revised Change Order Notice V.25.1 8.28.24.pdf

PDF 1 MB Posted

Attached to
Change Order Notice 1 Taintor Road Demo
Solicitation number
27-422DNR-MINES-B-54496
Issued by
Illinois

About this file

This is a Change Order Notice document for the Taintor Road Demo project issued by the State of Illinois. The change order addresses an increase to the existing contract dollar amount to accommodate additional work required for project execution. The document outlines modifications to the original contract terms and specifies the scope of additional work to be performed under the revised agreement.

The change order establishes revised pricing and contract terms to reflect the expanded scope of demolition work at the Taintor Road site. The document details the rationale for the cost increase, identifies the specific additional tasks or conditions necessitating the change order, and provides updated financial obligations for contract performance. All modifications are incorporated into the existing contract framework, with the change order serving as formal authorization for the contractor to proceed with the additional work at the newly established contract value.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.

This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.

Detailed explanation for this change order:

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
DropDownList1: DNR - Natural Resources
ProcurementTitle: Change order notice 1-Taintor Road Demo
BBREFNO.: 27-422DNR-MINES-B-54496
thedetails: Change Order #1 is to increase the contract by $59,036.13 for new contract total of $544,031.80. No dates are changing. Due to unforeseen tornado damage on June 10, 2026, fencing which was to be repurposed was destroyed. Due to the fence being destroyed, new fencing must be procured for the property. The property has a history of trespassing and vandalism. Additionally one of the buildings has fallen due to a tornado. Due to this collapse, causing additional work including hazardous material handling due to the inability to collect asbestos samples, additional time due to the collapse increased the safety monitoring and debris removal. Additionally, due to the collapse, additional demolition permits were required.
CheckBox1: 1
CheckBox2: 1