Revised Saginaw SOB Concrete RFP 171 20000001185.docx

DOCX document 276 KB Posted

Attached to
Saginaw - Concrete and Brick Replacement Project
Solicitation number
RFP 171 200000001185 3
Issued by
Saginaw County, Michigan

About this file

This is a Request for Proposal (RFP) from the State of Michigan, Department of Technology, Management and Budget, Financial Services Division, Procurement office, seeking a licensed contractor to remove and replace concrete and brick at the Saginaw State Office Building located at 411 E. Genesee, Saginaw, Michigan 48607. The project includes removal and disposal of existing concrete and brick in multiple areas including a 5' x 120' parking lot walkway, north and south handicap ramps, a 30' x 30' L-shaped curb area, optional northeast walk, northeast walk off-ramp, south entrance (45' x 30'), north entrance patch and repair, northwest corner section (10' x 60'), and brick retaining walls (ranging from 4' x 4' to 60' x 30'). All new concrete must be 4000 psi mix with fiber-mesh to a depth of 4 inches, and all installation must occur during standard business hours (7:30 AM to 5:00 PM). A mandatory site visit was scheduled for March 5, 2020 at 10:00 AM with attendance required for bid consideration. The proposal deadline was March 17, 2020 at 12:00 PM Eastern Time, with questions due by March 6, 2020. The contract will be awarded to the responsive and responsible bidder offering best value based on technical evaluation (40% General Requirements, 30% Service Levels, 20% Project Plan, 10% Vendor Questions Worksheet), with proposals scoring 80 or more points eligible for pricing evaluation.

Pricing must be submitted separately in modifiable format and must include all costs for materials, labor, saw cutting, sand installation, compaction, fiber-mesh concrete installation, expansion joints, cleanup, and disposal. Contractors must maintain Commercial General Liability Insurance ($1,000,000 per occurrence/$2,000,000 aggregate), Umbrella Liability Insurance ($5,000,000), Automobile Liability Insurance ($1,000,000), Workers' Compensation, and Employers Liability Insurance ($500,000). Liquidated damages of $5,000 plus $100 per day apply for late or improper completion, and $1,000 per individual per day for unauthorized removal of key personnel. The State anticipates contracting with a single vendor and reserves the right to consider prior performance, economic impact to Michigan, total cost of ownership, and qualified disabled veteran/service-disabled veteran-owned business status in its award decision. Payment will be made via Electronic Funds Transfer within 45 days of invoice receipt. All installation work must comply with prevailing wage requirements where applicable, and the contractor must demonstrate financial resources sufficient to ensure contract performance.

View the file

Other files

File Type Posted
Brick Repair.png PNG image
Saginaw SOB Concrete RFP 171 20000001185.docx DOCX document
Saginaw Concrete.png PNG image
Saginaw SOB Concrete RFP 171 20000001185 Vendor Questions annd Answers.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF MICHIGAN

Department of Technology, Management and Budget – Financial Services - Procurement

Saginaw State Office Building Concrete and Brick Replacement Project Request for Proposal No. 171 200000001185

Solicitation Manager Name: Rob Telesz Direct Phone: 517-241-5539 Email: teleszr1@michigan.gov Main Phone: 1-855-MI-PURCH 1-855-647-8724

This is a Request for Proposal (RFP) for:

A licensed contracted vendor to remove and replace concrete and brick at the Saginaw State Office Building.

RFP Timeline

Event
Time
Date
RFP issue date
N/A
2/25/2020
Pre-proposal meeting
10:00 a.m. Eastern
3/5/2020
Deadline for bidders to submit questions about this RFP
12:00 p.m. Eastern
3/6/2020
Anticipated date State will post answers to bidder questions on www.michigan.gov/SIGMAVSS
N/A
3/6/2020
Proposal deadline*
12:00 p.m. Eastern
3/17/2020
Anticipated contract begin date
N/A
TBD

*A bidder’s proposal received at 12:00:01 p.m. Eastern is late and subject to disqualification.

This RFP is subject to change. Check www.michigan.gov/SIGMAVSS for current information.

PROPOSAL INSTRUCTIONS

1. PROPOSAL PREPARATION. The State recommends reading all RFP materials prior to preparing a proposal, particularly these Proposal Instructions and the Vendor Questions Worksheet. Bidders must follow these Proposal Instructions and provide a complete response to the items indicated in the table below. References and links to websites or external sources may not be used in lieu of providing the information requested in the RFP within the proposal. Include the bidder’s company name in the header of all documents submitted with your proposal.

RFP Structure and Documentation

Document
Description
Bidder Response Instructions
Cover Page
Provides RFP title and number, important dates, and contact information for Solicitation Manager
Informational
Proposal Instructions
Provides RFP instructions to bidders
Informational
Confidential Treatment Form
Required verification on whether bidder’s proposal contains confidential information
Bidder to complete and submit by proposal deadline
Vendor Questions Worksheet
Questions to bidders on background and experience
Bidder to complete and submit by proposal deadline
Schedule A – Statement of Work
Statement of work
Bidder to complete and submit by proposal deadline
Schedule B – Pricing
Pricing for goods and services sought by the State through this RFP
Bidder to complete and submit by proposal deadline
Contract Terms
Provides legal terms for a contract awarded through this RFP
Deemed accepted by bidder unless information required in Section 8, Evaluation Process is submitted by proposal deadline

2. CONTACT INFORMATION FOR THE STATE. The sole point of contact for the State concerning this RFP is listed on the Cover Page. Contacting any other State personnel, agent, consultant, or representative about this RFP may result in bidder disqualification.

