Request for Bids Summary
This is a Request for Bids (RFB 2027-06) issued by the City of Woodstock, Georgia, for construction of streetscape improvements along Towne Lake Parkway from Mill Street to Main Street, Phase II. The project encompasses site preparation and grading, concrete sidewalk construction (250 square yards), curb and gutter installation (365 linear feet), driveway reconstruction (68 square yards), storm drainage infrastructure including 46 linear feet of 18-inch storm drain pipe and one catch basin, removal of a 30.5-inch diameter oak tree, installation of brick pavers (270 square feet), and comprehensive erosion and sedimentation control measures. The RFB was released on October 22, 2026, with a mandatory pre-bid meeting held virtually via GoTo Meetings on October 29, 2026, at 10:00 a.m. All questions must be submitted through Bid Net Direct by November 5, 2026, at 5:00 p.m. Bids are due electronically through Bid Net Direct by December 1, 2026, at 10:00 a.m., with public opening and bid reading via GoTo Meetings at 10:01 a.m. the same day. Award is anticipated within 60 days of bid opening. The contract requires completion within 90 consecutive calendar days of Notice to Proceed issuance, with liquidated damages assessed at $250 per calendar day of default. A one-year warranty is required upon satisfactory project completion.
Bidders must submit a 5 percent bid bond or certified check, and the successful contractor must provide 100 percent performance and payment bonds, general liability insurance ($1,000,000/$2,000,000 aggregate), workers' compensation insurance, and manufacturers' and contractors' liability coverage. All bidders must maintain active Georgia Department of Transportation (GDOT) prequalification status prior to bid submission, with subcontractors required to be prequalified or registered with GDOT. Pricing must be itemized and remain valid for 60 days following submission. Payment is processed as progress payments after 30 days of completed work, with 5 percent retainage held to ensure satisfactory performance and on-schedule completion. All work must comply with City of Woodstock and GDOT standards. Respondents must submit numerous compliance certifications including non-collusion affidavits, E-Verify affidavits, drug-free workplace certifications, debarment and suspension certifications, conflict of interest disclosures, and non-segregated facilities certifications. No specific set-asides for small or disadvantaged businesses are identified in this solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2027 _ 06 _ Addendum _ Pre Bid Meeting Resche.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12453 Highway 92, Woodstock, GA 30188 770-592-6000 ∙ www.woodstockga.gov
REQUEST FOR BIDS
For
Streetscapes VI – Towne Lake Parkway – Mill Street to Main Street – Phase II
RFB NUMBER
2027 – 06
RELEASED:
October 22, 2026
DUE:
December 1, 2026 10:00 A.M. EST
For all questions about this RFB contact:
Martyn Detz Financial Analyst: Purchasing
770-592-6000 Ext 1205 www.bidnetdirect.com//cityofwoodstock
TABLE OF CONTENTS
1.0 PURPOSE OF SOLICITATION
1.1 SOLICITATION ADVERTISEMENT
2.0 RFB SPECIAL INSTRUCTIONS
2.1 NON-COLLUSION AFFIDAVIT
2.2 CONTRACTOR COMPLIANCE CERTIFICATIONS
2.3 REQUIRED BONDS AND INSURANCE
2.4 TAXES, FEES, CODE COMPLIANCE AND REQUIRED LICENSING
2.5 GDOT PREQUALIFICATION
2.6 REFERENCES AND PROPRIETARY INFORMATION
2.7 ILLEGAL IMMIGRATION REFORM AND ENFORCEMENT ACT OF 2011
2.8 ANTI-BOYCOTT OF ISRAEL
2.9 FORMS
3.0 RFB PROCEDURES
3.1 RFB SUBMISSION
3.2 RFB COSTS
3.3 SCHEDULE OVERVIEW
3.4 PRE-BID MEETING
3.5 RFB QUESTIONS/COMMUNICATIONS
3.6 RFB AMENDMENTS
3.7 RFB FORMAT
3.8 BID & AWARD BASIS
3.9 BID OPENING
3.10 REJECTION OF BIDS/CANCELLATION OF RFB
3.11 BID WITHDRAWAL
3.12 RFB AWARD AND PRICING INFORMATION
3.13 PAYMENT TO CONTRACTOR AND RETAINAGE
3.14 MISCELLANEOUS
4.0 SCOPE OF WORK
4.1 PROJECT GENERAL NOTES
4.2 MAINTENANCE OF TRAFFIC
4.3 BRAND NAME
4.4 NOTICE TO PROCEED
4.5 BID PROPOSAL FORM
4.6 UNIT PRICING SHEET
4.7 SITE PLANS
RFB Number 2027 – 06 Page 3
1.0 PURPOSE OF SOLICITATION
The City of Woodstock, Georgia, herein referred to as the City, is accepting bids from qualified contractors for the purpose of constructing streetscapes along Towne Lake Pkwy, hereinafter referred to as the “Project”. This includes but is not limited to pouring concrete sidewalk, curb & gutter, and driveway, constructing storm drainpipe, and a catch basin, removing an oak tree, and installing brick pavers.
All work shall conform to Georgia Department of Transportation (GDOT) and City of Woodstock standards. The project is expected to be completed within 90 days of issuance of Notice to Proceed
(NTP).
1.1 Solicitation Advertisement
The City of Woodstock is accepting bids from qualified contractors for construction services for Streetscapes VI project.
