2026-02 Plans.pdf
PDF 2 MB Posted
- Solicitation number
- RFB 2026-02
- Issued by
- Kings County, Hayward City, California
About this file
These are construction plans for the Closure of Existing Underground Fuel Storage Tank project at the Hanford Municipal Airport in Hanford, California, prepared by Brandley Engineering in July 2025. The project involves decommissioning a 12,000-gallon Avgas underground storage tank and demolishing associated above-ground fuel dispensing equipment. The construction plans include detailed site safety and phasing plans, barricade layouts, and existing fueling area demolition strategies. The project is divided into two work zones: Zone 1 includes fuel tank manholes, piping, and pumps located at least 62 feet from the Taxiway A centerline, while Zone 2 covers work areas within 62 feet of the Taxiway A centerline. The contractor will be required to provide 2 weeks' notice prior to construction start and 48 hours' notice before any Taxiway A closure.
The project documents specify extensive safety and operational requirements, including the need for low-profile barricades, controlled access through Gate G4, and strict management of staging and storage areas within the airport perimeter fence. Soil boring logs (U10 and U14) are included to provide geotechnical information, revealing predominantly brown silty fine sand and sandy silt compositions at various depths. The contractor must adhere to specific environmental management protocols, such as proper waste disposal, spill prevention, and site restoration, including hydroseeding of disturbed areas. The project is identified with Request for Bid (RFB) number 2026-02 and is designed to minimize disruption to airport operations, with Taxiway A required to be reopened at the end of each working day.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB 2026-02 - HJO Closure of Existing Underground Fuel Storage Tank Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPROVED: DATE:
APPROVED: DATE:
HANFORD MUNICIPAL AIRPORT
CITY OF HANFORD
DESIGNED BY:
6125 KING ROAD, SUITE 201 · LOOMIS, CALIFORNIA 95650 · (916) 652-4725
HANFORD, CALIFORNIA
HANFORD MUNICIPAL AIRPORT
JULY 2025
CONSTRUCTION PLANS FOR:
CLOSURE OF EXISTING UNDERGROUND FUEL STORAGE TANK
SHEET INDEX
1 COVER AND SHEET INDEX
2 CONSTRUCTION SAFETY AND PHASING PLAN
3 BARRICADE PLAN
4 EXISTING FUELING AREA & UST DEMOLITION PLAN
5 SOILS LOCATION MAP AND BORING LOGS
LIVIC
Exp. 6-30-2027 No. C 71139RE
GIS
TE
RED
PROFESSIONAL ENGINEER
STATE OF CAL I FORNIA
ME
LIS
SA S. BRANDLEY
RFB 2026-02
UP
UP
UP
U P
TOFATOFATOFATOFATOFATOFATOFATOFATOFA
TOFA TOFA TOFA TOFA TOFA TOFA
X
X
X
X X
X X X X X X X X X X X X
XXX
X
X
X
XX
X X X
X
X
X
X
X
X
X
X
X
X
X
X
O
HP
O
HP
O
HP
O
HP
O
HP
G
E
E
X
XX
X
X
X
X
E
UP
S
S
PR
EV
IO
U
S R
ES
TR
O O
M
FO
U N
D
AT
IO
N
BE
NC
H
BB
Q
PB
HV
AC
CO
ND
UI
T
PE
T
W
AS
TE
ST
AT
IO
N
PB
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSARSARSARSARSARSARSARSARSARSARSARSARSARSA
ROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFA
STAGING NOTES:
1. CONTRACTOR SHALL FURNISH, PLACE, MAINTAIN & REMOVE BARRICADES AS NEEDED.
2. THERE ARE TWO WORK AREAS FOR THIS PROJECT:
- ZONE 1 IS FUEL TANK MANHOLES, PIPING, PUMPS, AND ANY OTHER COMPONENTS OF THE FUEL TANK SYSTEM
WHICH ARE LOCATED NO LESS THAN 62 FEET FROM THE TAXIWAY A CENTERLINE.
- ZONE 2 IS ANY PART OF THE FUEL TANK SYSTEM OR WORK AREA WHICH NEEDS TO BE ACCESSED WITHIN 62 FEET
OF THE TAXIWAY A CENTERLINE.