3. A MANDATORY SITE VIST will take place on Thursday, March 5, 2020 at 10:00 a.m. at the Saginaw State Office Building located at 411 E. Genesee Saginaw, MI 48607. Mike Noonan will be there to meet the contractors. This is a MANDATORTY SITE VISIT. You MUST sign the sign-in sheet to have your bid considered. If a contractor submits a bid and did not attend the mandatory site visit, the contractors bid will be disqualified. Mike Noonan, DTMB/SFA/BOD, will be in the lobby to meet you. You will need to sign-in at the security guard desk. Please bring a valid ID with you and proper inspection/measuring tools with you. All questions must be submitted in writing to Rob Telesz @ teleszr1@michigan.gov by Friday, March 6, 2020 by 12:00 p.m.

The purpose of the pre-proposal meeting is to discuss the RFP and the work to be performed and will include an inspection of the facility to receive the goods or services sought in this RFP. Statements made by the Solicitation Manager or designee at a pre-proposal meeting are not considered modifications to the RFP. If, however, the Solicitation Manager determines modifications to the RFP are warranted after the meeting, modifications will be posted in writing on www.michigan.gov/SIGMAVSS as explained in Section 4, Modifications.

Attendance at the pre-proposal meeting is limited to 3 people per bidder. If the pre-proposal meeting is mandatory, a bidder may be disqualified by being late. Subcontractor sign-in is permitted in lieu of the bidder as evidence of attendance. Accessibility requests for reasonable accommodations at the pre-proposal meeting should be made with the Solicitation Manager at least 10 business days before the date of the meeting. Accommodation requests received outside this time period cannot be guaranteed.

4. MODIFICATIONS. The State may modify this RFP at any time. Modifications will be posted on www.michigan.gov/SIGMAVSS . This is the only method by which the RFP may be modified.

5. QUESTIONS. Bidder questions about this RFP must be emailed the Solicitation Manager no later than the time and date specified on the Cover Page. In the interest of transparency, only written questions are accepted. Answers to questions will be posted on www.michigan.gov/SIGMAVSS. Submit questions using the format below; a Microsoft Excel format or similar is suggested.

Q #
Document and Section
Page #
Bidder Question

6. DELIVERY OF PROPOSAL.

Electronic – The bidder must submit its proposal, all attachments, and any modifications or withdrawals electronically through www.michigan.gov/SIGMAVSS. The price proposal should be saved separately from all other proposal documents. The bidder should submit all documents in a modifiable (native) format (examples include but are not limited to Microsoft Word or Excel and Google Docs or Sheets). In addition to submitting documents in a modifiable format, the bidder may also submit copies of documents in PDF. Attachment file size is limited to 6 MB per document. Bidder’s failure to submit a proposal as required may result in disqualification. The proposal and attachments must be fully uploaded and submitted prior to the proposal deadline. Do not wait until the last minute to submit a proposal, as the SIGMA VSS system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA VSS system will not allow a proposal to be submitted after the proposal deadline identified in the solicitation Closing On/Closing Date fields (Summary view/Detail view), even if a portion of the proposal has been uploaded.

Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder.

7. MANDATORY MINIMUM REQUIREMENTS. To avoid disqualification, the bidder must provide documentation to support the following:

· Must be able to provide the products mentioned in the product specifications.

· Must be able to provide the labor mentioned in the labor specifications.

· Must attend Mandatory Site Visit. Contractors must sign the sign-in sheet. If a bid is received and the contractor did not attend the Mandatory Site Visit, the Contractors bid will be disqualified.

· Must Be Insured. Please submit company Certificate of Liability Insurance Form when submitting a bid. The Form must include “The State of Michigan, its departments, divisions, agencies, offices, commissions, officers, employees and agents as ADDITIONAL INSUREDS”

Only proposals meeting the mandatory minimum requirements will be considered for evaluation.

8. EVALUATION PROCESS. The State will evaluate each proposal based on the following factors:

Technical Evaluation Criteria
Weight
1.
General Requirements Schedule A, Statement of Work, Section 1
40
2.
Service Levels – Schedule A, Statement of Work, Section 2.1
30
3.
Project Plan – Schedule A, Statement of Work, Section 9
20
4.
Vendor Questions Worksheet
10
Total
100

Proposals receiving 80 or more technical evaluation points will have pricing evaluated and considered for award.

The State may utilize all bidder information, without regard to a proposal’s technical score, to determine fair market value for goods or services sought. The State is not obligated to accept the lowest price proposal. If applicable, the State’s evaluation will include consideration of a bidder’s qualified disabled veterans/service-disabled veteran owned business(QDV/SDVOB) status under MCL 18.1261(8). Additional information on the SDVOB preference is available at: https://www.michigan.gov/dtmb/0,5552,7-358-82550_85746_48677-412612--,00.html.

The State strongly encourages strict adherence to the Contract Terms. The State reserves the right to deem a bid non-responsive for failure to accept the Contract Terms. Nevertheless, the bidder may submit proposed changes to the Contract Terms in track changes (i.e., visible edits) with an explanation of the bidder’s need for each proposed change. Failure to include track changes with an explanation of the bidder’s need for the proposed change constitutes the bidder’s acceptance of the Contract Terms. General statements, such as that the bidder reserves the right to negotiate the terms and conditions, may be considered non-responsive.

