This document contains Revised Evaluation Factors for a VA Medical Center construction project to create a GI Anesthesia Procedure Room. The solicitation requires offerors to demonstrate capability across four key evaluation factors: (1) Relevant Past Performance, (2) Technical Construction Experience, (3) Technical Qualifications of Proposed Staffing, and (4) Prime Contractor Safety Plan. Specific requirements include past performance on hospital construction projects between $500,000-$5,000,000, technical experience in hospital renovation under NAICS code 236220, and key personnel qualifications for Project Manager, Quality Control Manager, Safety Officer, and Site Superintendent.
The project involves renovation work in the Network Infrastructure Upgrade and Server Room of a VA Medical Center, with critical requirements to maintain continuous hospital operations during construction. Offerors must submit detailed documentation demonstrating their ability to self-perform at least 15% of on-site labor, provide comprehensive safety plans addressing employee and public safety, and show capability to work in an active hospital environment without disrupting patient care services. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15, with an anticipated completion date of August 19, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Ammendment 36C25525R0113 0002.docx | DOCX document | |
| 657-24-119JC_For Bidding CD Specifications R4 08-11-25.pdf | ||
| Quetions 1-19 Edit 657-24-119 JC-Final.docx | DOCX document | |
| Wage Determination 657-24-119JC 08142025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FACTOR 1: RELEVANT PAST PERFORMANCE OF PRIME CONTRACTOR
To be evaluated to determine if an offeror’s past performance is Technically Acceptable, Offerors should identify no less than ONE (1), and no more than THREE (3), previously awarded, and completed construction contracts, which were issued by either: Federal, State, or Local Government Agencies; and/or Private Organizations. To be evaluated as Relevant Past Performance, the construction contracts submitted by offerors must involve:
A. Has performed as a General/Prime contractor on Hospital floor and sink replacement project where the structure project was equal to, or greater than $500,000.00 to $5,000,000.00.
B. Work that was 100% completed within a time period of no more than Four (4) years prior to the date of submitting this proposal. If the contract/work is incomplete or was completed more than five years prior to the date of submitting this proposal, it will not be deemed relevant and not considered.
C. Relevant past performance must have been satisfactory or better.
For each of the submitted Relevant Past Performance contracts, provide the following information.
(1) The name of the construction contract, and the contract ID number.
(2) The name of the contracting agency or organization the contract was awarded by.
(3) The date of the construction contract award and the contract award amount in dollars.
(4) The date of the construction contract completion, and the final contract amount, in dollars.
(5) A brief description of the construction contract scope of work; and
(6) Identification of at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable).
Factor 1 SPECIAL NOTE 1 for Offerors That May Lack Past Performance Information: In accordance with FAR Part 15.305(a) (2), in the case of an offeror that is without a record of relevant past performance, or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance. Such offerors may submit relevant past performance information regarding: predecessor companies; key personnel who have relevant experience; or subcontractors that will be performing major or critical aspects of this requirement; provided that such information is relevant to the construction in this solicitation.
Factor 1 SPECIAL: NOTE 2 for Offerors that have Past Performance: Offerors may provide information on problems encountered on the identified contracts and the offeror’s corrective actions. The government also reserves the right to consider past performance information from all available sources, in addition to any information submitted by offerors.
FACTOR 2: TECHNICAL CONSTRUCTION EXPERIENCE OF PRIME CONTRACTOR.
To be Technically Acceptable, offerors must provide evidence that they have the technical qualifications and experience needed to meet the technical performance requirements of this project. Offerors must submit no less than TWO (2) examples of their successful technical construction experience with projects that involved technical requirements similar to the requirements of this project that involved construction of renovating VAMC hospital space The construction project submitted must involve:
A. Work as a prime or subcontractor under the same NAICS code as this solicitation, which is 236220, Commercial and Institutional Building Construction Contractors; that involved construction of Renovation and Demolition of various rooms Main Hospital, of a dollar magnitude equal to, or greater than $500,000.00 to $5,000,000.00. If offering subcontracted work as proof of technical construction experience, offerors must submit evidence that supports the magnitude of the work they performed as a subcontractor.
B. Work where the offeror self-performed at least FIFTEEN percent (15%) of the cost of the project labor performed on site, using the offeror's own employees. If offering subcontracted work as proof of technical construction experience, offerors must submit evidence that at least FIFTEEN percent (15%) of the cost of the subcontracted project labor performed on site was from the offeror's own employees.
C. Work that was of a similar nature to the scope of work for this project. This is defined as work performed at a Patient Care Area of an active and occupied Hospital or Medical Facility. If an offeror chooses to submit experience that was not conducted at Patient Care Area of a Hospital or Medical Facility, they must explain how the nature and complexity of the work conducted involved technical construction requirements equivalent to that described in the Plans & Specifications of this solicitation.
For each of the submitted Technical Construction Experience projects, provide the following information:
(1) The name and location of the Construction project.
(2) The performance period, including the starting and completion dates.
(3) The total cost of the project in dollars.
(4) The percentage of total labor self-performed by the offeror's employees.
(5) A brief description of the construction project scope of work, which explains how the project involved work as a prime contractor or subcontractor under NAICS Code 236220 involving construction work that was technically like the project work under this Solicitation.
FACTOR 3: TECHNICAL QUALIFICATIONS OF PROPOSED STAFFING.
To be Technically Acceptable, qualified offerors must submit a detailed resume of each key individual. This will be evaluated to determine if they have the appropriate technical training and or previous construction experience to meet the technical requirements of a project of this nature. No one individual can perform more than two of the staffing positions below:
(A) Project Manager – Must have a minimum of 5 years of experience as a project manager must provide a minimum of 3 projects with similar scope of this project. Provide the name of the construction contract, and the contract ID number; The name of the contracting agency or organization the contract was awarded by; The date of the construction contract award and the contract award amount in dollars; The date of the construction contract completion, and the final contract amount, in dollars; A brief description of the construction contract scope of work; Identification of at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable).
(B) Quality Control Manager –Provide a minimum of 3 projects with similar scope of this project that they have acted as the QC manager. Provide the name of the construction contract, and the contract ID number; The name of the contracting agency or organization the contract was awarded by; and The date of the construction contract award. A brief description of the construction contract scope of work and the QC program that was implemented.; Identify at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable).
(C) Safety Officer – Must provide a list of safety training at a minimum; life safety, excavation safety, scaffold safety, OSHA 30, fall protection training, crane/rigging safety with a minimum of 5 years of experience as a safety officer. Provide a minimum of 3 projects with similar scope of this project. Provide the name of the construction contract, and the contract ID number; The name of the contracting agency or organization the contract was awarded by; Provide a brief description of the construction contract scope of work and how the safety program was implemented; Identify at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable).
(D) Site Superintendent – Must have minimum of 5 years of experience as a site superintendent and must have OSHA 30 training. Provide at least 3 projects as a site superintendent with similar scope of this project. Provide the name of the construction contract, and the contract ID number; The name of the contracting agency or organization the contract was awarded by; The date of the construction contract award and the contract award amount in dollars; The date of the construction contract completion, and the final contract amount, in dollars; A brief description of the construction contract scope of work; and Identification of at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable).
FACTOR 4: PRIME CONTRACTOR SAFETY PLAN
Offerors must provide a construction safety plan:
Offerors must provide a Safety Plan.
1. The contractor's Safety Plan shall be evaluated for their compliance with local/State/Federal rules and regulations, ASME A17, and the company's consideration of safety of its employees and the public. The contractor's Safety Plan at the minimum shall address their safety policy, commitment to safety, detailed disciplinary action to be taken with respect to employees violating safety requirements, personnel safety responsibilities, personnel safety training, personal protective equipment, accident / incident reporting procedure and investigations, emergency procedures guidelines.
2. The contractor’s Safety Plan shall address their plan for completing all contract work on and around an active hospital without impacting patient care and completing all work in accordance with all construction documents and all local/State/Federal rules and regulations, and ASME A17.
3. Project Construction Plan: Project work is located in the Network Infrastructure Upgrade and Server Room of the VA Medical Center. Provide the approach of how you will plan to replace hall fixtures and wiring keeping in mind the ongoing and continuing operation of the medical center and the requirement to always have Network Infrastructure Upgrade and Server Room operational. The plan should include but not limited to the following:
| • | Impact to surrounding medical center services |
| • | Material delivery |
| • | Debris removal |
• Worker entry