RFB details and document information may be found by visiting Bid Net Direct. A pre-bid conference (not mandatory) for all bidders will be held virtual via Go To Meetings on Thursday, October 29th, 2026 at 10 am. All questions must be submitted through Bid Net Direct prior to November 5th at 5:00 p.m.
All responses to this RFB must be received electronically through Bid Net Direct to the City of Woodstock, Georgia no later than 10:00 A.M. on December 1, 2026. Bids will be publicly opened via GoTo Meetings and read aloud at 10:01 A.M. All bids will be evaluated by the City and the project will be awarded, if it is awarded, within 60 days of the bid opening. The Contract will be awarded to the lowest, responsive, responsible Bidder as determined by the review committee and as approved by City Council.
Pricing should be itemized for the project. The contractor shall be responsible for furnishing all materials and labor to complete the project and shall coordinate construction dates and times with the City of Woodstock, Georgia Public Works Director. Pricing shall be valid for a period of 60 days after the RFB submittal date. All work must be approved prior to the release of payment. All work is expected to be completed within 90 days after a notice to proceed has been issued, pending any unnatural weather occurrence. Bidder further agrees to pay as liquidated damages the sum of $250 per each consecutive calendar day that the Bidder shall be in default after the date stipulated in the contract for completing the work.
All bidders shall be prequalified with the Georgia Department of Transportation (GDOT) prior to submission of the bid. Subcontractors shall be prequalified or registered with GDOT.
OWNER requires a bid bond* or a certified check in the amount of five percent (5%) of the total bid to be enclosed with the bid at the time of bid opening. Check will be made payable to City of Woodstock, Georgia. The successful bidder will be required to furnish OWNER with Insurance, Workman's
RFB Number 2027 – 06 Page 4
Compensation Insurance, and Performance and Payment Bonds* in the amount of one-hundred percent (100%) of the total bid.
The Contractor shall submit a progress payment request after thirty (30) days for the completed work.
The City shall make a progress payment to the Contractor on the basis of a duly certified and approved progress payment for the work performed during the thirty (30) days under this contract, but to insure the proper performance of this Contract, the City shall retain five percent (5%) of the amount of each pay app as retainage if such work is satisfactory and completed on schedule as determined with the City.
CONTRACTORS and SUBCONTRACTORS bidding on this Project will be required to comply with all Federal, State, territorial, and local laws. The City reserves the right to accept or reject any and all bids or any or parts of a bid wherein its judgment, it will be in the best interest of the City; waive any technicalities/informalities in the RFB document and bid process; and to qualify and award any or all of this contract in any manner in which the City, acting in the sole and exclusive exercise of its discretion, deems to be in the City’s best interest. If no acceptable bid is received, the City also reserves the right to re-solicit bids, at its sole discretion.
For further information regarding this RFB, please call 770-592-6000 ext. 1205.
This Section Intentionally Left Blank
RFB Number 2027 – 06 Page 5
2.0 RFB SPECIAL INSTRUCTIONS
1. The City of Woodstock, Georgia hereby requests bids for the goods and services inclusive of the services requested in the RFB.
2. City of Woodstock, Georgia reserves the right to evaluate the firm’s bids. Only those firms who, in the opinion of the City, meet the minimum necessary bid requirements will have their price and contract/agreement evaluated.
3. All bids, fee schedules and other documents furnished to the City of Woodstock, Georgia are subject to the Georgia Open Records Act.
4. Termination: The contract will be subject to the terms and conditions included in the Service Agreement. The City of Woodstock, Georgia reserves the right to cancel the agreement with cause, due to nonperformance and/or violation of contract terms.
5. The City shall be notified of business name change(s) in writing within thirty (30) days of changes.
6. The City shall be notified and approve of key personnel change(s) in writing prior to any changes.
2.1 Non-Collusion Affidavit
By submitting a bid, the respondent represents and warrants that no official or employee of the City has an interest, directly or indirectly, in the bid or in the final contract award. The respondent further understands bids will be rejected if there is any evidence of collusion with another respondent. See section 2.9 for form.
Respondent agrees that it shall not engage in any activity or conduct that would result in a violation of the City of Woodstock, Georgia Code of Ethics.
Respondent certifies that this qualification, offer, or bid is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a qualification, offer, or bid for the same materials, supplies, services, or equipment and is in all respects fair and without collusion or fraud. Respondents understand collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards. Respondent agrees to abide by all conditions of this qualification, offer, or bid.
Furthermore, the respondent certifies that the firm has not divulged to, discussed or compared his bid with other respondents and has not colluded with any other respondent or parties to this bid whatsoever. Also, respondent certifies, and in the case of a joint bid each party thereto certifies as to his/her own organization, that in connection with this bid:
Any prices and/or cost data submitted have been arrived at independently, without consultation, communication, or agreement, for the purpose of restricting competition, as to
RFB Number 2027 – 06 Page 6 any matter relating to such prices and or cost data, with any other respondent or with any competitor;
Any prices and/or cost data quoted for this bid have not been knowingly disclosed by the respondent and shall not knowingly be disclosed by the respondent prior to the scheduled opening directly or indirectly to any other respondent or to any competitor;
No attempt has been made or shall be made by the qualifier to induce any other person or firm to submit a bid for the purpose of restricting competition;
The only person or persons interested in this bid, principal/principals is/are named therein and that no person other than therein mentioned has any interest in his bid or in the contract to be entered into; and
No person or agency has employed or retained to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage, or established commercial agencies maintained by the Purchaser for the purpose of doing business
2.2 Contractor Compliance Certifications
Respondents agree to be bound by applicable Federal, State and Local laws, regulations and directives.