The State may but is not required to conduct an on-site visit to tour and inspect the bidder’s facilities; require an oral presentation of the bidder's proposal; conduct interviews, research, reference checks, and background checks; and request additional price concessions at any point during the evaluation process.

9. NOTICE OF DEFICIENCY. The State reserves the right to issue a Notice of Deficiency to bidders if the State determines after the proposal deadline that a portion of the RFP was deficient, unclear, or ambiguous. Failure to respond to a Notice of Deficiency timely may be cause for disqualification.

10. CLARIFICATION REQUEST. The State reserves the right to issue a Clarification Request to a bidder to clarify its proposal if the State determines the proposal is not clear. Failure to respond to a Clarification Request timely may be cause for disqualification.

11. RESERVATIONS. The State reserves the right to:

a. Disqualify a bidder for failure to follow these instructions.

b. Discontinue the RFP process at any time for any or no reason. The issuance of an RFP, your preparation and submission of a proposal, and the State’s subsequent receipt and evaluation of your proposal does not commit the State to award a contract to you or anyone, even if all the requirements in the RFP are met.

c. Consider late proposals if: (i) no other proposals are received; (ii) no complete proposals are received; (iii) the State received complete proposals, but the proposals did not meet mandatory minimum requirements or technical criteria; or (iv) the award process fails to result in an award.

d. Consider an otherwise disqualified proposal, if no other proposals are received.

e. Disqualify a proposal based on: (i) information provided by the bidder in response to this RFP; (2) the bidder’s failure to complete registration on www.michigan.gov/SIGMAVSS ; or (3) if it is determined that a bidder purposely or willfully submitted false or misleading information in response to the RFP.

f. Consider prior performance with the State in making its award decision.

g. Consider overall economic impact to the State when evaluating proposal pricing and in the final award recommendation. This includes but is not limited to: considering principal place of performance, number of Michigan citizens employed or potentially employed, dollars paid to Michigan residents, Michigan capital investments, job creation, tax revenue implications, and economically disadvantaged businesses.

h. Consider total-cost-of-ownership factors (e.g., transition and training costs) when evaluating proposal pricing and in the final award recommendation.

i. Refuse to award a contract to any bidder that has failed to pay State taxes or has outstanding debt with the State.

j. Enter into negotiations with one or more bidders on price, terms, technical requirements, or other deliverables.

k. Award multiple, optional-use contracts, or award by Contract Activity.

l. Evaluate the proposal outside the scope identified in Section 8, Evaluation Process, if the State receives only one proposal.

12. AWARD RECOMMENDATION. The contract will be awarded to the responsive and responsible bidder who offers the best value to the State, as determined by the State. Best value will be determined by the bidder meeting the minimum point threshold and offering the best combination of the factors stated in Section 8, Evaluation Process, and price, as demonstrated by the proposal. The State will post an Award Recommendation and Evaluation Synopsis on www.michigan.gov/SIGMAVSS .

13. DEBRIEF MEETING AND BID PROTEST. The State will post an Award Recommendation and Evaluation Synopsis, which will provide instructions on how to request a debrief meeting

If you wish to initiate a protest of the award, you must submit your written protest to teleszr1@michigan.gov no later than 3:00 p.m., 3 calendar days after posting the Award Recommendation and Evaluation Synopsis or by 3:00 p.m. the next business day if that date falls on a state holiday or weekend. The State reserves the right to adjust this timing and will publish any change on the SIGMA VSS system.

Additional information about the protest process is available at www.michigan.gov/micontractconnect under the “Programs and Policies” link.

14. STATE ADMINISTRATIVE BOARD. Contracts equal to $250,000 or greater than require approval by the State Administrative Board. The State Administrative Board’s decision is final; however, its approval does not constitute a contract. The award process is not complete until the awarded contractor receives a contract fully executed by all parties.

15. GENERAL CONDITIONS. The State will not be liable for any costs, expenses, or damages incurred by a bidder participating in this solicitation. The bidder agrees that its proposal will be considered an offer to do business with the State in accordance with its proposal, including the Contract Terms, and that its proposal will be irrevocable and binding for a period of 180 calendar days from date of submission. If a contract is awarded to the bidder, the State may, at its option, incorporate any part of the bidder’s proposal into a contract. This RFP is not an offer to enter into a contract. This RFP may not provide a complete statement of the State’s environment or contain all matters upon which agreement must be reached. Other than verified trade secrets, proposals submitted via www.michigan.gov/SIGMAVSS are the State’s property.

16. CONFIDENTIAL TREATMENT FORM AND THE FREEDOM OF INFORMATION ACT. All portions of the bidder’s proposal and resulting contract are subject to disclosure as required under Michigan’s Freedom of Information Act (FOIA), MCL 15.231, et seq. However, some information may be exempt from disclosure. Under MCL 18.1261(13)(b), records containing “a trade secret as defined under section 2 of the uniform trade secrets act, 1998 PA 448, MCL 445.1902,” are exempt from disclosure under FOIA. In addition, “financial or proprietary information” submitted with a bidder’s proposal is exempt from disclosure under FOIA. A bidder’s failure to comply with this Section is grounds for rejecting a bidder’s proposal as non-responsive. As a part of its proposal, each bidder must follow the procedure below.

a. SUBMIT A COMPLETED “CONFIDENTIAL TREATMENT FORM” (CT FORM) WITH YOUR BID. Completion and submission of the CT Form is required regardless of whether the bidder seeks confidential treatment of information. Failure to submit a completed CT Form may be cause for disqualification from the solicitation process.

