RFB 239 PLAN SET EAST and WEST FINAL 10 23 2025.pdf

PDF 14 MB Posted

Attached to
Cooper Creek Reservoir Dock Replacement
Solicitation number
S-C00100-00015473
Issued by
Douglas County, Oregon

About this file

This document is a plan set for the Cooper Creek Reservoir Dock Replacement project in Oregon, containing final construction drawings and specifications dated October 23, 2025. The project involves the replacement of an existing dock structure at Cooper Creek Reservoir, with detailed architectural and engineering plans provided for bidders to reference during the proposal process. The plan set includes site plans, elevation drawings, material specifications, and construction details necessary for contractors to prepare accurate bids. Bidders are expected to use these documents to understand the full scope of work, site conditions, and technical requirements for the dock replacement project. The drawings establish the baseline for all cost estimates and construction timelines that contractors will submit in response to the Request for Bids (RFB 239).

The plan set serves as the primary reference document for establishing project costs, construction methodology, and resource requirements for all bidders competing for the contract award. All contractors must review the complete plan set to ensure their bids accurately reflect the specified materials, dimensions, construction methods, and site-specific conditions outlined in the drawings. The finalized plan set dated October 23, 2025, represents the definitive project scope and supersedes any preliminary or draft versions previously distributed to potential bidders.

View the file

Other files

File Type Posted
RFB 239 Bid Document.pdf PDF
RFB 239 - Proposed Contract.pdf PDF
RFB 239 - Cooper Crk Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .