This is a Request for Bids (RFB 2026-02) issued by the City of Hanford for the Hanford Municipal Airport's closure of an existing underground fuel storage tank. The project involves the decommissioning of one 12,000-gallon Avgas tank scheduled for closure on December 31, 2025, and the demolition of existing above-ground fuel dispensers and miscellaneous equipment. The bid is set to be opened on August 6, 2025, at 2:00 p.m., with a pre-bid conference scheduled for July 23, 2025, at 10:00 a.m. The contract time for completion is specified as 10 working days, with the contractor required to complete all work to the satisfaction of the Kings County Environmental Health Department prior to December 31, 2025.

The bid requires a contractor licensed in the C61/D40 classification with HAZ certification, with a bid security of 10% of the total bid amount. Liquidated damages are set at $3,000 per calendar day for delays beyond the specified construction time, with an additional $5,000 per calendar day if the project is not completed by December 31, 2025. The project is subject to California Air Resources Board (CARB) regulations, and bidders must provide Certificates of Reported Compliance (CRC) for their fleet and listed subcontractors. The project will be funded through the City of Hanford, with the contractor responsible for all necessary permits, safety measures, and compliance with federal, state, and local regulations, including airport operational safety requirements.

View the file

Other files

File Type Posted
2026-02 Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF HANFORD

HANFORD MUNICIPAL AIRPORT

Closure of Existing Underground Fuel Storage Tank

RFB 2026-02

Bid Opening: August 6, 2025 at 2:00 p.m.

REQUEST FOR BIDS

City of Hanford 315 N. Douty Street Hanford, CA 93230

(559) 585-2589

Prepared by:

7-8-25 mbrandley Melissa Stamp

-i-

REQUEST FOR BIDS FOR

HANFORD, KINGS COUNTY, CALIFORNIA

CLOSURE OF EXISTING UNDERGROUND FUEL STORAGE TANK

TABLE OF CONTENTS

Section Title Page

ORGANIZATION OF SPECIFICATIONS\

DIVISION I BIDDING AND CONTRACT DOCUMENTS

Notice to Contractors .................................................................................. A-1 Instructions to Bidders ................................................................................ B-1 Vicinity Map Proposal Forms Bid Proposal................................................................................................ C-1 Bid Schedule ............................................................................................... C-6 Bidder Guaranty Bond ................................................................................ C-8 Non-Collusion Declaration ......................................................................... C-10 Certification of Bidder’s Experience and Qualifications ........................... C-11 Designation of Subcontractors ................................................................... C-12 Fleet Compliance Certification .................................................................. C-13

Sample Forms Agreement Faithful Performance Bond Payment Bond Guaranty Bond

DIVISION II GENERAL PROVISIONS

Part A General Contract Provisions:

10 Definition of Terms .................................................................................... GP-1 20 Proposal Requirements and Conditions ..................................................... GP-8 30 Award and Execution of Contract .............................................................. GP-11 40 Scope of Work ............................................................................................ GP-13 50 Control of Work .......................................................................................... GP-16 60 Control of Materials .................................................................................... GP-21 70 Legal Relations and Responsibility to Public ............................................ GP-24 80 Execution and Progress .............................................................................. GP-32 90 Measurement and Payment ........................................................................ GP-38

-ii-

Section Title Page

DIVISION II GENERAL PROVISIONS (Continued) Part B General Construction Items – AC 150/5370-10H:

C-102 Temporary Air and Water Pollution, Soil Erosion, and Siltation Control ........................................................................................ GC-1 C-105 Mobilization .................................................................................................. GC-4 C-106 Marking and Lighting of Closed Airport Facilities ...................................... GC-6

DIVISION III SPECIAL CONDITIONS

SC (1) Location .............................................................................................. SC-1

(2) Work To Be Done .............................................................................. SC-1

(3) Plans and Specifications ..................................................................... SC-1

(4) Laws to be Observed .......................................................................... SC-1

(5) California Air Resources Board (“CARB”) Regulations .................. SC-3

(6) Laws Affecting Public Works ............................................................ SC-3

(7) Limits of Construction ....................................................................... SC-3

(8) Progress of Work and Time of Completion ....................................... SC-3

(9) Liquidated Damages........................................................................... SC-4

(10) Construction Schedule ....................................................................... SC-4

(11) Closures of Runway, Taxiways, and Aprons ..................................... SC-4

(12) Hauling Routes on Airport Property .................................................. SC-5

(13) Contractor's Storage and Staging Area .............................................. SC-6

(14) Watering ............................................................................................. SC-6

(15) Marking of Construction Equipment ................................................. SC-7

(16) Aircraft Right of Way and Access ..................................................... SC-7

(17) Protection of Cables, Controls, NAVAIDs and Weather Bureau Facilities ......................................................................................... SC-7

(18) Airport Security .................................................................................. SC-8

(19) Aviation Safety Requirements During Construction ......................... SC-9

(20) Preconstruction Conference ............................................................... SC-14

(21) Submittals and/or Shop Drawings ..................................................... SC-15

(22) Submittal and Shop Drawing Approvals ........................................... SC-16

(23) Videotaping ........................................................................................ SC-16

(24) Construction Management Plan ......................................................... SC-16

(25) Workmanship ..................................................................................... SC-17

(26) Contractor's Record Drawings ........................................................... SC-17

(27) Operation and Maintenance Manuals ................................................ SC-17

(28) Anti-Trust Assignment ....................................................................... SC-17

(29) Contractor Not Agent, Nor Employee ............................................... SC-17

(30) Contractor's Guarantee ....................................................................... SC-18

(31) Coordination Meeting ........................................................................ SC-18

(32) Existing Conditions ............................................................................ SC-18

(33) Determination of In-Place Density .................................................... SC-18

-iii-

Section Title Page

APPENDICES

APPENDIX A – Construction Safety and Phasing Plan (CSPP) APPENDIX B – Required Submittals APPENDIX C – Underground Storage Tank Permit

DIVISION I

BIDDING AND CONTRACT DOCUMENTS

Notice to Bidders Division I - Page A-1

NOTICE TO CONTRACTORS

Bid Submissions will be received through the Bidnet Direct’s California Purchasing Group website below until 2:00 p.m. on Wednesday, August 6, 2025, at which time they will be publicly opened digitally and posted for performing work in accordance with Plans and Specifications, therefore, as follows:

Bids are required to provide all labor, materials, equipment, supervision, and insurance necessary for the entire work as described herein:

• Closure of one 12,000-gallon Avgas tank, which is scheduled for decommissioning on Dec.

31, 2025. Demolition of the existing above ground fuel dispensers and miscellaneous equipment.

Obtaining Bid Documents Plans, specifications, and proposal forms to be used for bidding shall only be obtained through the Bidnet Direct’s California Purchasing A Group website:

http://www.bidnetdirect.com/california/cityofhanford

All vendors looking to do business with the City of Hanford are encouraged to register to access bids, related documents, addendum, planholder lists, and award information. All bid documents shall be included in the Bidnet Direct’s California Purchasing Group website submission to be valid at the time of bid opening.

Pre-bid Conference The City shall conduct a pre-bid conference on Wednesday, July 23, 2025, at 10:00 a.m. at the following location: 315 N. Douty Street, Hanford, California. All interested bidders are invited to attend.

Contract Time This work shall be constructed in accordance with details as shown on the plans and described in the specifications for this project. The construction work for the entire project shall be completed within ten (10) working days. Contractor shall complete work to the satisfaction of the Kings County Environmental Health Department prior to December 31, 2025.

Bid Security Bids must be from a contractor appropriately licensed by the time of award must be sealed and accompanied by cash, a certified or cashier's check, equivalent to ten percent (10%) of the proposal, payable to the order of City of Hanford, to guarantee that if a proposal is accepted, a contract will be entered into and its performance secured. Such guaranty to be forfeited should the bidder to whom the contract is awarded fail to enter into this contract. A Bidder's Bond to like effect and amount with http://www.bidnetdirect.com/california/cityofhanford

Notice to Bidders Division I - Page A-2 a corporate surety will be acceptable for this project. Bids must be in writing and signed by or on behalf of the bidder.

Questions/Addenda All questions regarding this project shall be in writing and shall be submitted through Bidnet, no later than 4:00 P.M. on July 30, 2025.

Any changes to, or clarification of, the project plans and specifications shall be in the form of an addendum issued to plan holders of record. Questions that prompt a change or clarification shall be included in the addendum with the subsequent answer.

Bonding Requirements The successful bidder or bidders will be required to furnish a Performance Bond for 100 percent of the contract price to secure fulfillment of all the bidder's obligations under such contract. The successful bidder will further be required to furnish a Payment Bond for 100 percent of the contract price to assure payment as required by law of all persons supplying labor and material in the execution of the work provided for in the contract.

Award of Contract The contract will be awarded on the basis of UNIT BID price and will provide for progressive payments and liquidated damages as fixed in the specifications. All proposals must be made on the forms as contained in the specifications for the previously described project and shall in all respects comply with the Instructions to Bidders and Contract Documents. Bids must be in writing and signed by or on behalf of the bidder. No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening thereof.

The City reserves the right to waive any informality or irregularity in a bid and to increase or decrease the amount of any part of the work.

CARB Contracting Requirements The California Air Resources Board (“CARB”) implemented amendments to the In-Use Off-Road Diesel-Fueled Fleets Regulations (“Regulation”) which are effective on January 1, 2024, and apply broadly to all self-propelled off road diesel vehicles 25 horsepower or greater and other forms of equipment used in California. A copy of the Regulation is available at https://ww2.arb.ca.gov/sites/default/files/barcu/regact/2022/off-roaddiesel/appa-1.pdf. Bidders are required to comply with all CARB and Regulation requirements, including, without limitation, all applicable sections of the Regulation, as codified in Title 13 of the California Code of Regulations section 2449 et seq. throughout the duration of the Project. Bidders must provide, with their Bid, copies of Bidder’s and all listed subcontractors’ most recent, valid Certificate of Reported Compliance (“CRC”) issued by CARB. Failure to provide valid CRCs as required herein may render the Bid non-responsive.

Contractor’s License Classification A contractor will not be required to be licensed to prepare a bid for the project but must be licensed in accordance with the provisions of Chapter 9, Division III of the Business and Professions Code, Notice to Bidders Division I - Page A-3 before performing any work on the project. A license of the classification of C61/D40 with HAZ is required for the work proposed under this contract and is mandatory.

Wage Rates All labor on the project shall be paid the minimum wage rates as established by the California Director of Industrial Relations.

DIR Registration This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR). No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section

1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)). No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

Securities Monthly progress payments shall be made to the Contractor for the value of the work completed during the preceding month, less a five percent (5%) security withhold. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the City or with a state or federally chartered bank as the escrow agent, who shall pay such monies to the Contractor upon satisfactory completion of the contract. Securities eligible for investment under this section shall include those listed in Government Code Section 16430 or bank or savings and loan certificates of deposit. The Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon.

CITY OF HANFORD, a Municipal Corporation of the State of California Dates: July 10, 2025, and July 16, 2025

Instructions to Bidders Division I - Page B-1

INSTRUCTIONS TO BIDDERS

1. PROPOSAL REQUIREMENTS

A. General Requirements. The Bidder’s / Contractor's attention is directed to Division II General Provisions, Part A, General Contract Provisions, Section 20, "Proposal Requirements and Conditions," for general details on the preparation of proposals for this Project.

B. Registration Requirement: Per Public Works Contractor Registration Law [SB 854], Contractors and Subcontractors who intend to bid or perform work on this Project must be registered with the Department of Industrial Relations. Information is available at:

https://www.dir.ca.gov/public-works/contractors.html

2. SCOPE OF PROJECT

The work to be done under this contract consists of furnishing all materials, plant and equipment, and performing all necessary labor in accordance with the prepared plans, specifications, and special provisions as directed by the City or its authorized representative, as follows:

• Closure of one 12,000-gallon Avgas tank, which is scheduled for decommissioning on Dec.

31, 2025. Demolition of the existing above ground fuel dispensers and miscellaneous equipment.

3. PROJECT INFORMATION

All questions regarding this project shall be in writing and shall be submitted through Bidnet, no later than 4:00 P.M. on July 30, 2025.

4. ADDENDA

If any person contemplating submitting a bid for the proposed contract is in doubt as to the true meaning of any part of the Plans and Specifications or other proposed Contract Documents or finds discrepancies in or omissions from the drawings or Specifications, he/she may submit to the City Engineer through BidNet a request for information for interpretation or correction thereof. The person submitting the request shall submit said request at least seven (7) days prior to the bid opening date. Any interpretation or correction of the proposed documents will be made only by Addendum duly issued, and a copy of such Addendum will be issued through Bidnet to planholders of record.

The City Council will not be responsible for any other explanations or interpretations of the proposed documents.

Each bid form shall include specific acknowledgment in the space provided of receipt of all addenda issued and mailed by the Owner during the bidding period. Failure to so acknowledge may result in the bid being rejected as not responsive.

https://www.dir.ca.gov/public-works/contractors.html

Instructions to Bidders Division I - Page B-2

5. PREPARATION OF BID

Bids will be received through the City’s Bidnet at:

Each bid must be submitted on the prescribed form. All blank spaces for bid prices must be filled in.

6. PROPOSAL GUARANTY- BIDDER’S BOND

Each proposal shall be accompanied by one of the following forms of the bidder’s security:

cash, certified cashier's check, or a bidder's bond executed by an admitted surety insurer, made payable to the City of Hanford for an amount equal to at least ten percent (10%) of the total bid amount. No bid will be considered unless such cash, certified cashier's check or bidder's bond is enclosed therewith. Bidder’s Bond shall be furnished from an admitted surety insurer listed in the Federal Register.

Pursuant to California Code of Civil Procedure Section 995.120 an "Admitted Surety Insurer" is defined as a corporate insurer or a reciprocal or inter-insurance exchange to which the Insurance Commissioner of the State of California has issued a Certificate of Authority to transact surety insurance in the State of California.

A scanned copy of Bid Bonds must be submitted electronically with the bid through Bidnet prior to bid opening. Original hard copies of Bid Bonds shall be provided by the apparent low bidder within five business days following bid opening and can be received at 900 S. 10th Ave. Hanford CA 93230 addressed to City Engineer.

7. BID PRICES

Bid prices shall include everything necessary for the completion of the work including, but not limited to, providing the materials, equipment, tools, plant and other facilities, and the management, superintendence, labor and services, and any warranty and maintenance required. Bid prices shall include allowance for federal, state and local taxes.

8. BIDDER'S QUALIFICATIONS

It is required that prior to award the Contractor hold a valid contractor's license of a class C61/D40 with HAZ in accordance with the State Contractor's License Law requirements under the provisions of Chapter 791, Statutes of California, 1929, as amended.

