This document is a comprehensive Project Manual for the Turbeville Branch Library construction project, prepared by Craig Gaulden Davis/PBK Architecture for Clarendon County Administration in South Carolina. The project involves constructing a one-story public library located at 1178 Smith Street in Turbeville, with a contract time of 365 calendar days from the date of commencement. Sealed bids will be received until 2:00 PM on October 2, 2025, at the Clarendon County Procurement Office. A non-mandatory pre-bid conference is scheduled for September 16, 2025, at 11:00 AM at the Turbeville Fire Station. General contractors licensed in South Carolina may obtain bid documents through the Clarendon County Procurement Department's website, and a bid guaranty of 5% of the base bid is required.

The project has a base bid with an optional alternate for roof materials, specifically allowing a deduct price for asphalt shingle roofing in lieu of standing seam metal roofing. The contract includes a $15,000 allowance for room signs and building-mounted letters. The project will utilize multiple engineering consultants, including Steward Engineering (Civil), Palmetto Structural Engineering (Structural), Stephens Engineering & Consulting (HVAC), and Burdette Engineering (Electrical). Bidders must comply with local codes, including the 2018 International Building Code, 2018 International Plumbing Code, and other applicable standards. The procurement process follows standard AIA document guidelines, with detailed requirements for submittals, substitutions, and contract modifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THE TURBEVILLE LIBRARY

TURBEVILLE BRANCH LIBRARY

CLARENDON COUNTY

TURBEVILLE, SOUTH CAROLINA

CONSTRUCTION DOCUMENTS

DESIGN OFFICE: 19 Washington Park, Greenville, South Carolina 29601

August 29, 2025

CGD PROJECT NO.: 22067

This page intentionally left blank

CLARENDON COUNTY, SOUTH CAROLINA

CGD PROJECT NUMBER: 22067

DATE OF ISSUE: AUGUST 29, 2025

OWNER:

CLARENDON COUNTY ADMINISTRATION

411 Sunset Drive Manning, South Carolina 29102 803-435-0135

ARCHITECT:

CRAIG GAULDEN DAVIS | PBK

19 Washington Park Greenville, South Carolina 29601 864-242-0761

CIVIL ENGINEER:

STEWARD ENGINEERING

1416 Saugus Court Chapin, South Carolina 29036 803-716-0772

STRUCTURAL ENGINEER:

PALMETTO STRUCTURAL ENGINEERING, LLC

104 Hunter Hill Circle Six Mile, South Carolina 29682 264-436-8684

HVAC ENGINEER:

STEPHENS ENGINEERING & CONSULTING

130 Heritage Lane Easley, South Carolina 29642 864-414-1965

ELECTRICAL ENGINEER:

BURDETTE ENGINEERING, INC.

200 Regent Park Court Greenville, South Carolina 29607 864-297-8717

Craig Gaulden Davis / PBK Clarendon County Administration CGD Project No. 22067 CGD - Turbeville Branch Library Construction Documents August 29, 2025

Table of Contents 00 01 02 - 1

SECTION 00 01 02 - TABLE OF CONTENTS

GENERAL

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 00 00 - Cover Page 00 01 01 - Title Page 00 01 02 - Table of Contents 00 01 07.1 - Seals Page - Architect 00 01 07.2 - Seals Page - Civil 00 01 07.3 - Seals Page - Structural 00 01 07.4 - Seals Page - Mechanical and Plumbing 00 01 07.5 - Seals Page - Electrical 00 10 00 - Solicitation 00 21 13.0 - AIA Document A701 - 2018 Instructions to Bidders 00 21 13.1 - Supplemental Instructions to Bidders 00 31 32.0 - Geotechnical Data 00 31 32.1 - Geotechnical Report 00 41 01 - Bid Form - Stipulated Sum (Single Prime Contract) 00 41 03 - AIA Document A310 - 2010 Bid Bond 00 50 00 - AIA Document A312 - 2010 Performance Bond & Payment Bonds 00 71 00 - AIA A101 - 2017 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum 00 72 00 - AIA A201 - 2017 General Conditions of the Contract for Construction

DIVISION 01 - GENERAL CONDITIONS

01 10 00 - Summary 01 21 00 - Allowances 01 22 00 - Unit Prices 01 23 00 - Alternates 01 26 00.0 - Contract Modification Procedures 01 29 00 - Payment Procedures 01 31 00 - Project Management and Coordination 01 32 00 - Construction Progress Documentation 01 33 00.0 - Submittal Procedures 01 33 00.1 - Digital Data Release Form 01 40 00 - Quality Requirements 01 41 00 - Regulatory Requirements 01 42 00 - References 01 42 16 - Definitions 01 50 00 - Temporary Facilities and Controls 01 56 00 - Temporary Barriers and Enclosures

Construction Documents August 29, 2025

Table of Contents 00 01 02 - 2

01 56 39 - Temporary Tree and Plant Protection 01 57 00 - Soil Erosion Control 01 60 00.0 - Product Requirements 01 60 00.1 - Request for Substitution Form 01 73 00 - Execution 01 74 00 - Miscellaneous Work and Cleanup 01 74 13 - General Cleaning 01 74 19 - Construction Waste Management and Disposal 01 75 00 - Starting and Adjusting Systems 01 77 00 - Closeout Procedures 01 78 23 - Operation and Maintenance Data 01 78 30 - Warranties 01 78 39 - Project Record Documents 01 79 00 - Demonstration and Training