Respondents must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, the Contract Work Hour Standard Act, and the National Occupational Safety and Health Act of 1970.
Respondents must certify that they do not and will not maintain or provide for their employees any facilities which are segregated on a basis of race, color, creed, or national origin.
Respondents must certify that they have a drug-free workplace, if applicable.
Respondent certifies on behalf of itself, and all Participating Members, Major Non-Participating Members and Contractors identified by such Proposer as of the date hereof, as follows, are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any local, state or federal department or agency. See section 2.9 for forms.
2.3 Required Bonds and Insurance
No bid may be withdrawn for a period of sixty (60) days after time has been called on the date of opening.
All bids must be accompanied by a certified check or bid bond of a reputable bonding company authorized to do business in the State of Georgia, in an amount equal to at least five percent (5%) of the total amount of the bid. No specific bid bond form is required. The standard Surety form suffices.
RFB Number 2027 – 06 Page 7
Upon the award of this RFB, the contractor shall provide the City with:
A 100% project value performance and payment bonds pursuant to O.C.G.A. § 36-91-70 and 90.
General Liability - $1,000,000/ $2,000,000 aggregate, naming the City as an additional insured during the duration of the contract
Worker’s Compensation – Statutory (for the State of Georgia and the State of domicile of the Contractor).
Manufacturers’ and Contractor’s Liability, covering operations performed by or for the Contractor, with limits of not less than Bodily Injury – $500,000/$1,000,000. Property Damage - $500,000.
Contractor Liability, covering liability of others assumed by the Contractor elsewhere in the contract under “Hold Harmless” Agreements or similar assumptions of liability.
Evidence of required bonds and insurance shall be presented prior to the execution of the Contract.
The Bonding Company must be licensed to do business in the State of Georgia, licensed to do business by the Georgia Secretary of State, authorized to do business in Georgia by the Georgia Insurance Department, listed in the Department of the Treasury’s Publication of Companies Holding Certificates of Authority as Acceptable Surety of Federal Bonds and as Acceptable Reinsuring Companies and have an A.M. Best rating of A-, Class VI or Higher. Insurance policies to be carried under the agreement shall not be changed or canceled without prior written notification to the City of Woodstock, Georgia.
2.4 Taxes, Fees, Code Compliance and Required Licensing
The firm shall be responsible for the payment of any required taxes or fees associated with the execution of this contract. The firm shall also be responsible for compliance with all applicable codes and statutes.
2.5 GDOT Prequalification
All bidders must hold an active prequalification status with the Georgia Department of Transportation (GDOT) prior to submission of the bid. Subcontractors shall be prequalified or registered with GDOT.
2.6 References and Proprietary Information
Submission of a bid authorizes the City to make inquiries concerning the respondent and its officers to any persons or firms deemed appropriate by the City. Any proprietary information that the respondent does not want disclosed to the public shall be so identified on each page in which it is found. Data or information so identified will be used by the City solely for the purpose of evaluation and contract negotiations only.
RFB Number 2027 – 06 Page 8
2.7 Illegal Immigration Reform and Enforcement Act of 2011
By providing a qualification or bid, qualifier/bidder certifies that he/she is in compliance with O.C.G.A.
§ 13-10-90 and 91, et seq. No qualification or bid will be considered by the City unless it is accompanied with a signed, notarized affidavit from the qualifier/bidder attesting to the following:
a) The affiant has registered with and is authorized to use and uses the federal work authorization program
b) The user identification number and date of authorization for the affiant; and
c) The affiant will continue to use the federal work authorization program throughout the contract period; and
The affiant will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the same information required in subparagraphs (a), (b) and (c) of this paragraph. See section 2.9 for form.
2.8 Anti-Boycott of Israel
By signing and submitting this bid and pursuant to O.C.G.A. § 50-5-85, respondent/bidder certifies that it is not currently engaged in, and agrees that for the duration of this agreement, it will not engage in a boycott of Israel.
2.9 Forms
a) Contractor Form
b) E Verify Form
c) Vendor Conflict of Interest Form
d) Non-Collusion Affidavit of Prime Contractor
e) Certification by Contractor Regarding Non-Segregated Facilities
f) Drug Free Workplace
g) Debarment and Suspension Certification
See following page(s).
City of Woodstock
12453 Hwy 92 • Woodstock, GA • 30188 • 770-592-6000 • www.woodstockga.gov
CONTRACTOR INFORMATION
Firm Name:
Contact Person:
Firm Address:
Phone:
Fax:
Email:
With this packet, please also provide a W-9 and Certificate of Insurance for the company/firm.
Signature – Authorized Officer or Agent Date http://www.woodstockga.gov/
INSTRUCTIONS
CONTRACTOR AFFIDAVIT AND AGREEMENT
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13- 10-91, stating affirmatively that the individual, firm, or corporation which is contracting with the City of Woodstock, Georgia (the “City”) has registered with and is participating in a federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.
Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontract who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number
Date of Authorization
Name of Contractor
Name of Project Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on __________________, 201____ in ________________ (city), ______ (state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
Subscribed and Sworn before me this the________ day of _______________, 201____, Notary Public My Commission Expires INSTRUCTIONS ONLY - C
OM
PLE
TE
FOLLOWING PAGE
E-Verify/Company ID Issued by the E-Verify Program
Date E-Verify/Company ID was issued by E-Verify
Contractor's Company/Firm Name
Name of project or type of service provided
City of Woodstock, Georgia http://www.woodstockga.gov/ welchcl Highlight welchcl Highlight
CONTRACTOR AFFIDAVIT AND AGREEMENT
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13- 10-91, stating affirmatively that the individual, firm, or corporation which is contracting with the City of Woodstock, Georgia (the “City”) has registered with and is participating in a federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.
Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontract who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number
Date of Authorization
Name of Contractor
Name of Project
Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on _______________, 202____ in ________________ (city), _________ (state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
Subscribed and Sworn before me this the________ day of _______________, 202____, Notary Public My Commission Expires
City of Woodstock, Georgia
PROCUREMENT USE ONLY
___ Yes, named employee was involved in Bid/ Proposal process.
___ No, named employee was not involved in procurement process or decision.
VENDOR CONFLICT OF INTEREST DISCLOSURE FORM
All vendors interested in conducting business with the City of Woodstock, Georgia must complete and return the Vendor Conflict of Interest Disclosure Form in order to be eligible to be awarded a contract. Please note that all vendors are subject to comply with the City’s conflict interest policies as stated within the certification section below. If a vendor has a relationship with a City official or employee, an immediate family member of a City official or employee, the vendor shall disclose the information required below.
Certification: I hereby certify that to my knowledge, there is no conflict of interest involving the vendor named below:
1. No City official or employee or City employee’s immediate family member has an ownership interest in vendor’s company or is deriving personal financial gain from this contract.
2. No retired or separated City official or employee who has been retired or separated from the City for less than one (1) year has an ownership interest in vendor’s Company.
3. No City employee is contemporaneously employed or prospectively to be employed with the vendor.
4. Vendor hereby declares it has not and will not provide gifts or hospitality of any dollar value or any other gratuities to any City employee or elected official to obtain or maintain a contract.
5. Please note any exceptions below:
Vendor Name Vendor Phone Number
Conflict of Interest Disclosure*
Name of City of Woodstock, Georgia employees, elected officials, or immediate family members with whom there may be a potential conflict of interest.
( ) Relationship to employee __________________________ ( ) Interest in vendor’s company _______________________ ( ) Other __________________________________________
*Disclosing a potential conflict of interest does not disqualify vendors. In the event vendors do not disclose potential conflicts of interest and they are detected by the City; vendor will be exempt from doing business with the City.
I certify that the information provided is true and correct by my signature below.
Signature of Authorized Representative Date Printed Name and Title of Authorized Representative
NON-COLLUSION AFFIDAVIT OF PRIME CONTRACTOR
State of _
County of _
, being first duly sworn, deposes and says that:
(1) He is (Owner, Partner, Officer, Representative, or Agent) of the CONTRACTOR that has submitted the attached Bid;
(2) He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said CONTRACTOR nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affiant, has in any way colluded, conspired, connived, or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted to or refrain from bidding in connection with such Contract, or has in any collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit or cost element of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against The City of Woodstock, Georgia or any person interested in the proposed Contract; and,
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the CONTRACTOR or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.
Signed
Name
Title __
Subscribed and Sworn to before me this day of , 20 .
(SEAL)
Title
My Commission expires Date
CERTIFICATION BY CONTRACTOR REGARDING NON-SEGREGATED FACILITIES
The CONTRACTOR certifies that he does not, and will not, provide and maintain segregated facilities for his employees at his establishments and, further that he does not, and will not, permit his employees to perform their services at those locations, under his control, where segregated facilities are provided and maintained. Segregated facilities include, but are not necessarily limited to, drinking fountains, transportation, parking, entertainment, recreation, and housing facilities; waiting, rest, wash, dressing, and locker rooms, and time clock, work, storage, restaurant, and other eating areas which are set apart in fact, or by explicit directive, habit, local custom, or otherwise, on the basis of color, creed, national origin, and race.
The CONTRACTOR agrees that, except where he has obtained identical certifications from proposed subcontractors for specific time periods, he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000.00 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files.
The CONTRACTOR agrees that a breach of this certification is a violation of the Equal Opportunity clause in this Contract. The penalty for making false statements is prescribed in 18 U.S.C. 1001.
Contractor
Signature
Printed Name and Title of Signer
DRUG FREE WORKPLACE CERTIFICATION
CONTRACTOR certifies that they are a drug free workplace as described below and will maintain compliance with such for the duration of the agreement.
In order to have a drug-free workplace, a business shall:
1) Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of controlled substances is prohibited in the workplace and specifying the actions that shall be taken against employees for violation of such prohibition.
2) Inform employees about the dangers of drug abuse in the workplace, the business’s policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.
3) Give each employee engaged in providing the commodities of contractual services that are under proposal a copy of the statement specified in the subsection (1).
4) In the statement specified in subsection (1), notify the employee that, as a condition of working on the commodities or contractual services that are under proposal, the employee shall abide by the terms of the statement and shall notify the employer of any conviction of, or plea of guilty or nolo contender to, any violation of Chapter 893 or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five (5) days after such conviction.
5) Impose a sanction on or require that satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee’s community, by any employee who is so convicted.
6) Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section.
As the person authorized to sign this statement, I certify that this firm complies fully with the above requirements.
Contractor Authorized Representative Signature
The undersigned Proposer certifies on behalf of itself, and all Participating Members, Major Non- Participating Members and Contractors identified by such Proposer as of the date hereof, as follows:
The undersigned certifies to the best of its knowledge and belief, that it and its principals:
a. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any federal department or agency.
b. Have not within a 3-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (federal, State or local) transaction or contract under a public transaction; violation of federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property;
c. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (federal, State or local) with commission of any of the offenses enumerated in paragraph 1b of this certification; and
d. Have not within a three (3) year period preceding this application/proposal had one or more public transactions (federal, State or local) terminated for cause or default.
Where the Proposer is unable to certify to any of the statements in this certification, it shall attach a certification to its proposal or bid stating that it is unable to provide the certification and explaining the reasons for such inability.
Signature of Contractor’s Authorized Official
Name and Title of Contractor’s Authorized Official
DEBARMENT AND SUSPENSION CERTIFICATION
RFB Number 2027 – 06 Page 9
3.0 RFB PROCEDURES
3.1 RFB Submission
Interested parties must submit proposals electronically through Bid Net Direct to the City of Woodstock, Georgia by the due date for their proposals to be considered. Bid Net Direct can be found directly at www.bidnetdirect.com//cityofwoodstock or by visiting the City of Woodstock’s website.
Fax and e-mail responses are not acceptable.
Responses to this RFB will be accepted until 10:00 a.m. (EST) on December 1, 2026 through Bid Net Direct.
The City of Woodstock, Georgia reserves the right to reject any and all responses resulting from this RFB. Late responses will not be accepted. If company response is sent or routed to City offices, the submission requirement has not been met and any such response will not be evaluated and will be disqualified from consideration.
3.2 RFB Costs
All costs incurred in the preparation and presentation of responses to the RFB shall be completely absorbed by the RFB respondent. All documents submitted as part of the RFB will become property of the City. Requests for specific material to be returned will be considered. Any material submitted that is confidential must be clearly marked as such.
3.3 Schedule Overview
This Request for Bids is scheduled as follows:
Release of RFB Pre-bid Meeting Question Deadline Responses Posted Bids Due Date
Public Opening
October 22, 2026 October 29, 2026, 10:00 A.M.
November 5, 2026, 5:00 P.M.
November 12, 2026, estimated December 1, 2026, 10:00 A.M.
December 1, 2026, 10:01 A.M.
December 14, 2026 RFB and Contract Award
RFB Number 2027 – 06 Page 10
3.4 Pre-Bid Meeting
A pre-bid conference (non-mandatory) for all bidders will be held virtually through Go To Meetings on Thursday, October 29, 2026, at 10:00 am. See below for pre-bid link.
Pre Bid - RFB 2027 - 06 - Streetscapes VI Oct 29, 2026, 10:00 – 10:30 AM (America/New_York)
Please join my meeting from your computer, tablet or smartphone.
https://meet.goto.com/605078253
You can also dial in using your phone.
Access Code: 605-078-253 United States: +1 (224) 501-3412
Join from a video-conferencing room or system.
Meeting ID: 605-078-253 Dial in or type: 67.217.95.2 or inroomlink.goto.com Or dial directly: 605078253@67.217.95.2 or 67.217.95.2##605078253
Get the app now and be ready when your first meeting starts:
https://meet.goto.com/install
3.5 RFB Questions/Communications
All questions about this RFB and submission requirements must be submitted in writing through Bid Net Direct. The City’s representative listed in this section will serve as the primary contact for this RFB.
Martyn Detz Financial Analyst: Purchasing 12453 Highway 92 Woodstock, Georgia 30188 770-592-6000 ext. 1205 www.bidnetdirect.com//cityofwoodstock
Any unauthorized contact shall not be responded to and may result in the disqualification of the responder’s submittal. Answers to questions submitted via Bid Net Direct will be communicated to respondents via Bid Net Direct.
Communications by companies, its agents, employees, and/or representatives regarding its bids or intention to submit a bid in response to this RFB with any employee, agent, or representative of the City of Woodstock, other than the representative listed in Section 1.5, may be considered inappropriate communications.
RFB Number 2027 – 06 Page 11
If any such inappropriate communications are deemed to hinder, influence and/or alter the competitive bid process, the City, in an effort to ensure a fair and equitable review and selection process, reserves the right to decline consideration of the offender’s sealed bid.
3.6 RFB Amendments
It is the responsibility of respondents to check Bid Net Direct or the Georgia Procurement Registry for RFB information and addendums.
3.7 RFB Format
1. Contractor Information Sheet - If the firm has branch offices, state the office that will have management responsibility for the work to be carried out.
2. A copy of the firm’s W9
3. A copy of the firm’s Public Liability Insurance, Workers’ Compensation and Commercial General Liability Insurance.
4. E-Verify Affidavit with Instructions.
5. GDOT Prequalification
6. Pricing Sheet. The Bid Proposal Form and Itemized Pricing Sheet must be completed and returned with bid submittal.
7. Vendor Conflict of Interest Form
8. Contractor Compliance Certifications: Certification of Non-Collusion, Certification of Non- Segregated Facilities, Certification of Drug-Free Workplace, Debarment and Suspension Form.
9. Annotated list of references (with addresses and telephone numbers).
10. Copy of Georgia Business License
11. Bid bonds (5% of total bid amount)
a. 100% project value performance and payment bond (pending contract award)
3.8 Bid & Award Basis
The City reserves the right to accept or reject any and all bids or any or parts of a bid wherein its judgment, it will be in the best interest of the City; waive any technicalities/informalities in the RFB document and bid process; and to qualify and award any or all of this contract in any manner in which the City, acting in the sole and exclusive exercise of its discretion, deems to be in the City’s best interest. If no acceptable bid is received, the City also reserves the right to re-solicit bids, at its sole discretion.
RFB Number 2027 – 06 Page 12
3.9 Bid Opening
A clear, concise bid in the specified bid format is requested with all the necessary information included.
Responses to this RFB will be accepted until 10:00 a.m. (EST) on December 1, 2026, through Bid Net Direct. Bids will be publicly opened and read aloud virtually via GoTo Meetings on December 1, 2026, 10:01 A.M.
Bid Opening - RFB 2027 - 06 - Streetscapes VI Dec 1, 2026, 10:00 – 10:15 AM (America/New_York)
Please join my meeting from your computer, tablet or smartphone.
https://meet.goto.com/518140149
You can also dial in using your phone.
Access Code: 518-140-149 United States: +1 (872) 240-3212
Join from a video-conferencing room or system.
Meeting ID: 518-140-149 Dial in or type: 67.217.95.2 or inroomlink.goto.com Or dial directly: 518140149@67.217.95.2 or 67.217.95.2##518140149
Get the app now and be ready when your first meeting starts:
https://meet.goto.com/install
3.10 Rejection of Bids/Cancellation of RFB
The City of Woodstock, Georgia reserves the right to reject any or all bids, to waive any irregularity or informality in a bid, and to accept or reject any item or combination of items, when to do so would be to the advantage of the City.
It is also within the right of the City to reject bids that do not contain all elements and information requested in this document. The City reserves the right to cancel this RFB at any time. The City will not be liable for any cost/losses incurred by the Offerors throughout this process.
3.11 Bid Withdrawal
A submitted bid may be withdrawn prior to the due date by a written request to the City representative listed in Section 1.5. A request to withdraw a bid must be signed by an authorized individual of the submitting company.
3.12 RFB Award and Pricing Information
The City intends to award to a single Contractor. The City may award the entire project or portions of the project to a single Contractor.
RFB Number 2027 – 06 Page 13
Pricing should be itemized for the project. The Bid Proposal Form and Itemized Pricing Sheet in must be completed and returned with bid submittal.
Pricing shall be valid for a period of 60 days after submission date.
The Contract will be awarded to the lowest, responsive, responsible Bidder as determined by the review committee and as approved by City Council.
3.13 Payment to Contractor and Retainage
All work must be approved prior to the release of payment.
The Contractor shall submit a progress payment request after thirty (30) days for the completed work.
The City shall make a progress payment to the Contractor on the basis of a duly certified and approved progress payment for the work performed during the thirty (30) days under this contract, but to insure the proper performance of this Contract, the City shall retain five percent (5%) of the amount of each pay app as retainage if such work is satisfactory and completed on schedule as determined with the City.
3.14 Miscellaneous
This RFB and any agreements related thereto must comply, inter alia, with all City laws and charters and are subject to all requisite City approvals including, but not limited to, City Management and City Council.
The City reserves the right to release modifications to this RFB or supplements to it from time to time.
Firms are responsible for periodically checking Bid Net Direct or the Georgia Procurement Registry for such modifications or supplements.
See following page(s).
RFB Number 2027 – 06 Page 14
4.0 SCOPE OF WORK
Goods and services shall meet or exceed the following guidelines:
Site Preparation, Grading & Earthwork
Grading complete: complete all required clearing, grubbing, excavation, embankment, grading, subgrade preparation, slope construction, demolition of existing concrete pavement, removal of 30.5” diameter oak tree, stump grinding and disposal or surplus/unsuitable materials
Borrow & Compaction: furnish suitable materials as necessary. All fill areas must be compacted to a minimum of 95% Standard Proctor density. Concrete and asphalt removed from the site shall not be used as fill within easement or right-of-way limits
Subgrade Subsurface Drainage: install perforated underdrain pipe in subgrade locations where wet subsurface conditions are encountered, as directed by the Engineer
Roadway, Trail & Driveway Construction
Graded Aggregate Base: Place and compact 63 Tons of 6-inch Graded Aggregate Base Course (GABC) for sidewalk
Concrete Sidewalk: Construct 250 SY of 4-inch Concrete Sidewalk along designated alignments.
All pedestrian facilities must strictly comply with ADA standards and yellow truncated dome detectable warning specs (Detail A-4). The city will provide all brick material for construction.
Curb & Gutter: Install 365 LF of 8" x 24" Concrete Curb & Gutter (Type 2)
Driveway Adjustments: Reconstruct residential and commercial driveways in-kind (68 SY of 8-inch Concrete Driveway)
Stormwater Drainage Infrastructure
Storm Sewer Installation: Install 46 LF of 18-inch Storm Drainpipe (H 1-10) at designated stations (A1 through A8).