3. CONTRACTOR SHALL PROVIDE A DETAILED SCHEDULE CLOSING OF EACH WORK AREA.
4. TAXIWAY A / ZONE 2 SHALL BE REOPENED AT THE END OF EACH WORKING DAY.
5. NO WORK SHALL BEGIN UNTIL ALL BARRICADES HAVE BEEN INSTALLED TO CLOSE THE APRONS AND TAXILANES AS SHOWN ON THE BARRICADE PLAN FOR EACH WORK ZONE. THE REQUIRED NOTAMS WILL BE ISSUED BY THE
AIRPORT MANAGER.
6. CONTRACTOR SHALL GIVE AIRPORT 2 WEEKS NOTICE PRIOR TO START OF CONSTRUCTION, AND 48 HOURS NOTICE
PRIOR TO ANY CLOSURE OF TAXIWAY A.
7. CONTRACTOR'S TEMPORARY STORAGE AND STAGING AREA IS SHOWN FOR INSIDE OF THE AIRPORT PERIMETER FENCE. THESE AREAS MAY BE USED FOR TEMPORARY STOCKPILES FOR EACH WORK ZONE. ALL STOCKPILES SHALL BE REMOVED AT THE END OF THE PROJECT AND EXISTING PAVEMENT BROOM CLEANED PER THE REQUIREMENTS OF
THE GENERAL NOTES.
8. CONTRACTOR'S ACCESS AND HAUL ROAD IS THROUGH GATE G4. GATES SHALL REMAIN CLOSED EXCEPT FOR CONTINUOUS DELIVERY OF MATERIALS . SEE GENERAL NOTE 21 ON SHEET 2 FOR CONTINUOUS GATE USE. PROTECT GATE AND CONTROLS FROM DAMAGE. AIRPORT ACCESS AND HAUL ROAD SHALL BE BROOM CLEAN. CONTRACTOR SHALL SELF INSPECT VEHICLES TO PREVENT AIRPORT MATERIALS BEING TRACKED ONTO ACCESS ROAD AND
ADJOINING COUNTY ROAD.
X
RSA
ROFA
TOFA
LIVIC
Ex p.
6-3 0-2
No . C
REGISTERED
PR
OF
ES
SIO
NA
L E
NGINEER
STATE O
F
CA
LI
FO
RNIA
MELISSA
S
. B
RA
NDLEY
TS
99.05 9905a.02.CSPP
1"=200'
6/30/2025
CO
NS
TR
UC
TI
ON
S
AF
ET
Y
AN
D
PH
AS
IN
G
PL
AN
HA
NF
OR
D
MU
NI
CI
PA
L
AI
RP
OR
T H
AN
FO
R D
C
AL
IF
O
R N
IA
MSB
DATE
DRAWN
CHECKED
PROJECT No.
FILE
SCALE
No
RE
VI
SI
ON
S
BY
AP
R
DA
TE
SHEET No.
EN
GI
NE
ER
O F
RE
CO
RD
G :\9
H
AN
FO
R D
\0
FU
EL
IS
LA
N D
\C
LO
SU
R
E
PL
AN
\9
5A
.0 2.
C
SP
P.
D
W G
PL
O
TT
ED
B Y
M el is sa
B ra nd le y 7/
8/
:3
PM
K
IN
G
R O
A D
SU
IT
E
L O
O M
IS
C A
LI
FO
R N
IA
-4
0 100 200200
SCALE: 1"=200'
CL
OS
UR
E
OF
E
XI
ST
IN
G
UN
DE
RG
RO
UN
D
FU
EL
ST
OR
AG
E
TA
NK
RUNWAY 14-32
B
TAXIWAY A
DE
HA
NF
O
RD
A
RM
O
NA
R O
AD
9 3/4 AVE.
FOGGY BOTTOM RD
AIRPORT ACCESS RD
G1
G2
G3
G4
WORK ZONE
SEE SHEET 3
CONTRACTOR'S
STAGING AND
STORAGE AREA
FA C
LEGEND
EXISTING FENCE LINE
EXISTING PAVEMENT
RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREA
CONTRACTOR'S STAGING AND STORAGE AREA
RUNWAY OBJECT FREE AREA
X X XX X X
AIRCRAFT ROUTE
HAUL ROAD
ARFF ACCESS ROUTE
LOW-PROFILE BARRICADE (SEE SHEET 3)
HANFORD CTAF: 122.800
ONLY
ONLY
GENERAL NOTES:
1. CONSTRUCTION OF THIS PROJECT SHALL BE IN ACCORDANCE WITH THE CONTRACT
AGREEMENT, THESE PLANS, TECHNICAL SPECIFICATIONS, SPECIAL PROVISIONS,
INFORMATION FOR BIDDERS, AND ALL APPLICABLE FAA STANDARDS, MUNICIPAL
STANDARDS, AND OTHER REFERENCED DOCUMENTS. CONTRACTOR SHALL COMPLY
WITH ALL FEDERAL, STATE, AND LOCAL SAFETY AND ENVIRONMENTAL
REGULATIONS. THE PROJECT IS SUBJECT TO INSPECTION OF THE OWNER AND THE
RESIDENT PROJECT REPRESENTATIVE DESIGNATED BY THE OWNER, THE FEDERAL
AVIATION ADMINISTRATION, AND ANY OTHER GOVERNING AGENCIES.
2. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY STATE AND
LOCAL PERMITS PRIOR TO CONSTRUCTION OF THIS PROJECT.
3. THE CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING A MINIMUM OF 2 WEEKS
IN ADVANCE TO OBTAIN CLEARANCE FOR WORK.
4. THE CONTRACTOR'S SUPERINTENDENT SHALL BE ON THE CONSTRUCTION SITE AT
ALL TIMES DURING WORKING HOURS WHILE THIS PROJECT IS IN PROGRESS.
SUPERINTENDENT SHALL BE CONTRACTOR'S DESIGNATED RESPONSIBLE
REPRESENTATIVE AND SHALL BE AVAILABLE IN CASE OF EMERGENCIES ON A
24-HOUR DAILY BASIS.
5. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE CLEANLINESS, SAFETY,
AND SECURITY OF THE WORK, STAGING AND STORAGE AREAS AT ALL TIMES.
6. CONTRACTOR SHALL FURNISH, INSTALL AND MAINTAIN LIGHTED BARRICADES
DURING CLOSING OF ALL TAXIWAYS, TAXILANES AND APRON. SEE STAGING NOTES,
AND SEE BARRICADE PLAN, SHEET 3 .
7. WHEN CONSTRUCTION ACTIVITY IS WITHIN THE TAXIWAY OBJECT FREE AREA OF
TAXIWAY A, CONTRACTOR SHALL FURNISH, INSTALL AND MAINTAIN BARRICADES TO
CLOSE THAT PORTION OF TAXIWAY A IN WHICH THE CONTRACTOR IS WORKING. SEE
STAGING NOTES, AND SEE BARRICADE PLAN, SHEET 3.
8. DUST CONTROL SHALL BE MAINTAINED BY THE CONTRACTOR ON ALL HAUL ROUTES.
CONTRACTOR SHALL MAINTAIN HAUL ROUTE AND PAVED SURFACES CLEAN OF
DEBRIS AT ALL TIMES. APRON AND TAXIWAYS SHALL BE MAINTAINED BROOM CLEAN.
ALL SWEEPERS USED ON AIRFIELD PAVEMENTS SHALL BE EQUIPPED WITH NYLON
BRISTLES, NO METAL BRISTLES WILL BE ALLOWED
9. THESE PLANS SHOW ITEMS TO BE CONSTRUCTED UNDER THIS CONTRACT AND
EXISTING FIELD CONDITIONS AT THE TIME THESE PLANS WERE PREPARED. THE
EXISTING INFORMATION SHOWN ON THESE PLANS IS FROM THE BEST SOURCES
AVAILABLE AT THE TIME OF COMPILATION. ACTUAL FIELD CONDITIONS, GRADES,
LOCATIONS AND OTHER FEATURES MAY DIFFER FROM CONDITIONS INDICATED ON
THESE DOCUMENTS. THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO
BE SATISFIED THAT THE INFORMATION IS STILL CURRENT AT THE TIME OF
CONSTRUCTION NOTICE TO PROCEED. CONTRACTOR SHALL IMMEDIATELY NOTIFY
THE ENGINEER AND OWNER OF ANY DISCREPANCIES OR CHANGES ENCOUNTERED.
10. THE LOCATION OF EXISTING UNDERGROUND UTILITIES, SERVICE LATERALS AND
CONDUIT ("UTILITIES") IS BASED ON THE BEST AVAILABLE INFORMATION TO THE
ENGINEER AND SHALL BE ASSUMED AS APPROXIMATE AND REQUIRING FIELD
VERIFICATION. CONTRACTOR WILL BE RESPONSIBLE FOR LOCATING AND AVOIDING
ALL UTILITIES AND FOR REPAIRING ALL DAMAGE THAT OCCURS TO DUE TO THE
CONTRACTOR'S ACTIVITIES.
CALL BEFORE YOU DIG. CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE
ALERT PRIOR TO CONSTRUCTION, AND SHALL POTHOLE TO VERIFY LOCATION,
DEPTH, AND SIZE OF UTILITIES WITHIN THE LIMITS OF CONSTRUCTION. NO EXTRA
PAYMENT FOR POTHOLING.
11. SHOULD CONTRACTOR ENCOUNTER AND DAMAGE A WATERLINE ON THE AIRPORT
HE SHALL IMMEDIATELY NOTIFY THE LOCAL FIRE DEPARTMENT AND THE AIRPORT
12. EXERCISE EXTREME CARE WHEN USING ANY EQUIPMENT TO PREVENT CONTACT
WITH ANY NEARBY POWER LINES AND POWER SOURCES. SAFE WORKING
CLEARANCES SHALL CONFORM TO THE NATIONAL ELECTRIC CODE.
13. ANY AND ALL REQUIRED UTILITIES FOR THE CONTRACTOR'S OPERATIONS SHALL BE
ARRANGED FOR AND PAID FOR BY THE CONTRACTOR AND PAID DIRECTLY TO THE
APPROPRIATE UTILITY. UTILITY ARRANGEMENTS SHALL BE SUBJECT TO THE
APPROVAL OF THE OWNER AND RPR. CONTRACTOR SHALL NOT DRAW WATER FROM
ANY FIRE HYDRANT FOR USE ON THE WORK WITHOUT FIRST OBTAINING WRITTEN
APPROVAL FROM THE CONTROLLING FIRE DEPARTMENT OR UTILITY.
14. THE CONTRACTOR SHALL MAINTAIN ACCESS TO ALL FIRE HYDRANTS AND BACKFLOW
PREVENTERS AT ALL TIMES
15. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER AND RPR ON THE PRECISE
LOCATION AND LIMITS OF THE CONTRACTOR'S STAGING AND STORAGE AREA, AS
WELL AS ANY SPECIAL REQUIREMENTS FOR FENCING, SECURITY OR ACCESS. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL UTILITIES AND HOOK-UPS
NECESSARY FOR THE CONTRACTOR'S USE AND FOR ALL PROJECT FIELD OFFICES AS
REQUIRED IN THE SPECIAL PROVISIONS. THE CONTRACTOR SHALL USE THE STAGING
AND STORAGE AREA FOR SHOP, MATERIAL AND EQUIPMENT STORAGE, AND OTHER
PROJECT-RELATED ACTIVITIES INCLUDING EMPLOYEE PARKING. ALL COSTS
ASSOCIATED WITH PREPARATION AND CLEANUP OF THE STAGING AREA SHALL BE
BORNE BY THE CONTRACTOR.
16. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE TRAFFIC REGULATIONS
CONCERNING THE USE OF STREETS AND ROADWAYS FOR HAULING. ANY DAMAGE
DONE TO THE ROADWAYS DUE TO THE CONTRACTOR'S EQUIPMENT OR HAULING
OPERATIONS SHALL BE REPAIRED TO THE OWNER'S SATISFACTION AT NO COST TO
THE OWNER.
17. THE CONTRACTOR SHALL NOT ENTER ONTO ANY AREA OUTSIDE OF THE
CONSTRUCTION LIMITS, STAGING AREA, OR DESIGNATED HAUL ROUTES WITHOUT
APPROVAL OF THE OWNER OR RPR.
18. IN CASE OF AN AIRCRAFT EMERGENCY THE AREA AROUND THE AIRCRAFT SHALL BE
EVACUATED AND NOT REENTERED BY THE CONTRACTOR WITHOUT GIVEN
PERMISSION EXCEPT FOR LIFESAVING ACTIVITIES.
19. ALL GATES USED BY THE CONTRACTOR SHALL REMAIN CLOSED AT ALL TIMES EXCEPT
WHEN AUTHORIZED EQUIPMENT IS ACTUALLY ENTERING THE AIRPORT. DURING
CONTINUOUS USE OF A GATE FOR DELIVERY OF EQUIPMENT OR MATERIALS,
CONTRACTOR SHALL REQUEST THAT THE AIRPORT PLACE THE GATE IN A LOCKED
OPEN STATE; CONTRACTOR SHALL PROVIDE A FLAGGER, TRAINED BY THE AIRPORT
AND PLACE THE FLAGGER AT THE OPEN GATE TO KEEP UNAUTHORIZED PERSONNEL
AND WILDLIFE FROM ENTERING THE AIRPORT.
