER R
ECORD D
RAW
IN
G)
MH
RIM = 1056.92
STORM MH
RIM = 1059.49
STORM MH
RIM = 1060.86
MH
RIM = 1057.20
CONCRETE PAD
SUPPORT FOOTINGS
(ON CONCRETE)
VAULT ACCESS
(UNKNOWN)
STORM INT (BEEHIVE)
RIM = 1045.25
CONCRETE
PAD
4"
10"
6"
6"
ABANDONED
ABANDONED
ABANDONED
8" VALVE
2013 WATER MAIN
REPLACEMENT:
VALVE WOULD NOT
FULLY CLOSE
2013 WATER MAIN
REPLACEMENT:
CUT & CAPPED OLD
MAIN UNDER TUNNEL
2"
1"
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LO
CATE
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
FROM WATER PLANT
(PER 2013 MAPPING)
DOMESTIC WATER PIPE TO
POWER HOUSE THRU FLOOR
(ABANDONED?)
CAPPED
WATER LINE
C
C
C
C
TUNNEL
CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
HANDHOLE (TYP)
HANDHOLE (TYP)
HANDHOLE (TYP)
FIBER OPTIC CONDUIT -
SEE ELECTRICAL (TYP)
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K:
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\W
O O
DW
AR
D
FI
BE
R O
PT
IC
\C
UT
IL
IT
Y
PL
AN
.d wg 4/
/2
:2
4:
A M
00-C305
U
TI
LI
TY
P
LA
N
BD
D
C R
B
C O
N
ST
R U
C
TI
O N
-0 4-
40 ---
---W R
C C
AM
PU
S
FI
BE
R
U
PG
R
AD
ES
.4 0)
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
4T H
S T.
W O
O D
W
AR
D , I
A
NORTH
BI
D
IS
SU
AN
C
E
SID
EW
ALK
SID
EW
ALK
SID
EW
ALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SID
EW
ALK
SIDEWALK
SIDEW
ALK
SI
D
EW
AL
K
W
SH
S
BO
U
LE
VA
R
D
ASH AVENUE
ASH AVENUE
CEDAR S
TR
EET
MAGNOLIA DRIVE
MAGNOLIA DRIVE
MAGNOLIA DRIVE
CONCRETE
CONCRETE
SIDEWALK CONCRETE
CHAINLINK
FENCE
CHAINLINK
FENCE
MH
RIM = 1070.98
MH
RIM = 1071.05
MH
RIM = 1071.36
STORM INT
RIM = 1064.04
STORM MH
RIM = 1065.82
STORM MH
RIM = 1065.67
CHAINLINK
FENCE
STAIRWELL
(BELOW GROUND)
STAIRWELL
(ABOVEGROUND)
HANDRAIL
CHAINLINK
FENCE
GAS METER
CONCRETE
STAIRWELL
(BELOW GROUND)
STAIRWELL
(ABOVEGROUND)
12" RCP ?? (TOP)
IE =
PLAYGROUND
SHED / OUTBUILDING
ACCESS VAULT
(STEEL)
ACCESS VAULT
(STEEL)
CONCRETE
PAD
LP TANK
STAIRWELL
(BELOW GROUND)
SID
EW
ALK
SID
EW
ALK
SIDEWALK
WESTWOOD
LARCHES
MEYERS
FRANKLIN STREET
ABANDONED
ABANDONED
6"
6"
6"
6"
15"
48"
10"
5"
ABANDONED
ABANDONED
ABANDONED
2014 NATURAL
GAS PIPING:
25' BORE
2014 NATURAL
GAS PIPING:
93' BORE
2014 NATURAL
GAS PIPING:
PLACED VENT ON
SLEEVE
2014 NATURAL
GAS PIPING:
30' BORE (SLEEVE)
2014 NATURAL
GAS PIPING:
90' BORE
2014 NATURAL GAS
PIPING:
6" ON SHEET C-105
2014 NATURAL GAS
PIPING:
STEEL CASING WITH
VENT. CASING: 2"
LARGER IN DIAMETER
THAN PIPE.
2014 NATURAL GAS
PIPING: STEEL CASING
WITH VENT. CASING: 2"
LARGER IN DIAMETER
THAN PIPE.