Structures: Construct 1 Catch Basin (Group 1, GDOT Standard 1033D/1034D) and 2 Safety End Section (18 Inch).
Maintenance of Existing Storm System: Clean all existing storm drainpipes and box culverts within the construction limits prior to final acceptance (cost included in Grading Complete).
Remove abandoned pipes as noted.
Traffic Control & Maintenance of Traffic
Lump Sum Traffic Control: Provide all staged construction, traffic maintenance, temporary signage, channelization drums, and temporary pavement markings in strict compliance with MUTCD (latest edition) and GDOT Section 150.
Safety & Access: always maintain uninterrupted ingress and egress for all adjacent property owners (GDOT Subsection 107.07). Maintain traffic drums at spacing equal to posted speed limit
RFB Number 2027 – 06 Page 15 or closer. Temporary crashworthy barriers must maintain a minimum 2-foot offset from travel lanes.
Sign Preservation: Maintain, clean, and reset existing traffic signs. Obsoleted or conflicting pavement markings shall be fully obliterated (blackout paint strictly prohibited).
Erosion & Sedimentation Control (ESPCP) as Landscaping
Pre-Disturbance Best Management Practices (BMPs): Install all initial erosion control BMPs prior to or concurrent with land-disturbing activities. Construct 3 Inlet Sediment Traps and maintain 65 LF of Fabric Check Dams
Site Stabilization: Stabilize cut/fill slopes continuously. Apply 2 Tons of Temporary Straw Mulch, and 290 SY of Sod for right-of-way restoration.
Utility Coordination & Special Requirements
Georgia 811 Call: Contractor shall call 811 / GA 811 prior to excavation and coordinate with utility owners (Atlanta Gas Light, AT&T, Charter, Comcast, Cherokee County Water & Sewer, City of Woodstock W&S, Georgia Power, Zayo/Crown Castle).
Irrigation Systems: Private irrigation/sprinkler systems within construction limits shall be cut and capped at the back of construction limits. Systems designated on plans for relocation shall be moved behind the sidewalk (cost included in Grading Complete).
The contractor shall be responsible for furnishing all materials, labor, and equipment. See the itemized pricing sheet in section 4.5 for full list of quantities and section 4.6 for detailed site plans. The portion of the project specifically is for construction along parcels 1, 2, 3 and 4 on the plan set.
4.1 Project General Notes
a. All work shall be done in accordance with City of Woodstock and Georgia Department of Transportation standard and supplemental specifications, current edition. All necessary licenses and permits shall be obtained by the contractor at his/her own expense unless previously obtained by the City.
b. All known facilities are shown schematically on plans and are not necessarily accurate in location as to plan or elevation. Utility facilities such as service lines or unknown facilities not shown on plans will not relieve the contractor of their responsibility under this requirement. ‘Existing utility facilities’ means any utility that exists on the project in its original, relocated or newly installed position.
c. Utility work coordination will be required as a part of this contract. The contractor shall be required to use the one-call center telephone number. 811 or 1-800-282-7411. For the purpose of coordinating the marking of underground utilities. The contractor’s attention is called to sub-section 105.06 of the GDOT standard specifications – cooperation with utilities.
RFB Number 2027 – 06 Page 16
Utility Contact Information:
Atlanta Gas Light Company – Gas
AT&T – telephone
Charter – Fiber
Comcast – Fiber
Cherokee County Water & Sewer Authority – Water & Sewer
City of Woodstock - Water & Sewer
Georgia Power – Power
Zayo and/or Crown Castle – Fiber
d. Ingress and egress shall be maintained at all times to adjacent properties. Refer to sub-section
107.07 of the Georgia standard specifications.
e. It shall be the contractors responsibility to furnish suitable borrow material for the project and to dispose of any unsuitable or waste material in compliance with all local, state and federal regulations. Concrete and asphalt materials removed from the project site may not be placed in fill locations that fall within easement areas. All fill areas must be compacted to minimum 95% standard proctor.
f. Perforated underdrain shall be placed in areas where wet conditions exist in the subgrade as directed by engineer.
g. Structures, trees, shrubs and other plant material that fall within the right of way and easement limits, but outside the limits of construction, shall not be disturbed unless directed by the engineer.
h. In area where new pavement or payment widening is required, saw cut of existing pavement will be required in accordance with section 411 of the Georgia standard specifications and will be included in price bid for ‘Grading Complete’
i. All road signs shall be reset if required and payment shall be included in ‘Traffic Control’
j. All cut and fill slopes shall be stabilized to comply with section 161.3.05.B of the specifications in order to reduce the potential for erosion. If the season does not permit permanent grassing, temporary straw mulch and/or temporary vegetation shall be used as per the erosion and sedimentation pollution control plan (ESPCP) or as directed by the engineer
k. All driveways shall be maintained during construction. All driveways to be constructed shall be replaced in kind I.E. asphalt for asphalt, concrete for concrete etc. Any other driveway material or specialized driveway will not be replaced in kind (i.e. pavers) and will be replaced with asphalt or concrete. Driveways shall be paved as follows:
Asphaltic Drives Residential – 1-1/2” Asph. Conc. 12.5 MM superpave, 165 lb/sy
- 6” graded aggregate base Commercial – 1 – ½” Asph Conc. 12.5 mm superpave, 165 lb/sy
- 2” asph conc. 19 mm superpave, 220 lb/sy
- 8” graded aggregate base
RFB Number 2027 – 06 Page 17
Concrete Drives Residential – 6” concrete valley gutter
- 6” concrete driveway
- 6” graded aggregate base Commercial – 8” concrete valley gutter
- 8” concrete driveway
- 6” graded aggregate base
l. Erosion control measures shall be installed to be in compliance with the approved erosion and sedimentation pollution control (ESPCP). Erosion control measures shall be installed prior to any land disturbing activities that involve environmental sensitive areas (ESA’s) as defined under section 107.23 F of the specifications and the ESPCP. In general, erosion control items should be installed prior to the start of any land disturbing activities. The installation of the erosion control items may be installed concurrent with the start of the land disturbing activities. If allowed by the ESPCP.