i. Complete and sign Section 1 of the CT Form if the bidder does NOT request confidential treatment of information contained in its proposal; or

ii. Complete and sign Section 2 of the CT Form if the bidder requests confidential treatment of certain information. Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy.”

b. FOIA REQUESTS. If a FOIA request is made for a bidder’s proposal, the Public Copy may be distributed to the public along with the bidder’s CT Form. The CT Form is a public document and serves as an explanation for the redactions to the Public Copy. Do not put any trade secret, financial, or proprietary information in the CT Form. Do not redact the CT Form itself.

c. NO ADVICE. The State will not advise a bidder as to the nature or content of documents entitled to protection from disclosure under FOIA or other laws, as to the interpretation of such laws, or as to the definition of trade secret or financial or proprietary information. Nothing contained in this provision will modify or amend requirements and obligations imposed on the State by FOIA or other applicable law.

d. FAILURE TO REQUEST CONFIDENTIAL TREATMENT. Failure to request material be treated as confidential as specified herein relieves the State, its agencies, and personnel from any responsibility for maintaining material in confidence.

e. Bids containing a request to maintain an entire proposal as confidential may be rejected as non-responsive. Bidders may not request confidential treatment with respect to resumes, pricing, and marketing materials. The State reserves the right to determine whether material designated as exempt by a bidder falls under MCL 18.1261 or other applicable FOIA exemptions. If a FOIA request is made for materials that the bidder has identified as trade secret, financial, or proprietary information, the State has the final authority to determine whether the materials are exempt from disclosure under FOIA.

f. Bidder forever releases the State, its departments, subdivisions, officers, and employees from all claims, rights, actions, demands, damages, liabilities, expenses and fees, which arise out of or relate to the disclosure of all or a portion of bidder’s proposal submitted under this RFP. Bidder must defend, indemnify and hold the State, its departments, subdivisions, officers, and employees harmless, without limitation, from and against all actions, claims, losses, liabilities, damages, costs, attorney fees, and expenses (including those required to establish the right to indemnification), arising out of or relating to any FOIA request, including potential litigation and appeals, related to the portion of bidder’s proposal submitted under this RFP that bidder has identified as a trade secret, or financial or proprietary information. The State will notify bidder in writing if indemnification is sought. The State is entitled to: (i) regular updates on proceeding status; (ii) participate in the defense of the proceeding; (iii) employ its own counsel; and to (iv) retain control of the defense, or any portion thereof, if the State deems necessary. Bidder will not, without the State’s written consent (not to be unreasonably withheld), settle, compromise, or consent to the entry of any judgment in or otherwise seek to terminate any claim, action, or proceeding. If a State employee, official, or law is involved or challenged, the State may control the defense of that portion of the claim. Any litigation activity on behalf of the State, or any of its subdivisions under this Section, must be coordinated with the Department of Attorney General. An attorney designated to represent the State may not do so until approved by the Michigan Attorney General and appointed as a Special Assistant Attorney General.

CONFIDENTIAL TREATMENT FORM (CT FORM)

INSTRUCTIONS. Complete either Section 1 or Section 2 of this CT Form and sign where indicated. This CT Form must be signed by the individual who signed the bidder’s proposal. A completed CT Form must be submitted with your proposal, regardless of whether your proposal contains confidential information. Failure to submit a completed CT Form with your bid is grounds for rejecting the proposal as non-responsive. See Section 16 of the Proposal Instructions for additional information.

Section 1. Confidential Treatment Is Not Requested

This section must be completed, signed, and submitted with the proposal if bidder does not request confidential treatment of any material contained in the proposal.

By signing below, the bidder affirms that confidential treatment of material contained in the proposal is not requested.

________________________________________________________________
RFP NumberRFP Title
_________________________________________________________
SignatureDate

[Printed Name] [Title] [Company]

Section 2. Confidential Treatment Is Requested

The section must be completed, signed, and submitted with the proposal if bidder requests confidential treatment of any material contained in the proposal. Submission of a completed CT Form is required to request confidential treatment.

Provide the information in the table below. Bidder may add rows or additional pages using the same format shown in the table. Bidder must specifically identify the information to be protected as confidential and state the reasons why protection is necessary. The CT Form will not be considered fully complete unless, for each confidentiality request, the bidder: (1) identifies whether the material is a trade secret (TS), financial information (FI), or proprietary information (PI); (2) explains the specific legal grounds that support treatment of the material as TS, FI, or PI; and (3) provides the contact information for the person at bidder’s organization authorized to respond to inquiries by the State concerning the material. Bidders must not simply cite to an applicable act or case name; rather, bidders must provide a complete justification as to how the material falls within the scope of an applicable act or relevant case law.

CONFIDENTIAL TREATMENT FORM (CT FORM)

RFP page #, paragraph #, and section #
State whether the material is a trade secret (TS), financial information (FI), or proprietary information (PI)
Explain the specific grounds in State or other applicable law which supports treatment of the material as TS, FI, or PI. Do not simply cite to the applicable act. Provide a complete justification as to how the material falls within the scope of the applicable act or relevant case law.
Provide the bidder contact information

By signing below, the bidder affirms that confidential treatment of material contained in its proposal is requested and has attached to this form a redacted “Public Copy” of the bidder’s proposal.

________________________________________________________________
RFP NumberRFP Title
_________________________________________________________
SignatureDate

[Printed Name] [Title] [Company]

VENDOR QUESTIONS WORKSHEET

Provide a detailed response to each question. “You” and “company” refers to the bidder.

Information Sought
Bidder Response

1. Contact Information

Bidder’s sole contact person during the RFP process. Include name, title, address, email, and phone number.

Person authorized to receive and sign a resulting contract. Include name, title, address, email, phone number and vendor customer code in SIGMA VSS.

2. Company Background Information

Legal business name and address. Include business entity designation, e.g., sole proprietor, Inc., LLC, or LLP.

What state was the company formed in?

Phone number

Website address

Number of years in business and number of employees

Legal business name and address of parent company, if any

Has there been a recent change in organizational structure (e.g., management team) or control (e.g., merger or acquisition) of your company? If the answer is yes: (a) explain why the change occurred and (b) how this change has affected your company.

Discuss your company’s history. Has growth been organic, through mergers and acquisitions, or both?

Has bidder ever been debarred, suspended, or disqualified from bidding or contracting with any entity, including the State of Michigan? If yes, provide the date, the entity, and details about the situation.

Has your company been a party to litigation against the State of Michigan? If the answer is yes, then state the date of initial filing, case name and court number, and jurisdiction.

Within the last 5 years, has your company or any of its related business entities defaulted on a contract or had a contract terminated for cause? If yes, provide the date, contracting entity, type of contract, and details about the termination or default.

State your gross annual sales for each of the last 5 years.

If receiving a contract under this RFP will increase your gross revenue by more than 25% from last year’s sales, explain how the company will scale-up to manage this increase.

Describe partnerships and strategic relationships you think will bring significant value to the State.

State the physical address of the place of business that would have primary responsibility for this account if bidder is awarded a contract under this RFP.

3. Qualified Disabled Veteran/Service-Disabled Veteran-Owned Business Program

Under MCL 18.1261, a “qualified disabled veteran” means a business entity that is 51% or more owned by 1 or more veterans with a service-connected disability. A “service-connected disability” means a disability incurred or aggravated in the line of duty in the active military, naval, or air service as described in 38 USC 101(16). Are you a qualified disabled veteran?
Enter YES or NO.

To demonstrate qualification as a qualified disabled veteran, you must provide:

(a) Proof of service and conditions of discharge (DD214 or equivalent);

(b) Proof of service-connected disability (DD214 if the disability was documented at discharge or Veterans Administration Rating Decision Letter or equivalent if the disability was documented after discharge); and

(c) Legal documents setting forth the ownership of the business entity.

In lieu of the documentation identified above, you may provide proof of certification by the National Veterans Business Development Council.

Enter the names of documents submitted with your proposal to demonstrate status as a qualified disabled veteran.

4. Participation in RFP Development or Evaluation

Did your company, an employee, agent, or representative of your company, or any affiliated entity participate in developing any component of this solicitation? For purposes of this question, business concerns, organizations, or individuals are affiliates of each other if, directly or indirectly: (1) either one controls or has power to control the other or (2) a third-party controls or has the power to control both. Indicia of control include, but are not limited to, interlocking management or ownership, identity of interests among family members, shared facilities or equipment, and common use of employees.

If you entered “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

If you are awarded a contract under this solicitation, in order to provide the goods or services required under a resulting contract, do you intend to partner or subcontract with a person or entity that assisted in the development of this solicitation?
If you entered “YES,” you are not eligible for contract award. An awarded vendor may not partner or subcontract with anyone to provide goods and services required under a resulting contract if that subcontractor or partner assisted in the development of this solicitation.
Will your company, or an employee, agent, or representative of your company, participate in the evaluation of the proposals received in response to this RFP?
If you entered “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

5. State of Michigan Experience and Prior Experience

Does your company have experience working with the State of Michigan? If so, please provide a list (including the contract number) of the contracts you hold or have held with the State for the last 10 years.

Describe at least 3 relevant experiences from the last 5 years supporting your ability to successfully manage a contract of similar size and scope for the work described in this RFP.

Experience 1

Company name Contact name Contact role at time of project Contact phone Contact email

City State Zip

1. Project name and description of the scope of the project

2. What role did your company play?

3. How is this project experience relevant to the subject of this RFP?

Dollar value

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained

Experience 2

Company name

Contact role at time of project

City

1. Project name and description of the scope of the project

Dollar value

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained

Experience 3

Company name

Contact role at time of project

City

1. Project name and description of the scope of the project

Dollar value

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained

6. Standard Contract Terms

Bidder must affirm agreement with the attached Contract Terms. If not in agreement, written exceptions in accordance with the Evaluation Process section of the Proposal Instructions must be provided with Bidder’s proposal.

7. Michigan Economic Impact

Number of employees currently employed at locations within the State of Michigan

Number of additional employees to be employed at locations within the State of Michigan if awarded this Contract (if any)

Minimum wage paid to employees employed at locations within the State of Michigan

Average wage paid to employees employed at locations within the State of Michigan

Percentage of employees employed at locations within the State of Michigan that are covered by employer-provided health insurance

8. Other

Abusive Labor Practices. The Contractor certifies that it will not furnish any Deliverable that was produced fully or partially by forced labor, forced or indentured child labor, or indentured servitude.
Enter YES or NO.
Certification of Michigan Business- Public Act 431 of 1984, Sec. 268. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Business Tax Corporate Income Tax Return. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Income Tax return showing income generated in, or attributed to the State of Michigan. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, withheld Michigan Income Tax from compensation paid to the company’s owners and remitted the tax to the Michigan Department of Treasury.
Enter YES or NO.
Iran Linked Business- Public Act 517 of 2012. I certify that the Company is not an Iran-Linked business as defined by Public Act 517 of 2012.
Enter YES or NO.
Clean Corporate Citizen. I certify that the Company is a Clean Corporate Citizen as defined by the Environmental Protection Act, 1994 PA 451.
Enter YES or NO.
Convict Labor. The Contractor certifies that if using convict labor, it is complying with all applicable state and federal laws and policies.
Enter YES or NO.
SOM Debt/Tax Payment. All SOM tax/debts. I certify that all applicable State of Michigan taxes are paid, and that no outstanding debt is owed to the State of Michigan.
Enter YES or NO.
Authorization to Verify Information provided by Vendor. I authorize the State to verify that all information provided in this registration, in bidding and contracting documents, and any attachments or supplement documents and processes are accurate.
Enter YES or NO.

Contractors Name

Version 10 (1/2020) 2

Request For Proposal No. 171 200000001185

Saginaw State Office Building Concrete and Brick Replacement Project

SCHEDULE A

STATEMENT OF WORK

CONTRACT ACTIVITIES

This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP.

The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.

BACKGROUND

Several concrete and brick areas at the Saginaw State Office Building need to be replaced. These areas include, walkways, curbs, ADA Ramps, etc.

SCOPE

The Department of Technology, Management and Budget – State Facilities Administration – Building Operations Division – is looking for a qualified vendor to remove and dispose of the existing concrete and brick areas at the Saginaw State Office Building located at 411 E. Genesee Saginaw, MI 48607.

The vendor must also include the full installation and materials and other materials associated with the completion of this project.

MANDATORY SITE VISIT

A MANDATORY SITE VIST will take place on Thursday, March 5, 2020 at 10:00 a.m. at the Saginaw State Office Building located at 411 E. Genesee Saginaw, MI 48607. Mike Noonan will be there to meet the contractors. This is a MANDATORTY SITE VISIT. You MUST sign the sign-in sheet to have your bid considered. If a contractor submits a bid and did not attend the mandatory site visit, the contractors bid will be disqualified. Mike Noonan, DTMB/SFA/BOD, will be in the lobby to meet you. You will need to sign-in at the security guard desk. Please bring a valid ID with you and proper inspection/measuring tools with you. All questions must be submitted in writing to Rob Telesz @ teleszr1@michigan.gov by Friday, March 6, 2020 by 12:00 p.m.

REQUIREMENTS

1. General Requirements

1.1. Remove the current concrete and replace with new concrete for all of the Descriptions Listed Below: The Saginaw State Office Building Map is attached and has letters that represent each area of the descriptions.

· Description 5’ x 120’ Parking Lot Walkway at the Employee Parking lot Sidewalk and Entrance.

Saw cutting of concrete, remove and dispose of existing concrete and materials Install sand and compact Install 4000 psi concrete mix with fiber – mesh to a depth of 4” Expansion Joint and Clean up Saginaw Concrete Picture Letter A

· Description Repair North and South side handicamp ramp as needed.

Saw cutting of concrete, remove and dispose of existing concrete and materials Install sand and compact Install 4000 psi concrete mix with fiber – mesh to a depth of 4” Expansion Joint and Clean up

Saginaw Concrete Picture Letter B

· Description 30’ x 30’ L shape north building west dumpster Parking lot curb repair and replacement as need field verify.

Saw cutting of concrete, remove and dispose of existing concrete and materials Install sand and compact Install 4000 psi concrete mix with fiber – mesh to a depth of 4” Expansion Joint and Clean up Saginaw Concrete Picture Letter C

· Description Optional northeast walk with city 12x120 Saw cutting of concrete, remove and dispose of existing concrete and materials Install sand and compact Install 4000 psi concrete mix with fiber – mesh to a depth of 4” Expansion Joint and Clean up Saginaw Concrete Picture Letter D

· Description North east walk off ramp replace walk with ADA approved access 12x12 Saw cutting of concrete, remove and dispose of existing concrete and materials Install sand and compact Install 4000 psi concrete mix with fiber – mesh to a depth of 4” Expansion Joint and Clean up Saginaw Concrete Picture Letter E

· Description South entrance remove brick and replace with concrete 45 x 30.

Saw cutting of concrete, remove and dispose of existing concrete and materials Install sand and compact Install 4000 psi concrete mix with fiber – mesh to a depth of 4” Expansion Joint and Clean up Saginaw Concrete Picture Letter F

· Description North entrance patch and repair ADA ramp Saw cutting of concrete, remove and dispose of existing concrete and materials Install sand and compact Install 4000 psi concrete mix with fiber – mesh to a depth of 4” Expansion Joint and Clean up Saginaw Concrete Picture Letter G

· Description Remove and Replace 10’ x 60’ of Concrete in the North West Corner of the Building.

Saw cutting of concrete, remove and dispose of existing concrete and materials Install sand and compact Install 4000 psi concrete mix with fiber – mesh to a depth of 4” Expansion Joint and Clean up Saginaw Concrete Picture Letter H

Contractor to explain in complete details on how they will perform all the concrete services mentioned above.