20. CONTRACTOR SHALL ACCESS THE AIRPORT THROUGH THE HANGAR ACCESS ROAD
GATE, GATE G4.
21. CONTRACTOR WILL PROVIDE A QUALIFIED FLAGGER WITH AN AIRCRAFT RADIO TO
MONITOR AIRPORT FREQUENCY, 122.800 MHZ AND OBSERVE AIRCRAFT
OPERATIONS WHEN CONTRACTOR IS WORKING NEAR ACTIVE TAXIWAYS, APRON
AND RESTRICTED AREAS.
22. CONTRACTOR SHALL INSTALL TEMPORARY BMP'S AS REQUIRED BY PERMITTING
AGENCIES.
23. ALL TRASH SHALL BE PLACED IN WASTE CONTAINERS TO PREVENT THE ATTRACTION
OF WILDLIFE. WASTE CONTAINERS SHALL BE EQUIPPED WITH LIDS AND SECURED AT
ALL TIMES. NO TRASH OR DEBRIS SHALL BE LEFT ON SITE BY THE CONTRACTOR.
24. NO MATERIAL SHALL BE WASTED OR STOCKPILED ON THE AIRPORT UNLESS
APPROVED BY THE OWNER AND RPR. STOCKPILED MATERIAL SHALL MEET
PERMITTING AGENCY BMP REQUIREMENTS AND SHALL BE CONSTRAINED IN A
MANNER TO PREVENT MOVEMENT AS A RESULT OF AIRCRAFT OPERATIONS OR
WIND AND IN ACCORDANCE WITH FAA ADVISORY CIRCULARS.
25. ANY WASTE, CONSTRUCTION DEBRIS, OR SOIL MUST BE DISPOSED OF PROPERLY.
DISPOSAL OF MATERIAL OFF-SITE SHALL BE DONE IN A LAWFUL MANNER AND AT A
SITE HAVING CURRENT APPROVAL TO ACCEPT SOLID WASTE. DISPOSAL SITE AND
PROCEDURES MUST BE IDENTIFIED BY THE CONTRACTOR AND SUBMITTED TO THE
OWNER AND RPR FOR APPROVAL PRIOR TO USE.
26. CONTRACTOR SHALL HAVE SPILL KITS AVAILABLE IN WORK AREAS AND SHALL
CONTAIN ALL SPILLS IMMEDIATELY AND SHALL NOTIFY RPR. AT ANY SIGN OF
CONTAMINATED SOIL, THE CONTRACTOR SHALL NOTIFY RPR AND OWNER FOR
ASSESSMENT OF APPROPRIATE REMEDIATION.
27. ANY SOLVENT USED TO CLEAN TOOLS, EQUIPMENT, OR SPILLS MAY BE CONSIDERED
A HAZARDOUS WASTE AND MUST BE PROPERLY MANAGED. NO SOLVENTS,
CLEANING BY-PRODUCTS, WASTE, REFUSE, OR LEFTOVER PAINT MAY BE DISPOSED
OF OR DISCHARGED INTO STORM DRAINS, DRYWELLS, OR ANY GROUND SURFACE,
OR OTHERWISE BE PERMITTED TO REMAIN ON AIRPORT PROPERTY. ALL SUCH
MATERIAL SHALL BE REMOVED OFF-SITE BY CONTRACTOR IN ACCORDANCE WITH
APPLICABLE LAWS AND REGULATIONS.
28. THE CONTRACTOR SHALL CONDUCT THE FINAL CLEANING OF AFFECTED AIRPORT
PAVEMENTS PRIOR TO REOPENING THE PAVEMENTS TO ALL VEHICLE TRAFFIC. THE
AREA AROUND ANY REMOVED STRUCTURES, POLES, PIPES, CONDUIT, AND
EQUIPMENT SHALL BE MADE SMOOTH AND COMPLETELY FREE FROM ANY BURRS,
SHARP EDGES, OR PROTRUSIONS WHICH COULD POSE A RISK TO VEHICLES OR
PEDESTRIANS.
29. CONTRACTOR SHALL ENSURE THAT ALL VAULT LIDS AND MANHOLE COVERS WHICH
WERE NOT DESIGNATED TO BE ABANDONED OR REMOVED ARE OPERATIONAL
FOLLOWING COMPLETION OF CONSTRUCTION.
30. AT THE CONCLUSION OF ALL WORK, CONTRACTOR SHALL SEED CONTRACTOR'S
STORAGE, STAGING AND TEMPORARY STOCKPILE AREA AND ALL DISTURBED
GRADING OR EMBANKMENT AREAS. LIMITS OF SEEDING SHALL BE VERIFIED BY
RESIDENT ENGINEER. HYDROSEEDING SHALL BE A REQUIRED BMP. NO ADDITIONAL
PAYMENT FOR SURFACE PREPARATION OR SEEDING OF DISTURBED AREAS SHALL BE
MADE. SEED MIX MUST MATCH LOCAL GRASSES, COMPLY WITH LOCAL
REQUIREMENTS, AND BE SUITABLE FOR USE ON AIRPORTS. SEED MIX, MULCH,
FERTILIZER, AND APPLICATION RATES SHALL BE APPROVED BY OWNER PRIOR TO USE.
HYDROSEEDING MUST PRODUCE ADEQUATE GROWTH TO SATISFY THE STATE
WATER BOARD SUCH THAT THE SWPPP, IF REQUIRED, CAN BE CLOSED OUT AFTER
THE PROJECT IS COMPLETE.
31. THE CONTRACTOR SHALL COMPLETE CLEANUP AND RESTORATION OF THE ENTIRE
PROJECT AREA, INCLUDING STAGING AND STORAGE AREAS PRIOR TO PROJECT FINAL
ACCEPTANCE.
WORK ZONES AND FACILITY CLOSURES
WORK
ZONE CONTRACTOR'S WORK WORK AREA FACILITY CLOSURE COMMENTS
1 CLOSURE OF EXISTING FUEL TANK FUEL ISLAND AND APRON OUTSIDE
OF TOFA
FUEL ISLAND, PORTION OF APRON
TAXILANE
REMAIN CLOSED FOR PROJECT
DURATION
2 SOIL SAMPLING AND CLOSURE OF
EXISTING FUEL TANK
TAXIWAY A OBJECT FREE AREA
(62' FROM TW A CENTERLINE)
WORK ZONE 1 CLOSURE, AND
TAXIWAY A BETWEEN TW D & TW E
PROVIDE 48 HOUR NOTICE PRIOR TO
CLOSURE, REOPEN EACH WORKING DAY
TRUE NORTH
SAFETY AREAS
AREA WIDTH CL DIST DIST BYND THLD
RSA 150' 75' 300'
ROFA 500' 250' 300'
TSA 79' 39.5'
TOFA 124' 62'
U P
U P
U P
U P
UP
UP
TOFATOFATOFATOFATOFATOFATOFA
TO
FA
TOFA TOFA TOFA
TOFA TOFA
SD
SD
SD
SD
SD
SD
SD
SD
X
X
X X X
X X
X
X
X
X
X
F F
ROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFA
X
RSA
ROFA
TOFA
STAGING NOTES:
1. CONTRACTOR SHALL FURNISH, PLACE, MAINTAIN & REMOVE BARRICADES AS NEEDED.
2. THERE ARE TWO WORK AREAS FOR THIS PROJECT:
- ZONE 1 IS FUEL TANK MANHOLES, PIPING, PUMPS, AND ANY OTHER COMPONENTS OF THE FUEL TANK SYSTEM
WHICH ARE LOCATED NO LESS THAN 62 FEET FROM THE TAXIWAY A CENTERLINE.
- ZONE 2 IS ANY PART OF THE FUEL TANK SYSTEM OR WORK AREA WHICH NEEDS TO BE ACCESSED WITHIN 62 FEET
OF THE TAXIWAY A CENTERLINE.
3. CONTRACTOR SHALL PROVIDE A DETAILED SCHEDULE CLOSING OF EACH WORK AREA.
4. TAXIWAY A / ZONE 2 SHALL BE REOPENED AT THE END OF EACH WORKING DAY.
5. NO WORK SHALL BEGIN UNTIL ALL BARRICADES HAVE BEEN INSTALLED TO CLOSE THE APRONS AND TAXILANES AS SHOWN ON THE BARRICADE PLAN FOR EACH WORK ZONE. THE REQUIRED NOTAMS WILL BE ISSUED BY THE
AIRPORT MANAGER.
6. CONTRACTOR SHALL GIVE AIRPORT 2 WEEKS NOTICE PRIOR TO START OF CONSTRUCTION, AND 48 HOURS NOTICE
PRIOR TO ANY CLOSURE OF TAXIWAY A.
7. CONTRACTOR'S TEMPORARY STORAGE AND STAGING AREA IS SHOWN FOR INSIDE OF THE AIRPORT PERIMETER FENCE. THESE AREAS MAY BE USED FOR TEMPORARY STOCKPILES FOR EACH WORK ZONE. ALL STOCKPILES SHALL BE REMOVED AT THE END OF THE PROJECT AND EXISTING PAVEMENT BROOM CLEANED PER THE REQUIREMENTS OF
THE GENERAL NOTES.
8. CONTRACTOR'S ACCESS AND HAUL ROAD IS THROUGH GATE G4. GATES SHALL REMAIN CLOSED EXCEPT FOR CONTINUOUS DELIVERY OF MATERIALS . SEE GENERAL NOTE 21 ON SHEET 2 FOR CONTINUOUS GATE USE. PROTECT GATE AND CONTROLS FROM DAMAGE. AIRPORT ACCESS AND HAUL ROAD SHALL BE BROOM CLEAN. CONTRACTOR SHALL SELF INSPECT VEHICLES TO PREVENT AIRPORT MATERIALS BEING TRACKED ONTO ACCESS ROAD AND
ADJOINING COUNTY ROAD.
LIVIC
Ex p.
6-3 0-2
No . C
REGISTERED
PR
OF
ES
SIO
NA
L E
NGINEER
STATE O
F
CA
LI
FO
RNIA
MELISSA
S
. B
RA
NDLEY
CL
OS
UR
E
OF
E
XI
ST
IN
G
UN
DE
RG
RO
UN
D
FU
EL
ST
OR
AG
E
TA
NK
96" (84" WHEN CONNECTED)
10"
SOLAR WARNING LIGHT
WATER RELEASE PLUGSAFETY ORANGE
SAFETY ORANGE PRISMATIC REFLECTOR
WHITE PRISMATIC REFLECTOR
FORK LIFT GROOVE
TS
99.05 9905a.02.CSPP
1"=50'
6/30/2025
BA
RR
IC
AD
E
PL
AN
HA
NF
OR
D
MU
NI
CI
PA
L
AI
RP
OR
T H
AN
FO
R D
C
AL
IF
O
R N
IA
MSB
DATE
DRAWN
CHECKED
PROJECT No.
FILE
SCALE
No
RE
VI
SI
ON
S
BY
AP
R
DA
TE
SHEET No.
EN
GI
NE
ER
O F
RE
CO
RD
G :\9
H
AN
FO
R D
\0
FU
EL
IS
LA
N D
\C
LO
SU
R
E
PL
AN
\9
5A
.0 2.
C
SP
P.
D
W G
PL
O
TT
ED
B Y
M el is sa
B ra nd le y 7/
8/
:3
PM
K
IN
G
R O
A D
SU
IT
E
L O
O M
IS
C A
LI
FO
R N
IA
-4
10" WATER-FILLED BARRICADE
NOT TO SCALE
TAXIWAY A
RETENTION
POND
WORK ZONE 2
CONTRACTOR'S STAGING
AND TEMPORARY STORAGE
AREA
LOW PROFILE
BARRICADE
LOW PROFILE
BARRICADE
TA
XI
W
AY
D
0 25 5050
SCALE: 1"=50'
CONTRACTOR
FLAGGER
X X
X
X X
X
X X XX X X X X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
LEGEND
EXISTING FENCE LINE
EXISTING PAVEMENT
RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREA
CONTRACTOR'S STAGING AND STORAGE AREA
RUNWAY OBJECT FREE AREA
X X XX X X
AIRCRAFT ROUTE
HAUL ROAD
ARFF ACCESS ROUTE
LOW-PROFILE BARRICADE
HANFORD CTAF: 122.800
WORK ZONES AND FACILITY CLOSURES
WORK
ZONE CONTRACTOR'S WORK WORK AREA FACILITY CLOSURE COMMENTS
1 CLOSURE OF EXISTING FUEL TANK FUEL ISLAND AND APRON OUTSIDE
OF TOFA
FUEL ISLAND, PORTION OF APRON
TAXILANE
REMAIN CLOSED FOR PROJECT
DURATION
2 SOIL SAMPLING AND CLOSURE OF
EXISTING FUEL TANK
TAXIWAY A OBJECT FREE AREA
(62' FROM TW A CENTERLINE)
WORK ZONE 1 CLOSURE, AND
TAXIWAY A BETWEEN TW D & TW E
PROVIDE 48 HOUR NOTICE PRIOR TO
CLOSURE, REOPEN EACH WORKING DAY
BARRICADE NOTES:
1. CONTRACTOR WILL FURNISH, INSTALL, AND MAINTAIN PLASTIC WATER-FILLED LIGHTED BARRICADES.
2. EACH BARRICADE SHALL HAVE 2 SOLAR-POWERED LIGHTS WITH RED LENSES EACH CONTROLLED BY
PHOTOCELLS SUCH THAT THEY ARE ON CONTINUOUS AT NIGHT AND OFF BY DAY.
3. BARRICADES SHALL BE SECURED IF NECESSARY TO RESIST MOVEMENT FROM JET BLASTS OR PROP BLAST.
4. LOCATE BARRICADES AS SHOWN ON THE PLAN AND DIRECTED BY RESIDENT PROJECT REPRESENTATIVE.
WHERE SPACING BETWEEN BARRICADES IS PERMITTED, SPACING SHALL NOT EXCEED 4 FEET. SEE THIS
SHEET FOR LOCATIONS.
5. AT THE COMPLETION OF THE CONSTRUCTION, ALL BARRICADES SHALL BE DRAINED OF WATER AND
REMOVED FROM THE AIRPORT.
TRUE NORTH
U P
UP
UP
UP
UP
UP
TOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFA
TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA
TO
FA
TOFA TOFA TOFA TOFA TOFA TOFA TOFA
X
X
X
X X X X X X X X
X X
G
W
W
ROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFA
U10
U14A A
A A
U-10
129(7)
112(7)
BROWN SILTY FINE SAND
113(12)
110(11)
111(4)
BROWN FINE SAND
U-14
97(22)
105(12)
BROWN SANDY SILT
108(21)
116(14)
103(6)
BROWN SILTY FINE SAND
114(18)
102(4)
BROWN SILTY VERY FINE
SAND
BROWN SILTY FINE SAND
BROWN CLEAN MEDIUM
TO FINE SAND
CLEAN MEDIUM TO FINE
SAND
RB
99.05 9905a.05.Soils
1" = 40'
6/30/2025
SO
ILS
LO
CA
TI
ON
M
AP
A
ND
B
OR
IN
G
LO
GS
HA
NF
OR
D
MU
NI
CI
PA
L
AI
RP
OR
T
MSB
DATE
DRAWN
CHECKED
PROJECT No.
FILE
SCALE
No
RE
VI
SI
ON
S
BY
AP
R
DA
TE
SHEET No.
EN
GI
NE
ER
O F
RE
CO
RD
G :\9
H
AN
FO
R D
\0
FU
EL
IS
LA
N D
\C
LO
SU
R
E
PL
AN
\9
5A
.0 5.
SO
IL
S.
D
W G
PL
O
TT
ED
B Y
M el is sa
B ra nd le y 7/
8/
:3
PM
K
IN
G
R O
A D
SU
IT
E
L O
O M
IS
C A
LI
FO
R N
IA
-4
TRUE NORTH
0 20 4040
SCALE: 1"=40'
CL
OS
UR
E
OF
E
XI
ST
IN
G
UN
DE
RG
RO
UN
D
FU
EL
ST
OR
AG
E
TA
NK
103(7)
U1
/6"
BORING NUMBER
SAMPLE NUMBER
SOIL DENSITY
DRY UNIT WEIGHT
(LBS/CU. FT.)
MOISTURE CONTENT
(% OF DRY UNIT WT)
AS INDICATED DRIVING
RECORD (BLOWS/6")
175 LB HAMMER 24" DROP
SECTION A-A
D
EP
TH
FT
D
EP
TH
FT
BORING LEGEND
EXISTING AC PAVEMENT
2024 SOIL BORING LOCATION
U10
LEGEND
LIVIC
Ex p.
6-3 0-2
No . C
REGISTERED
PR
OF
ES
SIO
NA
L E
NGINEER
STATE O
F
CA
LI
FO
RNIA
MELISSA
S
. B
RA
NDLEY
| Sheets and Views |
| 1 COVER AND SHEET INDEX |
| 2 CONSTRUCTION SAFETY AND PHASING PLAN |
| 3 BARRICADE PLAN |
| 4 EXISTING FUELING AREA & UST DEMOLITION PLAN |
| 5 SOILS LOCATION MAP AND BORING LOGS |
File details come from the government source that posted it. Updated .