This document is a Project Manual for the construction of a New RV Campground at Jericho Mountain State Park in Berlin, New Hampshire. The project is being managed by the New Hampshire Department of Natural and Cultural Resources (DNCR). Sealed bids for the general contract are due on July 10, 2024 at 2:00 pm, and a mandatory pre-bid site tour will be held on June 25, 2024. The scope of work includes site preparation, utilities, and construction of RV campsites, amenities, and support facilities. The contract specifies a Start Date of September 30, 2024 and a Completion Date of October 22, 2025.
The bid proposal requires a 5% Bid Bond and, if awarded a contract over $75,000, the contractor must provide a 100% Performance and Payment Bond. The contract will be awarded to the lowest responsive and responsible bidder, but DNCR reserves the right to reject any or all bids. The contract includes a $90,000 Allowance for modifications and unanticipated conditions. Pricing is required to be submitted on the provided Bid Proposal Form, with options for several additive alternates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| attachment_2_RFB DNCR 2024 ARP 2418.docx | DOCX document | |
| attachment_1_RFB DNCR 2024 ARP 2418.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF NEW HAMPSHIRE
DEPARTMENT OF NATURAL AND CULTURAL RESOURCES
DIVISION OF PARKS & RECREATION
172 Pembroke Road Concord, NH 03302-1856
Tel. (603) 271-3556 Fax (603) 271-3553
PROJECT MANUAL
Project No.: ARP 2418
JERICHO MOUNTAIN STATE PARK
NEW RV CAMPGROUND
298 Jericho Lake Road, Berlin NH 03570
June, 2024
This page intentionally left blank
New Hampshire Department of Natural and Cultural Resources Jericho New RV Campground
00 01 03 Project Directory-1
PROJECT DIRECTORY
NEW RV CAMPGROUND
JERICHO MOUNTAIN STATE PARK, ERROL NH
OWNER: Department of Natural and Cultural Resources
DIVISION OF PARKS & RECREATION
172 Pembroke Road
Concord, New Hampshire 03301
Telephone: 603-271-3556
Contact: Thomas Mansfield
E-mail: thomas.c.mansfield@dncr.nh.gov
CONSULTANTS:
CIVIL ENGINEER: HORIZONS ENGINEERING
176 Newport Road, Suite 8, New London, NH 03257
Telephone: 603-444-4111
Contact: Will Davis
E-mail: WDAVIS@HORIZONSENGINEERING.COM
LANDSCAPE ARCHITECT: SE GROUP
1 Mill Street, Suite 190, Burlington, VT 05401
Telephone: 802-682-0098
Contact: Patrick Olstad & Adam Portz
E-mail: POLSTAD@SEGROUP.COM and APORTZ@SEGROUP.COM
ARCHITECT: SAMYN-D’ELIA ARCHITECTS, PA
6 Central House Road, Holderness, NH 03245
Telephone: 603-968-7133:
Contact: Ward D’Elia
E-mail: WARD@SDARCHITECTS.COM
ELECTRICAL ENGINEER: CPB & ASSOCIATES
500 Depot Street, Rumney, NH 03266
Telephone: 603-786-9992
Contact: Charles Buckley
E-mail: CBUCK616@YAHOO.COM
END OF PROJECT DIRECTORY
Jericho: New RV Campground
00 01 10 Table of Contents-1
TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
Section 00 01 03 Project Directory
Section 00 01 10 Table of Contents
Section 00 11 16 Invitation to Bid
Section 00 21 13 Instructions to Bidders
Section 00 25 10 Requirements for Federal Aid Projects
Section 00 41 00 Bid Proposal Form
Section 00 72 00 General Conditions
Sample Standard State Contract P-37
Sample Application and Certificate for Payment (AIA G702-1983)
Sample Continuation Sheet for Application for Payment (AIA G703-1983)
Sample State Building Permit Application
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 Summary
Section 01 20 00 Price and Payment Procedures
Section 01 25 00 Substitution Procedures
Section 01 26 00 Contract Modification Procedures
Section 01 30 00 Administrative Requirements
Section 01 40 00 Quality Requirements
Section 01 50 00 Temporary Facilities and Controls
Section 01 50 10 Project Sign Sample
Section 01 60 00 Product Requirements
Section 01 70 00 Execution and Closeout Requirements
DIVISION 02 – EXISTING CONDITIONS
Section 02 01 00 Existing Utilities and Underground Structures
DIVISION 03 - CONCRETE
Section 03 30 53 Cast-In-Place Concrete
Section 03 41 00 Structural Precast Concrete
DIVISION 04 - MASONRY
Section 04 43 02 Site Stonework
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
Section 06 10 00 Rough Carpentry
Section 06 15 00 Wood Decking
00 01 10 Table of Contents-2
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
Section 07 31 13 Asphalt Shingles
Section 07 46 23 Wood Siding
DIVISION 09 – FINISHES
Section 09 91 13 Exterior Painting
Section 09 93 00 Staining and Transparent Finishing
DIVISION 12 - FURNISHINGS
Section 12 93 00 Site Furnishings
DIVISION 26 – ELECTRICAL
Section 26 01 11 Basic Electrical Materials and Methods
Section 26 05 13 Wires and Cables
Section 26 05 26 Grounding
Section 26 05 33 Raceways and Boxes
Section 26 24 14 Disconnect Switches and Circuit Breakers
Section 26 24 16 Panelboards
DIVISION 31 – EARTHWORK
Section 31 05 19 Geotextiles
Section 31 05 19.16 Geomembrane Liners
Section 31 08 00 Restoration of Surfaces
Section 31 11 00 Clearing, Grubbing and Stripping
Section 31 22 00 Site Grading
Section 31 23 16 Earthwork
Section 31 23 16.26 Rock Removal
Section 31 23 19 Dewatering
Section 31 25 00 Erosion Control
Section 31 37 13 Stone Fill and Rip Rap
Section 31 41 00 Shoring and Bracing
DIVISION 32 – EXTERIOR IMPROVEMENTS
Section 32 01 30 Landscape Maintenance
Section 32 12 16.31 Bituminous Concrete Paving
Section 32 91 15 Soil Preparation
Section 32 29 00 Turf and Grasses
Section 32 93 00 Trees, Shrubs and Groundcovers
00 01 10 Table of Contents-3
DIVISION 33 – UTILITIES
Section 33 14 00 Water Utility Piping
Section 33 14 43 Packaged Pumping Systems for Water Utility Service
Section 33 31 13 Sanitary Sewers, Manholes and Appurtenances
DIVISION 40 – PROCESS INTERCONNECTIONS
Section 40 05 97 Identification for Process Equipment, Piping, and Valves
Section 40 23 00 Water process Piping Valves and Accessories
END OF TABLE OF CONTENTS
00 11 16 Invitation to Bid-1
SECTION 00 11 16
INVITATION TO BID
NEW RV CAMPROUND
ARP 2418
Jericho Mountain State Park, Berlin NH
1. Sealed Bids: Proposals for a General Contract for the Construction of the above project will be received by the Owner until 2:00 P.M. prevailing time on July 10, 2024, at 2:00 pm at which time they will be publicly opened and read aloud. All Bids shall be made out only on the form included in the specifications package and delivered in a sealed, labeled envelope marked: Bid Proposal for Jericho RV Campground and deposited in the bid box located at the reception desk of the
Department of Natural and Cultural Resources (DNCR) offices at 172 Pembroke Road in
Concord, NH. Bidders are invited to attend the Bid opening. Bids received after the above stated time and date will not be accepted.
2. Technical Questions: Questions regarding the Bidding Documents shall be referred to:
Department of Natural and Cultural Resources, 172 Pembroke Road, Concord New Hampshire, 03301, attention Thomas Mansfield, Dept. Architect, Telephone (603) 271-3972, email:
thomas.c.mansfield@dncr.nh.gov.
3. Documents: Bidding Documents may be examined at the Design, Development and
Maintenance Section of DNCR, 172 Pembroke Road, Concord NH and at the following locations:
Construction Summary of New Hampshire Inc.: 734 Chestnut Street, Manchester, New
Hampshire 03104, (603) 627-8856, www.constructionsummary.com
Alpha Graphics: 933 Islington Street, Portsmouth, NH 03801, (800) 581-2712 or (603) 436- 3030, www.planroom.agportsmouth.com
McGraw-Hill Construction: 34 Crosby Drive, Suite 201, Bedford, Ma. 03170 (781) 430 2000 www.construction.com
Signature Digital Imaging: 45 Londonderry Turnpike, Hooksett, NH 03106, (603) 624-4025, www.signaturenh.com
ConstructConnect 20 Farrell Street, Suite 103, South Burlington, VT 05403. (800) 286 3633 or
(802) 658-3797 www.constructconnect.com
New Hampshire Department of Administrative Services Bureau of Purchase and Property Website: http://admin.state.nh.us/purchasing/vendorresources.asp
New Hampshire State Parks Website: www.nhstateparks.org/news-events/improving-state-parks/rfps-projects.
00 11 16 Invitation to Bid-2
4. Qualifications: All companies, corporations, and trade names bidding must be registered and have a Certificate of Existence from the New Hampshire Secretary of State’s Office, Corporate
Division (telephone 603-271-3244) in order to do business with the State of New Hampshire
5. Bid Security: A Bid Bond in the amount of five (5%) percent of the total amount of the lump sum bid price shall accompany each Bid Proposal in accordance with the Instructions to Bidders.
6. Bonds: The successful bidder, at the time of the execution of the contract, shall be required to provide the Owner with financial responsibility as security for the completion of the contract in accordance with the plans, specifications, and contract documents, in the form of a Performance and Payment Bond in the amount of One Hundred (100%) Percent of the contract award, if the contract award is seventy-five thousand dollars ($75,000) or more, the cost of which shall be a part of the Base Bid. The form of bond and the surety shall be acceptable to the Commissioner.
No contract bond shall be required on contract awards of less than seventy-five thousand dollars
($75,000).
7. Inspection of Site: Bidders are expected to thoroughly inspect existing building and site conditions prior to submission of Proposals. A pre-bid tour of the existing building/site will be conducted by the Owner and Architect on Tuesday, June 25, 2024 at 11:00 a.m. The tour will depart from the Jericho Mountain State Park Welcome Center. Attendance by Bidders shall be considered mandatory.
8. Awards: In most cases the proposal submitted by the qualified bidder with the lowest base bid price shall be selected. However, the Department of Natural and Cultural Resources (DNCR) reserves the right to reject any or all proposals or advertise for new proposals as it judges to be in the best interest of the state.
9. Domestic Preference for Procurement: The Contractor, consistent with 2 CFR 200.322, should, to the greatest extent practicable, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products).
END OF INVITATION TO BID
00 21 13 Instructions to Bidders-1
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
DEFINITIONS
1. Definitions set forth in the Specification Section 00 72 00 “General Conditions” or in other
Contract Documents are applicable to the Bidding Documents.
2. Bidding Documents include the Bidding Requirements and the proposed Contract Documents.
The Bidding Requirements include the Invitation to Bid, Instructions to Bidders, the Proposal
Form and other sample Bidding and Contract forms.
3. Addenda are written or graphic instruments issued prior to the execution of the Contract. They modify or interpret the Bidding Documents by additions, deletions, clarifications, or corrections.
Addenda will become part of the Contract Documents when the Construction Contract is executed.
4. A Bid is a complete and properly signed Proposal to do the Work or designated portion thereof for the sums stipulated therein, submitted in accordance with the Bidding Documents.
5. The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents as the base, to which Work may be added or deducted for sums stated in Alternate Bids.
6. An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from the amount of the Base Bid if the corresponding change in Work, as described in the Bidding
Documents, is accepted.
7. A Unit Price is an amount stated in the Bid as a possible price per unit of measurement for materials, equipment, services, or a portion of the Work as described in Bidding Documents. The choice of using Unit Prices, or an alternative method of payment, for additional Work shall be left solely to the Owner's discretion.
8. A Bidder is a person or entity who submits a Bid.
9. A Sub-Bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of the Work.
BIDDER'S REPRESENTATION
1. Each Bidder by making his Bid represents that he has examined and understands the Bidding
Documents, that the Bidding Documents are adequate to produce the required results, and that his Bid is in accordance therewith.
00 21 13 Instructions to Bidders-2
2. Each Bidder by making his Bid represents that he has visited and thoroughly inspected the existing site and familiarized himself with the local conditions under which the Work will be performed. Bidders are encouraged to make any and all inspections and tests as they feel necessary to achieve such familiarization prior to submitting Bids. Such inspections and tests shall be conducted at times mutually acceptable to the Owner and Bidder. Unless waived by the
Owner, Bidders shall make repairs following their testing, as necessary to restore tested areas to pre-testing condition. Should a Bidder conclude that time or other factor(s) prohibits him from performing sufficient tests, he shall so notify the Owner, in writing, prior to the receipt of Bids.
3. The submission of a Bid will be construed as conclusive evidence that the Bidder has made all such examinations and inspections necessary for a complete and proper assessment of the Work required, and that the Bidder has included in his Bid a sum sufficient to cover the cost of all items necessary to perform the Work as set forth in the proposed Contract Documents. No allowance will be made to a Bidder because of lack of such examination, inspection, or knowledge.
4. Each Bidder by making his Bid represents that he has assessed the conditions of the current construction marketplace, and verified that an adequate, experienced workforce is available to suitably man the Work of this Project and complete it in a timely fashion.
5. Each Bidder is assumed to have made himself familiar with all Federal, State and Local laws, ordinances, and regulations which in any manner affect those engaged in or upon the Work, or in any way affect those engaged or employed in the Work, and no plea of misunderstanding will be considered on account of ignorance thereof. The Contractor shall comply with all taxes, fees and assessments as levied by Federal, State and Local authorities.
BIDDING PROCEDURES
1. All Bids must be prepared on the Bid Proposal Form provided in the Specification and submitted in duplicate copies in accordance with the Notice to Bidders and Instructions to Bidders. Any bids submitted that are not on the official bid proposal forms will not be accepted.
2. A Bid shall be invalid if it has not been deposited at the designated location prior to the time and date in the Invitation to Bid, or prior to any extension thereof issued to the Bidders.
3. Each copy of a Bid shall be signed by the person or persons legally authorized to bind the Bidder to a Contract. A Bid by a corporation shall further give the state of incorporation and have a corporate seal affixed.
4. Unless otherwise provided in any supplement to these Instructions to Bidders, no Bidder shall modify, withdraw, or cancel his Bid or any part thereof for Ninety (90) days after the time designated for the receipt of Bids in the Notice to Bidders.
5. Prior to the receipt of Bids, Addenda will be e-mailed, mailed, or delivered to each person or firm recorded by the Owner as having received the Bidding Documents and will be available for inspection wherever the Bidding Documents are kept available for that purpose.
00 21 13 Instructions to Bidders-3
BID SECURITY
1. Bid Security shall be made payable to the Owner, in the amount of not less than five percent (5%) of the Bid Sum and shall be attached to the Bid. Security shall be either a certified check made payable to the “Treasurer, State of New Hampshire,” or Bid Bond issued by surety licensed to conduct business in the State of New Hampshire. The successful Bidder's security will be retained until he has signed the Agreement or Contract and furnished the required Performance and Payment Bonds and Certificates of Insurance. The Owner reserves the right to retain the
Security of the next two lowest Bidders until the low Bidder enters into a Contract, or until Sixty
(60) days after Bid opening, whichever occurs first. Bid Security of all other Bidders will be returned as soon as practicable. If any Bidder refuses to enter into an Agreement or Contract, the Owner will retain his Bid Security as liquidated damages, but not as a penalty.
EXAMINATION OF BIDDING DOCUMENTS
1. Each Bidder shall examine the Bidding Documents carefully and, not later than seven (7) days prior to the date of receipt of Bids, shall make written request to the Owner for interpretation or correction of any ambiguity, inconsistency, or error therein, which he may discover. Any interpretation or correction will be issued as an Addendum by the Owner. Only a written interpretation or correction by Addendum will be binding. No Bidder shall rely upon any interpretation or correction given by any other method. Bidders are encouraged to direct any questions which may arise to the Owner, in order to provide necessary clarifications prior to the receipt of Bids. Bidders shall promptly notify the Owner of any ambiguity, inconsistency, or error which they may discover upon examination of the Bidding Documents, or the existing building, site, or local conditions. Should a Bidder fail to notify the Owner of errors, discrepancies, or contradictions, he shall be assumed to have bid the more expensive alternative.
SUBSTITUTIONS
1. Each Bidder represents that his Bid is based upon the materials and equipment described in the
Bidding Documents. Where the language "or approved equal" is used in the Bidding Documents, it is intended to require that all such materials and equipment shall be submitted as required by these Instructions to Bidders and approved by the Owner prior to the receipt of Bids.
2. No substitution will be considered unless written request has been submitted to the Owner for approval at least seven (7) days prior to the date for receipt of Bids. Each such request shall conform to the requirements of Section 01 25 00 “Substitution Procedure.”.
3. If a Bidder proposes to use a material which, while suitable for the intended use, deviates in any way from the detailed requirements of the Contract Documents, he shall inform the Owner in writing of the nature of such deviations at the time the material is submitted for approval. It shall be the responsibility of the Bidder to notify the Owner, in writing, of the presence of Asbestos or any other hazardous materials in any proposed substitution. Such written notice shall be in the form of a cover letter attached to the related documents.
00 21 13 Instructions to Bidders-4
4. In requesting approval of deviations or substitutions, a Bidder shall provide, upon request, evidence leading to a reasonable certainty that the proposed substitution or deviation will provide a quality of result at least equal to that otherwise attainable. If, in the opinion of the Owner, the evidence presented by the Bidder does not provide a sufficient basis for such reasonable certainty, the Owner may reject such substitution or deviation without further investigation.
5. In requesting approval of substitutions, a Bidder represents that he will provide the same warranty and/or guarantee for the substitution that he would for that specified.
6. The Contract Documents are intended to produce a building and site improvements of consistent character and quality of design. The Owner shall judge the design and appearance of proposed substitutes on the basis of their suitability in relationship to the overall design of the Project, as well as for their intrinsic merits. The Owner will not approve proposed substitutions which, in his opinion, would be out of character, obtrusive, or otherwise inconsistent with the character or quality of design of the project.
7. The Contractor shall be solely responsible for coordinating the installation of accepted substitutions, making such changes as may be required for the Work to be complete in all respects. Any additional cost, or any loss or damage arising from the substitution of any material or any method for those originally specified shall be borne by the Contractor, notwithstanding approval or acceptance of such substitution by the Owner, unless such substitution was made at the written request or direction of the Owner.
8. The burden of proof of the merit of a proposed substitution is upon the proposer. Approval of a proposed substitution is valid only upon issuance by the Owner in written form, and the Owner's decision of approval or disapproval of a proposed substitution shall be considered final.
DETERMINATION OF RIGHT TO DO BUSINESS WITH STATE OF NEW HAMPSHIRE
1. If selected as the low bidder, the bidder must be registered and have a Certificate of Good
Standing from the Secretary of State, Corporate Division (telephone 603-271-3244) in order to do business with the State of New Hampshire.
PROPOSAL SELECTION
1. In most cases the proposal submitted by the qualified bidder with the lowest base bid price shall be selected. However, the Department of Natural and Cultural Resources (DNCR) reserves the right to reject any or all proposals or advertise for new proposals as it judges to be in the best interest of the State of New Hampshire.
CONTRACTORS QUALIFICATIONS
1. Upon the Owner’s request, the successful bidder shall provide evidence that they have been successfully performing this type, scale, and quality of Work for a minimum of five (5) years.
Upon request by the Owner, a comprehensive list of all similar projects worked on in the past two
(2) years by the Contractor shall be submitted along with contact information for three (3)
00 21 13 Instructions to Bidders-5 references or owners representatives involved with three (3) different projects completed by the
Contractor.
EXECUTION OF AGREEMENT
1. Execution and Approval of Agreement: The Agreement shall be signed by the successful Bidder and returned, together with Bonds if applicable, within fifteen (15) Days after the Agreement has been mailed or otherwise delivered to the Bidder. No Agreement shall be considered as in effect until it has been fully executed by all Parties thereto and, when the Price Limitation is more than
$10,000, the Agreement has been concurred in by Governor and Council.
2. Failure to Execute Agreement: Failure to execute the Agreement within fifteen (15) Days after the
Agreement has been mailed or otherwise delivered to the successful Bidder shall be just cause for the cancellation of the bid and the forfeiture of the Bid Security which shall become the property of the Department, not as a penalty, but in liquidation of damages sustained. Award of the Contract may then be made to the next lowest Bidder, or the Work may be re-advertised as the Commissioner of the Department of Natural and Cultural Resources may decide.
PRECONSTRUCTION CONFERENCE
1. Either before or soon after the actual award of the Contract (but in any event prior to the start of construction), the Contractor or his representative and his principal subcontractors shall attend a preconstruction conference with representatives of the Owner. The conference will serve to acquaint the participants with the general plan of contract administration and requirements under which the construction operation is to proceed.
END OF INSTRUCTIONS TO BIDDERS
00 25 10 Requirements for Federal Aid Projects-1
SECTION 00 25 10
REQUIREMENTS FOR FEDERAL AID PROJECTS
00 25 10 Requirements for Federal Aid Projects-2
00 25 10 Requirements for Federal Aid Projects-3
00 25 10 Requirements for Federal Aid Projects-4
00 25 10 Requirements for Federal Aid Projects-5
00 41 00 Bid Proposal Form-1
SECTION 00 41 00
BID PROPOSAL FORM
Project No. ARP 2418
PROJECT: New RV Campground
Jericho Mountain State Park 298 Jericho Lake Road, Berlin NH 03570
BID OPENING DATE: July 10, 2024, at 2:00 pm at DNCR’s office at 172 Pembroke Road, Concord, NH
START DATE: September 30, 2024
COMPLETION DATE: October 22, 2025
Sealed bid proposals for the above project will be accepted until the time and date indicated above. Bids may be deposited in the bid box at DNCR’s offices in Concord or mailed to the attention of Thomas Mansfield, Dept. Architect, Department of Natural and Cultural Resources (DNCR), 172 Pembroke Road, Concord NH 03301. Please note on the outside of the sealed envelope: Bid Proposal for Jericho RV Campground.
DATE:
PROPOSAL OF:
GRAND TOTAL / LUMP SUM BASE BID (A+B):
00 41 00 Bid Proposal Form-2
PROPOSAL
Proposal of...
(name)
(address)
To furnish and deliver all materials, except as noted, and to perform all work in accordance with the Contract of the State of New Hampshire, Department of Natural and Cultural Resources for the construction of...
Project: ARP 2418 New RV Campground Jericho Mountain State Park 298 Jericho Lake Road, Berlin NH 03570
Commissioner Department of Natural and Cultural Resources 172 Pembroke Road Concord, N.H. 03302-1856
Commissioner:
In accordance with the advertisement of the Department of Natural and Cultural Resources inviting proposals for the project herein before named and in conformity with the Plans and Specifications on file in the office of the Department of Natural and Cultural Resources, (firm name) hereby certifies that is/are the only person, or persons, interested in this proposal as principals; that this proposal is made without collusion with any person, firm, or corporation; that an examination has been made of the Plans, of the Standard Specifications, and Special Attentions, Supplemental Specifications, and Special Provisions, all of which are attached hereto, and also of the site of the work; and I, or we, propose to furnish all necessary machinery, equipment, tools, labor, and other means of construction, and to furnish all materials specified in the manner and at the time prescribed; and understand that the quantities of work as shown herein are approximate only and are subject to increase or decrease, and further understand that all quantities of work are to be performed at the quoted prices.
To execute the form of contract and begin work within 15 (fifteen) days after the notice to proceed has been received or otherwise delivered to the contractor and to prosecute said work until its completion.
It is further proposed:
To furnish a contract bond in the amount of one hundred percent (100%) of the contract award, if the contract award is seventy-five thousand dollars ($75,000) or more, as security for the completion of the contract in accordance with the plans and specifications and contract documents. The form of bond and the surety shall be acceptable to the Commissioner. No contract bond shall be required on contract awards of less than seventy-five thousand dollars ($75,000).
To guarantee all of the work performed under this contract to be done in accordance with the plans and specifications and contract documents.
Enclosed, herewith, find certified check or bid bond in the amount of 5% of the total amount of the Lump Sum Price made payable to the “Treasurer, State of New Hampshire” as a proposal guarantee which is understood, will be forfeited in the event the form of contract is not executed, if awarded to the undersigned. Note: Personal checks will not be accepted as a proposal guarantee.
The undersigned acknowledges receipt of the following addenda, issued during the bidding time, and states that these have been incorporated in the proposal:
Addendum #1 dated
Addendum #2 dated
Addendum #3 dated Dated
ALLOWANCE #1: Unanticipated Modification and/or Additions to Contract Items:
Include in the Contract, a stipulated sum/price of $90,000 for use upon the Project Managers instruction.
This Allowance will make money available for modifications and/or additions to contract items due to owner-initiated changes, or for unknown, latent, or differing existing conditions, or for the removal of hazardous materials that are encountered by construction.
a. Contractor’s costs for products, delivery, installation, labor, insurance, payroll, taxes, equipment rental, overhead and profit will be included in Change Orders authorizing expenditure of funds from this Allowance. The cost of the bond for the amount of Allowance shall be included as part of the lump sum base bid.
b. Funds will be drawn from an Allowance only by Change Order. Contractor can proceed with Change Order Work against Allowance with direction from the Project Manager. The Contractor shall not proceed with any work that will exceed the amount of Allowance remaining.
c. Credits can only be added to an Allowance by Change Order. The Contractor may not use a credit until a Change Order is fully executed.
d. Notwithstanding the Contractors objection, the Project Manager may at any time reduce the funds remaining in the Allowance by Change Order.
e. At Final Payment of the Contract, funds remaining in the Allowance will be credited to the
State.
SCHEDULE OF VALUES: NEW RV CAMPGROUND
JERICHO MOUNTAIN STATE PARK
INDICATE DOLLAR AMOUNT OF CONTRACT SUM ALLOCATED TO EACH CATEGORY OF WORK
AS DESIGNATED BELOW:
Specification Sections
Description Amount
00 72 00 General Conditions
Bond Cost
Insurance
03 30 53 Cast-In-Place Concrete
03 41 00 Precast Architectural Concrete
Shelters, Pump House and Kiosk
Signage
RV Pedestals Campsite Accessories
RV Dump Station
33 31 13 Facility Sanitary Sewers and Manholes Septic System
26 01 00 Electrical System
Storm Water Treatment System Filter Pond and Sediment Forebay
31 11 00 Site Clearing
31 22 00 Earth Moving
31 25 00 Erosion and Sedimentation Controls
Trenching
Gravel Parking Spurs and Amenity Pads
32 12 16.31 Asphalt Paving
32 93 00 Plantings
32 92 00 Seeding and Sodding
Water Utilities and Distribution Piping
Sub Total (A):
Allowance #1 (B): $90,000
Grand Total: lump sum base bid (A + B)
Add Alternative No. 1: Electric power to the event area $
Add Alternative No. 2: Shelter Camp Sites L1.03 $
Add Alternative No. 3: Infill Sites L1.02 $
Add Alternative No. 4: Electric power to five existing cabins E1.03J $
Unit Price: Rock Removal _______________________per cubic yard
NOTE: This Schedule of Values must be completely filled out in order for bid proposal to be considered responsive.
SIGNATURE PAGE
Company Name:
Address:
Phone:
E-mail Address:
Signature of Authorized Bidder:
Print:
Title:
Address of Bidder:
(If different than company)
Names and Addresses of Members of the Firm/Corporation
Name address
00 72 00 General Conditions-1
SECTION 00 72 00
GENERAL CONDITIONS
TABLE OF ARTICLES
1. GENERAL PROVISIONS
2. CONTRACTOR’S RESPONSIBILITIES
3. OWNER’S RESPONSIBILITIES
4. SUBCONTRACTS
5. TIME
6. CHANGES
7. PAYMENT
8. INDEMNITY, INSURANCE, AND BONDS
9. SUSPENSION, NOTICE TO CURE, AND TERMINATION
10. DISPUTE MITIGATION AND RESOLUTION
11. MISCELLANEOUS
12. CONTRACT DOCUMENTS
ARTICLE 1 – GENERAL PROVISIONS
1.01 Definitions
A. Addenda: Written or graphic instruments issued prior to opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents.
B. Agreement: The written agreement between the Parties, executed on New Hampshire Form
Number P-37, and these General Conditions, as modified, and exhibits and attachments made part of the agreement upon execution.
C. Allowance: The sum stipulated in the Contract Documents, for use by the Owner to pay for unanticipated Modifications or Changes to the Contract Price.
D. Architect: The term “Architect”, where used throughout the Contract Documents, shall indicate the
Design Professional retained or employed by the Owner and having the authority to make decisions about the design intent of the Project.
E. Bidding Requirements: The Invitation to Bid, Instructions to Bidders, bid bond or other bid security, if any, the Bid Proposal Form, and the bid with any attachments.
F. Business Day: All Days, except Saturdays, Sundays, and legal holidays indicated in the Contract
Documents.
G. Change Order: A written order signed by the Parties after execution of the Agreement, indicating changes in the scope of Work, the Contract Price, or Contract Time.
H. Construction Change Directive: A change to the Work directed by the Owner pursuant to Section
6.03.
00 72 00 General Conditions-2
I. Construction Schedule: A schedule, prepared and maintained by the Contractor, describing the sequence and duration of the activities comprising the Contractor’s plan to accomplish the Work within the Contract Time.
J. Contract: The entire and integrated written Agreement between the Owner and Contractor concerning the Work.
K. Contract Documents: Consist of the Agreement, Invitation to Bid, Instructions to Bidders, Conditions of the Contract (General, Supplementary, and other Conditions), Drawings, Specifications, Addenda issued prior to execution of the Contract, other documents listed in the
Agreement, and Modifications issued after execution of the Contract.
L. Contract Price: The stated amount in the Contractors bid, excluding Allowances, to perform the
Work under the Contract Documents, as modified by any Alternates.
M. Contract Time: The period of time between the Date of Commencement and the total time authorized to achieve Final Completion.
N. Contractor: The person or entity identified in the Agreement and includes the Contractor’s
Representative.
O. Date of Commencement: The date of commencement of the Work as identified in the Notice to
Proceed.
P. Day: A calendar day.
Q. Defective Work: Any portion of the Work that does not conform to the requirements of the Contract
R. Design Professional: The licensed architect or engineer, and its consultants, retained or employed by the Owner to perform design services for the Project.
S. Final Completion: The date when the Contractor’s obligations under this Agreement are complete and accepted by the Owner and final payment becomes due and payable, as enumerated in Box
1.7 “Completion Date” of the Agreement.
T. Hazardous Material: Any substance or material identified now or in the future as hazardous under the Law, or any other substance or material that may be considered hazardous or otherwise subject to statutory or regulatory requirement governing handling, transportation, disposal, or cleanup.
U. Law: Federal, state, or local law, ordinance, code, rule, and regulations applicable to the Work with which the Contractor must comply that are enacted as of the Agreement date.
V. Modification: A written amendment to the Contract signed by both Parties, a Change Order, a
Construction Change Directive, or a written order for a minor change in the Work issued by the
Design Professional.
W. Notice to Proceed: A written notice by the Owner to the Contractor fixing the date on which the
Contract Time will commence to run and on which Contractor shall start to perform the Work.
00 72 00 General Conditions-3
X. Others: Other contractors, suppliers, and persons or entities at the Site who are not employed by the Contractor or Subcontractors.
Y. Owner: The State Agency indicated in Box 1.1 “State Agency Name” of the Agreement and includes the Owner’s Representative.
Z. Owner’s Representative: The Owners appointed representative having authority to act on the
Owners behalf and shall be responsible for general supervision and administration of the Contract.
AA. Parties: Collectively the Owner and the Contractor.
BB. Price Limitation: The amount indicated in Box 1.8 “Price Limitation” of the Agreement. The Price
Limitation is the grand total lump sum, comprised of the Contract Price and the Allowance, available to pay for the Work under the Construction Documents.
CC. Project: The building, facility, or other improvements for which the Contractor is to perform Work under the Agreement. It may also include construction by the Owner or Others.
DD. Site: The area of the Project location where the Work is to be performed.
EE. Subcontractor: A person or entity retained by the Contractor as an independent contractor to provide labor, materials, equipment, or services necessary to complete a specific portion of the work.
FF. Substantial Completion: The date when the Work (or a specified part thereof) is sufficiently complete in accordance with the Contract Documents so that the Owner may occupy or utilize the
Project, or a designated portion, for the use for which it is intended, without unapproved disruption.
GG. Sub-Subcontractor: A person or entity who has an agreement with a Subcontractor, another Sub-subcontractor, or Supplier to perform a portion of the Subcontractor’s Work or to supply material or equipment.
HH. Supplier: A person or entity retained by the Contractor to provide material or equipment for the
Work.
II. Work: The construction and services necessary or incidental to fulfill the Contractor’s obligations for the Project in conformance with and reasonably inferable from the Agreement and the Contract
Documents. The Work may refer to the whole Project or only a part of the Project if work is also being performed by the Owner or Others.
1.02 Parties Relationship
A. The Parties agree to proceed with the Project on the basis of mutual trust, good faith, and fair dealing. The parties shall each endeavor to promote harmony and cooperation among all Project participants.
B. The Contractor represents that it is an independent contractor and that in its performance of the
Work it shall act as an independent contractor.
00 72 00 General Conditions-4
C. Neither the Contractor nor any of its agents or employees shall act on behalf of or in the name of the Owner.
1.03 Ethics
A. The Parties shall perform their obligations with integrity, ensuring at a minimum that each:
1. Avoids conflicts of interest and promptly discloses any to the other Party.
2. Warrants that it has not and shall not pay or receive any contingent fees or gratuities to or from the other Party, including its agents, officers, and employees, Subcontractors, or others for whom they may be liable, to secure preferential treatment.
1.04 Design Professional
A. The Owner, through its Design Professional, shall provide all architectural and engineering design services necessary for completion of the Work, excluding however:
1. Design services delegated to the Contractor in accordance with Section 2.15.
2. Services within the construction means, methods, techniques, sequences, and procedures employed by the Contractor, its Subcontractors, and Sub-subcontractors in connection with their construction operations.
1.05 Ownership and Use of Drawings, Specifications, and Other Instruments of Service
A. The Owners design professionals, including the Architect, the Architects consultants, Engineers, and other professionals providing services shall be deemed the authors and owners of their respective Instruments of Service, including the Drawings and Specifications, and retain all common law, statutory, and other reserved rights in their Instruments of Service, including copyrights. The Contractor, Subcontractors, Sub-subcontractors, and Suppliers shall not own or claim a copyright in the Instruments of Service. Submittal or distribution to meet official regulatory requirements or for other purposes in connection with the Project is not to be construed as publication in derogation of the design professionals reserved rights.
B. The Contractor, Subcontractors, Sub-subcontractors, and Suppliers are authorized to use and reproduce the Instruments of Service provided to them solely and exclusively for execution of the
Work. All copies made under this authorization shall bear the copyright notice, if any, shown on the Instruments of Service. The Contractor, Subcontractors, Sub-subcontractors, and Suppliers may not use the Instruments of Service on other projects or for additions to the Project outside the scope of Work without the specific written consent of the Owner, and Owner’s design professionals.
1.06 Digital Data Use and Transmission
A. Except as otherwise stated elsewhere in the Agreement, the Parties may transmit and shall accept, Project-related correspondence, text, data, documents, drawings, information, and graphics, including but not limited to shop drawings and other submittals, in electronic media or digital format, either directly, or though access to a secure Project website.
00 72 00 General Conditions-5
B. If the Agreement does not establish protocols for electronic or digital transmittals, the Parties shall jointly develop such protocols.
C. When transmitting items in electronic media or digital format, the transmitting party makes no representations as to long term compatibility, usability, or readability of the items resulting from the recipient’s use of software application packages, operating systems, or computer hardware differing from those used in the drafting or transmittal of the items, or from those established in applicable transmittal protocols.
ARTICLE 2 – CONTRACTOR’S RESPONSIBILITIES
2.01 General Responsibilities
A. The Contractor shall use its diligent efforts to perform the Work in an expeditious manner consistent with the Contract Documents. Such Work includes furnishing construction administration and management services.
B. The Contractor shall provide all labor, materials, equipment, and services necessary to complete the Work, all of which shall be provided in full accord with and reasonably inferable from the
Contract Documents.
C. Unless the Contract Documents instruct otherwise, the Contractor shall solely be responsible for and have control over the construction means, methods, techniques, sequences, procedures, site security, and safety precautions, and for coordinating all portions of the Work under the Agreement.
D. The Contractor shall perform Work only within locations allowed by the Contract Documents, Law, and applicable permits unless otherwise directed by the Owner.
2.02 Construction Personnel and Supervision
A. The Contractor shall provide competent supervision for the performance of the Work. Before commencing the Work, or making a change in the supervisory personnel, the Contractor shall notify the Owner in writing of the name and qualifications of its proposed superintendent(s) and project manager so the Owner may review the individual’s qualifications. If, for reasonable cause, the
Owner refuses to approve the individual, or withdraws its approval after once giving it, the
Contractor shall name a different superintendent or project manager for the Owner’s review. Any disapproved superintendent shall not perform in that capacity thereafter at the Site. The superintendent shall represent the Contractor, and communications given to the superintendent shall be as binding as if given to the Contractor.
B. The Contractor shall be responsible to the Owner for acts or omissions of the Contractor’s employees, Subcontractors and their agents and employees, and other persons or entities performing portions of the Work for or on behalf of the Contractor or any of its Subcontractors and
Suppliers.
C. The Contractor shall permit only qualified persons to perform the Work. The Contractor shall enforce safety procedures, strict discipline, and good order among persons performing the Work.
If the Owner determines that a particular person does not follow safety procedures, or is unfit or
00 72 00 General Conditions-6 unskilled for the assigned Work, the Contractor shall immediately reassign the person upon receipt of the Owner’s written notice to do so.
D. The Contractor’s representative shall possess full authority to receive instructions from the Owner and to act on those instructions.
E. The Contractor shall coordinate and supervise the work performed by Subcontractors to ensure that the Work is carried out without conflict between trades and so that no trade, at any time, causes delay to the general progress of the Work. The Contractors and all Subcontractors at all times shall afford each trade, any separate contractor, or the Owner and Others, every reasonable opportunity for the installation of their work and the storage of materials, subject to the specific limitations or restrictions of a particular site.
2.03 Cooperation with Work of Owner and Others
A. The Owner may perform work at the Site directly or by Others. Any agreements with Others to perform construction or operations related to the Project shall include provisions pertaining to insurance, indemnification, waiver of subrogation, consequential damages, coordination, interference, cleanup, and safety that are substantively the same as the corresponding provisions of the Agreement.
B. If the Owner elects to perform work at the Site directly or by Others, the Parties shall coordinate the activities of all forces at the Site and agree upon fair and reasonable schedules and operational procedures for Site activities. The Owner shall require each separate contractor to cooperate with the Contractor and assist with the coordination of activities and the review of construction schedules and operations. The Contract Price and Contract Time may be equitably adjusted for changes resulting from the coordination of construction activities, and the Construction Schedule shall be revised accordingly.
C. With regard to work of the Owner and Others, the Contractor shall:
1. Proceed with the Work in a manner that does not hinder, delay, or interfere with the work of the Owner or Others or cause the work of the Owner or Others to become defective;
2. Afford the Owner or Others reasonable access for introduction and storage of their materials and equipment and performance of their activities; and
3. Coordinate the Contractor’s Work with theirs.
D. Before proceeding with any portion of the Work affected by the construction or operations of the
Owner or Others, the Contractor shall give the Owner prompt written notification of any defects the
Contractor discovers in their work which will prevent the proper execution of the Work. The
Contractor’s obligations in this subsection do not create a responsibility for the work of the Owner or Others but are for the purpose of facilitating the Work. If the Contractor does not notify the
Owner of defects interfering with the performance of the Work, the Contractor acknowledges that the work of the Owner or Others is not defective and is acceptable for the proper execution of the
Work. Following receipt of written notice from the Contractor of defects, the Owner shall promptly inform the Contractor what action, if any, the Contractor shall take with regard to the defects.
2.04 Contract Document Review
00 72 00 General Conditions-7
A. Prior to commencing the Work, the Contractor shall examine and compare all Contract Documents as well as information furnished by the Owner, shall take field measurements of any existing conditions related to the Work, and shall observe any conditions at the Site affecting the Work.
These obligations are for the purpose of facilitating coordination and construction of the Work by the Contractor and are not for the purpose of discovering errors, omissions, or inconsistencies in the Contract Documents; however, the Contractor shall promptly report to the Owner and, if directed, the Design Professional in the form of a request for information (RFI) any errors, inconsistencies, or omissions discovered by or made known to the Contractor by such examination.
It is recognized that the Contractor’s review is made in the Contractor’s capacity as a contractor and not as a licensed design professional, unless otherwise specifically provided in the Contract
B. The Contractor is not required to ascertain that the Contract Documents are in accordance with applicable laws, ordinances, codes, rules and regulations, or lawful orders of authorities having jurisdiction, but the Contractor shall promptly report to the Owner any nonconformity discovered by or made known to the Contractor as a request for information.
C. Nothing in this section shall relieve the Contractor of responsibility for its own errors, inconsistencies, and omissions.
2.05 Workmanship
A. The Work shall be executed in accordance with the Contract Documents in a workmanlike manner.
All materials used in the Work shall be furnished in sufficient quantities to facilitate the proper and expeditious execution of the Work and shall be new except as otherwise provided in the Contract
B. Work for which no explicit quality of standards of materials and/or workmanship is defined in the
Contract Documents shall be of best quality for the intended use and consistent with the quality of surrounding work and of the construction of the Project generally.
C. All manufactured articles, materials, and equipment shall be applied, installed, connected, erected, used, cleaned, and conditioned in accordance with manufacturer’s written instructions, unless specifically indicated otherwise in the Contract Documents.
D. Where the Work is to fit with existing conditions or work to be performed by Others, the Contractor shall join the Work fully and completely with such conditions or work, unless otherwise specified.
E. The Contractor shall be responsible for inspection of portions of the Work already performed to determine that such portions are in proper condition to receive subsequent Work.
F. The Contractor shall study and compare all Drawings and verify all figures shown thereon before laying out or constructing the Work. The Contractor shall be responsible for errors in its work and the work of its Subcontractors that might reasonably have been avoided thereby. The Contractor shall establish and be responsible for the accuracy of all lines, grades, measurements, levels, column lines, wall and partition lines required by the various Subcontractors in laying out their Work and shall protect and preserve all permanent bench and other markers. Checking of the figures or layout by the Design Professional shall not relieve the Contractor of these responsibilities.
00 72 00 General Conditions-8
2.06 Material Furnished by the Owner or Others
A. If the Work includes installation of materials or equipment furnished by the Owner or Others, it shall be the responsibility of the Contractor to examine the items so provided and thereupon handle, store, and install the items, unless otherwise provided in the Contract Documents, with such skill and care as to provide a satisfactory and proper installation. Loss or damage due to acts or omissions of the Contractor shall be the responsibility of the Contractor and may be deducted from any amounts due or to become due the Contractor. Any defects discovered in such materials or equipment shall be reported at once to the Owner. Following receipt of written notice from the
Contractor of defects, the Owner shall promptly inform the Contractor what action, if any, the
Contractor shall take with regard to the defects.
2.07 Tests and Inspections
A. The Contractor shall schedule all tests, inspections, and approvals of the Work required by the
Contract Documents, Law, or orders of authorities having jurisdiction at an appropriate time so as to not delay the progress of the Work. The Contractor shall give proper notice to all required parties of such tests, inspections, and approvals. If feasible, the Owner and Others may timely observe the tests at the normal place of testing. The Contractor shall bear all expenses associated with tests, inspections, and approvals required by the Contract Documents, which, unless otherwise agreed to, shall be conducted by an independent testing laboratory or entity retained by the
Contrac…