In accordance with Senate Bill 854 (SB 854), all contractors submitting a bid for this project must be registered with the Department of Industrial Relations (DIR). All contractors and subcontractors who bid and work on any City-awarded public works project must be registered.

Instructions to Bidders Division I - Page B-3

9. DESIGNATION OF SUBCONTRACTORS

In the State of California all bids shall be accompanied by a List of Subcontractors that the Bidder proposes to use who will perform work or labor or render service to the Bidder in excess of one-half of one percent of the Bidder’s total bid or $10,000, whichever is greater. The names, principal business address, license number, and portion of work that will be done by each subcontractor shall be submitted on the form which is furnished in the Proposal Forms of these Contract Documents.

Bidder shall be solely responsible to correct any errors in the listing of the California Contractor’s license number. A deadline of 24 hours after bid opening is established by which a bidder must submit corrected California Contractor’s license number information to the City. A bidder’s failure to submit corrected California Contractor’s license numbers will cause the bid to be non-responsive.

If the Bidder fails to specify a subcontractor for any portion of the work to be performed under the Contract in excess of one-half of one percent of the Bidder’s total bid, the Bidder agrees to perform that portion itself. The successful bidder shall not, without the consent of City either:

a.) Substitute any person, firm, or corporation as subcontractor in place of the subcontractor designated in the original bid; or b.) Permit any subcontractor to be assigned or transferred or allow it to be performed by anyone other than the original subcontractor listed in the bid.

The Bidder shall include in his proposal for the work the name and the location of the place of business, the California Contractors License number, and DIR number of each subcontractor who will perform work or labor or render service to the general contractor in or about the construction of the work or improvement in an amount in excess of one half (1/2) of one percent (1%) of the general contractor's total bid, and the portion of the work which will be done by each subcontractor. An inadvertent error in California Contractor License Number shall not be grounds for filing a bid protest or ground for considering the bid nonresponsive as long as the corrected Contractor’s License Number is submitted to the City by the prime contractor within 24 hours of the bid opening.

10. PREVAILING WAGE REQUIREMENTS

Wage rates and restrictions on working days and times shall meet all requirements of the Labor Code of the State of California for public contract. All labor on this Project shall be paid not less than the minimum wage rates established by the State of California's Director of the Department of Industrial Relations (State Wage Rates). The bidder may contact the Director of the Department of Industrial Relations, phone number (415) 703-4774 or www.dir.ca.gov/dlsr/PWD / (website), to obtain a schedule of the State general prevailing wages applicable to the location and work to be done.

The Contractor and the Contractor’s subcontractors are responsible for compliance with the requirements of Section 1777.5 and 1777.6 of the Labor Code of the State of California regarding employment of apprentices.

http://www.dir.ca.gov/dlsr/PWD

Instructions to Bidders Division I - Page B-4

11. CONTRACT BONDS

Upon receipt of written notice of award of the contract and not more than fifteen (15) days thereafter, the Contractor shall furnish the following bonds with power of attorney issued by a surety licensed to do business in the State of California. The form of the bonds shall be acceptable to the Owner:

A. Faithful Performance Bond in a sum equal to one hundred percent (100%) of the amount of the contract awarded. This bond shall be made payable to the City of Hanford to guarantee the faithful performance of the contract.

B. Payment Bond in a sum equal to one hundred percent (100%) of the amount of the contract awarded. This bond shall be made payable to the City of Hanford to guarantee the payment of all labor, materials, rentals, etc. This bond shall have specific provisions to assure payment of all unemployment contributions which become due and payable.

12. EXISTING FACILITIES

The Contractor's attention is directed to the fact that the existing airport facilities must be kept in operation with an absolute minimum of interference, except as specified in the Special Conditions section of these specifications, in order that no delays or hazards affect the using of this airport facility.

The Contractor shall be required to plan and coordinate his work with the Resident Project Representative (RPR) in such a manner as to ensure safety and a minimum of hindrance to the public using the facilities. All construction and access to the construction must be confined to the limits designated by the RPR.

Portions of the tie down apron, fuel island and Taxiway A at the airport will be closed intermittently during construction of the project but the runway, remaining taxiways, and hangars shall be kept open for aircraft operations.

13. SUBLETTING OF CONTRACT

The Contractor shall not sublet, sell, transfer, assign or otherwise dispose of the contract or contracts or any portion thereof, or of his right, title, or interest therein, without written consent of the Owner. In case such consent is given, the Contractor will be permitted to sublet a portion thereof, but shall perform with his own organization not less than 30 percent of the total contract cost, except that any items designated by the Contractor and approved by the Owner as "specialty items" may be performed by subcontract and the cost of any such specialty items so performed by subcontract may be deducted from the total cost before computing the amount of work to be performed by the Contractor with his own organization. No subcontracts or transfer of contract shall release the Contractor of his liability under contracts and bonds.

14. CALIFORNIA AIR RESOURCES BOARD (“CARB”) REGULATIONS

The City is a Public Works Awarding Body, as defined under Title 13 California Code of Regulations section 2449(c)(46). Accordingly, Bidders must submit, with their Bids, valid

Instructions to Bidders Division I - Page B-5

Certificates of Reported Compliance (“CRC”) for the Bidder’s fleet and for the fleet(s) of its listed subcontractors (including any applicable leased equipment or vehicles). Bidder must additionally complete and submit the Fleet Compliance Certification, included in the Bid Documents. Failure to provide a CRC for the Bidder, and for all listed subcontractors, or failure to complete the Fleet Compliance Certification, may render the Bid non-responsive.

15. BID EVALUATION

Bids will be evaluated for price, conformance to the Plans, Specifications, Bid Documents, experience, and other factors as appropriate.

The bid price for each item on the Bid Schedule shall include all costs associated with completing the work included in the item and only those costs. Profit and overhead shall be factored into each item.

In case of conflict in the proposal between unit price bid and the extended total, the unit price bid shall govern. In case of conflict between words and numerals, the words, unless obviously incorrect, shall govern.

16. BASIS OF AWARD

The contract, if awarded, will be awarded to the lowest responsive and responsible bidder who is in compliance with these instructions and the Advertised Notice to Bidders, provided the bids are reasonable and it is to the interest of the Owner to accept them. The competency and the responsibility of bidders and of their proposed subcontractors will be considered in making the award of the bid.

The Owner reserves the right to reject any or all bids and to waive irregularities not affecting substantial rights.

The basis of the award is subject to all conditions as contained in the General Contract Provisions, Section 30, Award and Execution of Contract, of these specifications. It is understood and agreed that all equipment and material items shall be in stockpile under immediate control of the Contractor prior to the time they will be needed to complete the work at the Airport.

17. UNBALANCED PRICING

An offer with unbalanced pricing is not acceptable. Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices or payment for incomplete work, or for work not done. Unbalanced pricing exists when, despite an acceptable total overall price, the price of one or more Contract line items is significantly over or understated, as determined by the Engineer in the application of customary construction industry standard techniques for cost and price analysis.

All offers with separately priced line items or sub-line items will be analyzed to determine if the prices are unbalanced. Bidders shall provide a schedule of values for all lump sum items upon request. If an offer is deemed to be unbalanced, the CITY will:

Instructions to Bidders Division I - Page B-6

A. Consider the risks to the CITY associated with the unbalanced pricing in determining the competitive range and in making the award decision; and

B. Consider whether award of the Contract will result in paying unreasonably high prices for Contract performance and whether the award fails to represent the lowest ultimate cost to the CITY.

An offer may be rejected if the CITY deems that the lack of balances poses an unacceptable risk to the CITY. The CITY reserves the right to delete all or part of an item that is deemed to be unbalanced and award the Contract; and to require that item of work to be done by force account or negotiated price.

18. WORKER'S COMPENSATION INSURANCE

The Contractor shall provide worker's compensation insurance, as required under the laws of the State of California, protecting the employees on the work, and shall pay all premiums due thereunder.

19. PUBLIC LIABILITY INSURANCE

For insurance requirements see “Insurance Requirements” included in Item 70-21 of Division II, Part A, General Contract Provisions, of these specifications.

20. TIME OF COMPLETION

The Contractor shall begin work within ten (10) calendar days after the date set in the written Notice to Proceed by the Owner and shall diligently prosecute same to completion for all of the proposed construction.

This work shall be constructed in accordance with details as shown on the plans and described in the specifications for this project. The construction work for the entire project shall be completed within ten (10) working days beginning on date of written Notice to Proceed. Contractor shall complete work to the satisfaction of the Kings County Environmental Health Department prior to December 31, 2025.

21. LIQUIDATED DAMAGES

If the Contractor refuses or fails to complete the work within the working day time specified, including authorized extensions, there shall be deducted from monies due the Contractor, not as a penalty, but as liquidated damages the sum of Three Thousand Dollars ($3,000.00) for each calendar day subsequent to the time specified and the time the work is actually completed and accepted. Delays caused by adverse weather conditions or conditions for which the Owner is clearly responsible will be added to the contract time.

The contractor shall complete all work to the satisfaction of the Kings County Environmental Health Department prior to December 31, 2025. If the contractor refuses or fails to complete this work prior to December 31, 2025, there shall be deducted from monies due the Contractor, not as a penalty, Instructions to Bidders Division I - Page B-7 but as liquidated damages, the sum of Five Thousand Dollars ($5,000) for each calendar day after December 31, 2025, the contractor has not completed the work.

22. CERTIFIED PAYROLL

The Contractor shall submit all certified payrolls, including subcontractors, to the CITY and DIR each month. Failure to submit complete certified payroll in a timely manner may delay progress payments. For certified payroll to be considered for review, the submittal must contain the necessary information in a clear, logical manner.

23. CONTRACTOR’S LICENSE

Each Bidder must have a Class “C61/D40 with HAZ” California Contractor's License as required under provisions of the California Business and Professions Code.