2014 NATURAL GAS
PIPING:
65' BORE (SLEEVE)
2014 NATURAL
GAS PIPING:
580' BORE
2"
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LO
CATE)
(DRONE LO
CATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LO
CATE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LO
CATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
PER 2013 MAP
6" WATER MAIN UNDER
TUNNEL - OR THROUGH
FOOTING (PER 2013 MAP)
PROPOSED WATER
MAIN - 2023
(PER 2013 MAP)
FLOOR DRAIN
(PLUGGED)
FLOOR DRAIN
(PLUGGED)
FLOOR DRAIN
(PLUGGED)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LO
CATE)
(DRONE LO
CATE)
(DRONE LO
CATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
C302 C306
C302 C306
C
C
C
C
UTILITY
CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY
CROSSING
UTILITY
CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
HANDHOLE
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
HANDHOLE (TYP)
HANDHOLE (TYP)
FIBER OPTIC CONDUIT -
SEE ELECTRICAL (TYP)
UTILITY CROSSING
TUNNEL CROSSING
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K:
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\W
O O
DW
AR
D
FI
BE
R O
PT
IC
\C
UT
IL
IT
Y
PL
AN
.d wg 4/
/2
:2
4:
A M
00-C306
U
TI
LI
TY
P
LA
N
BD
D
C R
B
C O
N
ST
R U
C
TI
O N
-0 4-
40 ---
---W R
C C
AM
PU
S
FI
BE
R
U
PG
R
AD
ES
.4 0)
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
4T H
S T.
W O
O D
W
AR
D , I
A
NORTH
BI
D
IS
SU
AN
C
E
SID
EW
ALK
SI
DE
W
AL
K
SIDEW
ALK
SIDEWALK
CEDAR STREET
STORM INT
RIM = 1062.53
STORM MH
RIM = 1058.21 STORM MH
RIM = 1058.15
STORM INT
RIM = 1057.69
RIM = 1058.75
STORM MH
RIM = 1057.18
ACCESS VAULT
(STEEL)
(STEEL)
GRAVEL
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
EMPLOYEES
HOME
PIN
E STR
EET
FRANKLIN STREET
PINE STREET
6"
6"
RELOCATED
4"
4"
6"
4" 6"
10"
10"
18" 6"
6"
6"
10"
6"
6"
48"
12"
48"
15"
15"
ABANDONED
ABANDONED
24"
RELOCATED
RELOCATED
6"
SHUT OFF
ABANDONED
ABANDONED
4"
ABANDONED
ABANDONED
ABANDONED
ABANDONED
ABANDONED
2013 WATER MAIN REPLACEMENT:
BORE & ENCASE 6" WATER MAIN
UNDER TUNNEL: OLD MAIN CAPPED
2013 WATER MAIN
REPLACEMENT: BORE & ENCASE
6" WATER MAIN UNDER TUNNEL:
CAP OLD MAINS
CAPPED. OLD MAIN
WAS STILL LIVE.
(PER 2013 MAP)
2013 WATER MAIN REPLACEMENT:
BECAUSE THE EXISTING WATER MAIN WAS TIGHT UP AGAINST
THE TUNNEL FLOOR, 6" BRANCH WAS BORED UNDER THE
TUNNEL: ROAD: TIED INTO THE EXISTING MAIN SOUTH OF THE
ROAD. OLD BRANCH WAS CAPPED. BRACH WAS STILL LIVE.
SHUT OFF
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LO
CATE)
(DRONE LOCATE)
(DRONE LO
CATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LO
CATE
(DRONE LOCATE)
ELECTRICAL
CONDUIT CROSSING
VALVE WITH
UNKNOWN UTILITY
PER 2013 MAP
UNKNOWN UTILITY
CROSSING FROM
GROUND THRU WALL
AND WALL
UNKNOWN UTILITY
THRU LEFT SIDE
(2) 2" POLY SERVICES
(2013 PER MAPPING)
(DRONE LOCATE)
(DRONE LOCATE)
C
C
C
C
C303 C307
C
C
C307 C309
C307 C309
C
C
C303 C307
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
HANDHOLE
(TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY
CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
HANDHOLE
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
HANDHOLE
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
HANDHOLE
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
HANDHOLE (TYP)
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
HANDHOLE (TYP)
UTILITY CROSSING
UTILITY CROSSING
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
HANDHOLE (TYP)
FIBER OPTIC CONDUIT -
SEE ELECTRICAL (TYP)
HANDHOLE (TYP)
UTILITY CROSSING
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K:
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\W
O O
DW
AR
D
FI
BE
R O
PT
IC
\C
UT
IL
IT
Y
PL
AN
.d wg 4/
/2
:2
4:
A M
00-C307
U
TI
LI
TY
P
LA
N
BD
D
C R
B
C O
N
ST
R U
C
TI
O N
-0 4-
40 ---
---W R
C C
AM
PU
S
FI
BE
R
U
PG
R
AD
ES
.4 0)
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
4T H
S T.
W O
O D
W
AR
D , I
A
NORTH
BI
D
IS
SU
AN
C
E
SIDEWALK
CEDAR STREET
N A
VE
N
U E
MH
RIM = 1056.02
STORM MH
RIM = 1056.31
STORM MH
RIM = 1056.49
STORM INT
RIM = 1056.23
MH
RIM = 1059.15
CONCRETE
ACCESS VAULT
(STEEL)ACCESS VAULT
(STEEL)
ACCESS VAULT
(STEEL)
SIDEWALK
PHONE BOOTH
(FAUX)
C H
ER
R
Y LAN
E
10"
10"
10"
2"
5"
ABANDONED
ABANDONED
6"
4"
2"
4"
6"
6"
ABANDONED
15"
RELOCATED
4"
SHUT OFF - COTTAGE ISOLATION
(1 OF 2) PER FACILITY MEETING
6"
ABANDONED
ABANDONED
ABANDONED
ABANDONED
ABANDONED
8" VALVE
(PER 2013)8" VALVE (PER 2013)
2013 WATER MAIN REPLACEMENT:
DID NOT REMOVE BECAUSE OLD MAIN
IS STILL LIVE DUE TO UNKNOWN
CROSS-SECTIONS
2013 WATER MAIN REPLACEMENT:
BECAUSE THE WATER MAIN (EXISTING) WAS TIGHT UP AGAINST
THE TUNNEL FLOOR, 6" BRANCH WAS BORED UNDER TUNNEL:
ROAD: TIED INTO THE EXISTING MAIN SOUTH OF THE ROAD. OLD
BRANCH WAS CAPPED. BRANCH WAS STILL LIVE.
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LO
CATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LO
CATE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
UNKNOWN UTILITY CROSSING
THRU FLOOR/RIGHT WALL
ELECTRICAL CONDUIT
THRU TUNNEL
UNKNOWN UTILITY
CROSSING FROM
GROUND THRU WALL
AND WALL
C
C
C304 C308
C304 C308
C
C
UTILITY CROSSING (TYP)
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING (TYP)
UTILITY CROSSING
HANDHOLE (TYP)
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATIONUTILITY CROSSING
UTILITY CROSSING
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
FIBER OPTIC CONDUIT -
SEE ELECTRICAL (TYP)
UTILITY CROSSING
HANDHOLE (TYP)
TUNNEL CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F HG
A B C D E F HG
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K:
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
\2
0\
De liv er ab le s\
Dr aw in gs
\1 _C ivi l\W
O O
DW
AR
D
FI
BE
R O
PT
IC
\C
UT
IL
IT
Y
PL
AN
.d wg 4/
/2
:2
4:
A M
00-C308
U
TI
LI
TY
P
LA
N
BD
D
C R
B
C O
N
ST
R U
C
TI
O N
-0 4-
40 ---
---W R
C C
AM
PU
S
FI
BE
R
U
PG
R
AD
ES
.4 0)
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
4T H
S T.
W O
O D
W
AR
D , I
A
NORTH
BI
D
IS
SU
AN
C
E
FRANKLIN STREET
FRANKLIN STREET
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE) (DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(DRONE LOCATE)
(D
RO
NE
LO
CA
TE
(DRONE LOCATE)
C307 C309
C307 C309
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY
CROSSING UTILITY
CROSSING
UTILITY CROSSING
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY
CROSSING
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
HANDHOLE
(TYP)
UTILITY CROSSING
HANDHOLE (TYP)
FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR EXACT LOCATION
UTILITY CROSSING
UTILITY CROSSING
UTILITY CROSSING
UTILITY
CROSSING
HANDHOLE (TYP)FIBER OPTIC CONNECTION TO
BUILDING - SEE ELECTRICAL
PLANS FOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .