RFB927920-01 - WRC Decentralization Phase 2 & Myers Hall Fire Alarm & Sprinklers - Drawings.pdf

PDF 12 MB Posted

Attached to
RFB927920-01 - WRC Decentralization & Myers Hall Fire Alarm & Sprinklers
Solicitation number
RFB927900-01
Issued by
Scott County, Iowa

About this file

The document is a comprehensive set of architectural, mechanical, electrical, and fire protection drawings for the Iowa Department of Administrative Services' WRC Decentralization Phase 2 and Myers Hall Fire Alarm and Sprinkler project (Project Number 214220339), located at 1251 334th Street in Woodward, Iowa. The project involves extensive renovation and systems upgrades across multiple buildings, including mechanical system decentralization, fire alarm system upgrades, and fire sprinkler installations. The drawings are dated January 10, 2023, and represent 100% Construction Document (CD) phase plans covering basement, first, second, and third floor modifications for Westwood and Myers Hall facilities.

The project includes replacing existing steam heating systems with new hot water heating systems, installing new fin tube radiators, upgrading electrical infrastructure, implementing new fire alarm and sprinkler systems, and making associated architectural modifications. The planned work involves comprehensive demolition of existing mechanical, electrical, and fire protection systems, followed by installation of new infrastructure across multiple building spaces. Specific systems being upgraded include heating water pumps, boilers, unit heaters, fire alarm panels, electrical distribution, and fire protection components. The drawings indicate the work will be performed in compliance with multiple building codes, including the 2015 International Building Code, International Fire Code, and Americans with Disabilities Act requirements, with careful attention to preserving the historic character of the buildings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET NUMBER MYERS HALL

ARCHITECTURAL

04-AD01 DEMOLITION PLANS

04-A110 BASEMENT AND FIRST FLOOR PLANS & DOORS

04-A111 SECOND FLOOR REFLECTED CEILING PLAN

PLUMBING

04-P100 PLUMBING PLANS

FIRE PROTECTION

04-FP000 FIRE PROTECTION GENERAL INFORMATION

04-FP100 BASEMENT FIRE PROTECTION PLAN

04-FP101 FIRST FLOOR FIRE PROTECTION PLAN

04-FP102 SECOND FLOOR FIRE PROTECTION PLAN

04-FP300 FIRE PUMP PLANS, DETAILS & SCHEDULES

MECHANICAL

04-MD100 BASEMENT MECHANICAL PIPING DEMOLITION PLAN

04-MD101 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN

04-MD102 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN

04-M100 BASEMENT MECHANICAL PIPING PLAN

04-M101 FIRST FLOOR MECHANICAL PIPING PLAN

04-M102 SECOND FLOOR MECHANICAL PIPING PLAN

04-M103 THERMOSTAT ZONING PLANS

04-M500 MECHANICAL DETAILS

04-M501 CONTROLS

04-M502 CONTROLS

04-M600 MECHANICAL SCHEDULES

ELECTRICAL

04-ED100 BASEMENT LEVEL ELECTRICAL DEMOLITION PLAN

04-ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

04-ED102 SECOND FLOOR ELECTRICAL DEMOLITION PLAN

04-E100 BASEMENT LEVEL ELECTRICAL PLAN

04-E101 FIRST FLOOR ELECTRICAL PLAN

04-E102 SECOND FLOOR ELECTRICAL PLAN

04-E600 ELECTRICAL SCHEDULES

FIRE ALARM

04-ED300 BASEMENT LEVEL FIRE-ALARM DEMOLITION PLAN

04-ED301 FIRST FLOOR FIRE-ALARM DEMOLITION PLAN

04-ED302 SECOND FLOOR FIRE-ALARM DEMOLITION PLAN

04-E300 BASEMENT LEVEL FIRE-ALARM PLAN

04-E301 FIRST FLOOR FIRE-ALARM PLAN

04-E302 SECOND FLOOR FIRE-ALARM PLAN

I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL

SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR UNDER

MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY

LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA.

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:

PRINTED OR TYPED NAME

SIGNATURE

MY LICENSE RENEWAL DATE IS JUNE 30,

DATE

ARCHITECT

LICENSE NUMBER

Eric E. Maguire

A SHEETS

07879

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:

PRINTED OR TYPED NAME

SIGNATURE

MY LICENSE RENEWAL DATE IS DECEMBER 31,

DATE

LICENSE NUMBER

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS

PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I

AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS

OF THE STATE OF IOWA.

Tyson L. Scheidecker

M, P, & FP SHEETS

21691

MECHANICAL ENGINEER

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:

PRINTED OR TYPED NAME

SIGNATURE

MY LICENSE RENEWAL DATE IS DECEMBER 31,

DATE

LICENSE NUMBER

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS

PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I

AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS

OF THE STATE OF IOWA.

Kevin J. Bruxvoort

E SHEETS

19927

ELECTRICAL ENGINEER

SHEET NUMBER WESTWOOD SHEET INDEX

ARCHITECTURAL

01-AD01 WESTWOOD DEMO FLOOR PLANS & DEMO REFLECTED CEILING PLANS

01-A101 WESTWOOD FLOOR PLANS & RCPs

MECHANICAL

01-MD100 BASEMENT MECHANICAL PIPING DEMOLITION PLAN

01-MD101 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN

01-MD102 SECOND AND THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN

01-M100 BASEMENT MECHANICAL PIPING PLAN

01-M101 FIRST FLOOR MECHANICAL PIPING PLAN

01-M102 SECOND AND THIRD FLOOR MECHANICAL PIPING PLAN

01-M103 THERMOSTAT ZONING PLANS

01-M500 MECHANICAL DETAILS

01-M501 CONTROLS

01-M600 MECHANICAL SCHEDULES

ELECTRICAL

01-ED100 BASEMENT LEVEL ELECTRICAL DEMOLITION PLAN

01-ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

01-ED102 SECOND AND THIRD FLOOR ELECTRICAL DEMOLITION PLAN

01-E100 BASEMENT LEVEL ELECTRICAL PLAN

01-E101 FIRST FLOOR ELECTRICAL PLAN

01-E102 SECOND AND THIRD FLOOR ELECTRICAL PLAN

FIRE ALARM

01-ED300 BASEMENT LEVEL FIRE ALARM DEMOLITION PLAN

01-ED301 FIRST FLOOR FIRE ALARM DEMOLITION PLAN

01-ED302 SECOND AND THIRD FLOOR FIRE ALARM DEMOLITION PLAN

01-E300 BASEMENT LEVEL FIRE ALARM PLAN

01-E301 FIRST FLOOR FIRE ALARM PLAN

01-E302 SECOND AND THIRD FLOOR FIRE ALARM PLAN

SEAL

W

E S

T O

W N

P K

W Y

S

U

IT

E

W E

S T

D E

S M

O

IN

E S

IA

.2

.8

S

H

IV

E -H

A T

T E

R Y

.C O

M

BA D E

FC G

SHEET INDEX CERTIFICATIONS

H

BA D E FC G H

Autodesk Revit 2021

/1

/2

:3 :1

P

M

A u to d e s k D o c s /I A

D A

S

W R

C P ro je c ts

/F ir e P u m p H o u s e -M

E P

-C e n t.

rv t

WRC Decentralization Phase 2 (#9279.20), Myers Hall Fire Alarm Phase 1 (#9294.00) & Fire Sprinkler (#9279.21) Iowa Department of Administrative Services 1251 334th St, Woodward, IA 50276

00-G000

W R

C D e c e n tr a liz a ti o n

P h a s e

.2

M y e rs

H a ll F ir e A la rm

P h a s e

.0

F ir e

S p ri n k le r

.2

Io w a D e p a rt m e n t o f

A d m in is tr a ti v e S e rv ic e s th

S t, W o o d w a rd

IA

P R

O J E

C T

N U

M B

E R

C D

IS

S

U E

D A

T E

-0

-1

SHEET NUMBER GENERAL SHEET INDEX

00-G000 COVER SHEET

00-G001 CAMPUS MAP

MECHANICAL & PLUMBING

00-MP00 MECHANICAL & PLUMBING GENERAL INFORMATION

ELECTRICAL

00-E000 ELECTRICAL GENERAL INFORMATION

SHEET NUMBER COTTAGE STYLE A

FIRE ALARM

C1-ED301 COTTAGE STYLE-A FIRE-ALARM DEMOLITION PLAN

C1-E301 COTTAGE STYLE-A FIRE-ALARM PLANS

SHEET NUMBER COTTAGE STYLE B

FIRE ALARM

C2-ED301 COTTAGE STYLE-B FIRE-ALARM DEMOLITION PLANS

C2-E301 COTTAGE STYLE-B FIRE-ALARM PLANS

SHEET NUMBER COTTAGE STYLE C

FIRE ALARM

C3-ED301 COTTAGE STYLE-C FIRE-ALARM DEMOLITION PLAN

C3-E301 COTTAGE STYLE-C FIRE-ALARM PLANS

SHEET NUMBER ADMIN BUILDING

FIRE ALARM

02-E301 ELECTRICAL ADMINSTRATION FIRE ALARM UPGRADES

Applicable Codes 2015 International Building Code as adopted by Iowa Administrative Rule 661-201 and 661-301 2015 International Fire Code as adopted by Iowa Administrative Rule 661-201 2015 International Residential Code as adopted by Iowa Administrative Rule 661-301 2012 International Energy Conservation Code as adopted by Iowa Administrative Rule 661-303 2015 International Existing Building Code as adopted by Iowa Administrative Rule 661-301 and 661-350 2012 NFPA 101 Life Safety Code as adopted by Iowa Administrative Rule 661-205 2010 Americans with Disabilities Act as adopted by Iowa Administrative Rule 661-302 Smoke Alarms/Detectors as adopted by Iowa Administrative Rule 661-210 (effective July 1, 2021) Carbon Monoxide Alarms as adopted by Iowa Administrative Rule 661-211 State Mechanical Code as adopted by the Department of Public Health Iowa Administrative Rule 641-61 State Plumbing Code as adopted by the Department of Public Health Iowa Administrative Rule 641-25 State Electrical Code as adopted by the State Electrical Licensing Board Iowa Administrative Rule 661-504 Westwood Occupancy: I-2 Construction Type: I-B Myers Occupancy: I-2, B Construction Type: I-B Cottages Occupancy: I-2

Life Safety

01-10-2023

01-10-2023

01-10-2023

A P

P R

O V

E D

B Y

D R

A W

N B

Y

IS

S

U E

D F

O R

IS

S

U E

D A

T E

P R

O J E

C T

N U

M B

E R

F

IE

L D

B O

O K

W

E S

T O

W N

P K

W Y

S

U

IT

E

W E

S T

D E

S M

O

IN

E S

IA

.2

.8

S

H

IV

E -H

A T

T E

R Y

.C O

M

BA D E

FC G

H

BA D E FC G H

Autodesk Revit 2021

/1

/2

:3 :2

P

M

A u to d e s k D o c s /I A

D A

S

W R

C P ro je c ts

/F ir e P u m p H o u s e -M

E P

-C e n t.

rv t

C A

M P

U S

M A

P

C D

T L S

L D

F

-0

-1

00-G001

W R

C D e c e n tr a liz a ti o n

P h a s e

.2

M y e rs

H a ll F ir e A la rm

P h a s e

.0

F ir e

S p ri n k le r

.2

Io w a D e p a rt m e n t o f

A d m in is tr a ti v e S e rv ic e s th

S t, W o o d w a rd

IA

►8" HWS PIPE SIZE, SYSTEM, AND FLOW TAG (DIAMETER)

EXISTING TO REMAIN

TO BE DEMOLISHED

HEATING WATER RETURN

HEATING WATER SUPPLY

HIGH PRESSURE STEAM

LOW PRESSURE CONDENSATE

LOW PRESSURE STEAM

BALANCING VALVE

BALL VALVE

CHECK VALVE

THREE WAY VALVE

MOTORIZED CONTROL VALVE

THREE WAY MOTORIZED CONTROL VALVE

PRESSURE REDUCING VALVE

SOLENOID VALVE

BUTTERFLY VALVE

MECHANICAL SYMBOLS LIST

ELBOW UP

ELBOW DOWN

PIPE OFFSET UP

PIPE OFFSET DOWN

PIPE TEE TURNED UP

PIPE TEE TURNED DOWN

PIPE TEE

PIPE CAP

PIPE UNION

PIPE TRANSITION

KEYNOTE

CAP EXISTING PIPE OR DUCT

NEW CONNECTION INTO EXISTING PIPE OR DUCT

DETAIL NUMBER

SHEET NUMBER ON

WHICH THE DETAIL

RESIDES

LPS

LPC

HPS

HWS

HWR

HWS

HWS

THERMOSTAT T

GENERAL MECHANICAL ABBREVIATIONS

SYMBOLS

& AND

@ AT

# NUMBER or POUND

A

A/E ARCHITECT/ENGINEER

AD ACCESS DOOR

ADJ ADJUSTABLE/ADJACENT

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

AP ACCESS PANEL

APPROX APPROXIMATE(LY)

AS AIR SEPARATOR

AVG AVERAGE

B

BAS BUILDING AUTOMATION SYSTEM

BFF BELOW FINISHED FLOOR

BFBP BOILER FEED BOOSTER PUMP

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR

C

CAP CAPACITY

CFM CUBIC FEET PER MINUTE

CFH CUBIC FEET PER HOUR

CH CHILLER

CHP CHILLED WATER PUMP

CHSP CHILLED WATER SECONDARY PUMP

CIRC CIRCULATING

CLG CEILING

CONT CONTINUATION

CONTR CONTRACTOR

CONV CONVECTOR

COORD COORDINATE

CTRL CONTROL

CU COPPER

CUH CABINET UNIT HEATER

D

°/DEG DEGREE

°C DEGREES CELSIUS

°F DEGREES FAHRENHEIT

DB DRY BULB

DDC DIRECT DIGITAL CONTROLS

DEMO DEMOLITION

DIA DIAMETER

DIAG DIAGRAM

DWG DRAWING

E

EAT ENTERING AIR TEMPERATURE

ELEC ELECTRICAL

EQ EQUAL

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ET EXPANSION TANK

EWB ENTERING WET BULB

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F

FS FLOW SWITCH

FT FINNED TUBE RADIATION

FTHD FOOT HEAD OR PRESSURE DROP

G

GA GAUGE

GAL GALLON

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

H

HP HORSEPOWER

HPR HIGH PRESSURE STEAM RETURN

HPS HIGH PRESSURE STEAM SUPPLY

HTG HEATING

HVAC HEATING, VENTILATION, AIR CONDITIONING

HX HEAT EXCHANGER

HZ HERTZ (FREQUENCY)

I

ID INSIDE DIAMETER

IN INCHES

IN WC INCHES (WATER COLUMN)

INS INSULATION

INSTR INSTRUMENT

ISO ISOMETRIC

K

KW KILOWATT

KWH KILOWATT HOUR

L

LAT LEAVING AIR TEMPERATURE

LB(S) POUND(S)

LDB LEAVING DRY BULB (TEMP)

LWB LEAVING WET BULB (TEMP)

LWT LEAVING WATER TEMPERATURE

M

MAINT MAINTENANCE

MAX MAXIMUM

MBH BRITISH THERMAL UNIT (1000/HR)

MC MECHANICAL CONTRACTOR

MCC MOTOR CONTROL CENTER

MCA MINIMUM CIRCUIT AMPS

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM OR MINUTE

MISC MISCELLANEOUS

N

NA NOT APPLICABLE

NC NORMALLY CLOSED OR NOISE CRITERIA

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

O

OD OUTER DIAMETER

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

OFOI OWNER FURNISHED OWNER INSTALLED

P

PG PRESSURE GAUGE

PH PHASE

PSIG POUNDS PER SQUARE INCH GAUGE

R

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RPM REVOLUTIONS PER MINUTE

S

SCH SCHEDULE

SCHM SCHEMATIC

SHT SHEET

SPEC SPECIFICATION(S)

SQ IN SQUARE INCH

SV SAFETY VALVE

SYS SYSTEM

SRV SAFETY RELIEF VALVE

T

T THERMOSTAT

TCC TEMPERATURE CONTROL CONTRACTOR

TEMP TEMPERATURE OR TEMPORARY

THRU THROUGH

TP TOTAL PRESSURE

TYP TYPICAL

U

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

V

VEL VELOCITY

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

W

W/ WITH

W/O WITHOUT

WB WET BULB

WPD WATER PRESSURE DROP

WT WEIGHT

WTR WATER

1. UNLESS NOTED OTHERWISE: LIGHT LINES DENOTE EXISTING PIPING, OR EQUIPMENT WHICH

IS TO REMAIN. BOLD LINES INDICATE NEW WORK TO BE INSTALLED UNDER THIS CONTRACT.

2. PLUMBING SHOWN IS IN SCHEMATIC FORM. NOT ALL RISERS AND DROPS ARE SHOWN.

PROVIDE OFFSETS AS REQUIRED TO MEET SPACE REQUIREMENTS AND TO AVOID

INTERFERENCE WITH OTHER TRADES. THE CONTRACTOR SHALL PROVIDE COMPLETE FULLY

FUNCTIONAL SYSTEMS.

3. ALL EQUIPMENT AND ACCESSORIES SHALL BE INSTALLED TO BE EASILY ACCESSIBLE.

4. PLUMBING WORK SHALL BE COORDINATED WITH OTHER TRADES, INCLUDING BUT NOT

LIMITED TO DUCTWORK, ELECTRICAL EQUIPMENT, PIPING AND FIRE PROTECTION. SPACE

ABOVE CEILING IS LIMITED AND SHALL BE COORDINATED WITH OTHER TRADES.

5. ALL WORK WITHIN THE CONTRACT DOCUMENTS, WHICH INCLUDE THIS DRAWING, SHALL BE

COMPLETED IN A SAFE WORKMANLIKE MANNER AND IN ACCORDANCE WITH ALL

APPLICABLE STATE, LOCAL AND NATIONAL CODES, REGULATIONS AND ORDINANCES. IF ANY

CONFLICTS ARISE BETWEEN THE CONTRACT DOCUMENTS AND THE APPLICABLE CODES,

REGULATIONS OR ORDINANCE, THE CONTRACTOR SHALL BE RESPONSIBLE TO HAVE ALL

WORK CONFORM TO THE STRICTER OF SAID REQUIREMENTS.

6. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS AS

REQUIRED FOR ELECTRICAL, FIRE PROTECTION, PLUMBING, MECHANICAL AND BACKFLOW

PREVENTION INSTALLATIONS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO

PROVIDE BOTH A COMPLETE AND COMPLIANT INSTALLATION AS MAY BE DETERMINED BY

THE AUTHORITY(S) HAVING JURISDICTION.

7. CONTRACTOR SHALL NOT PROCURE OR FABRICATE ANY PIPING, DUCTWORK OR OTHER

EQUIPMENT WITHOUT FIRST VERIFYING ALL DIMENSIONS AND CONDITIONS WHETHER

CURRENTLY EXISTING OR NOT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK,

INCLUDING ANY REQUIRED REWORK.

8. MAINTAIN ALL MANUFACTURER RECOMMENDED EQUIPMENT SERVICE AND SAFETY

CLEARANCES. DO NOT LOCATE ANY EQUIPMENT OR RUN MATERIALS ABOVE ANY

ELECTRICAL PANELS OR SWITCHGEAR. MAINTAIN ALL NFPA/NEC CODE REQUIRED

CLEARANCES.

9. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING, SCHEDULING AND

SEQUENCING OF THEIR WORK WITH ALL OTHER TRADES. PROVIDE OFFSETS, EASEMENTS,

OR RELOCATE TO AVOID CONFLICTS WITH WORK OF OTHER TRADES. FURNISH SUFFICIENT

RESOURCES TO MEET ALL PROJECT MILESTONES AND DEADLINES.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE WATERTIGHT AND WEATHER-

PROOF INTEGRITY OF ROOFS, WALLS AND FLOORS DURING CONSTRUCTION. EACH TRADE

SHALL LOCATE/DIMENSION/COORDINATE THEIR ROOF, FLOOR AND WALL OPENINGS WITH

THE GENERAL CONTRACTOR (GC) OR CONSTRUCTION MANAGER.

11. PROTECT NEW WORK FROM DAMAGE OR DECONTAMINATION. PROVIDE TEMPORARY

PROTECTIVE CAPPING OR TAPED POLYETHYLENE ENCLOSURES OVER OPEN DUCTWORK

AND PIPING ENDS AND EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING

MECHANICAL SYSTEMS PRIOR TO PLACING THEM IN SERVICE.

12. IN A NEAT AND WORKMANLIKE MANNER: PATCH ANY REMAINING OPENINGS AND FILL

EXCESSIVE GAPS; REWORK AND REFINISH TO MATCH ADJACENT STRUCTURES; FLASH AND

SEAL ALL MECHANICAL AND ELECTRICAL PENETRATIONS THRU WALLS, CEILINGS AND

FLOORS WITH METAL FRAMEWORK OR ESCUTCHEONS. ALL OPENINGS SHALL BE PROPERLY

SEALED SO AS TO MEET FIRE RATING NEEDS.

GENERAL PLUMBING NOTES

1. THIS DRAWING DIAGRAMMATICALLY REPRESENTS THE LAYOUT OF EXISTING CONDITIONS

WITH MAJOR PLUMBING COMPONENTS. THEY ARE NOT INTENDED TO SHOW ACCESSORIES

OR INCIDENTALS COMMON TO EQUIPMENT INDICATED, THOUGH THESE ITEMS ARE TO BE

REMOVED, ACCESSIBILITY TO DEMOLITION ITEMS SHALL NOT BE INFERRED. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF BUILDING AND EXISTING

CONDITIONS, PRIOR TO BID SUBMISSION.

2. EXISTING PIPING PENETRATIONS VACATED/REVEALED DURING DEMOLITION AND REMODEL

SHALL BE INFILLED AND FINISHED TO MATCH EXISTING. IF MATERIALS FOR REPAIR TO MATCH

EXISTING ARE NOT AVAILABLE (IE GLAZED WALL TILE), GROUT ABANDONED PENETRATION

FULL AND FINISH FLUSH. PRIOR APPROVAL OF THE OWNER MUST BE OBTAINED BEFORE ANY

PROPOSED NON-SIMILAR FINISH WORK BEGINS.

3. DISCONNECT AND REMOVE ALL PREVIOUSLY ABANDONED PIPING WITHIN THE PROJECT

AREA. REMOVE EXISTING/ABANDONED HANGERS AND SUPPORTS IF DEEMED NOT REUSABLE.

4. ALL PIPING SHOWN IS BASED ON ORIGINAL DRAWINGS AND LIMITED SITE OBSERVATIONS.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS PRIOR

TO COMMENCING WORK.

5. ALL PIPING ASSOCIATED WITH EXISTING SYSTEMS SHALL BE DEMOLISHED. NO PIPING SHALL

BE ABANDONED.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR DRAINING PIPING SYSTEMS TO BE CUT, CAPPED

OR REMOVED. DISCHARGE FROM SUCH SYSTEMS SHALL BE APPROPRIATELY DISPOSED OF

PER FEDERAL, STATE AND LOCAL REQUIREMENTS.

7. COORDINATE WITH GENERAL CONTRACTOR FOR FLOOR, WALL AND ROOF PATCHING

REQUIRED DUE TO PENETRATIONS RESULTING FROM DEMOLITION OF EXISTING AND

INSTALLATION OF NEW EQUIPMENT AND COMPONENTS.

8. CONTRACTOR IS RESPONSIBLE TO VERIFY ACTUAL NUMBER AND LOCATION OF SYSTEMS

AND COMPONENTS TO BE DEMOLISHED AND REMOVED.

9. TO MINIMIZE DISRUPTIONS, COORDINATE ALL DEMOLITION WITH OWNER, GENERAL

CONTRACTOR, OR CONSTRUCTION MANAGER BEFORE SHUTTING DOWN ANY UTILITY OR

SIMILAR SYSTEM. SHUTDOWNS FOR UTILITIES OR SIMILAR SYSTEMS SHALL BE REQUESTED

WELL IN ADVANCE PER THE SPECIFICATION.

10. ALL WORK WITHIN THE CONTRACT DOCUMENTS, WHICH INCLUDE THIS DRAWING, SHALL BE

COMPLETED IN A SAFE WORKMANLIKE MANNER AND IN ACCORDANCE WITH ALL APPLICABLE

STATE, LOCAL AND NATIONAL CODES, REGULATIONS AND ORDINANCES. IF ANY CONFLICTS

ARISE BETWEEN THE CONTRACT DOCUMENTS AND THE APPLICABLE CODES, REGULATIONS

OR ORDINANCE, THE CONTRACTOR SHALL BE RESPONSIBLE TO HAVE ALL WORK CONFORM

TO THE STRICTER OF SAID REQUIREMENTS.

11. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS AS

REQUIRED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE BOTH A

COMPLETE AND COMPLIANT INSTALLATION AS MAY BE DETERMINED BY THE AUTHORITY(S)

HAVING JURISDICTION.

12. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE WATERTIGHT AND WEATHER-

PROOF INTEGRITY OF ROOFS, WALLS AND FLOORS DURING CONSTRUCTION. EACH TRADE

SHALL LOCATE/DIMENSION/COORDINATE THEIR ROOF, FLOOR AND WALL OPENINGS WITH

THE GENERAL CONTRACTOR (GC) OR CONSTRUCTION MANAGER.

GENERAL PLUMBING DEMOLITION NOTES

PIPE SIZE AND SYSTEM TAG (DIAMETER)

EXISTING TO REMAIN

TO BE DEMOLISHED

DOMESTIC COLD WATER

NATURAL GAS

SANITARY SEWER

SANITARY VENT

BALANCING VALVE

BALL VALVE

PLUMBING SYMBOLS LIST

2" CW

V

SAN

NG

CW

SAN

SAN

ELBOW UP

ELBOW DOWN

PIPE OFFSET UP

PIPE OFFSET DOWN

PIPE TEE TURNED UP

PIPE TEE TURNED DOWN

PIPE TEE

PIPE CAP

PIPE UNION

PIPE TRANSITION

KEYNOTE

CAP EXISTING PIPE

NEW CONNECTION INTO EXISTING PIPE

DETAIL NUMBER

SHEET NUMBER ON

WHICH THE DETAIL

RESIDES

6" CW UP

6" HW DN

GENERAL PLUMBING ABBREVIATIONS

SYMBOLS

& AND

@ AT

# NUMBER or POUND

A

ADJ ADJUSTABLE/ADJACENT

AFF ABOVE FINISHED FLOOR

ALT ALTERNATE

AMB AMBIENT

AP ACCESS PANEL

APPROX APPROXIMATE(LY)

AS AIR SEPARATOR

ASSY ASSEMBLY

ATM ATMOSPHERE

AUX AUXILIARY

AVG AVERAGE

B

BAS BUILDING AUTOMATION SYSTEM

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

BOP BOTTOM OF PIPE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR

C

C COMPRESSOR (AIR)

CAL CALIBRATE

CAP CAPACITY

CCW COUNTER CLOCKWISE

CIP CAST IRON PUMP

CIRC CIRCULATING

CL CENTER LINE

CLG CEILING

CLR CLEAR(ANCE)

CLW CLOCKWISE

CO CLEANOUT

COND CONDENSATE

CONSTR CONSTRUCTION

CONT CONTINUATION

CONTR CONTRACTOR

COORD COORDINATE

CTRL CONTROL

CU COPPER

CU FT CUBIC FEET

CU IN CUBIC INCH

D

°/DEG DEGREE

°F DEGREES FAHRENHEIT

DB DRY BULB

DDC DIRECT DIGITAL CONTROLS

DEMO DEMOLITION

DIA DIAMETER

DIAG DIAGRAM

DN DOWN

DR DRAIN

DV DRAIN VALVE

DWG DRAWING

E

EA EACH

EER ENERGY EFFICIENCY RATIO

EF ENERGY FACTOR

ELEV ELEVATION

ELEC ELECTRICAL

EQ EQUAL

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FPT FEMALE PIPE THREAD

FS FLOOR SINK

G

G GAS

GA GAUGE

GAL GALLON

GC GENERAL CONTRACTOR

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GWH GAS FIRED WATER HEATER

H

H&CW HOT AND COLD WATER

HORIZ HORIZONTAL

HP HORSEPOWER

HVAC HEATING, VENTILATION, AIR CONDITIONING

HZ HERTZ (FREQUENCY)

I

ID INSIDE DIAMETER

IN INCHES

IN WC INCHES (WATER COLUMN)

INS INSULATION

INSTR INSTRUMENT

IP IRON PIPE

IPS IRON PIPE SIZE

ISO ISOMETRIC

K

KW KILOWATT

KWH KILOWATT HOUR

L

LAV LAVATORY

LB(S) POUND(S)

LWT LEAVING WATER TEMPERATURE

M

MAINT MAINTENANCE

MAX MAXIMUM

MBH BRITISH THERMAL UNIT (1000/HR)

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPS

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM OR MINUTE

MISC MISCELLANEOUS

MPT MALE PIPE THREAD

N

NA NOT APPLICABLE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPT NATIONAL PIPE THREAD

NTS NOT TO SCALE

O

OD OUTER DIAMETER

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

OFOI OWNER FURNISHED OWNER INSTALLED

P

PG PRESSURE GAUGE OR PROPYLENE GLYCOL

PH PHASE

PLBG PLUMBING

PRV PRESSURE RELIEF VALVE OR PRESSURE

REGULATING VALVE

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

R

RD ROOF DRAIN

RECIRC RECIRCULATE(ING)

REQD REQUIRED

RHC REHEAT COIL

RPM REVOLUTIONS PER MINUTE

S

SCH SCHEDULE

SCHM SCHEMATIC

SF SQUARE FEET

SHT SHEET

SK SINK

SP SUMP PUMP OR STATIC PRESSURE

SPEC SPECIFICATION(S)

SQ IN SQUARE INCH

SS STAINLESS STEEL

STBY STANDBY

STD STANDARD

STL STEEL

SUCT SUCTION

SV SAFETY VALVE

SYS SYSTEM

SRV SAFETY RELIEF VALVE

T

T THERMOSTAT

TD TRENCH DRAIN

TEMP TEMPERATURE OR TEMPORARY

THRU THROUGH

TOP TOP OF PIPE

TYP TYPICAL

U

UL UNDERWRITERS LABORATORIES

UNO UNLESS NOTED OTHERWISE

UR URINAL

UTIL UTILITY

V

VAC VACUUM

VBX VALVE BOX

VEL VELOCITY

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THRU ROOF

W

W/ WITH

W/O WITHOUT

WB WET BULB

WC WATER CLOSET

WH WATER HEATER OR WALL HYDRANT

WHA WATER HAMMER ARRESTOR

WPD WATER PRESSURE DROP

WT WEIGHT

WTR WATER

SEAL

A P

P R

O V

E D

B Y

D R

A W

N B

Y

IS

S

U E

D F

O R

IS

S

U E

D A

T E

P R

O J E

C T

N U

M B

E R

F

IE

L D

B O

O K

W

E S

T O

W N

P K

W Y

S

U

IT

E

W E

S T

D E

S M

O

IN

E S

IA

.2

.8

S

H

IV

E -H

A T

T E

R Y

.C O

M

BA D E

FC G

H

BA D E FC G H

Autodesk Revit 2022

W R

C D e c e n tr a liz a ti o n P h a s e

.2

/1

/2

:4 :3

P

M

A u to d e s k D o c s /I A

D A

S

W R

C P ro je c ts

/W e s tw o o d -M

E P

-R

M a s te r.

rv t

M E

C H

A N

IC

A

L

P L U

M B

IN

G

G E

N E

R A

L

IN

F O

R M

A T

IO

N

C D

T L S

C A

S

-0

-1

00-MP00

Io w a D e p a rt m e n t o f

A d m in is tr a ti v e S e rv ic e s th

S t, W o o d w a rd

IA

1. LIGHT LINES INDICATE EXISTING PIPING, DUCTWORK, EQUIPMENT, ETC. TO

REMAIN. BOLD LINES INDICATE PIPING, DUCTWORK, EQUIPMENT, ETC. TO

BE INSTALLED BY THIS CONTRACT UNLESS NOTED OTHERWISE.

2. COORDINATE ROUGH-IN AND FINAL LOCATION OF DUCTWORK AND PIPING

WITH LIGHTING, STRUCTURE, SPRINKLERS, ETC. PROVIDE OFFSETS

AND/OR EASEMENTS, OR RELOCATE AS REQUIRED AVOIDING CONFLICTS

WITH WORK OF OTHER TRADES.

3. PROVIDE TEMPORARY FILTRATION ON RETURNS DURING CONSTRUCTION

TO PREVENT DUST FROM SPREADING TO DUCTWORK, HVAC EQUIPMENT,

AND NON-CONSTRUCTION AREAS.

4. PIPING IS SHOWN IN SCHEMATIC FORM. ROUTE AS REQUIRED FOR

CLEARANCE. VERIFY ROUTING AND CLEARANCES AND COORDINATE WITH

OTHER TRADES PRIOER TO FABRICATION.

5. BREAK CONNECTIONS ARE REQUIRED AT ALL MAJOR EQUIPMENT AND

PIPING ITEMS THAT REQUIRE REMOVAL FOR MAINTENANCE.

6. PIPE REDUCTIONS ON HORIZONTAL PIPING GOING FROM LARGER TO

SMALLER SHALL BE MADE WITH ECCENTRIC REDUCERS: TOP FLAT FOR

LIQUID SYSTEMS, CONCENTRIC REDUCERS MAY BE USED FOR FLOW

GOING FROM SMALL TO LARGER SIZE PIPE.

7. FIRE SAFE ALL PIPE PENETRATIONS PER UL AT RATED WALLS.

8. THERMOSTATS SHALL BE MOUNTED 4'-0" ABOVE FINISHED FLOOR.

9. NEW FLOOR/WALL/CEILING PENETRATIONS REQUIRED FOR MECHANICAL

PIPING INSTALLATION SHALL BE CLEANLY BORED AT RIGHT ANGLES. AS

NEW PIPING IS INSTALLED, NEW PIPING PENETRATIONS SHALL BE NEATLY

CAULKED TO FILL VOID. EXPOSED WALL PENETRATIONS SHALL BE

FINISHED WITH ESCUTCHEONS.

10. ALL NEW PIPING EXPOSED IN OCCUPIED SPACES SHALL HAVE PVC

JACKETS INSTALLED OVER THE PIPING INSULATION. ANY PIPING

REQUIRED TO BE EXPOSED SHALL BE INSTALLED VERTICALLY OR

HORIZONTALLY IN LEAST VISIBLE LOCATIONS.

11. ALL NEW EQUIPMENT AND ACCESSORIES (CIRCUIT SETTERS,

CIRCULATION PUMPS, EXPANSION TANKS, ETC.) SHALL BE INSTALLED TO

BE EASILY ACCESSIBLE.

12. ALL CONDENSATE PIPING SHALL BE SLOPED 1/8" PER FOOT MINIMUM.

13. CONTRACTOR SHALL PATCH/REPAIR ALL UNUSED OPENINGS AND

MODIFIED FINISH SURFACES. PATCHING SHALL MATCH MATERIALS,

FINISH, AND TEXTURE OF ADJACENT SURFACES.

14. PATCH ANY REMAINING OPENINGS AND FILL EXCESSIVE GAPS. REWORK

AND REFINISH TO MATCH ADJACENT STRUCTURES. FLASH AND SEAL ALL

MECHANICAL AND ELECTRICAL PENETRATIONS THRU WALLS, CEILINGS,

AND FLOORS WITH METAL FRAMEWORK OR ESCUTCHEONS. ALL

OPENINGS SHALL BE PROPERLY SEALED TO MEET FIRE RATING NEEDS.

15. HEATING AND WATER BRANCH PIPING TO TERMINAL HEATING DEVICES

SHALL BE 3/4" PIPE SIZE UNLESS OTHERWISE NOTED.

16. NEW WORK HAS BEEN SHOWN DIAGRAMMATICALLY AND DUE TO THE

LIMITED SCALE OF THESE DRAWINGS, THE PLACEMENT AND ROUTING OF

ALL DUCTWORK, PIPING, ETC. IS CONSIDERED SCHEMATIC IN NATURE.

THEREFORE, THE DRAWINGS MAY NOT SHOW ALL OFFSETS AND

TRASITIONS, WHICH MAY BE REQUIRED. THE CONTRACTOR SHALL

PROVIDE COMPLETE FULLY FUNCTIONAL SYSTEMS.

17. ALL WORK WITHIN THE CONTRACT DOCUMENTS SHALL BE COMPLETED IN

A SAFE MANNER AND IN ACCORDANCE WITH ALL APPLICABLE STATE AND

NATIONAL CODES, REGULATIONS, AND ORDINANCES. IF ANY CONFLICTS

ARISE BETWEEN THE CONTRACT DOCUMENTS AND THE APPLICABLE

CODES, REGULATIONS, OR ORDINANCES, THE CONTRACTOR SHALL BE

RESPONSIBLE TO HAVE ALL WORK CONFORM TO THE STRICTER OF SAID

REQUIREMENTS.

18. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS AND

INSPECTIONS AS REQUIRED FOR ELECTRICAL, FIRE PROTECTION,

PLUMBING, MECHANICAL, AND BACKFLOW PREVENTION INSTALLATIONS.

IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE BOTH A

COMPLETE AND COMPLIANT INSTALLATION AS MAY BE DETERMINED BY

THE AUTHORITY/AUTHORITIES HAVING JURISDICTION.

19. CONTRACTOR SHALL NOT PROCURE OR FABRICATE ANY PIPING,

DUCTWORK, OR OTHER EQUIPMENT WITHOUT FIRST VERIFYING ALL

DIMENSIONS AND CONDITIONS WHETHER CURRENTLY EXISTING OR NOT.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK, INCLUDING

ANY REQUIRED REWORK.

20. MAINTAIN ALL MANUFACTURER RECOMMENDED EQUIPMENT SERVICE

AND SAFETY CLEARANCES. DO NOT LOCATE ANY EQUIPMENT OR RUN

MATERIALS ABOVE ANY ELECTRICAL PANELS OR SWITCHGEAR. MAINTAIN

ALL NFPA/NEC/CODE REQUIRED CLEARANCES.

21. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING,

SCHEDULING, AND SEQUENCING OF THEIR WORK WITH ALL OTHER

TRADES. PROVDE OFFSETS, EASEMENTS, OR RELOCATE AS REQUIRED

AVOIDING CONFLICTS WITH WORK OF OTHER TRADES. FURNISH

SUFFICIENT RESOURCES TO MEET ALL PROJECT MILESTONES AND

DEADLINES.

22. PROTECT WORK FROM DAMAGE OR CONTAMINATION. PROVIDE

TEMPORARY PROTECTIVE CAPPING OR TAPED POLYETHYLENE

ENCLOSURES OVER OPEN DUCTWORK AND PIPING ENDS AND

EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING

MECHANICAL SYSTEMS PRIOR TO PLACING THEM IN SERVICE.

23. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE

WATERTIGHT AND WEATHER-PROOF INTEGRITY OF ROOFS, WALLS, AND

FLOORS DURING CONSTRUCTION. EACH TRADE SHALL

LOCATE/DIMENSION/COORDINATE THEIR ROOF, FLOOR, AND WALL

OPENINGS AS NEEDED WITH THE GENERAL CONTRACTOR OR

CONSTRUCTION MANGER.

GENERAL MECHANICAL NOTES

1. THESE DRAWINGS REPRESENT THE LAYOUT OF EXISTING CONDITIONS OF

MAJOR COMPONENTS. THEY ARE NOT INTENDED TO SHOW ACCESSORIES

OR INCIDENTALS COMMON TO THE COMPONENTS INDICATED, THOUGH

THESE ITEMS ARE TO BE REMOVED. ACCESSIBILITY TO DEMOLITIUON ITEMS

SHALL NOT BE INFERRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

FIELD VERIFICATION OF BUILDING AND EXISTING CONDITIONS PRIOR TO BID

SUBMISSION.

2. DEMOLITION WORK SHOWN IS BASED ON LIMITED SITE OBSERVATIONS AND

CONSTRUCTION/RECORD DOCUMENTS. CONTRACTOR SHALL NOT

DEMOLISH ANY MECHANICAL PIPING, DUCTWORK, EQUPIMENT, OR OTHER

ITEMS WITHOUT FIRST VERIFYING EXISTING CONDITIONS. CONSULT

OWNER'S REPRESENTATIVE OR CONSTRUCTION MANAGER BEFORE START

OF WORK.

3. DEMOLITION OF MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT SHALL

INCLUDE ALL HANGERS, FITTINGS, DAMPERS, VALVES, ETC.

4. REPAIR ANY INSULATION DAMAGED DURING REMOVAL. REPAIR WORK TO

MATCH EXISTING.

5. COORDINATE WALL AND FLOOR PATCHING REQUIREMENTS. PATCHWORK

SHALL MATCH MATERIALS, FINISH, AND TEXTURE OF ADJACENT SURFACES.

6. CONTRACTOR SHALL PATCH/REPAIR ALL UNUSED OPENINGS AND MODIFIED

FINISH SURFACES. PATCH SHALL MATCH MATERIALS, FINISH, AND TEXTURE

OF ADJACENT SURFACES.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER AND TIMELY DISPOSAL

OF ALL CONSTRUCTION DEBRIS INCLUDING BUT NOT LIMITED TO EQUIPMENT

AND MATERIALS NOT CLAIMED BY OWNER.

8. IT IS ESSENTIAL TO MINIMIZE DISRUPTIONS. COORDINATE ALL DEMOLITION

WITH THE OWNER OR CONSTRUCTION MANAGER BEFORE SHUTTING DOWN

ANY UTILITY OR SIMILAR SYSTEM. SHUTDOWN OF UTILITIES OR SIMILAR

SYSTEMS SHALL BE REQUESTED WELL IN ADVANCE AND PRE-APPROVED BY

THE PROPER AUTHORITY AND/OR AUTHORITIES HAVING JURISDICTION

BEFORE WORK BEGINS.

9. ALL WORK WITHIN THE CONTRACT DOCUMENTS SHALL BE COMPLETED IN A

SAFE MANNER AND IN ACCORDANCE WITH ALL APPLICABLE STATE AND

NATIONAL CODES, REGULATIONS, AND ORDINANCES. IF ANY CONFLICTS

ARISE BETWEEN THE CONTRACT DOCUMENTS AND THE APPLICABLE CODES,

REGULATIONS, OR ORDINANCES, THE CONTRACTOR SHALL BE

RESPONSIBLE TO HAVE ALL WORK CONFORM TO THE STRICTER OF SAID

REQUIREMENTS.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE WATERTIGHT

AND WEATHERPROOF INTEGRITY OF ROOFS, WALLS, AND FLOORS DURING

CONSTRUCTION. EACH TRADE SHALL LOCATE/DIMENSION/COORDINATE

THEIR ROOF, FLOOR, AND WALL OPENINGS AS NEEDED WITH THE

CONSTRUCTION MANAGER.

11. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS AND

INSPECTIONS AS REQUIRED FOR ELECTRICAL, FIRE PROTECTION,

PLUMBING, MECHANICAL, AND BACKFLOW PREVENTION INSTALLATIONS. IT

SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE BOTH A

COMPLETE AND COMPLIANT INSTALLATION AS MAY BE DETERMINED BY THE

AUTHORITY AND/OR AUTHORITIES HAVING JURISDICTION.

12. PROVIDE TEMPORARY SPACE TEMPERING (HEATING/COOLING/DE-

HUMIDIFICATION) AS NEEDED TO PROTECT SPACES AND INSTALLATIONS

FROM EXPOSURE TO DAMAGING CONDITIONS.

GENERAL MECHANICAL DEMOLITION NOTES

1. PIPING IS SHOWN IN SCHEMATIC FORM. ROUTE AS REQUIRED FOR CLEARANCE

WITH EXISTING CONDITIONS AND OTHER TRADES.

2. UNIONS AND VALVES TO BREAK CONNECTIONS ARE REQUIRED AT ALL MAJOR

EQUIPMENT AND ALL PIPING ITEMS THAT REQUIRE REMOVAL FOR MAINTENANCE.

3. PIPE REDUCTIONS ON HORIZONTAL PIPING GOING FROM LARGER TO SMALLER

SHALL BE MADE WITH ECCENTRIC REDUCERS. TOP FLAT FOR LIQUID SYSTEMS.

CONCENTRIC REDUCERS MAY BE USED FOR FLOW GOING FROM SMALL TO

LARGER SIZE PIPE.

4. FIRE SAFE ALL PIPE PENETRATIONS PER UL AT RATED WALLS AND FLOORS.

5. REFER TO DETAILS FOR ADDITIONAL INFORMATION.

6. FLOOR/WALL/CEILING PENETRATIONS REQUIRED FOR MECHANICAL PIPING

INSTALLATION SHALL BE CLEANLY BORED AT RIGHT ANGLES. AS NEW PIPING IS

INSTALLED, NEW PIPING PENETRATIONS SHALL BE NEATLY CAULKED TO FILL VOID.

EXPOSED WALL PENETRATIONS SHALL BE FINISHED WITH ESCUTCHEONS.

7. ALL NEW EQUIPMENT AND ACCESSORIES (CIRCUIT SETTERS, CIRCULATION

PUMPS, EXPANSION TANKS, ETC.) SHALL BE INSTALLED TO BE EASILY ACCESSIBLE.

ALL ALREANACES FOR EQUIPMENT PER MANUFACTURERS' INSTRUCTIONS SHALL

BE REQUIRED.

8. CONNECTIONS BETWEEN DISSIMILAR PIPING MATERIALS SHALL BE MADE USING

DIELECTRIC FITTINGS.

9. THERMOSTATS SHALL BE MOUNTED AT 4'-0" ABOVE FINISHED FLOOR.

10. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

GENERAL MECHANICAL PIPING NOTES

HT AFF SYMBOL DESCRIPTION

EM

E E

K

D

OS

MC

T

SP

M

UC

CLG

A

A

P

E

J J

T

25 KVA

1 SF-1

M

R

OS IR

LS A

PC

W

X

TV

SS

S S

S

V

IC

FS

TS

F

F

F

F 110cd

F

F 110cd

F

F S 110cd

FA ANNUN

FACP

FARP

P P

R/F135 R/F135

P

F

DH

CH

FR

FB 1

ASD

DR

TV

TRACK AND TRACK LIGHT (TYPE DENOTED)AS NOTED

EMERGENCY BATTER LIGHT (TYPE DENOTED)96"

EXIT SIGN (TYPE DENOTED)

LIGHT FIXTURE ON EMERGENCY CIRCUITAS NOTED

SINGLE POLE SWITCH

3-WAY SWITCH

48"

48"

4-WAY SWITCH48"

KEYED SWITCH48"

DIMMER SWITCH48"

OCCUPANCY SENSOR SWITCH48"

MOMENTARY CONTACT SWITCH48"

TIMER SWITCH48"

FAN SPEED CONTROL48"

MOTOR HORSEPOWER RATED SWITCH48"

PUSH BUTTON48"

DURESS PUSH BUTTON, UNDER COUNTER48"

DUPLEX RECEPTACLE18" UNO

FOURPLEX RECEPTACLE18" UNO

FLOOR BOX (TYPE DENOTED)

CEILING MOUNTED DUPLEX RECEPTACLE

HT AFF SYMBOL DESCRIPTION

SURFACE RACEWAY (TYPE DENOTED)18"

CLOCK (TYPE DENOTED)

POWER POLE (OPEN OFFICE STYLE)

ELECTRICAL CONNECTION (SEE SCHEDULE)

JUNCTION BOXAS NOTED

CIRCUIT BREAKER PANEL72"**

POWER OR DISTRIBUTION PANEL72"**

SPECIAL CABINET (TYPE DENOTED)72"**

TRANSFORMER (TYPE DENOTED)

GENERATOR (KVA DENOTED)

MOTOR (SEE SCHEDULE)

MOTORIZED DAMPER

SAFETY DISCONNECTION SWITCH72"**

ADJUSTABLE SPEED DRIVE

RELAY72"**

OCCUPANCY SENSOR (TYPE DENOTED)

LIGHT LEVEL SENSOR (TYPE DENOTED)

SM

PHOTOCELLAS NOTED

CCTV CAMERA (TYPE DENOTED)AS NOTED

SURVEILLANCE MONITOR

HT AFF SYMBOL DESCRIPTION HT AFF SYMBOL DESCRIPTION

CONDUIT CONCEALED IN WALL OR OVERHEAD

CONDUIT CONCEALED BELOW FLOOR

CONDUIT TRANSITION UP

CONDUIT TRANSITION DOWN

CONDUIT STUBBED OUT

BRANCH CIRCUIT HOME RUN

CABLE TRAY (TYPE DENOTED)

CONDUIT SLEEVE (SIZE DENOTED)

WALL TELEPHONE OUTLET (TYPE DENOTED)48"***

TELEPHONE OUTLET (TYPE DENOTED)18" UNO

DATA OUTLET (INDICATED QTY CABLES)18" UNO

VOICE/DATA OUTLET (TYPE DENOTED)18" UNO

WIRELESS ACCESS POINT

TELEVISION OUTLET18" UNO

CEILING MOUNTED TELEVISION OUTLET

SPEAKER (WALL OR CEILING MOUNT)84"

HORN TYPE SPEAKER84"

SURFACE MOUNT SPEAKER SUSPENDED FROM CEILING

VOLUME CONTROL48"

INTERCOM STATION48"

ICM INTERCOM MASTER

KEYED NOTE (SEE SCHEDULE)E#

SPRINKLER FLOW SWITCH

SPRINKLER VALVE TAMPER SWITCH

FIRE ALARM HORN80"***

FIRE ALARM HORN WITH STROBE (CANDELAS)80"***

FIRE ALARM BELL80"***

FIRE ALARM BELL WITH STROBE (CANDELAS)80"***

FIRE ALARM CHIME80"***

FIRE ALARM CHIME WITH STROBE (CANDELAS)80"***

FIRE ALARM STROBE CANDELAS80"***

FIRE ALARM SPEAKER WITH STROBE (CANDELAS)80"***

FIRE ALARM REMOTE ANNUNCIATOR 72"**

FIRE ALARM CONTROL PANEL72"**

FIRE ALARM RELAY PANEL72"**

SMOKE DETECTOR (TYPE DENOTED)

SB = LOW FREQUENCY SOUNDER BASE

CO = COMBINATION SMOKE DETECTOR

AND CO DETECTOR

8"****

HEAT DETECTOR (TYPE AND TEMP DENOTED)

DUCT SMOKE DETECTOR (TYPE DENOTED)

LINEAR HEAT DETECTOR

REMOTE TEST/STATUS STATION48"

PULLSTATION48"***

DOOR HOLDER

DOOR CLOSER/HOLD OPEN

SMOKE DAMPER RELEASE

FIRE ALARM SHUT DOWN RELAY

ELECTRICAL SYMBOL LEGEND

ALL DISTANCES ARE TO CENTER OF DEVICE OR EQUIPMENT UNLESS OTHERWISE NOTED. DEVICES INDICATED AT 48" MAY NOT BE INSTALLED WITH ANY OPERABLE PART HIGHER THAN 48". DEVICES MAY BE INSTALLED IN CONCRETE MASONRY UNITS WITH THE TOP OF THE DEVICE AT 48".

* DISTANCE ABOVE DOOR FRAME ** DISTANCE TO TOP OF EQUIPMENT OR DEVICE *** DISTANCE TO HIGHEST OPERABLE POINT OF EQUIPMENT **** DISTANCE BELOW CEILING ***** DISTANCE TO BOTTOM OF DEVICE

1 LIGHTING CONTROL DENOTATION

SURFACE LIGHT (TYPE DENOTED)X

X RECESSED LIGHT (TYPE DENOTED)

X

X

X

WALL MOUNTED LIGHT (TYPE DENOTED)PER SCHED

WALL MOUNTED FLOOD LIGHT (TYPE DENOTED)PER SCHED

SITE POLE MOUNTED LIGHT (TYPE DENOTED)PER SCHED

SURFACE LIGHT (TYPE DENOTED)

SUSPENDED OR PENDANT LIGHT (TYPE DENOTED)

RECESSED LIGHT (TYPE DENOTED)

SITE BOLLARD LIGHT (TYPE DENOTED)XPER SCHED

PIV POST INDICATING VALVE

FIRE ALARM MICROPHONE INTERFACE72"**

FAMI

1P 1 POLE (2P, 3P, 4P, ETC.)

A AMPERE

AC ABOVE COUNTER

ACLG ABOVE CEILING

ADO AUTOMATIC DOOR OPENER

AF AMP FRAME

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFI ARC FAULT CIRCUIT

INTERRUPTER

AHU AIR HANDLING UNIT

AL ALUMINUM

ALT ALTERNATE

AMP AMPERE

AMPL AMPLIFIER

ANNUN ANNUNCIATOR

APPROX APPROXIMATELY

AQ-STAT AQUASTAT

ARCH ARCHITECT, ARCHITECTURAL

AS AMP SWITCH

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AWG AMERICAN WIRE GAUGE

BATT BATTERY

BD BOARD

BLDG BUILDING

BMS BUILDING MANAGEMENT

SYSTEM

C CONDUIT

CAB CABINET

CAT CATALOG

CATV CABLE TELEVISION

CB CIRCUIT BREAKER

CCTV CLOSED CIRCUIT TELEVISION

CKT CIRCUIT

CLG CEILING

COMB COMBINATION

CMPR COMPRESSOR

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION OR

CONTINUOUS

CONTR CONTRACTOR

CONV CONVECTOR

CP CIRCULATING PUMP

CRT CATHODE-RAY TUBE

CT CURRENT TRANSFORMER

CTR CENTER

CU COPPER

DCP DOMESTIC WATER

CIRCULATING PUMP

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DPR DAMPER

DS SAFETY DISCONNECT SWITCH

DT DOUBLE THROW

DWG DRAWING

EC ELECTRICAL CONTRACTOR

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

EP ELECTRIC PNEUMATIC

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXH EXHAUST

EXP EXPLOSION PROOF

FA FIRE ALARM

FABP FIRE ALARM BOOSTER POWER

SUPPLY PANEL

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FIXT FIXTURE

FLR FLOOR

FLUOR FLUORESCENT

FU FUSE

FUDS FUSED SAFETY DISCONNECT

SWITCH

GA GAUGE

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GFI GROUND FAULT CIRCUIT

INTERRUPTER

GFP GROUND FAULT PROTECTOR

GND GROUND

GRS GALVANIZED RIGID STEEL

(CONDUIT)

GYP BD GYPSUM BOARD

HOA HANDS-OFF-AUTOMATIC

SWITCH

HORIZ HORIZONTAL

HP HORSEPOWER

HPF HIGH POWER FACTOR

HT HEIGHT

HTG HEATING

HTR HEATER

HV HIGH VOLTAGE

HVAC HEATING, VENTILATING AND

AIR CONDITIONING

HWP HYDRONIC WATER PUMP

IC INTERRUPTING CAPACITY

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

IR INFRARED

I/W INTERLOCK WITH

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

LOC LOCATE OR LOCATION

LT LIGHT

LTG LIGHTING

LTNG LIGHTNING

LV LOW VOLTAGE

MAX MAXIMUM

MAG.S MAGNETIC STARTER

M/C MOMENTARY CONTACT

MC MECHANICAL CONTRACTOR

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDC MAIN DISTRIBUTION CENTER

MDP MAIN DISTRIBUTION PANEL

MFR MANUFACTURER

MFS MAIN FUSED DISCONNECT

SWITCH

MH MANHOLE

MIC MICROPHONE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MMS MANUAL MOTOR STARTER

MOA MULTIOUTLET ASSEMBLY

MSP MOTOR STARTER PANELBOARD

MSBD MAIN SWITCHBOARD

MT MOUNT

MT.C EMPTY CONDUIT

MTS MANUAL TRANSFER SWITCH

MTR MOTOR, MOTORIZED

N.C. NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER'S

ASSOCIATION

NFDS NON-FUSED SAFETY

DISCONNECT SWITCH

NIC NOT IN CONTRACT

NL NIGHT LIGHT

N.O. NORMALLY OPEN

NPF NORMAL POWER FACTOR

NTS NOT TO SCALE

OH OVERHEAD

OL OVERLOADS

PA PUBLIC ADDRESS

PB PULL BOX OR PUSHBUTTON

PE PNEUMATIC ELECTRIC

PED PEDESTAL

PF POWER FACTOR

PH PHASE

PIV POST INDICATING VALVE

PNL PANEL

PP POWER POLE

PR PAIR

PRI PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE

(CONDUIT)

PWR POWER

QUAN QUANTITY

RCPT RECEPTACLE

REQD REQUIRED

RM ROOM

RSC RIGID STEEL CONDUIT

RTU ROOF TOP UNIT

SC SURFACE CONDUIT

SEC SECONDARY

SHT SHEET

SIM SIMILAR

S/N SOLID NEUTRAL

SPEC SPECIFICATION

SPKR SPEAKER

SP SPARE

SR SURFACE RACEWAY

SS STAINLESS STEEL

SSW SELECTOR SWITCH

S/S STOP/START PUSHBUTTONS

STA STATION

STD STANDARD

SURF SURFACE MOUNTED

SW SWITCH

SWBD SWITCHBOARD

SYM SYMMETRICAL

SYS SYSTEM

TEL TELEPHONE

TEL/DATA TELEPHONE/DATA

TERM TERMINAL

TL TWIST LOCK

TR TAMPER RESISTANT

T-STAT THERMOSTAT

TTC TELEPHONE TERMINAL

CABINET

TV TELEVISION

TVTC TELEVISION TERMINAL

CABINET

TYP TYPICAL

UC UNDER COUNTER

UE UNDERGROUND ELECTRICAL

UG UNDERGROUND

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UT UNDERGROUND TELEPHONE

UTIL UTILITY

UV UNIT VENTILATOR OR

ULTRAVIOLET

V VOLT

VA VOLT-AMPERES

VDT VIDEO DISPLAY TERMINAL

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W WATT

W/ WITH

WG WIRE GUARD

WH WATER HEATER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFR TRANSFER

L L

ELECTRICAL ABBREVIATIONS LIST

ANGLE

@ AT

DELTA

' FEET

" INCHES

# NUMBER

Ø PHASE

C CENTER LINE

P PLATE

1. ALL WORK SHALL BE IN CONFORMANCE WITH THE NATIONAL

ELECTRICAL CODE - LATEST EDITION ADOPTED BY THE STATE,

AND THE AUTHORITY HAVING JURISDICTION. THE COMPLETE

INSTALLATION SHALL BE IN ACCORDANCE WITH THE ADAAG

(AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES).

2. IT IS THE INTENT OF THESE DOCUMENTS TO COMPLY WITH THE

APPLICABLE CODES. WHERE DISCREPANCIES OCCUR, NOTIFY THE

ENGINEER/ARCHITECT IN WRITING FOR INTERPRETATION.

CORRECT ANY INSTALLATION THAT FAILS TO COMPLY WITH THE

CODES AND STANDARDS AT NO ADDITIONAL COST TO THE

OWNER.

3. CONTRACTOR SHALL PROVIDE ALL WORK NECESSARY INCLUDING

ALL LABOR, MATERIALS, PERMITS, TAXES, FEES, INSPECTIONS,

HARDWARE, AND COST FOR INSTALLATION FOR A COMPLETE AND

OPERATIONAL SYSTEM.

4. ALL MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE NEW,

COMPLETE WITH MANUFACTURER’S GUARANTEE OR WARRANTY

AND SHALL BE LISTED BY A NATIONALLY RECOGNIZED TESTING

LABORATORY (NRTL).

5. COORDINATE ELECTRICAL INSTALLATION WITH ALL TRADES PRIOR

TO INSTALLATION. IF ELECTRICAL WORK INSTALLED INTERFERES

WITH OTHER TRADES AFTER INSTALLATION, THE CONTRACTOR

SHALL MAKE ALL NECESSARY CHANGES TO CORRECT THE

CONDITION AT NO ADDITIONAL COST TO THE OWNER.

6. DRAWINGS ARE DIAGRAMMATIC. ALL DIMENSIONS SHOWN ARE

APPROXIMATE. CONTRACTOR SHALL VERIFY ALL FURNITURE,

MODULAR FURNITURE, AND EQUIPMENT LOCATIONS WITH

ARCHITECTURAL PLANS, ELEVATIONS AND REVIEWED SHOP

DRAWINGS. PRIOR TO MAKING THE ACTUAL ELECTRICAL

INSTALLATION THIS CONTRACTOR SHALL ADJUST CONNECTION

LOCATIONS TO ACCOMMODATE FURNITURE AND/OR EQUIPMENT.

7. ALL ELECTRICAL PANELS WITH ANY BRANCH CIRCUIT/LOAD

REVISIONS (DEMOLITION OR NEW WORK) SHALL HAVE A NEW

TYPED UPDATED CIRCUIT DIRECTORY CARD INSTALLED INSIDE

THE DOOR OF THE ELECTRICAL PANEL. THE CONTRACTOR SHALL

VERIFY THAT ALL UNUSED CIRCUIT BREAKERS ARE TURNED ‘OFF’

AND PROPERLY INDICATED AS ‘SPARE’ ON THE NEW CIRCUIT

DIRECTORY CARD.

8. NO ENERGIZED CONDUCTORS SHALL BE EXPOSED AT ANYTIME

EXCEPT WHEN THE IMMEDIATE AREA IS UNDER THE SUPERVISION

OF A QUALIFIED ELECTRICIAN.

9. WHERE CONDUIT IS SURFACE MOUNTED TO A WALL AND RUN

VERTICALLY DOWN TO A SWITCH/OUTLET BOX, UTILIZE 1-HOLE OR

2-HOLE CONDUIT STRAPS.

10. THE CONTRACTOR SHALL KEEP THE WORK AREA CLEAN OF ALL

DEBRIS ON A DAILY BASIS. ALL NEW MATERIALS AWAITING

INSTALLATION SHALL BE KEPT IN AREAS DESIGNATED BY THE

OWNER.

11. PERIODIC SITE OBSERVATION BY THE ENGINEER IS SOLELY FOR

THE PURPOSE OF DETERMINING IF THE WORK OF THE

CONTRACTOR IS PROCEEDING IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION

SHOULD NOT BE CONSTRUED AS EXHAUSTIVE OR CONTINUOUS

TO CHECK THE QUALITY OR QUANTITY OF THE WORK, BUT

RATHER PERIODIC IN AN EFFORT TO GUARD THE OWNER AGAINST

DEFECTS OR DEFICIENCIES IN THE WORK OF THE CONTRACTOR.

12. THE INFORMATION CONTAINED ON THE ELECTRICAL DRAWINGS IS

IN ITSELF INCOMPLETE AND VOID UNLESS USED IN CONJUNCTION

WITH ALL OTHER DISCIPLINE DRAWINGS, THE SPECIFICATIONS,

TRADE PRACTICES, OR APPLICABLE STANDARDS, CODES, ETC.,

AND SHALL BE CONSIDERED THE CONTRACT DOCUMENTS AND

WITH ALL THEREIN BY REFERENCE, WHICH THE CONTRACTOR

CERTIFIES KNOWLEDGE OF BY SIGNING THE CONTRACT.

13. CONTRACTOR IS TO ASSUME FULL RESPONSIBILITY, UNRELIEVED

BY REVIEW OF SHOP DRAWINGS OR PERIODIC OBSERVATION OF

CONSTRUCTION, FOR COMPLIANCE WITH THE CONTRACT

DOCUMENTS, FOR DIMENSIONS TO BE CONFIRMED AND

CORRELATED ON THE JOB SITE AND BETWEEN INDIVIDUAL

DRAWINGS OR SETS OF DRAWINGS FOR FABRICATION

PROCESSES AND CONSTRUCTION TECHNIQUES (INCLUDING

EXCAVATION, SHORING, SCAFFOLDING, BRACING, ERECTION,

FORM WORK, ETC.), FOR COORDINATION OF THE VARIOUS

TRADES, AND FOR SAFE CONDITIONS ON THE JOB SITE.

VARIATIONS IN FIELD CONDITIONS RELATIVE TO THE CONTRACT

DOCUMENTS SHALL BE REPORTED TO THE ENGINEER AS SOON

AS THEY ARE FOUND. WORK SHALL NOT PROGRESS UNTIL

WRITTEN PERMISSION FROM THE ENGINEER IS OBTAINED.

ELECTRICAL GENERAL NOTES

1. LIGHT LINES INDICATE EXISTING WALLS AND EQUIPMENT

TO REMAIN. DASHED LINES INDICATE WALLS, EQUIPMENT,

AND ELECTRICAL ITEMS TO BE REMOVED.

2. COORDINATE PATCHING REQUIREMENTS FOR UNUSED

OPENINGS WITH THE CONSTRUCTION MANAGER.

3. FIRE ALARM - REMOVE EXISTING CEILING MOUNTED

DEVICES TO PERMIT REMOVAL OF CEILING. WALL

MOUNTED NOTIFICATION DEVICES SHALL BE SALVAGED

AND RETURNED TO OWNER. COORDINATE WORK WITH

PROJECT PHASING TO MAINTAIN FIRE ALARM SYSTEM

PROTECTION OF SPACES AT ALL TIMES.

4. ALL EXISTING FIRE ALARM DEVICES TO BE SALVAGED AND

RETURNED TO OWNER. COORDINATE DISPOSAL OF ALL

ITEMS NOT REQUESTED AS SALVAGE BY THE OWNER.

5. DRAWINGS DO NOT IDENTIFY ALL OUTLETS, SWITCHES,

CABLING, OR EQUIPMENT TO BE REMOVED. CONTRACTOR

SHALL BECOME FAMILIAR WITH THE SITE PRIOR TO

BIDDING AND INCLUDE LABOR AND MATERIAL NECESSARY

FOR REQUIRED DEMOLITION IN THEIR BID.

6. WIRING SHALL BE REMOVED BACK TO SERVING PANEL.

INSTALLATION OF NEW CONDUCTORS IN EXISTING

CONDUITS WILL BE PERMITTED AS DESCRIBED IN THE

DIVISION 26 SPECIFICATIONS.

7. CONTRACTOR TO REMOVE ELECTRICAL CONNECTION TO

HVAC AND PLUMPING EQUIPMENT THAT IS BEING

REMOVED. REFER TO DEMOLITION DRAWINGS FOR

LOCATION OF EQUIPMENT.

DEMOLITION GENERAL NOTES

SEAL

A P

P R

O V

E D

B Y

D R

A W

N B

Y

IS

S

U E

D F

O R

IS

S

U E

D A

T E

P R

O J E

C T

N U

M B

E R

F

IE

L D

B O

O K

W

E S

T O

W N

P K

W Y

S

U

IT

E

W E

S T

D E

S M

O

IN

E S

IA

.2

.8

S

H

IV

E -H

A T

T E

R Y

.C O

M

BA D E

FC G

H

BA D E FC G H

Autodesk Revit 2022

F ir e

A la rm P h a s e

.0

W R

C D e c e n tr a liz a ti o n P h a s e

.2

/1

/2

:0

:0

A

M

A u to d e sk

D o c s:

IA

D A

S

W R

C P ro je c ts

/W e s tw o o d -M

E P

-R M a s te r.

rv t

E L E

C T

R

IC

A L

G E

N E

R A

L

IN

F O

R M

A T

IO

N

C D

K J B

R M

L

-0

-1

00-E000

Io w a D e p a rt m e n t o f

A d m in is tr a ti v e S e rv ic e s th

S t, W o o d w a rd

IA

DN UP

UP UP

UP

DN

DN

UPDN

DN DN

DN

UP

UP

DN

AD.01

AD.02

AD.02

AD.02AD.02

AD.02

AD.02

AD.02AD.02AD.02

AD.02

AD.02

AD.01

AD.02

AD.02

AD.02

N.C. N.C. N.C.

N.C.

AD.01

AD.01

N.C.

AD.02

AD.02

AD.02

AD.02

AD.01

AD.01

AD.01

AD.02

AD.02

AD.02

N.C.N.C.

AD.02

AD.01AD.02

AD.02

AD.02

AD.02

AD.02AD.02

AD.02AD.02AD.02AD.02AD.02AD.02

N.C.N.C.

N.C.

N.C. N.C.

N.C.N.C.

N.C.

N.C.

N.C.

N.C.

1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF

DEMOLITION WORK. NOTIFY ARCHITECT IN WRITING OF

DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS

AND FIELD CONDITIONS ENCOUNTERED.

2. TO PROTECT OWNER AND CONTRACTOR,

PHOTOGRAPHICALLY DOCUMENT EXISTING CONDITIONS TO

REMAIN, PRIOR TO START OF DEMOLITION AND

CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER

ON PHOTOGRAPHIC DOCUMENTATION.

3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL

OF EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION

FROM THE OWNER.

4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.

5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND

EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO

START OF CONSTRUCTION UNLESS NOTED OTHERWISE.

6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT

PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE

COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT

WEATHER IS POSSIBLE.

7. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING

REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.

8. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN

GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS

NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING

CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN

FIELD VERIFICATION AND COORDINATION WITH THE

ARCHITECT PRIOR TO COMMENCING WITH STATED WORK.

9. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY

DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND

FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR

REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,

MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION

TO LIKE NEW CONDITION.

10. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,

INCLUDING BUT NOT LIMITED TO DOORS, FRAMES,

HARDWARE, MARBLE, EQUIPMENT, AND LIGHTING FIXTURES

TO THE OWNER AND STOCKPILE THEM IN AN APPROVED

CONSTRUCTION AREA. DISPOSE OF THESE MATERIALS AFTER

OWNER'S REVIEW AND APPROVAL.

11. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL

FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE

WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.

12. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE

PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM

AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS

REQUIRED PER THE BUILDING.

13. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL

OR DEMOLITION AND PATCHING REQUIRED OF EXISTING

MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.

MATCH EXISTING FINISHES.

14. ALL NEW AND EXISTING PENETRATIONS IN EXISTING WALLS,

FLOORS AND CEILING DECKS SHALL RECEIVE UL AND FACILITY

APPROVED FIRE SEALANT MATERIALS TO MATCH RATING

REQUIREMENT OF AREA BEING PENETRATED.

ARCHITECTURAL DEMOLITION NOTES

EXISTING WALL PARTITIONS

EXISTING DOOR

DEMOLITION PLAN SYMBOLS LEGEND

REMOVE CEILING PANELS AND GRID FOR

INSTALL OF ABOVE CEILING UTILITIES.

COORDINATE WITH MEP DRAWINGS.

NO CEILING IN SPACEN.C.

CORRIDOR

TOILET

103 COUNSEL

WORKROOM

STORAGE

112 OFFICE

DAY ROOM

ACTIVITY

NOT USED

FOOD SERVING AREA

OFFICE

LOBBY

OFFICE

STORAGE

123A

MECHANICAL

COUNSEL

125 TOILET

TOILET

127 STORAGE

COUNSEL

129 TOILET

TOILET

131 DAY ROOM

OFFICE

TOILET

TOILET

102OFFICE

STAFF RESTROOM

MUD ROOM

A02.01

A02.01

A02.01

A02.01

A02.01 A02.01 A02.01 A02.01

A02.01 A02.01

A02.01

A02.01

A02.01

A02.01

A02.01

DAY ROOM

TOILET

TOILET

STORAGE

STORAGE

MECHANICAL

BREAKROOM

STORAGE

STORAGE

STORAGE

TOILET

JANITOR CLOSET

202A

TOILET

OFFICE

DAY ROOM

STORAGE

TOILET

ACTIVITY

OFFICE

STORAGE

MECHANICAL

STORAGE

OFFICE

STORAGE

STORAGE

TOILET

TOILET

STAFF TOILET

229A

TOILET

TOILET

STORAGE

DAY ROOM

A02.01

A02.01

A02.01

A02.01

A02.01

A02.01

A02.01

A02.01

A02.01 A02.01

A02.01

A02.01

A02.01 A02.01

CLASSROOM

B09

TOILET

B03

TOILET

B02

MECH

B06

STORAGE

B07

STORAGE

B08

DAY ROOM

B01

MECHANICAL

B09A

STORAGE

B10

ELECTRICAL ROOM

B35

ACTIVITY

B15

BEAUTY

B20

CLASS ROOM

B16

COOLER

B18

OFFICE

B19

ACTIVITY

B17

COMMON AREA

B13

STORAGE

B012

STORAGE

B21

STORAGE

B23

LOBBY

B24

ELEV. EQPT.

B25

MECHANICAL

B26A

TOILET

B27

TOILET

B28

OFFICE

B31

STORAGE

B32

STORAGE

B33

DAY ROOM

B34

STAFF RESTROOM

B30

SPRINKLER

B04

MECHANICAL

B12

MECHANICAL

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

309 STORAGE

STORAGE

MECHANICAL

STORAGE

STORAGE

A P

P R

O V

E D

B Y

D R

A W

N B

Y

IS

S

U E

D F

O R

IS

S

U E

D A

T E

P R

O J E

C T

N U

M B

E R

F

IE

L D

B O

O K

W

E S

T O

W N

P K

W Y

S

U

IT

E

W E

S T

D E

S M

O

IN

E S

IA

.2

.8

S

H

IV

E -H

A T

T E

R Y

.C O

M

BA D E

FC G

H

BA D E FC G H

Autodesk Revit 2022

KEY PLAN

F ir e

A la rm P h a s e

.0

W R

C D e c e n tr a liz a ti o n P h a s e

.2

/1

/2

:4

:5

A u to d e s k D o c s

/I A

D A

S

W R

C P ro je c ts

/W e s tw o o d -A

-R M a s te r.

rv t

W E

S T

W O

O D

D E

M O

F L

O O

R P

L A

N S

D

E M

O R

E F

L E

C T

E D

C E

IL

IN

G P

L A

N S

C D

E E

M

Z M

S

-0

-1

01-AD01

Io w a D e p a rt m e n t o f

A d m in is tr a ti v e S e rv ic e s th

S t.

W o o d w a rd

IA

TRUE NORTH

NORTH

PLAN

TRUE NORTH

NORTH

PLAN

TRUE NORTH

NORTH

PLAN

TRUE NORTH

NORTH

PLAN

01/16" = 1'-0"D2

WESTWOOD BASEMENT DEMO RCP

24'

TRUE NORTH

NORTH

PLAN

01/16" = 1'-0"D4

WESTWOOD FIRST FLOOR DEMO RCP

24'TRUE NORTH

NORTH

PLAN

01/16" = 1'-0"D6

WESTWOOD SECOND FLOOR DEMO RCP

24'TRUE NORTH

NORTH

PLAN

01/16" = 1'-0"E6

WESTWOOD THIRD DEMO RCP

24'

TRUE NORTH

NORTH

PLAN

KEYNOTES

KEY NOTE

A02.01 REMOVE RADIATOR ENCLOSURE FRONT ACCESS

PANEL TO ENABLE DEMO OF MECHANICAL EQUIPMENT

PER MECHANICAL DEMO PLANS 01-MD100, 01-MD101,

01-MD102. ACCESS PANEL TO BE REINSTALLED WITH

T20 TORX SECURITY SCREWS.

AD.01 DEMO CEILING IN ROOM

AD.02 REMOVE CEILING PANELS AND GRID FOR INSTALL OF

ABOVE CEILING UTILITIES. COORDINATE WITH MEP

DRAWINGS.

01/16" = 1'-0"A4

WESTWOOD FIRST FLOOR PLAN DEMO

24'

01/16" = 1'-0"A6

WESTWOOD SECOND FLOOR PLAN DEMO

24'

01/16" = 1'-0"A2

WESTWOOD BASEMENT DEMO

24'

01/16" = 1'-0"B6

WESTWOOD THIRD FLOOR PLAN DEMO

24'

UP

UP

DN UP

UP UP

UP

DN

DN

UPDN

DN DN

DN

DN

FSTS

F S

F S

F S

F

F S

S

FA

S

FA

F S

S

FA

F S

S

FA

F S

F S

S

F S

S

FA

F S

S

FA

F S

F S

S

FA

S

FA

F S

F S

F S

F S

S

FA

S

FA

F F

F S

S

FA

F S

S

FA

F S

F S

S

FA

S

FA

F S

F S

F S

FS

TS

TS

F

F

F

FFS

TS

FS

TS

F

F S

F F

FACP

F

F S

S

F S S

FA

S

FA F

S

S

FA

S

FA

F S

F S

S

FA

S

FA

F S

F S

F S

F S

F S

F S

S

FA

F S

S

FA

S

FA

F S

S

FA

F S

F S

F S

FS

S

FA

F S

S

FA

F S

F S

F S

S

FA

F S

F S

S

FA

F S

F S

F S

F S F

S

F S

F S

F S

F S

F S

F S

F S

F S

F S

F S

F S

F S

F S F F

F F

F S F

S

F S

S

FA

S

FA

F S

F S

S

FA

S

FA

F S

F S

F S

F S

F S

F S

F S

F S

S

FA

S

FA

F S

F F

FF

FS

F

F S

S

FA

S

FA

S

FA

S

FA

S

FA

F S

S

FA

F S

F S

F F

F

F

F S

F S

F S

DAY ROOM

B01

TOILET

B02

TOILET

B03

CORRIDOR

B05

MECH

B06

STORAGE

B07

STORAGE

B08

CLASSROOM

B09

MECHANICAL

B09A STORAGE

B10

STORAGE

B012

COMMON AREA

B13

STAIR

S2

ACTIVITY

B15

CLASS ROOM

B16

ACTIVITY

B17

COOLER

B18

OFFICE

B19

BEAUTY

B20

STORAGE

B21

STORAGE

B22

STORAGE

B23

LOBBY

B24

ELEV. EQPT.

B25

MECHANICAL

B26A

TOILET

B27

TOILET

B28

OFFICE

B31

STORAGE

B32

STORAGE

B33

DAY ROOM

B34

ELECTRICAL ROOM

B35

STORAGE

B11

ELEV.

CLASSROOM

B26

SPRINKLER

B04

MECHANICAL

B12

STAFF RESTROOM

B30

TOILET

B17A

STAIRS

S1

OFFICE

OFFICE

OFFICE

TOILET

TOILET

COUNSEL

CORRIDOR

TOILET

TOILET

COUNSEL

WORKROOM

STORAGE

112 OFFICE

DAY ROOM

FOOD SERVING AREA

LOBBY

OFFICE

STORAGE

123A

MECHANICAL

COUNSEL

TOILET

TOILET

COUNSEL

129 TOILET

TOILET

131 DAY ROOM

STORAGE

ACTIVITY

MUD ROOM

Elev.

A02.01

A02.02

A02.02

A02.02

CORRIDOR

WORK ROOM

136WORKROOM

STAIRS

S2

STAIRS

S1

TOILET

117A

STAIR

STAIR

DAY ROOM

OFFICE

TOILET

JANITOR CLOSET

202A

TOILET

STORAGE

TOILET

TOILET

STORAGE

STORAGE

STORAGE

BREAKROOM

DAY ROOM

OFFICE

STORAGE

OFFICE

STORAGE

232 TOILET

TOILET

DAY ROOM

STORAGE

TOILET

STAFF TOILET

229A

TOILET

229STORAGE

ACTIVITY

TOILET

STORAGE

STORAGE

MECHANICAL

STORAGE

MECHANICAL

ELEV.

A02.02

A02.02

A02.02A02.02

A02.02

A02.02

A02.02

WORKROOM

WORKROOM

STAIRS

S2

STAIRS

S1

STAIRS

STAIRS

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

MECHANICAL

STORAGE

STORAGE

STORAGE

MECHANICAL

A02.01

STAIRS

S2

ACTIVITY

B17

CLASS ROOM

B16

OFFICE

B19

COOLER

B18

BEAUTY

B20

ELEV.

LOBBY

B24

MECHANICAL

B26A

CLASSROOM

B26 DAY ROOM

B34

TOILET

B28

TOILET

B27

OFFICE

B31

STORAGE

B33

STORAGE

B32

ELEV. EQPT.

B25

STORAGE

B23

COMMON AREA

B13

STORAGE

B21

STORAGE

B012

STORAGE

B22

STORAGE

B11

STORAGE

B10

CLASSROOM

B09

MECHANICAL

B09A

STAIR

S2

ACTIVITY

B15

ELECTRICAL ROOM

B35TOILET

B03

TOILET

B02

DAY ROOM

B01

MECH

B06

STORAGE

B07

STORAGE

B08

OFFICE

OFFICE

OFFICE

TOILET

TOILET

COUNSEL

CORRIDOR

TOILET

TOILET

COUNSEL

WORKROOM

STORAGE

OFFICE

DAY ROOM

FOOD SERVING AREA

LOBBY

OFFICE

STORAGE

123A

MECHANICAL

COUNSEL

TOILET

TOILET

COUNSEL

TOILET

TOILET

131 DAY ROOM

STORAGE

ACTIVITY

MUD ROOM

Elev.

CORRIDOR

DAY ROOM

OFFICE

TOILET

JANITOR CLOSET

202A

TOILET

STORAGE

TOILET

TOILET

STORAGE

STORAGE

STORAGE

BREAKROOM

DAY ROOM

OFFICE

STORAGE

OFFICE

STORAGE

TOILET

TOILET

DAY ROOM

STORAGE

TOILET

STAFF TOILET

229A

TOILET

STORAGE

ACTIVITY

TOILET

STORAGE

STORAGE

MECHANICAL

STORAGE

MECHANICAL

ELEV.

GYPSUM BOARD CEILING/ SOFFIT

ACOUSTICAL CEILING PANEL SYSTEM

SURFACE LIGHT

SUSPENDED OR PENDANT LIGHT

RECESSED LIGHT

CEILING PLAN SYMBOLS LEGEND

1. NOTIFY ARCHITECT OF INADEQUATE CLEARANCES FOR

CEILING LAYOUT…

This is the start of the file's text. The full file is on GovTribe.