m. Sprinkler systems to be handled as follows:
Case 1 – systems within the construction limits owned by individuals or private companies are to be removed to the back of the construction limits and plugged
Case 2 – systems shown by the plans to be removed and relocated shall be relocated to the back of the sidewalk. Cost shall be included in price bid for ‘Grading Complete’
n. An N.O.I (notice of intent) is not required for this project
o. All existing storm drain pipes including box culverts within the construction limits shall be cleaned prior to completion of project. Cost to be included in ‘Grading Complete’
p. All existing pipe no longer in use shall be removed unless otherwise noted on plans or as directed by the engineer. Removal of pipe shall be included in price bid for ‘Grading Complete’
q. All pedestrian facilities shall be installed in compliance with the American Disabilities Act
Contractor shall obtain necessary permits and licenses, provide all labor, materials, and equipment, maintain property access, protect vegetation and structures, properly dispose of waste materials, restore disturbed areas, coordinate with utilities, maintain ADA compliance, and submit as-builts and test reports.
4.2 Maintenance of Traffic
a. All items necessary for compliance with these requirements shall be included in the price bid for ‘Traffic Control’
b. All signs and pavement markings shall conform to the manual on uniform traffic control devices, latest edition.
RFB Number 2027 – 06 Page 18
c. Existing traffic signs shall be maintained by the contractor throughout construction.
Maintenance includes replacing damaged and stolen signs, and periodic cleaning of existing signs and construction related traffic control devices.
d. Existing pavement markings that conflict as determined by the engineer shall be obliterated by the contractor (black out paint prohibited)
e. Temporary traffic barriers shall have two (2’) feet minimum offset from the edge of any travel lane. Only traffic drums, meeting the minimum requirements of the MUTCD and section 150, and temporary barriers that are crashworthy shall be used adjacent to travel lanes, unless prior approval is granted by City of Woodstock. The temporary barriers cannot be placed less than two (2’) feet from the edge of the travel lanes. The use of type I and type II barricades and traffic cones is prohibited.
f. Traffic drums meeting the minimum requirements of the MUTCD and section 150 shall be used for channelization of traffic in all traffic shifts. For any work zone, the maximum drum spacing, in feet, shall be the design or posted speed limit, whichever is less. Based on field conditions, the maximum spacing of the traffic drums may need to be further reduced.
g. All traffic control devices shall be maintained by the contractor so as not to interfere with sight distances along any adjacent side road or driveway.
h. City of Woodstock reserves the right to modify the maintenance of traffic plan as field conditions warrant. If additional traffic control devices are required, these shall be provided by the contractor at no additional expense to the City.
i. No lane closures are allowed between 6 and 9 am and 4 – 7 pm without prior approval by the City
j. Lump-sum traffic control: the price bid for lump-sum traffic control include the cost of staged construction, maintenance of traffic (including aggregate surface course), installation and removal of all temporary signage, interim pavement markings, barricades, and other interim traffic control devices necessary for the construction and maintenance of the project. Devices utilized on the project shall be in compliance with the manual on uniform traffic control devices (MUTCD), current edition and section 150. All devices, signs, posts, barricades, etc shall be from the GDOT qualified products list (QPL). All devices shall be crashworthy under AASHTO and NCHRP 350 requirements. The engineer may direct that additional devices and markings be added to the traffic control plan. The cost of nominal items added by the engineer shall be included in the lump-sum traffic control except for the addition of a changeable message sign(s) or a unit price will be determined when a changeable message sign(s) is not included in the contract.
RFB Number 2027 – 06 Page 19
4.3 Brand Name
Unless otherwise specified, the items in this bid have been identified, described, and referenced by a brand name or trade name/mark that is intended to be descriptive, but not restrictive, and is used to indicate the quality and characteristics of products that may be offered.
Other products may be considered for award if such products are clearly identified in the bid and are determined by the City to meet its needs in all respects. It shall be the responsibility of the bidder(s), including the bidder whose product is referenced, to indicate the brand name and model or series number of the product offered and to furnish with their bid such specifications, catalog pages, brochures, or other data that will provide an adequate basis for determining the quality and functional capabilities of the product offered.
However, the City may elect to purchase brand name products or services when the goods comprise a major brand system, program, or service previously selected by the City and due to operation effectiveness, future enhancements or additions, or maintenance and storage of spare parts preclude the mixing of brands, manufactures, etc.
Any information provided should be properly labeled. The City reserves the right to request product demonstrations and/or samples from any bidders prior to bid award.