24. APPEAL BY UNSUCCESSFUL BIDDERS

Any unsuccessful Bidder may appeal a pending bid award prior to award by the CITY. The appellant must:

A. Submit a written protest to the CITY within five (5) workdays after the bid opening.

B. Describe, in the written protest, the issues to be addressed on appeal.

C. Post, with the written protest, a bond with good and solvent surety authorized to do business in this state or submit other security in a form approved by the CITY, who will hold the bond or security until a determination is made on the appeal.

D. Post the bond or other security in the amount of 25% of the total dollar value of appellant’s bid, up to a maximum bond or other security amount of $250,000.

E. Not seek any type of judicial intervention until the CITY has rendered its final decision on the protest.

25. INDEPENDENT CONTRACTOR STATUS

The parties agree that the Contractor shall have the status of and shall perform all work under this Contract as an independent Contractor, maintaining control over all its consultants, subconsultants, contractors, or subcontractors. The only contractual relationship created by this Contract is between the CITY and the Contractor, and nothing in this Contract shall create any contractual relationship between the CITY’s and Contractor's consultants, subconsultants, contractors, or subcontractors.

The parties also agree that by explicit agreement of the parties, the Contractor is not a CITY employee and that there shall be no:

• Withholding of income taxes by the CITY;

• Industrial insurance coverage provided by the CITY;

Instructions to Bidders Division I - Page B-8

• Participation in group insurance plans which may be available to employees of the CITY;

• Participation or contributions by either the independent Contractor or the CITY to the public employees’ retirement system;

• Accumulation of vacation leave or sick leave.

26. SHOP AND MANUFACTURER'S DRAWINGS

The successful bidder shall submit to the RPR an electronic PDF of the name of manufacturers, catalog numbers, and shop drawings of each item of equipment he proposes to furnish and install under this contract. These submittals shall be made to the RPR prior to or at the preconstruction conference.

27. PAYMENTS

Progress payments shall be made at least once each month as the work progresses. These progress payments shall be based on work accomplished during the previous working month, based on the various contract bid items and the unit bid prices included in the Bid Schedule submitted by the Contractor with his/her bid. In applying for payments, the Contractor shall submit a statement based on this schedule. Payment will be made only for material and work actually incorporated in the work.

28. WITHHOLDING

Owner shall withhold from each payment due the Contractor five percent (5%) of the amount claimed. This 5% of the payment shall be withheld until final acceptance of the total project is given by the Owner and by the RPR. After final acceptance of the project is given and the Contractor has submitted acceptable release of all liens and furnished the RPR acceptable red-lined drawings showing the "as-built" condition of the completed project, then the Owner shall release for payment the 5% retention. Owner will make such final payment of retention within thirty-five (35) days of final acceptance of the project and submittal of release of liens, red-lined as-built drawings, and all other Contractor Final Project Documentation required by the City.

Pursuant to Government Code Section 4590, at the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the City or with a state or federally chartered bank as the escrow agent, who shall pay such monies to the Contractor upon satisfactory completion of the contract.

Securities eligible for investment under this section shall include those listed in Government Code Section 16430 or bank or savings and loan certificates of deposit.

The Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon.

Instructions to Bidders Division I - Page B-9

29. DEFINITIONS

Whenever in the specifications or on the drawings the word directed, required, permitted, designated, ordered, or words of like import are used, it shall be understood that the direction, requirement, permission, designation or order of the City of Hanford is intended; and, similarly, the words approved, satisfactory, suitable, acceptable, or words of like import, shall mean approved by the representative of the City of Hanford authorized to express such approval.

30. TAXES

Bidders shall have included in their bids any and all Federal, State and local taxes of whatever nature in connection with material to be furnished to the City. Absolutely no extras shall be allowed for such by the City. The successful bidder will be required to obtain a Business Tax Certificate from the City of Hanford prior to commencing work under a contract with the City. Failure to obtain the Tax Certificate within fifteen (15) days of the AWARD OF CONTRACT will be cause for termination of the Contract or the contract process if not yet fully executed.

31. UNDERGROUND STORAGE TANK PERMIT

The City has an Underground Storage Tank (UST), which expires on December 31, 2025. A copy of this permit has been included in these specifications as Appendix C.

32. CONTRACT DOCUMENTS

The form of agreement which the successful bidder, as Contractor, will be required to execute and the form of bonds which he will be required to furnish are included in the Contract Documents and should be carefully examined by each bidder. The agreement and bonds will be executed in two

(2) original counterparts. The complete contract consists of the Contract Documents as defined in the agreement, and are intended to cooperate and be complementary so that any work called for in one and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said documents. The intention of the documents is to include all labor, materials, equipment, transportation and services necessary for the proper execution of the work.

33. DECLARATION FOR FINAL PAYMENT

After the completion of the work of this contract, the Contractor shall file with the City his/her declaration under penalty of perjury stating that all workers and persons employed, all firms supplying the materials and all subcontractors upon the project, have been paid in full and that there are no bills outstanding against the project for either labor or materials except certain items, if any, to be set forth in detail in the declaration. The filing of such declaration by the Contractor and all other submittals required by the City shall be a condition precedent to Contractor's receipt of the final payment on this contract.

** END OF SECTION **

Instructions to Bidders Division I - Page B-10

Page Intentionally Left Blank

PROPOSAL FORMS

SUBMIT THIS SHEET AS PART OF YOUR BID.

Bid Proposal Division I - Page C-1

BID PROPOSAL

Bid Opening Date: Wednesday, August 6, 2025 Bid Opening:

Hour of Bid Opening: 2:00 P.M. Bidnet http://www.bidnetdirect.com/california/cityof hanford

Pre-Bid Conference Date: July 23, 2025 Place of Pre-Bid Conference:

Hour of Pre-Bid Conference: 10:00 A.M. City of Hanford Finance Department 315 N. Douty Street Hanford, California 93230

TO: The City of Hanford, State of California:

The undersigned bidder declares that he has carefully examined the Plans and Specifications, Instructions to Bidders, General Contract Provisions, Contract Form and Bond Forms including Addenda No.(s) to the project described as follows:

The undersigned bidder further declares that he has made an examination of the site of the proposed work and has made such investigations as are necessary to determine the character of the materials to be handled, the probable interference due to airport operations and other conditions to be encountered, independently of the indications of the Plans, that he has examined the general prevailing wage rates for all public projects of the State of California and hereby accepts the same and certifies that these rates shall be paid for labor connected with this project. That if this proposal is accepted, he will contract with the City of Hanford, in the form of Contract hereto annexed; will, to the extent of his bid, provide any and all necessary machinery, tools, and apparatus, and other means of construction; and will furnish all material and labor as specified or called for by the plans as is necessary to complete the work in the manner specified and in accordance with the requirements of the City of Hanford.

In the performance of this project, the undersigned agrees to abide by all of the Contract requirements contained in the Specifications and all documents. It is further certified that the wage rates been examined and the prices bid in this proposal are based on the above-mentioned schedule.

The undersigned agrees that he will order all materials and equipment under this contract and will commence work within ten (10) days after receiving written notice to proceed and that he will complete the work within ten (10) working days of written Notice to Proceed. Contractor shall complete work to the satisfaction of the Kings County Environmental Health Department prior to December 31, 2025.

Bid Proposal Division I - Page C-2

The undersigned further agrees that should he fail to complete any segment of work in the working day time specified, he will pay liquidated damages in the amount of $3,000.00 for each consecutive calendar day thereafter to the City as prescribed in these specifications.

The contractor further agrees that should he fail to complete all work to the satisfaction of the Kings County Environmental Health Department prior to December 31, 2025, he will pay liquidated damages in the amount of Five Thousand Dollars ($5,000) for each calendar day thereafter to the City as prescribed in these specifications.

The undersigned further declares that this proposal is made according to the provisions and under the terms of the contract documents bound herewith; and in accordance with the accompanying plans, which plans and the aforementioned contract documents are hereby made a part of this proposal.

The bidder further declares that he will accept the unit prices and/or lump sum prices as hereinafter written in the Bid Schedule of this proposal as full payment for the proposed work.

It is understood that City reserves the right to reject this proposal and that it shall remain open and not be withdrawn for a period of thirty (30) days from the date prescribed for its opening.

It is understood that the City reserves the right to increase or decrease the quantities of items bid in the contract with no change in the unit prices bid, provided the change in a major item (20 percent of total bid) does not exceed 25 percent.

Attached hereto and incorporated herein, in compliance with Section 4100-4113 of the Government Code of the State of California, is a "Designation of Subcontractors."

It is understood and agreed that if written notice of the acceptance of this proposal is mailed or delivered personally to the undersigned bidder within thirty (30) days after the opening of the proposal, or at any time thereafter before it is withdrawn, the undersigned bidder will execute and deliver the Contract Documents to City in accordance with the proposal as accepted, together with the insurance documents specified in Minimum Scope of Insurance requirements of these specifications, and will also furnish and deliver to City the Performance Bond and Payment bond as herein specified, all within ten (10) days after personal delivery or deposit in the mails, as the case may be, of the notification of award and that the work under the contract shall be commenced by the undersigned bidder on the date to be stated in City's notice to proceed, and shall be completed in the time specified in the agreement for construction or any modification thereto duly made by change order.

Notice of acceptance or request for additional information may be addressed to the undersigned bidder at the business address set forth below:

Bid Proposal Division I - Page C-3

The undersigned bidder declares that this proposal is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization, or corporation; that the proposal is genuine and not collusive or sham; that the undersigned bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham proposal and has not directly or indirectly colluded or agreed with any bidder or anyone else to put in a sham proposal or to refrain from bidding; that the undersigned bidder has not directly or indirectly sought by agreement, communication, or conference with anyone to fix his bid price or the bid price of any other bidder, or to fix any overhead, profit or cost advantage against the City or anyone interested in this proposed contract; that the only persons or parties interested in this proposal as principals are those named herein; that all statements contained in this proposal are true; that the undersigned bidder has not directly, or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any other person, partnership, corporation, or association except to such person or persons as have a direct financial interest in bidder's general business; and that he is aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self insurance in accordance with the provisions of that code, and he will comply with such provisions before commencing the performance of the work of this contract.