1.2. Remove and Replace the brick retaining walls around the facility next to all the steps and loading ramps. The Saginaw State Office Building Map is attached and has letters that represent each area of the descriptions.

· Description Handicap Retaining Wall 60’ X 15’ Remove Current Brick and Install New Brick Saginaw Brick Repair Picture Letter A

· Description Repair & Replace brick-caulk all joints as needed Approx. 10’ X 20’ Remove Current Brick and Install New Brick Saginaw Brick Repair Picture Letter B

· Description Repair & Replace brick-caulk all joints as needed Approx. 4’ X 4’ Remove Current Brick and Install New Brick Saginaw Brick Repair Picture Letter C

· Description Brick replace and tuck-point Approx. 60’ X 30’ Remove Current Brick and Install New Brick Saginaw Brick Repair Picture Letter D

Contractor to explain in complete details on how they will perform all the brick services mentioned above.

**All installation must be conducted during standard business hours 7:30 AM – 5:00 PM**

1.3. Warranties

Contractor to explain in the box below any warranties included in the bid and explain the process for reporting warranty issues and how the Contractor will handle any repairs or replacements.

The State reserves the right to require additional warranties other than those identified by the Contractor in its response to this RFP.

1.4. Recall Requirements and Procedures

Contractor to explain in the box below any recall requirements and procedures.

1.5. Quality Assurance Program

Contractor to explain their Quality Assurance Program(s) in the box below.

1.6. Incentives

Contractor to explain in the box below any special incentives or services including, but not limited to, return policies, trade-in programs for the existing product, quantity discounts, etc.

2. Service Levels

2.1. Time Frames and Installation

Contractor must be able to remove and dispose of the existing materials. Contractor must provide and install the products listed in Section 1. General Requirements. Installation will be considered complete when all existing concrete, brick and materials are removed and disposed of the new concrete, brick and other materials needed to complete this project are installed properly. All installation shall be conducted during standard business hours 7:30 AM – 5:00 PM

Contractor to explain in complete details in the box below on how they will remove and dispose of the existing concrete, bricks and materials. Contractor also to explain in complete detail how they will prep the entire are and install the new product and how long it will take for them to install all the product being purchased in the bid once the purchase order is received.

3. Staffing

3.1. Contractor Representative

The Contractor must appoint one lead worker, specifically assigned to State of Michigan accounts, that will respond to State inquiries regarding the Contract Activities, answering questions related to ordering and delivery, etc. (the “Contractor Representative”).

The Contractor must notify the Contract Administrator at least 3 calendar days before removing or assigning a new Contractor Representative.

3.2. Key Personnel

The Contractor must appoint one individual who will be directly responsible for the day to day operations of the Contract (“Key Personnel”). Key Personnel must be specifically assigned to the State account, be knowledgeable on the contractual requirements, and respond to State inquires within 24 hours.

Contractor’s Key Personnel must be on-site at 411 E. Genesee Saginaw, MI 48607 during the following times: 7:30 AM – 5:00 PM.

The Contractor may not remove or assign Key Personnel without the prior consent of the State. Prior consent is not required for reassignment for reasons beyond the Contractor’s control, including illness, disability, death, leave of absence, personal emergency circumstances, resignation, or termination for cause. The State may request a résumé and conduct an interview before approving a change. The State may require a 30-calendar day training period for replacement personnel.

The Contractor must identify the Key Personnel, indicate where they will be physically located, describe the functions they will perform, and provide current chronological résumés.

Contractor to list Key Personnel in the Box Below.

3.3. Non-Key Personnel

The Contractor must notify the Contract Administrator at least 10 calendar days before removing or assigning non-key personnel.

3.4. Customer Service Toll-Free Number

The Contractor must specify its toll-free number for the State to make contact with the Contractor Representative. The Contractor Representative must be available for calls during the hours of 8 am to 5 pm EST.

3.5. Disclosure of Subcontractors

If the Contractor intends to utilize subcontractors, the Contractor must disclose the following:

The legal business name; address; telephone number; a description of subcontractor’s organization and the services it will provide; and information concerning subcontractor’s ability to provide the Contract Activities.

The relationship of the subcontractor to the Contractor.

Whether the Contractor has a previous working experience with the subcontractor. If yes, provide the details of that previous relationship.

A complete description of the Contract Activities that will be performed or provided by the subcontractor.

Contractor to explain in complete detail if they intend to use a sub-contractor or not. If a sub-contractor will be used, please list the name of the sub-contractor and the key contact for the sub-contractor.

3.8. Security

The Contractor will be subject the following security procedures: Background checks. Contractor employees must have ID Badges when entering the building.

The bidder’s staff may be required to make deliveries to or enter State facilities. The bidder must: (a) explain how it intends to ensure the security of State facilities, (b) whether it uses uniforms and ID badges, etc., (c) identify the company that will perform background checks, and (d) the scope of the background checks. The State may require the Contractor’s personnel to wear State issued identification badges.

The Contractor must explain any additional security measures in place to ensure the security of State facilities in the box below:

4. Pricing

4.1. Price Term

Pricing is firm for the entire length of the Contract.

4.2. Price Changes

Adjustments will be based on changes in actual Contractor costs. Any request must be supported by written evidence documenting the change in costs. The State may consider sources, such as the Consumer Price Index; Producer Price Index; other pricing indices as needed; economic and industry data; manufacturer or supplier letters noting the increase in pricing; and any other data the State deems relevant.

Following the presentation of supporting documentation, both parties will have 30 days to review the information and prepare a written response. If the review reveals no need for modifications, pricing will remain unchanged unless mutually agreed to by the parties. If the review reveals that changes are needed, both parties will negotiate such changes, for no longer than 30 days, unless extended by mutual agreement.

The Contractor remains responsible for Contract Activities at the current price for all orders received before the mutual execution of a Change Notice indicating the start date of the new Pricing Period.

4.3 Electronic Catalog

To enable catalog management functionality, the Contractor must supply the State with product and pricing information as identified in the Schedule B – Pricing Matrix of this RFP. The Contractor must supply the State with updated product and pricing information over the duration of the Contract using the then- current catalog template provided by the State. Product and price changes provided in this manner will not take effect until the catalog is updated in the State’s procurement system.

5. Ordering

5.1. Authorizing Document

The appropriate authorizing document for the Contract will be a Purchase Order.

5.2 Order Verification

The Contractor must have internal controls, approved by DTMB-Procurement, to verify abnormal orders and to ensure that only authorized individuals place orders.

6. Delivery

6.1. Delivery Programs

The Contractor must explain in detail its delivery programs (e.g., standard delivery and quick-ship), including any limitations such as quantity.

The Contractor must explain the transportation method (e.g., UPS, FedEx, Contractor fleet, or other third party carrier) it intends on utilizing in delivery of the Contract Activities.

6.2. Packaging and Palletizing

Packaging must be optimized to permit the lowest freight rate. Shipments must be palletized whenever possible using manufacturer's standard 4-way shipping pallets.

7. Acceptance

7.1. Acceptance, Inspection and Testing

The State will use the following criteria to determine acceptance of the Contract Activities:

7.2. Final Acceptance

Final acceptance will be completed when the entire job is completed. The project manager will determine when the job has been completed/

8. Invoice and Payment

8.1. Invoice Requirements

All invoices submitted to the State must include: (a) date; (b) purchase order; (c) quantity; (d) description of the Contract Activities; (e) unit price; (f) shipping cost (if any); and (g) total price.

8.2. Payment Methods

The State will make payment for Contract Activities by EFT.

8.3. Procedure

Contractor must be set up to receive payments through EFT.

9. Project Plan A project plan must be submitted that details how the entire project will be addressed or phased throughout the contract period. The plan must include: (a) the Contractor's organizational chart with names and title of personnel assigned to the project, which must align with the staffing stated in accepted proposals; and (b) the project breakdown showing sub-projects, tasks, and resources required.

Contractor to provide complete details on their Project Plan in the box below:

10. Licensing Agreement The Contractor must provide a copy of any applicable licensing agreement.

11. Liquidated Damages Late or improper completion of the Contract Activities will cause loss and damage to the State and it would be impracticable and extremely difficult to fix the actual damage sustained by the State. Therefore, if there is late or improper completion of the Contract Activities the State is entitled to collect liquidated damages in the amount of $5,000 and an additional $100 per day for each day Contractor fails to remedy the late or improper completion of the Work.

Unauthorized Removal of Key Personnel will interfere with the timely and proper completion of the Contract, to the loss and damage of the State, and it would be impracticable and extremely difficult to fix the actual damage sustained by the State. Therefore, the State may assess liquidated damages against Contractor as specified below.

The State is entitled to collect $1,000 per individual per day for the removal of any Key Personnel without prior approval of the State.

The State is entitled to collect $1,000 per individual per day for an unapproved or untrained key personnel replacement.

12. Additional Requirements

12.1. Environmental and Energy Efficient Products

The Contractor must provide products that meet the following environmental or energy efficient standards:

12.2. Hazardous Chemical Identification

In accordance with the federal Emergency Planning and Community Right-to-Know Act, 42 USC 11001, et seq., as amended, the Contractor must provide a Material Safety Data Sheet listing any hazardous chemicals, as defined in 40 CFR §370.2, to be delivered. Each hazardous chemical must be properly identified, including any applicable identification number, such as a National Stock Number or Special Item Number.

The Contractor must identify any hazardous chemicals that will be provided under any resulting contract.

12.3. Mercury Content

Pursuant to MCL 18.1261d, mercury-free products must be procured when possible. The Contractor must explain if it intends to provide products containing mercury, the amount or concentration of mercury, and whether cost competitive alternatives exist. If a cost competitive alternative does exist, the Contractor must provide justification as to why the particular product is essential. All products containing mercury must be labeled as containing mercury.

12.4. Brominated Flame Retardants

The State prefers to purchase products that do not contain brominated flame retardants (BFRs) whenever possible. The Contractor must disclose whether the products contain BFRs.

Contractor to provide complete details if any of their product contains any of the contents listed under section 12. Additional Requirements in the box below:

Request For Proposal No.171 200000001185

Saginaw State Office Building Concrete and Brick Replacement Project

SCHEDULE B

PRICING

1. The Contractor must provide a pricing schedule for the proposed Contract Activities using this Schedule B Pricing. The pricing schedule should be submitted in a modifiable format (e.g.. Microsoft Word or Excel); however, you may also submit an additional pricing schedule in a non-modifiable format (e.g., PDF). Failure to complete the pricing schedule as requested may result in disqualification of your proposal.

2. Price proposals must include all costs, including but not limited to, any one-time or set-up charges, fees, and potential costs that Contractor may charge the State (e.g., shipping and handling, per piece pricing, and palletizing).

3. The Contractor is encouraged to offer quick payment terms.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .