Revised Attachment A. Existing OR Floor Conditions Layout 9-27-2022.docx

DOCX document 1 MB Posted

Attached to
The objective is to repair the floor and replace flooring material in multiple locations in the OR Department at the US PHS Indian Hospital Located In Claremore, Oklahoma. t
Solicitation number
246-23-Q-0002
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A. Existing OR Floor Conditions and Layouts

1. OR A room 564

Cut by depression, 3-4” wide depression where previous floor patch was performed

OR A door entry showing ruts in sheet vinyl from gurney traffic (2 pics). Replace 5’x5’ section, repair flooring

Heat welded seams split depression and cut in middle of floor

OR A room 564 dimensions

OR A room 564 flooring issues locations

2. OR B room 556

Center of floor where seam is located, soft floor underneath with crater from material pushed out, cuts with black tape to keep out liquids

Center of room top view of crater depression and cut in floor

OR B door entry floor level view showing ruts in sheet vinyl from gurney traffic and depressions by door transition area

OR B door entry at transition area, heat welded seam separated, floor underneath sheet vinyl issues

OR B room 556 dimensions

3. OR Interior Hallway 551 – 7 tears minimum along concrete seam where sheet vinyl is raised

Typical raised flooring edge over concrete seam with cuts/tears

Typical heat-welded seams that are split

OR Interior Hallway 551 image5.jpeg image6.jpeg image7.png image8.png image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.png image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.png image1.jpeg image2.png image3.png image4.jpeg

File details come from the government source that posted it. Updated .