DIVISION 02 - EXISTING CONDITIONS

02 05 00 - Sitework - General Requirements 02 05 01 - Materials and Equipment 02 40 00 - Demolition

DIVISION 03 - CONCRETE

See Structural Drawings 03 05 10 - Cement Concrete 03 30 00 - Sidewalks, Driveways, and Curbs 03 30 00.1 - Cast-in-Place Concrete 03 35 00 - Concrete Floor Finishing 03 40 00 - Monolithic or Sectional Precast Structures

DIVISION 04 - MASONRY

See Structural Drawings 04 22 00 - Concrete Unit Masonry 04 42 00 - Exterior Stone Cladding 04 43 16 - Stone Fabrications

DIVISION 05 - METALS

See Structural Drawings 05 50 00 - Metal Fabrications 05 52 13 - Pipe and Tube Railings

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

See Structural Drawings 06 10 00 - Rough Carpentry 06 10 53 - Miscellaneous Rough Carpentry 06 16 00 - Sheathing

Construction Documents August 29, 2025

Table of Contents 00 01 02 - 3

06 41 13 - Wood-Veneer-Faced Architectural Cabinets 06 41 16 - Plastic-Laminate-Clad Architectural Cabinets 06 60 00 - Cellular PVC Fabrications

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 00 - Thermal Insulation 07 26 00 - Vapor Retarder 07 27 28 - Fluid-Applied Membrane Air Barrier 07 31 13 - Asphalt Shingles 07 41 13 - Standing Seam Metal Roof Panels 07 46 46 - Cement Board Siding 07 62 00 - Sheet Metal Flashing and Trim 07 92 00 - Joint Sealants

DIVISION 08 - OPENINGS

08 11 13 - Hollow Metal Doors and Frames 08 14 16 - Flush Wood Doors 08 41 13 - Aluminum-Framed Entrances and Storefronts 08 71 00 - Door Hardware 08 71 13 - Automatic Door Operators 08 80 00 - Glazing

DIVISION 09 - FINISHES

09 21 16 - Gypsum Board Assemblies 09 30 00 - Tiling 09 51 23 - Acoustical Ceiling Panels 09 65 00 - Resilient Flooring 09 68 13 - Tile Carpeting 09 91 13 - Exterior Painting 09 91 23 - Interior Painting

DIVISION 10 - SPECIALTIES

10 14 19 - Dimensional Letter Signage 10 14 23 - Panel Signage 10 28 00 - Toilet, Bath, and Laundry Accessories 10 44 00 - Fire Protection Specialties 10 75 00 - Flagpoles

DIVISION 11 - EQUIPMENT

11 31 00 - Residential Appliances

DIVISION 12 - FURNISHINGS

12 24 94 - Roller Window Shades 12 36 61.0 - Solid Surfacing Countertops 12 36 61.19 - Quartz Surfacing Countertops

Construction Documents August 29, 2025

Table of Contents 00 01 02 - 4

DIVISION 21 - FIRE SUPPRESSION

21 00 00 - Fire Sprinkler System Specification Sheet

DIVISION 22 - PLUMBING

22 05 00 - Common Work Results for Plumbing 22 05 29 - Hangers and Supports for Plumbing Piping and Equipment 22 05 53 - Identification for Plumbing Piping and Equipment 22 07 00 - Plumbing Insulation 22 11 16 - Domestic Water Piping 22 11 19 - Domestic Water Piping Specialties 22 13 16 - Sanitary Waste and Vent Piping 22 13 19 - Sanitary Waste Piping Specialties 22 33 00 - Electric Domestic Water Heaters 22 40 00 - Plumbing Fixtures

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 00 - Common Work Results for HVAC 23 05 29 - Hangers and Supports for HVAC Piping and Equipment 23 05 53 - Identification for HVAC Piping and Equipment 23 05 93 - Testing, Adjusting, and Balancing for HVAC 23 07 00 - HVAC Insulation 23 23 00 - Refrigerant Piping 23 31 13 - Metal Ducts 23 33 00 - Air Duct Accessories 23 34 23 - HVAC Power Ventilators 23 37 13 - Diffusers, Registers, and Grilles 23 81 26 - Split-System Air-Conditioners

DIVISION 26 - ELECTRICAL

26 05 00 - General Provisions 26 05 01 - Basic Materials 26 05 19 - Conductors 26 05 26 - Grounding 26 05 39 - Electrical Raceways 26 05 48 - Vibration and Seismic Controls for Electrical Systems 26 05 73.13 - Short-Circuit Studies 26 05 73.16 - Coordination Studies 26 05 73.19 - Arc-Flash Hazard Analysis 26 05 75 - Electrical Testing 26 26 00 - Service and Distribution 26 51 00 - Lighting

Construction Documents August 29, 2025

Table of Contents 00 01 02 - 5

DIVISION 27 - COMMUNICATIONS

27 05 00 - Telecommunications Raceway System

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 46 21.11 - Addressable Fire Alarm Systems

DIVISION 31 - EARTHWORK

31 10 00 - Site Clearing 31 23 16 - Excavation - Earth and Rock 31 23 23 - Backfilling 31 31 00 - Soil Treatment

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 12 00 - Hot-Mix Asphalt Paving 32 92 00 - Lawn Restoration

DIVISION 33 - UTILITIES

33 06 00 - High-Density Polyethylene Pipe and Fittings 33 10 00 - Water Distribution Systems 33 30 00 - Sanitary Sewer and Gravity Systems

END OF SECTION

CGD Project No. 22067 Turbeville Branch Library Construction Documents August 29, 2025