Wherever in this proposal an amount is stated in both words and figures, in case of discrepancy, the words shall prevail; if all or any portion of the proposal is required to be given in unit prices and totals and a discrepancy exists between any such unit prices and totals so given, the unit prices shall prevail.

Accompanying this proposed bid is (insert words, "cash," "cashier's check," "certified check," or "bidder's bond," as the case may be) of the (name of surety if bid bond submitted) in an amount equal to at least ten percent (10%) of total of the bid. If the enclosure is a check or bond, it is made payable to the City of Hanford.

The names of all persons interested in the foregoing proposal as principals are as follows:

(Stockholders and limited partners need not be listed unless they are officers or employees of the corporation or limited partnership. All general partners and corporate officers shall be listed. If a stockholder or partner is a firm, list the principles of that firm, as stated herein.)

(If bidder or other interested person is a corporation, it must furnish a certificate attesting to corporate existence and authority of officers to sign contracts and other documents. State legal name of corporation, names of the president, secretary, treasurer, and manager thereof.)

NAME BUSINESS ADDRESS INTEREST (owner, partner, etc.)

Attach additional sheets if necessary

Bid Proposal Division I - Page C-4

By submission of a bid, a bidder certifies possession of duly issued and valid Contractor's license issued by the State of California will be obtained prior to award of the contract, which license authorizes bidder to contract to perform the type of work required by the specifications.*

Licensed in accordance with an Act providing for the Registration of Contractors:

License No.: _______________________________

Class of License: ___________________________

DIR Registration No.________________________

Name and Relationship to Bidder of Licensed Firm or Individual:

License Holder: _____________________________________________________________

Relationship to Bidder: _______________________________________________________

*If bidder does not hold a valid contractor’s license at the time of bidding, leave these lines blank. At the time of award of the contract the apparent low bidder shall be required to hold a valid contractor’s license and to submit this information to the Owner.

Bid Proposal Division I - Page C-5

Signature of Bidder:

CONTRACTOR Street Address

Sign here: ___________________________________ City, State & Zip

By: ________________________________ Type Name

-AND-

Sign here: ___________________________________ Telephone (Include Area Code)

By:__________________________ Email Address Type Name

(CORPORATE SEAL)

NOTE: If bidder is a corporation, the legal name of the corporation shall be set forth above together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation and a corporate seal; if bidder is a copartnership, the true names of the firm shall be set forth above together with the signature of the partner or partners authorized to sign contracts in behalf of the copartnership; and if bidder is an individual, his signature shall be placed above.

Bid Proposal Division I - Page C-6

HANFORD MUNICIPAL AIRPORT

HANFORD, CALIFORNIA

CLOSURE OF EXISTING UNDERGROUND FUEL STORAGE TANK

BID SCHEDULE

Item No.

Estimated Quantity

Item Description and Unit Price (written in words)

Unit Price

Item Total

1 Lump Sum

Mobilization (C-105)*

______________________________Dollars and___________________________Cents Lump Sum

Lump Sum $____________*

2 Lump Sum

Marking and Lighting of Closed Airport Facilities (C-106) ______________________________Dollars and___________________________Cents Lump Sum

Lump Sum $_____________

3 Lump Sum

Closure of Existing Underground Tanks (Sheet No. 4)

______________________________Dollars and___________________________Cents Lump Sum

Lump Sum $_____________

4 100 Gallons

Removal and Disposal of all Fuel and/or Rinse Water Exceeding 200 Gallons (Sheet No. 4)

______________________________Dollars and___________________________Cents per Gallon

*Mobilization shall be limited to 10 percent of the total bid.

TOTAL BID AMOUNT (In Figures) $______________________

TOTAL BID AMOUNT (In Words)

Bid Proposal Division I - Page C-7

NOTES:

1. In the event the product of a unit price and an estimated quantity do not equal the extended amount stated, the unit price will govern and the correct product of the unit price and the estimated quantity shall be deemed to be the amount bid.

2. In case of conflict between words and numerals, the words, unless obviously incorrect, shall govern.

Bid Proposal Division I - Page C-8

BIDDER GUARANTY BOND

KNOW ALL MEN BY THESE PRESENTS:

That, , hereinafter called the Principal, and , hereinafter called the Surety, are jointly and severally held and firmly bound unto the City of Hanford, hereinafter called the Obligee, each in the penal sum of 10 percent (10%) of the total amount of the bid of the

Principal for the work, this sum not to exceed

Dollars ($___________) of lawful money of the United States for the payment whereof unto the Obligee, the Principal and Surety jointly and severally bind themselves forever firmly by these presents.

WHEREAS, the Principal is herewith submitting its offer for the…