Revised Scope of Work - Large.docx
DOCX document 41 KB Posted
- Attached to
- DNR-Carlyle SFWA- Data Collection
- Solicitation number
- 20-422DNR-DIREC-B-15461
- Issued by
- Fulton County, Illinois
About this file
This document is a Scope of Work issued by the Illinois Department of Natural Resources (IDNR) for a LiDAR and Orthophoto Collection project at the Carlyle Lake State Fish and Wildlife Area in Fayette County, Illinois.
IDNR is seeking proposals for the collection and delivery of high-resolution LiDAR data and orthorectified aerial imagery to produce an accurate base map representing surface water flow across the site. The selected vendor must have 5 years of experience in geospatial data collection and mapping, and is required to provide data at 3-inch Ground Sample Distance, classified LiDAR data in LAS format, 0.5-foot contours, and 1:50 scale planimetric mapping. All data must be referenced to specific coordinate systems, and the vendor will be required to provide ground control points and assist with map accuracy verification. The project must be completed by June 30, 2021. There is no pre-submission conference, and all questions must be submitted in writing 3 days prior to the bid due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CarlyleLakeSFWA_LiDAR_Boundary.pdf | ||
| Forms B Section V.20.1~63.docx | DOCX document | |
| Carlyle Boundary.kmz | KMZ file | |
| Forms A Section V.18.1~48.doc | DOC document | |
| SMALL CONSTRUCTION BID FORM~60.docx | DOCX document | |
| Standard Terms and Conditions~2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
SMALL PURCHASE PROCUREMENT
SCOPE OF WORK & PROJECT REQUIREMENTS
Date: June 3, 2020 File# 4-20-043
LOCATION: Carlyle Lake State Fish and Wildlife Area
PROJECT TITLE: LiDAR and Orthophotograph Collection
PROJECT NARRATIVE:
Due to extensive flooding and significant degradation of the earthen levees which negatively affect the water level management regime, the Illinois Department of Natural Resources is seeking a not-to-exceed proposal to collect and provide Light Detection and Ranging (LiDAR) and Orthophoto (Orthorectified (geometrically corrected) Aerial Photography) details for the Carlyle Lake State Fish and Wildlife Area (SFWA) property, located southwest of Vandalia, IL in Fayette County. The purpose for this LiDAR and Orthophoto collection is to provide an accurate base map which represents how surface water flows across the site. This information shall be used to aide in the design and construction of a proposed wetland enhancement at Carlyle Lake SFWA.
SCOPE OF WORK:
IDNR is requesting the selected Vendor collect enough data to provide the IDNR with a Triangulated Irregular Network (TIN) surface in Civil 3D 2019 format to generate 0.5-foot contours according to National Mapping Standards. The selected Vendor shall locate and map all visible features including but not limited to swales, ditches, berms, fences, edge of agriculture fields, edge of wooded areas, roads, riverbanks and any other features that impact surface drainage. The Vendor is also responsible for setting proper ground control to provide the information requested. It is expected that enough data will be collected and processed to accurately depict cross sections of existing berms, ditches and any other relevant features.
ATTACHMENTS:
The following documents are included:
1) The project area is detailed in the attached PDF labeled “Carlyle Lake SFWA LiDAR Boundary”.
PROJECT SPECIFICATIONS & REQUIREMENTS:
Schedule Scheduling of the data gathering phase of this effort shall be approved by the Illinois Department of Natural Resources, or their approved Agent. Several factors shall be taken into consideration for scheduling. These factors include, but are not limited to, tree canopy cover, current flood stage of the project site, and time of year.
A. Project Specifications:
1) The awarded vendor must have 5 years of experience in the commercial geospatial data collection and photographic mapping industry and be able to provide documentation of completion of at least 5 projects similar in size and scope to this one.
2) Data collection at 3-inch (0.075 meter) Ground Sample Distance (GSD), digital 4-band aerial imagery together with the collection and processing of high accuracy classified LiDAR data in a Laser (LAS) format sufficient to derive the following:
a. A surface model with enough accuracy to support 0.5-foot contours adhering to the American Society for Photogrammetry and Remote Sensing (ASPRS) Class III vertical accuracy standards. This surface model will be augmented by ground topographical information as required to fill any dense vegetation data voids.
b. Planimetric mapping adhering to ASPRS Class 1 horizontal accuracy standards developed at a one-inch equals fifty feet (1:50) scale
c. Orthorectified color aerial imagery at a 3-inch resolution
d. It is required that the LiDAR acquisition be flown in overlapping perpendicular directions to better penetrate the tree canopy.
e. The imagery/LiDAR provider shall ensure that the project area is fully and sufficiently covered with no data voids due to data holidays (i.e. gaps between flight lines) and/or from system malfunctions. Data voids in the bare earth not caused by classification of geographic features shall not exceed three times the point spacing. Data voids of this size are unacceptable and shall be reason to reject the entire sub-project dataset.
3) All mapping files created for this project shall be referenced to the following systems:
a. Horizontal coordinates shall be State Plane Coordinate System, Illinois West Zone, US Survey Feet, and NAD83 (2011).
b. All elevations shall be in US Survey Feet and referenced to NAVD 88, Geoid 12B.
4) A single, non-overlapped, tiling scheme will be established and agreed upon between IDNR and the aerial mapping subconsultant prior to deliverables development. This established scheme will be used for all tiled deliverables.
5) LiDAR data shall be collected using an approved fully calibrated system capable of collecting multiple echoes per pulse with a minimum of a first, last, and one intermediate return. The system must also be able to collect the intensity (LiDAR pulse signal strength) for each return signal.
a. Ground Control Points
i. All mapping will be controlled with enough ground control points to meet the project mapping accuracy requirements
ii. All ground control point information established by the contractor shall be stable and recoverable by IDNR, or its Agent, and shall be provided to the IDNR for use in map accuracy checks
iii. Map accuracy checks of the surface models will be verified by IDNR, or its Agent, before final deliverables are delivered.
1. To verify mapping, DNR shall request the selected Vendor provide the horizontal coordinates of at least 20 check points visible in the mapping. IDNR, or its Agent, shall confirm these coordinates meet or exceed ASPRS Class 1 horizontal accuracy standards using Real Time Kinematics (RTK) Global Positioning System (GPS) or conventional methods and observations.
2. To verify surface models, DNR, or its Agent, shall provide the horizontal coordinates of 20 map accuracy check points in each type of terrain (low vegetation, high vegetation, non-vegetated, and paved surfaces) to the selected Vendor. A total of at least 80 check points will be provided as collected using RTK GPS or conventional survey methods. The Vendor shall then provide the IDNR with elevation values for these points as developed from the mapping. The IDNR, or its Agent, confirm that the map accuracy meets the specified requirements. Mapping not meeting map accuracy requirements specified in this request will need to be resurveyed or revised by the Vendor and shall be re-checked, after revision, with existing check points such that the deliverables are verified to meet or exceed ASPRS Class III vertical accuracy requirements.
| B. | Project Instructions and Notes: |
| 1) | Work Completed by Prime Contractor: |
A minimum of thirty percent (30%) of the work shall be completed by the Prime Contractor on this project. Pursuant to (30 ILCS 500/1-15.17) the Contractor is the person having a contract with the Illinois Department of Natural Resources.
2) Coordination of Work Activities:
All work activities and entry to the site must be coordinated with the site superintendent.
3) Deliverables:
The Vendor shall perform photogrammetric and lidar mapping services sufficient to provide the following deliverables:
1. Natural color 0.25-foot resolution digital orthophotography
a. Orthophoto deliverables shall conform to ASPRS Horizontal Data Accuracy Class 1
b. Orthophoto mosaic images shall be in a Multi-resolution Seamless Image Database (MrSID) format
2. A surface model in AutoDesk Civil 3D 2016, or newer release, Triangular Irregular Networks (TIN) file format conforming to ASPRS 2014 Accuracy Standards for Digital Geospatial Data - Class III. The surface model shall be constructed from LiDAR and orthorectified aerial photography using appropriate break lines and surface construction techniques that accurately represent all areas identified.
a. An AutoDesk Civil 3D 2016, or newer release, Drawing (DWG) format file containing all break lines developed/used for surface model creation
b. Point data records, meeting LAS Specification 1.4, shall be provided as American Standard Code for Information Interchange (ASCII), comma delimited XYZi formatted data files
a. Geo-reference information shall be included in all LAS file headers
b. Lidar data shall meet or exceed Quality Level 1 from the National Enhanced Elevation Assessment (NEEA)
c. Raw point cloud data including all points collected
d. Classified point cloud data with the following classification scheme (minimum):
· Code Description 1 –Unclassified
· Code Description 2 – Bare-earth ground
· Code Description 3 – Vegetation and/or Noise
· Code Description 9 – Water
· Code Description 11 – Road Surface
3. Project Level Metadata complying with Federal Government Data Committee metadata format standard in XML format.
a. Metadata shall describe the project, data acquisition methods, system calibration, processing methods, and statistical validation process and results. Project documentation will include control point and flight diagram information from the LiDAR acquisition flight.
4) Contractor’s Licensing and/or Certifications:
Contractor shall be responsible for compliance with all applicable contractor and trades person licensing with the appropriate State agency.
| C. | Project Requirements: |
| 1) | Project Meeting |
| There is no pre-submission conference for this procurement. |
| 2) | Duration |
| Bids shall be good for ninety (90) calendar days after the Bid Opening Date. |
| 3) | Prevailing Wage Rates |
| This contract [or agreement] calls for the construction of a “public work,” within the meaning of | |
| the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”). The Act requires | |
| contractors and subcontractors to pay laborers, workers and mechanics performing services on | |
| public works projects no less than the current “prevailing rate of wages” (hourly cash wages | |
| plus, amount for fringe benefits) in the county where the work is performed. The Illinois | |
| Department of Labor (IDOL) publishes the prevailing wage rates on its website at | |
| http://labor.illinois.gov/. IDOL revises the prevailing wage rates and the | |
| contractor/subcontractor has an obligation to check the IDOL’s web site for revisions to | |
| prevailing wage rates. For information regarding current prevailing wage rates, please refer to | |
| IDOL’s website. All contractors and subcontractors rendering services under this contract must | |
| comply with all requirements of the Act, including but not limited to, all wage requirements and | |
| notice and record keeping duties. |
| 4) | Certified Payroll |
| State law 820 ILCS 130/5 requires all contractors and sub-contractors working on state | |
| construction projects to submit certified payroll records to the Department of Natural | |
| Resources. The payroll records must include all workers employed by contractors on the | |
| project. |
In accordance with 820 ILCS 130/5, the contractor and sub-contractor(s) shall make and keep, for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project.
No later than the 15th day of each calendar month, the contractor shall file a certified payroll for the immediately preceding month with the Department of Natural Resources.
5) Small Business Set-Aside N/A
| 6) | Subcontractors |
| The Contractor shall identify the names of all subcontractors to be utilized by them in the | |
| performance of this contract, together with the anticipated amount of money that each | |
| subcontractor is expected to receive pursuant to this contract. Pursuant to Illinois Procurement Code (30 ILCS 500/1-15-108), a person or entity is not a “subcontractor” if that person only Provides goods or supplies that are incidental to the performance of a contract by a person who has a contract subject to the Code. |
| 7) | Insurance |
| Contractor shall, at all times during the term of this contract and any renewals or extensions, maintain and provide a Certificate of Insurance naming the State as an additionally insured for all required bonds and insurance. Certificates may not be modified or canceled until at least thirty (30) days’ notice has been provided to the State. Contractor shall provide: (a) General Commercial Liability insurance in the amount of $1,000,000 per occurrence (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-owned Auto (Combined Single Limit Bodily Injury and Property Damage), in amount of $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in the amount required by law. Insurance shall not limit Contractor’s obligation to indemnify, defend, or settle any claims. |
8) Performance Bond/Labor and Material Payment Bond Pursuant to the Public Construction Bond Act (30 ILCS 550/), a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, shall be required if the project cost exceeds $50,000. Each bond shall be in the full amount of the contract. The bond must be from a surety licensed to do business within the State of Illinois and acceptable to IDNR.
9) Minority Contractor Opportunity Initiative The State requires a fee of $15 to cover Expenses related to the administration of the Minority Contractor Opportunity Initiative. Any Vendor awarded a contract under Section 20-10, 20-15, 20-25 or 20-30 of the Illinois Procurement Code (30 ILCS 500) of $1000 or more is required to pay a fee of $15. The Comptroller shall deduct the fee from the first check issued to the Vendor under the contract and deposit the fee in the Comptroller’s Administrative Fund.
10) Permits and Licenses Permits and licenses necessary for the execution of the work shall be secured and paid for by the Contractor.
11) Change Orders Change order shall be defined as a change in a contract term, other than as specifically provided for in the contract, which authorizes or necessitates any increase or decrease in the cost of the contract or the time for completion. A change order shall be executed by the State agency and vendor evidencing the change. All changes shall be approved by the CPO, or designee, and be accompanied by a written determination that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed and the change is germane to the original contract as signed. Change orders that increase or decrease the cost of a contract or an estimated contract by a total of $10,000 or more or the time of completion by more than 30 days shall be published on the Illinois Procurement Bulletin, pursuant to Section 15-25 of the Code and documented pursuant to Section 33E-9 of the Criminal Code of 2012, in advance of execution of the change order.
12) Inducement Resolution All or a portion of this project may be paid or reimbursed from the proceeds of tax-exempt bonds subsequently issued by the State.
13) Payment Payments, including late payment charges, will be paid in accord with the State Prompt Payment Act and rules when applicable, 30 ILCS 540/; 74 III. Adm. Code 900. This shall be the Contractor’s sole remedy for late payments by the State. Payment terms contained in Contractor’s invoice(s) shall have no force or effect.
| 14) | Contract Award |
| Contract award will be made to the lowest, responsible, responsive bidder. The Department of Natural Resources reserves the right to reject any or all bids. |
| 15) | Term of Contract |
| All work shall be completed by June 30, 2021. |
16) Bid Submittal Bids may be submitted electronically on BidBuy or by submitting the attached Bid Form to Frederick.Murphy@illinois.gov .
| 17) | Bid Submittal Date and Time |
| Refer to the BIDBUY solicitation for the bid date and time. |
18) Questions ALL QUESTIONS PERTAINING TO THE SCOPE OF WORK OR THE BIDBUY PROCEDURES, MUST BE DIRECTED TO Frederick.Murphy@illinois.gov --- ALL QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN THREE (3) BUSINESS DAYS BEFORE THE BID DATE.