SEALS PAGE - ARCHITECT

00 01 07.1 - 1

SECTION 00 01 07.1 - SEALS PAGE - ARCHITECT

PART 1 GENERAL

1.1 DESIGN PROFESSIONAL - ARCHITECT OF RECORD

Name and South Carolina License No.: David L. Dixon, 3944 Firm Name: Craig Gaulden and Davis, LLC / PBK Architecture South Carolina Registered Firm License No.: B74013 Firm Address:

19 Washington Park Greenville, South Carolina 29601

Divisions 1 - 12 Sections except where indicated as prepared by other design professionals of record.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

Craig Gaulden Davis / PBK CGD Project No. 22067 Construction Documents

Clarendon County Administration CGD - Turbeville Branch Library

August 29, 2025

SEALS PAGE - CIVIL

00 01 07.2 - 1

SECTION 00 01 07.2 - SEALS PAGE - CIVIL

PART 1 GENERAL

1.1 DESIGN PROFESSIONAL - CIVIL ENGINEER OF RECORD

Name and South Carolina License No.: 37811 Firm Name: Steward Engineering South Carolina Registered Engineering Firm License No.: 7098 Firm Address:

1416 Saugus Court Chapin, South Carolina 29036

Division 1: General Requirements (01 57 00 and 01 74 00) Division 2: Site Work Division 3: Concrete Division 31: Earthwork Division 32: Exterior Improvements and Division 33: Utilities Sections except where indicated as prepared by other design professionals of record.

INSERT PROFESSIONAL SEALS ABOVE

PART 2 PRODUCTS (NOT APPLICABLE)

Construction Documents August 29, 2025

SEALS PAGE - STRUCTURAL

00 01 07.3 - 1

SECTION 00 01 07.3 - SEALS PAGE - STRUCTURAL

PART 1 GENERAL

1.1 DESIGN PROFESSIONAL - STRUCTURAL ENGINEER OF RECORD

Name and South Carolina License No.: Matthew Ryan Summey, P.E., # 21980 Firm Name: Palmetto Structural Engineering South Carolina Registered Engineering Firm License No.: 4761 Firm Address:

104 Hunter Hill Circle Six Mile, South Carolina 29682

Divisions 3, 4, 5, and 6 Sections except where indicated as prepared by other design professionals of record.

INSERT PROFESSIONAL SEAL ABOVE

PART 2 PRODUCTS (NOT APPLICABLE)

SEALS PAGE - HVAC

00 01 07.4 - 1

SECTION 00 01 07.4 - SEALS PAGE - HVAC

PART 1 GENERAL

1.1 DESIGN PROFESSIONAL - HVAC ENGINEER OF RECORD

Name and South Carolina License No.:

Firm Name: Stephens Engineering & Consulting

South Carolina Registered Engineering Firm License No.: 18685

Firm Address:

130 Heritage Lane

Easley, South Carolina 29642

Divisions 21, 22, 23 Sections except

INSERT PROFESSIONAL SEAL ABOVE

SEALS PAGE - ELECTRICAL

00 01 07.5 - 1

SECTION 00 01 07.5 - SEALS PAGE - ELECTRICAL

PART 1 GENERAL

1.1 DESIGN PROFESSIONAL - ELECTRICAL ENGINEER OF RECORD

Name and South Carolina License No.: Larry C. Mahaffey, PE SC Lic #15549

Firm Name: Burdette Engineering, Inc.

South Carolina Registered Engineering Firm License No.: C00495

Firm Address:

200 Regent Park Court

Greenville, South Carolina 29607

Divisions 26, 27, and 28 Sections except

INSERT PROFESSIONAL SEAL ABOVE

Solicitation

00 10 00 - 1

ADVERTISEMENT FOR BIDS

The County of Clarendon will receive sealed bids until 2:00 PM, local time, on October 2, 2025, at the Clarendon County Procurement Office, 3 South Church Street, Manning, South Carolina 29102 for The Turbeville Branch Library, Turbeville, South Carolina. At this time and place all bids received will be publicly opened and read aloud. A “Bid Guaranty” of not less than Five (5%) percent of the Base Bid is required.

A Non-Mandatory Pre-Bid Conference is scheduled for September 16, 2025, at 11:00 AM, at the new Turbeville Fire Station, 5164 Turbeville Highway, Manning, South Carolina 29102. While attendance is not mandatory, your participation is recommended.

Drawings and specifications for the project were prepared by Craig Gaulden Davis, LLC | PBK Architecture, 19 Washington Park, Greenville, South Carolina 29601 (Tel: 864- 242-0761). General Contractors licensed to do business in the State of South Carolina may obtain sets of bid documents through the Clarendon County Procurement Department via https://clarendoncountyprocurement.sc.gov/solicitations Bidders must obtain bidding Documents/Plans from the above listed source(s) and request to be listed as an official plan holder by contacting Jeffrey A Hyde, Clarendon County Procurement Director at jhyde@clarendoncountygov.org. Only those bidding documents / plans obtained from the source(s) are official. Bidders that rely on copies of bidding documents / plans obtained from any other source do so at their own risk.

To be eligible for consideration, bids must comply with the laws of the State of South Carolina and the Procurement Code of Clarendon County, South Carolina. Bids will be required to remain open for acceptance or rejection by the Owner for thirty (30) days after the bid opening date. All other instructions concerning submission of a bid will be found in the “Instructions to Bidders”, which is a part of the Contract Documents.

https://clarendoncountyprocurement.sc.gov/solicitations mailto:jhyde@clarendoncountygov.org

D R

A F

T

DRAFT AIA

Document A701® – 2018

Instructions to Bidders

AIA Document A701® – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018The American Institute of Architects. All rights reserved. The

“American Institute of Architects,” “AIA,” the AIA Logo, "A701," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:56:56 ET on 02/03/2023 under Order No.2114391637 which expires on

12/14/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.

User Notes: (1999333176)

ADDITIONS AND DELETIONS:

The author of this document has added information needed for its completion.

The author may also have revised the text of the original AIA standard form.

An Additions and Deletions

Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed.

This document has important legal consequences.

Consultation with an attorney is encouraged with respect to its completion or modification.

FEDERAL, STATE, AND LOCAL

LAWS MAY IMPOSE

REQUIREMENTS ON PUBLIC

PROCUREMENT CONTRACTS.

CONSULT LOCAL AUTHORITIES

OR AN ATTORNEY TO VERIFY

REQUIREMENTS APPLICABLE TO

THIS PROCUREMENT BEFORE

COMPLETING THIS FORM.

It is intended that AIA

Document G612™–2017, Owner’s Instructions to the

Architect, Parts A and B will be completed prior to using this document.

ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.

for the following Project:

(Name, location, and detailed description)

«Turbeville Library »

«Turbeville, South Carolina »

Construction of a one-story public library for the Town of Turbeville in Clarendon

County, South Carolina. Project location is 1178 Smith Street, Turbeville, South

Carolina 29162 »

THE OWNER:

(Name, legal status, address, and other information)

«Clarendon County Administration »« »

«411 Sunset Drive »

«Manning, South Carolina 29102 »

«(803) 435-0135 »

THE ARCHITECT:

(Name, legal status, address, and other information)

«Craig Gaulden and Davis, LLC | PBK Architecture »« »

«19 Washington Park »

«Greenville, South Carolina 29601 »

«(864) 242-0761 »

TABLE OF ARTICLES

1 DEFINITIONS

2 BIDDER’S REPRESENTATIONS

3 BIDDING DOCUMENTS

4 BIDDING PROCEDURES

5 CONSIDERATION OF BIDS

6 POST-BID INFORMATION

7 PERFORMANCE BOND AND PAYMENT BOND

8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS

A F

T

AIA Document A701® – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018The American Institute of Architects. All rights reserved. The

“American Institute of Architects,” “AIA,” the AIA Logo, "A701," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:56:56 ET on 02/03/2023 under Order No.2114391637 which expires on

12/14/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms

ARTICLE 1 DEFINITIONS

§ 1.1 Bidding Documents include the Bidding Requirements and the Proposed Contract Documents. The Bidding

Requirements consist of the advertisement or invitation to bid, Instructions to Bidders, supplementary instructions to bidders, the bid form, and any other bidding forms. The Proposed Contract Documents consist of the unexecuted form of Agreement between the Owner and Contractor and that Agreement’s Exhibits, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in

Article 8 of these Instructions.

§ 1.2 Definitions set forth in the General Conditions of the Contract for Construction, or in other Proposed Contract

Documents apply to the Bidding Documents.

§ 1.3 Addenda are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents.

§ 1.4 A Bid is a complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.

§ 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the

Bidding Documents, to which Work may be added or deleted by sums stated in Alternate Bids.

§ 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.

§ 1.7 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, as described in the Bidding Documents.

§ 1.8 A Bidder is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding

Documents.

§ 1.9 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of the Work.

ARTICLE 2 BIDDER’S REPRESENTATIONS

§ 2.1 By submitting a Bid, the Bidder represents that:

.1 the Bidder has read and understands the Bidding Documents;

.2 the Bidder understands how the Bidding Documents relate to other portions of the Project, if any, being bid concurrently or presently under construction;

.3 the Bid complies with the Bidding Documents;

.4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be performed, and has correlated the Bidder’s observations with the requirements of the Proposed Contract

Documents;

.5 the Bid is based upon the materials, equipment, and systems required by the Bidding Documents without exception; and

.6 the Bidder has read and understands the provisions for liquidated damages, if any, set forth in the form of

Agreement between the Owner and Contractor.

ARTICLE 3 BIDDING DOCUMENTS

§ 3.1 Distribution § 3.1.1 Bidders shall obtain complete Bidding Documents, as indicated below, from the issuing office designated in the advertisement or invitation to bid, for the deposit sum, if any, stated therein.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall obtain Bidding

Documents.)

«https://clarendoncountyprocurement.sc.gov/solicitations

Or

A

AIA Document A701® – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018The American Institute of Architects. All rights reserved. The

“American Institute of Architects,” “AIA,” the AIA Logo, "A701," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:56:56 ET on 02/03/2023 under Order No.2114391637 which expires on

12/14/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms www.bidnetdirect.com//clarendoncounty »

§ 3.1.2 Any required deposit shall be refunded to Bidders who submit a bona fide Bid and return the paper Bidding

Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper documents will be deducted from the deposit. A Bidder receiving a Contract award may retain the paper Bidding

Documents, and the Bidder’s deposit will be refunded.

§ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders unless specifically offered in the advertisement or invitation to bid, or in supplementary instructions to bidders.

§ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete Bidding Documents.

§ 3.1.5 The Bidding Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant of use is conferred by distribution of the Bidding Documents.

§ 3.2 Modification or Interpretation of Bidding Documents § 3.2.1 The Bidder shall carefully study the Bidding Documents, shall examine the site and local conditions, and shall notify the Architect of errors, inconsistencies, or ambiguities discovered and request clarification or interpretation pursuant to Section 3.2.2.

§ 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitted by the Bidder in writing and shall be received by the Architect at least seven days prior to the date for receipt of Bids.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall submit requests for clarification and interpretation.)

«All communications shall be by eMail to project@clarendoncountygov.org »

§ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modifications and interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely upon them.

§ 3.3 Substitutions § 3.3.1 The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance, and quality to be met by any proposed substitution.

§ 3.3.2 Substitution Process § 3.3.2.1 Written requests for substitutions shall be received by the Architect at least ten days prior to the date for receipt of Bids. Requests shall be submitted in the same manner as that established for submitting clarifications and interpretations in Section 3.2.2.

§ 3.3.2.2 Bidders shall submit substitution requests on a Substitution Request Form if one is provided in the Bidding

§ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or equipment specified in the Bidding Documents; (2) the reason for the requested substitution; (3) a complete description of the proposed substitution including the name of the material or equipment proposed as the substitute, performance and test data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall include a statement setting forth changes in other materials, equipment, or other portions of the Work, including changes in the work of other contracts or the impact on any Project Certifications (such as LEED), that will result from incorporation of the proposed substitution.

§ 3.3.3 The burden of proof of the merit of the proposed substitution is upon the proposer. The Architect’s decision of approval or disapproval of a proposed substitution shall be final.

§ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, such approval shall be set forth in an

Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them.

A

AIA Document A701® – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018The American Institute of Architects. All rights reserved. The

“American Institute of Architects,” “AIA,” the AIA Logo, "A701," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:56:56 ET on 02/03/2023 under Order No.2114391637 which expires on

12/14/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms

§ 3.3.5 No substitutions will be considered after the Contract award unless specifically provided for in the Contract

§ 3.4 Addenda § 3.4.1 Addenda will be transmitted to Bidders known by the issuing office to have received complete Bidding

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Addenda will be transmitted.)

««https://clarendoncountyprocurement.sc.gov/solicitations

Or www.bidnetdirect.com//clarendoncounty »

§ 3.4.2 Addenda will be available where Bidding Documents are on file.

§ 3.4.3 Addenda will be issued no later than seven (7) four days prior to the date for receipt of Bids, except an

Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.

§ 3.4.4 Prior to submitting a Bid, each Bidder shall ascertain that the Bidder has received all Addenda issued, and the

Bidder shall acknowledge their receipt in the Bid.

ARTICLE 4 BIDDING PROCEDURES

§ 4.1 Preparation of Bids § 4.1.1 Bids shall be submitted on the forms included with or identified in the Bidding Documents.

§ 4.1.2 All blanks on the bid form shall be legibly executed. Paper bid forms shall be executed in a non-erasable medium.

§ 4.1.3 Sums shall be expressed in both words and numbers, unless noted otherwise on the bid form. In case of discrepancy, the amount entered in words shall govern.

§ 4.1.4 Edits to entries made on paper bid forms must be initialed by the signer of the Bid.

§ 4.1.5 All requested Alternates shall be bid. If no change in the Base Bid is required, enter “No Change” or as required by the bid form.

§ 4.1.6 Where two or more Bids for designated portions of the Work have been requested, the Bidder may, without forfeiture of the bid security, state the Bidder’s refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall neither make additional stipulations on the bid form nor qualify the Bid in any other manner.

§ 4.1.7 Each copy of the Bid shall state the legal name and legal status of the Bidder. As part of the documentation submitted with the Bid, the Bidder shall provide evidence of its legal authority to perform the Work in the jurisdiction where the Project is located. Each copy of the Bid shall be signed by the person or persons legally authorized to bind the

Bidder to a contract. A Bid by a corporation shall further name the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached, certifying the agent’s authority to bind the Bidder.

§ 4.1.8 A Bidder shall incur all costs associated with the preparation of its Bid.

§ 4.2 Bid Security § 4.2.1 Each Bid shall be accompanied by the following bid security:

(Insert the form and amount of bid security.)

A

AIA Document A701® – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018The American Institute of Architects. All rights reserved. The

“American Institute of Architects,” “AIA,” the AIA Logo, "A701," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:56:56 ET on 02/03/2023 under Order No.2114391637 which expires on

12/14/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms

«Five percent (5%) »

§ 4.2.2 The Bidder pledges to enter into a Contract with the Owner on the terms stated in the Bid and shall, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder.

Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty. In the event the Owner fails to comply with Section 6.2, the amount of the bid security shall not be forfeited to the Owner.

§ 4.2.3 If a surety bond is required as bid security, it shall be written on AIA Document A310™, Bid Bond, unless otherwise provided in the Bidding Documents. The attorney-in-fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of an acceptable power of attorney. The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.

§ 4.2.4 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until

(a) the Contract has been executed and bonds, if required, have been furnished; (b) the specified time has elapsed so that

Bids may be withdrawn; or (c) all Bids have been rejected. However, if no Contract has been awarded or a Bidder has not been notified of the acceptance of its Bid, a Bidder may, beginning« sixty (60) »days after the opening of Bids, withdraw its Bid and request the return of its bid security.

§ 4.3 Submission of Bids § 4.3.1 A Bidder shall submit its Bid as indicated below:

(Indicate how, such as by website, host site/platform, paper copy, or other method Bidders shall submit their Bid.)

«Clarendon County Procurement

3 South Church Street This is the Voter Registration and Elections Building

Manning, South Carolina 29102 »

§ 4.3.2 Paper copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the party receiving the Bids and shall be identified with the Project name, the Bidder’s name and address, and, if applicable, the designated portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation “SEALED BID ENCLOSED” on the face thereof.

§ 4.3.3 Bids shall be submitted by the date and time and at the place indicated in the invitation to bid. Bids submitted after the date and time for receipt of Bids, or at an incorrect place, will not be accepted.

§ 4.3.4 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.

§ 4.3.5 A Bid submitted by any method other than as provided in this Section 4.3 will not be accepted.

§ 4.4 Modification or Withdrawal of Bid § 4.4.1 Prior to the date and time designated for receipt of Bids, a Bidder may submit a new Bid to replace a Bid previously submitted, or withdraw its Bid entirely, by notice to the party designated to receive the Bids. Such notice shall be received and duly recorded by the receiving party on or before the date and time set for receipt of Bids. The receiving party shall verify that replaced or withdrawn Bids are removed from the other submitted Bids and not considered. Notice of submission of a replacement Bid or withdrawal of a Bid shall be worded so as not to reveal the amount of the original Bid.

§ 4.4.2 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids in the same format as that established in Section 4.3, provided they fully conform with these Instructions to Bidders. Bid security shall be in an amount sufficient for the Bid as resubmitted.

§ 4.4.3 After the date and time designated for receipt of Bids, a Bidder who discovers that it made a clerical error in its

Bid shall notify the Procurement Director Architect of such error within two days, or pursuant to a timeframe specified by the law of the jurisdiction where the Project is located, requesting withdrawal of its Bid. Upon providing evidence of such error to the reasonable satisfaction of the Architect, the Bid shall be withdrawn and not resubmitted. If a Bid is withdrawn pursuant to this Section 4.4.3, the bid security will be attended to as follows:

A

AIA Document A701® – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018The American Institute of Architects. All rights reserved. The

“American Institute of Architects,” “AIA,” the AIA Logo, "A701," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:56:56 ET on 02/03/2023 under Order No.2114391637 which expires on

12/14/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms

(State the terms and conditions, such as Bid rank, for returning or retaining the bid security.)

«Bid Security shall be returned »

ARTICLE 5 CONSIDERATION OF BIDS

§ 5.1 Opening of Bids If stipulated in an advertisement or invitation to bid, or when otherwise required by law, Bids properly identified and received within the specified time limits will be publicly opened and read aloud. A summary of the Bids may be made available to Bidders.

§ 5.2 Rejection of Bids Unless otherwise prohibited by law, the Owner shall have the right to reject any or all Bids.

§ 5.3 Acceptance of Bid (Award) § 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, provided the

Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless otherwise prohibited by law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the Owner’s judgment, is in the Owner’s best interests.

§ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted.

ARTICLE 6 POST-BID INFORMATION

§ 6.1 Contractor’s Qualification Statement Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request and within the timeframe specified by the Architect, a properly executed AIA Document A305™, Contractor’s Qualification

Statement, unless such a Statement has been previously required and submitted for this Bid.

§ 6.2 Owner’s Financial Capability A Bidder to whom award of a Contract is under consideration may request in writing, fourteen days prior to the expiration of the time for withdrawal of Bids, that the Owner furnish to the Bidder reasonable evidence that financial arrangements have been made to fulfill the Owner’s obligations under the Contract. The Owner shall then furnish such reasonable evidence to the Bidder no later than seven days prior to the expiration of the time for withdrawal of Bids.

Unless such reasonable evidence is furnished within the allotted time, the Bidder will not be required to execute the

Agreement between the Owner and Contractor.

§ 6.3 Submittals § 6.3.1 After notification of selection for the award of the Contract, the Bidder shall, as soon as practicable or as stipulated in the Bidding Documents, submit in writing to the Owner through the Architect:

.1 a designation of the Work to be performed with the Bidder's own forces;

.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers of each; and

.3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work.

§ 6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.

§ 6.3.3 Prior to the execution of the Contract, the Architect will notify the Bidder if either the Owner or Architect, after due investigation, has reasonable objection to a person or entity proposed by the Bidder. If the Owner or Architect has reasonable objection to a proposed person or entity, the Bidder may, at the Bidder’s option, withdraw the Bid or submit an acceptable substitute person or entity. The Bidder may also submit any required adjustment in the Base Bid or

Alternate Bid to account for the difference in cost occasioned by such substitution. The Owner may accept the adjusted bid price or disqualify the Bidder. In the event of either withdrawal or disqualification, bid security will not be forfeited.

A

AIA Document A701® – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018The American Institute of Architects. All rights reserved. The

“American Institute of Architects,” “AIA,” the AIA Logo, "A701," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:56:56 ET on 02/03/2023 under Order No.2114391637 which expires on

12/14/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms

§ 6.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable objection must be used on the Work for which they were proposed and shall not be changed except with the written consent of the Owner and Architect.

ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND

§ 7.1 Bond Requirements § 7.1.1 If stipulated in the Bidding Documents, the Bidder shall furnish bonds covering the faithful performance of the

Contract and payment of all obligations arising thereunder.

§ 7.1.2 If the furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid. If the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds shall be added to the Bid in determining the Contract Sum.

§ 7.1.3 The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.

§ 7.1.4 Unless otherwise indicated below, the Penal Sum of the Payment and Performance Bonds shall be the amount of the Contract Sum.

(If Payment or Performance Bonds are to be in an amount other than 100% of the Contract Sum, indicate the dollar amount or percentage of the Contract Sum.)

§ 7.2 Time of Delivery and Form of Bonds § 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the Work is to commence sooner in response to a letter of intent, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Section 7.2.1.

§ 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment

Bond.

§ 7.2.3 The bonds shall be dated on or after the date of the Contract.

§ 7.2.4 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix to the bond a certified and current copy of the power of attorney.

ARTICLE 8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS

§ 8.1 Copies of the proposed Contract Documents have been made available to the Bidder and consist of the following documents:

.1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor, unless otherwise stated below.

(Insert the complete AIA Document number, including year, and Document title.)

.2 AIA Document A101™–2017, Exhibit A, Insurance and Bonds, unless otherwise stated below.

.3 AIA Document A201™–2017, General Conditions of the Contract for Construction, unless otherwise stated below.

A

AIA Document A701® – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018The American Institute of Architects. All rights reserved. The

“American Institute of Architects,” “AIA,” the AIA Logo, "A701," and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 10:56:56 ET on 02/03/2023 under Order No.2114391637 which expires on

12/14/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms

.4 AIA Document E203™–2013, Building Information Modeling and Digital Data Exhibit, dated as indicated below:

(Insert the date of the E203-2013.)

.5 Drawings

Number Title Date

TBD

.6 Specifications

Section Title Date Pages

.7 Addenda:

Number Date Pages

.8 Other Exhibits:

(Check all boxes that apply and include appropriate information identifying the exhibit where required.)

[ « » ] AIA Document E204™–2017, Sustainable Projects Exhibit, dated as indicated below:

(Insert the date of the E204-2017.)

[ « » ] The Sustainability Plan:

Title Date Pages

[ « » ] Supplementary and other Conditions of the Contract:

Document Title Date Pages

.9 Other documents listed below:

(List here any additional documents that are intended to form part of the Proposed Contract

Documents.)

Turbeville Branch Library 06/06/2025 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS Clarendon County Administration Page 1 of 2

SUPPLEMENTAL INSTRUCTIONS TO BIDDERS

FORM OF INSTRUCTIONS TO BIDDERS

Reference AIA Document A701-2018, Instructions to Bidders bound in the Project Manual.

These Supplemental Instructions to Bidders amend or supplement The Instructions to Bidders (AIA Document A701-2018) and other provisions of the Bidding Documents and Contract Documents as indicated below.

All provisions of the Instruction to Bidders (AIA Document A701-2018) which are not so amended or supplemented shall remain in full force and effect.

Bidders shall examine the Bidding and Contract Documents for additional instructions or requirements.

MODIFICATIONS TO A701-2018

ARTICLE 2 BIDDERS REPRESENTATIONS

Add the following sentence to paragraph:

2.1.3 The Bidder by having visited the site has correlated the Bidder’s personal observations with the requirements of the proposed Contract Documents and has accepted the full responsibility for any pre-bid existing conditions that would affect the costs and could have been ascertained by a site visit.

2.1.7 The Workplace shall be maintained drug-free in accordance with applicable laws.

2.2 Attendance at the Pre-Bid Conference is recommended. Prospective Bidders are encouraged to be present at the Pre-Bid Conference at the specified time and place.

ARTICLE 3 BIDDING DOCUMENTS

Delete paragraph 3.1.1 and substitute the following:

3.1.1 Bidders may obtain complete sets of Bidding Documents electronically from the issuing office designated in the Advertisement or Invitation to Bid. Bidders shall not rely on documents from other sources other than those listed in the Advertisement or Invitation for Bids. No digital (CAD) documents will be issued by the Architect or the Architect’s Consultants during the bidding phase.

Delete paragraph 3.1.3 and substitute the following:

3.1.3 Bidders and Sub-bidders shall use complete sets of the Bidding Documents in preparing Bids or sub-bids; Neither the Owner nor the Architect assumes responsibility for errors or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. Partial sets of Bidding Documents will not be issued.

Add the following paragraph:

3.1.5 Addenda will only be posted to the designated sources listed in the Advertisement or Invitation for Bids. It shall be the responsibility of the Bidder to ensure that they have received all addenda issued for the project.

Turbeville Branch Library 06/06/2025 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS Clarendon County Administration Page 2 of 2

3.2 INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS

Add the following sentence to paragraph 3.2.3

No oral interpretation of Bidding Documents or oral instructions will be given prior to the award of the Contract.

3.3 SUBSTITUTIONS

Delete the first sentence in paragraph 3.3.2 and substitute the following paragraph:

3.3.2 No substitution will be considered prior to the receipt of Bids unless the Architect’s Proposed Substitution Request Form has been fully completed, signed by one of the Prime Contractors bidding the work and submitted to the Architect for review and disposition at least ten days prior to the date for receipt of Bids. Forms that contain incomplete information or that are unsigned will not be considered for approval. Substitutions that are approved for use on the project will be issued by Addendum.

3.4 ADDENDA

Add the following paragraph:

ARTICLE 4 BIDDING PROCEDURES

Add the following sentence to paragraph 4.1.1:

4.1.1 The Bidder shall make no stipulations or qualify its Bid in any manner not permitted on the Bid Form. Qualified bids shall be deemed non-responsive.

Add the following paragraph:

4.1.8 Unsigned Bids shall be rejected: provided however, that an unsigned Bid shall not be rejected when it is accompanied by a properly prepared Bid Security or by other material indicating the Bidder’s intention to be bound by the unsigned document, such as the submission of a Bid Guarantee with the Bid or a letter with the Bid signed by the Bidder, referring to and identifying the Bid itself. Bids that are conditional, illegible, obscure, contain mathematical errors, erasures, alterations, or irregularities of any kind, may at the discretion of the Owner, be rejected.

5.3 ACCEPTANCE OF BID (AWARD)

Add the following paragraph:

5.3.3 It is the intent of the Owner to award a Contract to the lowest evaluated responsive bid submitted by a qualified, responsible Bidder. The Owner reserves the right to conduct discussions with apparent responsive Bidders for the purpose of clarification to assure a full understanding of the requirements of the Invitation for Bid.

END OF SUPPLEMENTAL INSTRUCTIONS TO BIDDERS

Construction Documents August 29, 2025

GEOTECHNICAL DATA

00 31 32.0 - 1

SECTION 00 31 32.0 - GEOTECHNICAL DATA

PART 1 GENERAL

1.1 GEOTECHNICAL DATA

A. This document provides Owner's information for Bidders' convenience and is not meant to supplement the Bidders' own investigations. The attachment is made available for Bidders' information only.

B. The subsurface soil investigation is to determine the nature of the soil below the natural grade has been made at various locations on the site. Test borings indicate only the soil conditions at the points where samples were taken and are not intended to indicate the soil conditions for the entire site.

C. Data on indicated subsurface conditions is not intended as representations or warranties of accuracy or continuity of such soil conditions between soil borings. It is expressly understood that the Owner will not be responsible for interpretations or conclusions drawn there from by Bidders.

D. Test boring and exploratory operations may be made by the Contractor at no additional cost to the Owner.

E. The complete soil investigation data report is made available for the convenience of the Contractor only and is included herewith as follows:

Report of the Geotechnical Investigation prepared by:

ECS Southeast, LLP

5935 Rivers Avenue, Suite 105A North Charleston, SC 29406

Phone: 843-654-4448

PART 2 PRODUCTS

(NOT APPLICABLE)

PART 3 EXECUTION

(NOT APPLICABLE)

Bid Form – Stipulated Sum (Single-Prime Contract) 00 41 01 - 1

DOCUMENT 00 41 01 - BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT)

PART 1 -

1.1 BID INFORMATION

A. Bidder: .

B. Project Name: Turbeville Branch Library

C. Project Location: 1178 Smith Street, Turbeville, SC 29162.

D. Owner: Clarendon County Administration.

E. Architect: Craig Gaulden Davis, Inc.

F. Architect Project Number: 22067.

1.2 CERTIFICATIONS AND BASE BID

A. Base Bid, Single-Prime (All Trades) Contract: The undersigned Bidder, having carefully examined the Procurement and Contracting Requirements, Conditions of the Contract, Drawings, Specifications, and all subsequent Addenda, as prepared by Craig Gaulden Davis, Inc. and Architect's consultants, having visited the site, and being familiar with all conditions and requirements of the Work, hereby agrees to furnish all material, labor, equipment and services, including all scheduled allowances, necessary to complete the construction of the above-named project, according to the requirements of the Procurement and Contracting Documents, for the stipulated sum of:

1. Dollars ($ )

B. DEDUCT ALTERNATE NO. 1: Asphalt shingle roof.

1. Provide a deduct alternate to furnish and install asphalt shingle roofing, as specified in

Specification Section 07 31 13 – “Asphalt Shingles” in lieu of standing seam metal roofing (base bid).

2. Dollars ($ )

00 41 01 - 2

1.3 BID GUARANTEE

A. The undersigned Bidder agrees to execute a contract for this Work in the above amount and to furnish surety as specified within 10 days after a written Notice of Award, if offered within 60 days after receipt of bids, and on failure to do so agrees to forfeit to Owner the attached cash, cashier's check, certified check, U.S. money order, or bid bond, as liquidated damages for such failure, in the following amount constituting five percent (5%) of the Base Bid amount above:

1. Dollars ($_______________).

B. In the event Owner does not offer Notice of Award within the time limits stated above, Owner will return to the undersigned the cash, cashier's check, certified check, U.S. money order, or bid bond.

1.4

SUBCONTRACTORS AND SUPPLIERS

A. The following companies shall execute subcontracts for the portions of the Work indicated:

1. Plumbing Work: .

2. HVAC Work: .

3. Electrical Work: .

1.5

UNIT PRICES

A. Unit Prices are proposed as follows:

1. Unit Price No. 1: Removal & Replacement of Unsatisfactory Soil Material:

/ Cubic Yard

2. Unit Price No. 2: Mass Rock Excavation and Replacement with Satisfactory Soil Material:

3. Unit Price No. 3: Trench Rock Excavation and Replacement with Satisfactory Soil Material:

1.6

ACKNOWLEDGEMENT OF ADDENDA

A. The undersigned Bidder acknowledges receipt of and use of the following Addenda in the preparation of of this Bid:

1. Addendum No. 1, dated .

2. Addendum No. 2, dated .

3. Addendum No. 3, dated .

4. Addendum No. 4, dated .

00 41 01 - 3

1.7 CONTRACTOR'S LICENSE

A. The undersigned further states that it is a duly licensed contractor, for the type of work proposed, in Clarendon County, and that all fees, permits, etc., pursuant to submitting this proposal have been paid in full.

1.8 SUBMISSION OF BID

A. Respectfully submitted this day of , 2025.

B. Submitted By: (Name of bidding firm or corporation).

C. Authorized Signature: (Handwritten signature).

D. Signed By: (Type or print name).

E. Title: (Owner/Partner/President/Vice President).

F. Witness By: (Handwritten signature).

G.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .