Revised-040ADV-26-R-0033.pdf
PDF 506 KB Posted
- Attached to
- GPO Fire Door Inspection Services
- Solicitation number
- 040ADV-26-R-0033-0001
- Issued by
-
Government Publishing Office
About this file
Solicitation Summary: Fire Door Assessment, Repair, and Replacement Services
This is a Request for Proposal (RFP) for fire door inspection, assessment, repair, and replacement services at the U.S. Government Publishing Office (GPO) headquarters in Washington, D.C. The solicitation (040ADV-26-R-0033) is unrestricted and issued under the commercial items acquisition process. The contract involves three contract line items (CLINs): CLIN 1001 for fire door assessment and reporting on a firm fixed-price basis, CLIN 2001 for fire door repairs on a time-and-materials basis, and CLIN 3001 for fire door replacements using a firm ceiling-price with retroactive price redetermination structure. The base period covers 365 calendar days from the Notice to Proceed, with the assessment phase requiring completion within 90 calendar days. The contractor must conduct a comprehensive evaluation of approximately 250 fire-rated openings across GPO buildings A, B, C, and D, documenting all deficiencies against NFPA 80, NFPA 101, and applicable building codes, and provide repair or replacement recommendations with rough order of magnitude cost estimates.
The proposal deadline is 5:00 PM EST on September 14, 2026, with questions due by August 7, 2026. Proposals must be submitted electronically in four volumes: signed SF 1449 with SAM.GOV registration and W-9; technical approach (limited to ten pages, addressing corporate experience, technical methodology, management approach, materials management, and quality control); past performance questionnaires from at least three references; and pricing proposal with narrative explanation. Award will be made to the responsible offeror with the lowest evaluated price whose proposal is technically acceptable, without discussions unless deemed in the Government's best interest. Key personnel must hold current fire door inspector certifications (CFDAI, IQP, or QFDI) and OSHA 10-hour training cards. The contractor must establish security badging and facility access procedures, comply with GPO operational requirements including business hours of 7:00 AM to 3:30 PM Monday through Friday, and provide all tools, equipment, and materials. Payment will be made by electronic funds transfer upon deliverable acceptance by the Contracting Officer's Representative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 040ADV-26-R-0033-0001.pdf | ||
| Attachment 3 Wage Determination.pdf | ||
| QA-040ADV-26-R-0033.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31b. NAME OF CONTRACTING OFFICER (Type or print) 30c. DATE SIGNED
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
1. REQUISITION NUMBER
PR-26-GPO-2998
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER
040ADV-26-R-0033
6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
WHITE, TROY D
b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY CODE GPO 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 0 % FOR:
GPO
732 North Capitol St NW Washington, DC, 20401, US
11. DELIVERY FOR FREE ON
12. DISCOUNT TERMS
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
13a. THIS CONTRACT IS A
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
8(A)
13b. RATING
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
BOARD (FOB) DESTINATION RATED ORDER UNDER 14. METHOD OF SOLICITATION REQUEST
UNLESS BLOCK IS MARKED
SEE SCHEDULE
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
FOR
PROPOSAL
(RFP)
15. DELIVER TO
See Schedule
CODE 16. ADMINISTERED BY CODE
Same As Issuing Office
17a. CONTRACTOR/
OFFEROR
CODE FACILITY
CODE
18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Government Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print)
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
36. PAYMENT
COMPLETE PARTIAL FINAL
37. CHECK NUMBER
PARTIAL FINAL
STOCK RECORD (S/R) 40. PAID BY
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER
42a. RECEIVED BY (Print)
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE 42b. RECEIVED AT (Location)
42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 11/2021) BACK
040ADV-26-R-0033
TABLE OF CONTENTS:
1. Listing of Incorporated Purchase Requisitions
2. Section B - Supplies or Services and Prices/Costs
3. Section C - Description/Specifications/Work Statement
4. Section D - Packaging and Marking
5. Section E - Inspection and Acceptance Terms
6. Section F - Delivery or Performance
7. Section G - Contract Administration Data
8. Section H - Special Contract Requirements
9. Section I - Contract Clauses
10. Section J - List of Documents, Exhibits, and other Attachments
11. Section K - Representations, Certifications, and Other Statements of Offerors
12. Section L - Instructions, Conditions and Notices to Offerors
13. Section M - Evaluation Factors for Award
1. Listing of Incorporated Purchase Requisitions
Incorporated Purchase Requisition Numbers:
PR-26-GPO-2998
2. Section B - Supplies or Services and Prices/Costs
Item
Number Base Item
Number Supplies/Services Quantity Unit
1001 Assessment & Inspection 1
Contract Type: Firm Fixed Price Unit Price Extended Price
Description:
Purchase Requisitions PR-26-GPO-2998
IDC Type: Not Applicable
Item Number Base Item
Supplies/Services Quantity Unit
2001 1001 Fire Door Repairs
Contract Type: Time and Materials Unit Price Other Direct Costs
Description:
Purchase Requisitions
Item Number Base Item
Supplies/Services Quantity Unit
3001 1001 Fire Door Replacement 1 EACH Contract Type: Firm Ceiling- Retroactive Price Redetermination
Unit Price
Description: The maximum inventory is up to 250 fire door assemblies
Purchase Requisitions
3. Section C - Description/Specifications/Work Statement
1.0 Project Background
Fire doors are essential to the safety of a building and its occupants and should be monitored and maintained accordingly to ensure proper functionality and code compliance. The U.S. Government Publishing Office (GPO) requires fire door inspection, assessment and repair services at the Main GPO Headquarters (Buildings A, B, C, D) at 732 N.
Capitol Street NW, Washington, D.C. 20401.
This is a Firm-Fixed-Price (FFP) service contract. The base CLIN covers the fire door assessment and reporting services. Option CLIN 2001 provides fire door repairs on a Time-and-Materials (T&M) basis, and Option CLIN 3001 provides for fire door replacements. All work shall comply with the current adopted edition of National Fire Protection Association (NFPA) 80.
2.0 Project Objectives
The Contractor shall:
1. Perform a complete, field verified fire door assessment for GPO Headquarters.
2. Identification of all deficiencies affecting fire-rating or life safety compliance.
3. Repair or replace recommendations with ROM cost estimates to support GPO capital planning.
4. Develop a Fire Door Detail Report.
5. An option to allow GPO to authorize deficiency repairs or replacement under this contract.
3.0 Applicable Codes and Standards
The GPO Headquarters and the fire-rated openings located inside the buildings must comply with the following codes and standards, most current adopted editions of the following:
• NFPA 80, Standard for Fire Doors and Other Opening Protectives
• NFPA 101, Life Safety Code
• International Building Code (IBC)
• International Fire Code (IFC)
• DC Construction Codes, current adopted edition
• Local Authority Having Jurisdiction (AHJ) requirements
Codes and standards are listed for reference. The Contractor is responsible for identifying and complying with all applicable requirements, based on field conditions and AHJ direction.
4.0 Scope of Services
The Contractor shall furnish all labor, equipment, and materials to perform the following:
4.1 Fire Door Assessment & Reporting
The Contractor shall submit a Work Plan covering; assessment methodology, NFPA 80 compliant inspection checklist, scheduling by floor, and photo file naming convention. The Contractor shall submit a Work Plan for Government approval within 10 days of NTP. The Work Plan will contain a baseline schedule. Revisions to the baseline schedule shall be approved by the Government. Monthly schedule updates are required. The Work Plan should include all actions the contractor plans to take to fulfill the scope of work requirements.
The Contractor shall conduct a fire door assessment for GPO Headquarters in accordance with the codes and standards listed in section 3.0 Applicable Codes and Standards. The Contractor shall locate and record all accessible fire-rated openings. For each opening, record:
• Unique Door ID
• Door location
• Door type
• Nominal size
• Fire rating
• Label status
• Leaf configuration
• Hardware components
• Date of observation
• Make, model, and serial
• Deficiency description
• Quote for repair or replacement if applicable
• Expected/Remaining useful life
• Pass/Fail per NFPA 80 inspection criteria
• Photos of observations
• Recommended corrective action
NFPA 80 Annual Inspection Each fire-rated opening shall be inspected for, at a minimum:
• Self-closing and positive latching function.
• Door and frame clearances and gap dimensions.
• Door hardware completeness and function.
• Vision light glazing listing compliance.
• Smoke seal conditions where required.
• Evidence of unlisted field modifications.
The NFPA 80 Inspection Checklist shall be submitted to the Government for approval 10 days of NTP. The Checklist will be used as the NFPA 80 conformance document. The Checklist must be signed by the Fire Door Inspector upon completion of inspection to be acceptable.
Inventory & Deficiency Matrix
A Fire Door inventory and deficiency matrix shall be submitted to the government by the Contractor within 90 days of NTP. The Fire Door inventory and deficiency matrix shall document all GPO Headquarters and the fire doors, and if applicable the documentation shall contain a deficiency matrix. If there are any deficiencies, discrepancies, or violations to NFPA 80 or NFPA 101 found within GPO headquarters or to its fire rated openings, a deficiency matrix shall be constructed and delivered to the government for each door or NFPA 101 violation. The deficiency matrix will account for Life Safety, NFPA violations, and routine maintenance.
The Contractor shall notify the COR of Life Safety deficiencies as required by NFPA 101. Notification of any NFPA 101 deficiencies or discrepancies shall be documented in a manner consistent with NFPA 101 requirements.
Final Fire Door Report
From the fire door assessment and inspection, a Fire Door Report will be developed and delivered to GPO. Included in the report are any NFPA 80, NFPA 101, or IBC discrepancies and/or violations as well as a quote for repair or replacement if applicable. The Fire Door Report will be a single report displaying the findings and the results of the assessment performed for GPO Headquarters. If any doors are found to have deficiencies, the Contractor is to deliver that information consistent with NFPA requirements.
ROM Cost Estimates
Provide a Rough Order of Magnitude cost estimate for each deficiency. The Contractor shall provide a written recommendation for each deficiency.
Photo Documentation
Photograph each opening: full door face (both sides), label, hardware, and all identified deficiencies. The Contractor shall submit photo documentation for each unique violation, discrepancy, or deficiency of any 3.0 Applicable Codes and Standards.
4.2 Option CLIN 2001: Fire Door Repairs (Time-and Materials)
The Government may exercise Option CLIN 2001 to authorize repairs for fire doors identified as deficient during the Fire Door Assessment and documented in the Fire Door Detail Report. Repairs shall correct deficiencies, discrepancies, or violations of the applicable codes and standards identified in Section 3.0.
The Contractor shall furnish all labor, materials, equipment, and incidentals necessary to perform the authorized repairs. All repair work shall comply with NFPA 80, the current adopted edition, and all other applicable codes and standards identified in Section
3.0 Upon complementation of each repair, the Contractor shall re-inspect the affected fire door in accordance with NFPA 80 and submit a Post-Inspection Report documenting the inspection results and the updated Pass/Fail/ status.
4.3 Option CLIN 3001: Fire Door Replacements (Firm Ceiling-Price with Retroactive Price Redetermination)
If and to the extent exercised, Option CLIN 3001 will authorize the replacement of fire doors determined to require replacement of fire doors determined to require replacement during the Fire Door Assessment and document in the Fire Door Detail Report. The Government will determine the quantity of fire doors that require replacement following completion of the Fire Door Assessment.
Replacement fire door assemblies shall be UL listed for the required fire rating and installed in accordance with NFPA 80, the current adopted edition, and all other applicable codes and standards identified in Section 3.0. Prior to procurement of replacement components, the Contractor shall submit product data and UL listing documentation to the COR for review.
If, based on the Fire Door Assessment and Fire Door Detail Report completed under CLIN 0001, the Government determines that replacement of one or more fire door assemblies is required, Option CLIN 3001 may be exercised to authorize the replacement of those fire door assemblies. CLIN 3001 shall be a Fixed Ceiling-Price with Retroactive Price Redetermination contract. The final price for authorized replacement work shall be determined in accordance with the contract following completion of the work.
5.0 Deliverables
The contractor is required to submit the following items for successful completion of the contract.
• Work Plan | 10 days of NTP
• NFPA 80 Inspection Checklist | 10 days of NTP
• Life safety deficiency notification | Within 24 hours of identification
• Fire door inventory and deficiency matrix | 10 days after field survey
• Photo documentation | With Draft Final Report
• Draft Final Report | Per Work Plan
• Final Report | 10 days after Government comments
• Post repair, replacement, or installation inspection report if applicable | 5 days after repair completion
All deliverables shall be submitted electronically to the COR unless otherwise directed by the Government.
6.0 Quality Control
The Contractor shall establish and maintain a Quality Control (QC) plan to ensure accurate inspections, complete documentation, and code compliant reporting. Prior to submission of any deliverable, the Contractor shall have the Lead Inspector conduct an internal review and sign the deliverable cover sheet certifying conformance with contract requirements.
7.0 Acceptance
Deliverables shall be considered acceptable when:
• Inspections comply with NFPA 80 requirements.
• Inventory documentation is complete.
• Deficiencies are clearly identified.
• Reports are accurate and organized.
• Cost estimates are reasonable.
The Government will provide written comments or acceptance within 15 calendar days of deliverable receipt. Resubmittals are due within 7 calendar days of Government comments. Acceptance occurs only upon written notification from the CO or
COR.
8.0 Safety
All on-site Contractor personnel shall hold, at minimum, a current OSHA 10-hour training card. Due to the age of GPO facilities, some hazardous materials such as lead and asbestos may be encountered during the project. If any hazardous materials are detected, all repair, replacement and installation work shall halt, and it should be brought to the attention of the COR. The GPO Safety branch will help coordinate tests and remediation if necessary.
9.0 Key Personnel
All work shall be performed by qualified, trained, and properly certified inspectors. The Fire Door Inspector(s) responsible for performing inspections shall currently hold at least one of the following certifications:
• Certified Fire & Egress Door Assembly Inspector (CFDAI),
• Intertek Qualified Personnel (IQP) Fire Door Inspector
• Qualified Fire Door Inspector (QFDI)
Certifications shall be submitted with the proposal. Again, all on-site Contractor personnel shall hold, at minimum, a current OSHA 10-hour training card.
10.0 Period of Performance
The Period of Performance (POP) for this contract shall be 365 calendar days from the date of Notice to Proceed
(NTP).
The Contractor shall complete the Case CLIN (Assessment and Reporting) withing 90 calendar days after issuance of the NTP.
If exercised, Option CLIN 2001 (Fire Door Repairs) and Option CLIN 3001 (Fire Door Replacements) shall be performed within the contract POP and completed within the timeframe specified in the Government’s option exercise or written authorization.
11.0 Government-Furnished Information (GFI)
The GPO will provide:
• Available as-built drawings.
• Historical fire door inspection reports.
• Facility access coordination.
• The Contractor is responsible for field verification.
12.0 Contractor Furnished Items
The Contractor shall furnish all tools, inspection instruments, personal protective equipment, materials, and transportation required to perform the work. No Government equipment will be made available.
• No destructive testing without prior written CO approval.
• Fire doors shall be returned to operational condition immediately after inspection at each opening.
• Work shall be scheduled with the COR no less than five (5) business days in advance.
13.0 Agency Operations Information
13.1 Hours of Service
The Contractor shall perform services during normal GPO business hours unless otherwise directed by the Contracting Officer (CO).
• Normal Business Hours:
o Monday through Friday, 7:00 a.m. to 3:30 p.m.
• After-Hours Work:
o Certain tasks may require performance outside normal business hours, including evenings, weekends, or Federal holidays, to support GPO operations, emergency response, or to minimize disruption to occupants. After-hours work shall be coordinated in advance with the COR and shall be approved by the
CO.
• No overtime, premium pay, or schedule changes will be authorized unless approved in advance by the CO.
13.2 Identification Badges and Security Access
All Contractor personnel requiring access to GPO facilities shall comply with GPO security and badging requirements.
Contractor personnel shall obtain and always visibly display GPO-issued identification badges while on GPO property.
GPO will provide affiliated badges with security background checks to the Contractor, allowing them to escort their workers onto the premises. This shall be completed within 30 days of award. If a Contractor has not been granted an affiliated badge, they shall exchange a valid federal or state-issued identification for a GPO Visitor’s badge to enter the premises. Contractor is responsible for escorting all its unbadged staff members, to include subcontractors, for the entirety of the contract Identification badges are property of GPO and shall be returned immediately upon contract completion, personnel reassignment, or termination. Contractor personnel may be denied access or have badges revoked for failure to comply with security policies or conduct standards.
13.3 Sign-In / Sign-Out Requirements
All Contractor personnel are required to sign-in at 732 North Capitol St. NE Washington, DC 22041. All Contractor personnel are required to sign-out at the same location above.
13.4 Parking and Transportation
Parking within the GPO complex is extremely limited and not guaranteed. It is the responsibility of Contractor personnel to purchase a parking pass for the designated parking areas. GPO will not validate or make reimbursement for parking violations of the Contractor’s personnel under any circumstances. Unauthorized parking on GPO property may result in citation, towing or revocation of site access privileges.
13.5 Conduct and Compliance
Contractor personnel shall conduct themselves in a professional manner consistent with the operational environment of a Federal legislative complex. Smoking, tobacco use, or e-cigarettes are prohibited inside all GPO buildings. No individual is permitted to bring illegal drugs, alcohol or firearms of any type onto a government installation. Disruptive behavior, failure to follow access procedures, or noncompliance with GPO rules may result in removal from the site and replacement at no additional cost to the Government.
13.6 Contractor Responsibility
The Contractor shall be responsible for all facilities in which the work will take place and to also be familiar with the conditions under which the work will be accomplished. The Contractor shall inspect existing conditions prior to commencing work, including elements subject to damage or movement during the project. Should the work create dust, water or mud, the Contractor shall be responsible for cleaning the floors and walls. The Contractor shall be responsible for the removal and replacement of all ceiling tiles affected by the work.
4. Section D - Packaging and Marking
None
5. Section E - Inspection and Acceptance Terms
E.1 MATERIALS MANAGEMENT ACQUISITION REGULATION (MMAR) 46.503 PLACE OF ACCEPTANCE (APR 2010)
The Contracting Officer or the duly authorized representative will accept supplies and services provided under this contract. The place of acceptance will be:
U.S. Government Publishing Office 732 North Capital Street NW Washington DC 20401
E.2 RESPONSIBILITY FOR INSPECTION AND ACCEPTANCE
The Contracting Officer’s Representative (COR), as appointed/designated by letter per the information listed in Section G of this document, is the Government's official responsible for inspection and acceptance of required services under the terms and conditions of this contract. The Government may designate additional representative(s)to provide periodic inspections or observations during the performance of this contract. However, Government inspections are for the sole benefit of the Government and do not relieve the Contractor of its responsibilities to provide adequate quality control for the works described in Section J Attachments. The Contractor is responsible for inspection of its own work to ensure that all work performed conforms to the terms and conditions of the contract.
6. Section F - Delivery or Performance
Line Item: 1001 Delivery Date Delivery Address
90 Calendar Days after
NTP
GPO
732 North Capitol St NW Washington DC District of Columbia US 20401
Line Item: 2001 Period Of Performance Start Date Period Of Performance End Date Period Of Performance Address
Date of Option Exercise
Date of Option Exercise
732 North Capitol St NW
Line Item: 3001 Period Of Performance Start Date Period Of Performance End Date Period Of Performance Address
Date of Option Exercise Date of Option Exercise
GPO
732 North Capitol St NW
F.1. CLAUSES INCORPORATED BY REFERENCE
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
NUMBER DATE TITLE
52.242-15 Aug-89 Stop-Work Order 52.242-17 Aug-84 Government Delay of Work
F.5. Observance of Legal Holidays/Federal Non-Workdays
For work to be performed at Government site(s), the Contractor must establish a standard holiday schedule that exactly coincides with the Government's schedule for employees working on a Government site(s). Holidays observed are listed below. For Government site work, holidays and other non-workdays are not billable unless work is specifically requested by the Government and productive hours are performed on those days. For work to be performed at Contractor site(s), the Holiday schedule may differ if it is customary practice (For example, when the day after Thanksgiving is given in lieu of Columbus or Veterans’ Day).
The following is a list of the official Federal Government holidays:
Date Holiday
Monday, September 07 Labor Day Monday, October 12 Columbus Day
Wednesday, November 11 Veterans Day Thursday, November 26 Thanksgiving Day
Friday, December 25 Christmas Day
*This holiday is designated as "Washington’s Birthday" in section 6103(a) of title 5 of the United States Code, which is the law that specifies holidays for Federal employees. Though other institutions such as state and local governments and private businesses may use other names, it is our policy to always refer to holidays by the names designated in the law. Detailed information regarding federal holidays can be found on the U.S. Office of Personnel Management’s website. Retrieved from https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2024.
F.2. SECURITY
All contractor personnel are required to sign in at 732 North Capitol St. NE, Washington, DC 22041 upon arrival and sign out at the same location upon departure. Identification badges must be worn at all times while on GPO grounds. Contractor personnel are responsible for purchasing a parking pass for designated parking areas. Parking information is available from GPO Police Services.
If participating in the GPO Parking Program, contractor personnel must adhere to the GPO Policy and pay a fee of $9.00 per day.
Fees must be paid before the issuance of a permit and are non-refundable. The GPO will not validate or reimburse parking violations incurred by contractor personnel under any circumstances. Smoking, tobacco use, and e-cigarettes are only permitted in designated smoking sections. Illegal drugs, alcohol, or firearms of any type are prohibited on government installations. Contractor personnel must exchange a valid federal or state identification for a GPO Visitor’s Badge upon entry. Expired identification is not acceptable.
The Visitor’s Badge must be visible at all times as safety allows. Contractors must be escorted at all times or be within the line of sight of the escort.
F.3. NOTICE TO THE GOVERNMENT OF DELAYS
In the event the Contractor encounters difficulty in meeting performance requirements, or when the Contractor anticipates difficulty in complying with the delivery schedule or completion date, or whenever the Contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this requirement the following must happen: The Contractor must immediately notify the Contracting Officer and the COR in writing, giving pertinent details provided, however, that this data shall be informational only in character and that this provision must not be construed as a waiver by the Government of any delivery schedule or date, or any rights or remedies provided by law or under this contract.
7. Section G - Contract Administration Data
CONTRACT MANAGEMENT
Notwithstanding the Contractor s responsibility for total management responsibility during the performance of the contract, the administration of the contract will require maximum coordination with the GPO points of contact during performance of the contract.
CONTRACTING OFFICER (CO), CONTRACTING SPECIALIST AND CONTRACTING OFFICER S REPRESENTATIVE
(COR)
Troy White Contracting Officer U.S. Government Publishing Office https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url%3D2024
Agency Acquisition Room: A530 Address: 732 North Capitol St NW Washington DC 20401 E mail: twhite@gpo.gov
Brittany Freeman Contract Specialist U.S. Government Publishing Office Agency Acquisition Room: A530 Address: 732 North Capitol St NW Washington DC 20401 E mail: bfreeman@gpo.gov
Contracting Officer s Representative (COR): TBD Technical Point of Contact: TBD
An administrative letter issued by the Contracting Officer which designates the COR will be provided separately to the Contractor.
CONTRACTING OFFICER S AUTHORITY
The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officer
s. In the event the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made at the contractor s risk. No adjustment will be made in the contract terms and conditions of this contract, including price.
CONTRACTING OFFICER S REPRESENTATIVE (COR)
The COR is responsible for the technical aspects of the project and serves as technical liaison with the Contractor. The COR is also responsible for the final inspection and acceptance of all products, services, reports, and such other responsibilities as may be specified in this contract. The COR is not authorized to make any commitments or otherwise obligate the GPO or authorize any changes, which affect the Contract price, terms or conditions. Any Contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the expressed prior authorization of the Contracting Officer.
If the Contractor performs a service that alters the current cost, quantity, or scope without prior written approval from the CO, the Contractor does so at his/her own risk. The COR may designate assistant COR(s) to act for the COR by naming such assistant(s) in writing and transmitting a copy of such designation through the Contracting Officer to the Contractor.
The COR is not authorized to make any commitments or otherwise obligate the GPO or authorize any changes, which affect the quantity, quality, scope or Contract price. All request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the expressed prior authorization of the Contracting Officer. If the Contractor performs a service that alters the current cost, quantity, or scope without prior written approval from the CO, the Contractor does so at his/her own risk. The COR may designate an alternate COR(s) to act for the COR by naming such alternate(s) in writing and transmitting a copy of such designation through the Contracting Officer to the Contractor.
INVOICE SUBMISSION, ACCEPTANCE AND APPROVALS
Contracting Officer (CO) Troy White Email: twhite@gpo.gov
Contract Specialists (CS) Brittany Freeman Email: bfreeman@gpo.gov
Contracting Officer’s Representatives (COR): TBD Alternate COR: TBD mailto:twhite@gpo.gov mailto:bfreeman@gpo.gov mailto:twhite@gpo.gov mailto:bfreeman@gpo.gov
Invoice email submission & mailing address:
US Government Printing Office (GPO) Comptroller North Capitol & H Streets, NW Mail Stop: FMCS Washington, DC 20401 invoicegpo@gpo.gov
(202) 512 0874
In order to receive payment, deliverables must be accepted and approved by the Contracting Officer s Representative (COR).
PAYMENT METHOD
Payments under this contract will be made by the GPO by electronic funds transfer (EFT).
NOTICE: The following solicitation provisions and/or contract clauses pertinent to this section are hereby incorporated by reference:
Materials Management Acquisition Regulation (MMAR)
NUMBER DATE TITLE
52.232.34 May 1999 Payment by Electronic Funds Transfer Other Than Central Contractor Registration
Effective January 1, 1999 payments on all GPO purchase orders will only be made by electronic fund transfer (EFT) unless you are granted a waiver. A waiver can only be granted if you certify below in writing that you do not have an account with a financial institution or an authorized payment agent and return the certification to the Contracting Officer.
Requesting Office Address
732 North Capitol St NW
Washington DC 20401
Phone: Fax:
Contact Details:
Property Administration Office Address
GPO
732 North Capitol St NW Washington DC 20401 Phone: Fax:
Contact Details:
COR Office Address
GPO
732 North Capitol St NW
Washington DC 20401 Phone: Fax:
Contact Details:
Issuing Office Address
GPO
732 North Capitol St NW Washington DC 20401 Phone: Fax:
Contact Details:
WHITE, TROY D
mailto:invoicegpo@gpo.gov
GPO INVOICE INSTRUCTIONS July 2024
I. Invoices shall be paid in accordance with the contract terms and conditions, following receipt of a proper invoice under Part 3 of these instructions. Please note that the Prompt Pay Act (31 USC Chapter 39) does not apply to GPO.
Payments under this contract will be made by the GPO by electronic funds transfer (EFT). For additional information and questions please send an email to InvoiceGPO@gpo.gov.
The Contractor shall submit each invoice electronically via email to the following address invoicegpo@gpo.gov.
System for Award Management (SAM), formerly Central Contractor Registration (CCR) registration is required for all vendors doing business with the federal government with some exceptions. For mailing in invoices, use the following GPO s address
US Government Publishing Office (GPO) Office of Finance Mail Stop
FMCE
North Capitol & H Streets, NW Washington, DC 20401 Phone (202) 512 0874
II. Effective January 1, 1999, payments on all GPO purchase orders will only be made by electronic fund transfer (EFT) unless you are granted a waiver. A waiver can only be granted if you certify below in writing that you do not have an account with a financial institution or an authorized payment agent and return the certification to the Contracting Officer. If it is determined that the amount billed is incorrect, the invoice may be rejected by the Government, or the contractor may be required to submit a revised invoice.
NOTICE The following solicitation provisions and/or contract clauses pertinent to this section are hereby incorporated by reference
Materials Management Acquisition Regulation (MMAR) 52.232 33 Payment by Electronic Funds Transfer Central Contractor Registration (May 1999)
III. To constitute a proper invoice, each invoice must include the following information and/or attached documentation
(1) Name, address and telephone of the Contractor
(2) Date of invoice and invoice number
(3) Contract number (Delivery or Task Order, if applicable) complete numbers (including task order or call number and contract line item(s)) and also modification number, if applicable. All relevant information to the invoice that the contract contains must be reflected on the invoice.
(4) Description (quantity, unit of measure, unit price, and extended price) of the supplies or services rendered (including hours incurred and billing rate, as applicable to the contract). All relevant information that the contract contains must be reflected on the invoice.
(5) Name, title, phone number, email and mailing address of person to notify in the event of a defective invoice.
(6) A schedule depicting the following information a Amount Invoiced The Total Amount of Invoice and this Invoice Period separated by each CLIN Number (if applicable) b Total contract Price and price for each CLIN c Cumulative Amount Invoiced and Authorized Value of Contract Balance Remaining on Contract d If the contractor is billing for prices/costs incurred over more than a single month, the prices/costs for each month in twhite@gpo.gov mailto:InvoiceGPO@gpo.gov which the costs were incurred and shall be segregated into the month they were actually incurred.
(7) Add all payment terms and related discount items on the invoice per the contract payment method and clauses.
(8) Name of Contracting Officer’s Representative (COR) and
(9) Signature of authorized representative of the firm with the following invoice certification
The undersigned hereby certifies to the best of my knowledge and belief that the sum claimed under this contract is proper and due, and all the prices/costs of contract performance have been paid or to the extent allowed under the applicable payment clause will be paid by the Contractor when due in the ordinary course of business, the work reflected by these costs has been performed, and amounts involved are consistent with the requirements of this Contract.
BY NAME
TITLE
DATE
IV. In the event the contractor owes money to GPO, the contractor shall clear the amount owed to GPO first before any new invoices will be processed and paid. The contractor shall send a refund check to GPO to the address above and provide GPO with the tracking information.
V. Inquiries regarding the status of invoices may be directed to invoicegpo@gpo.gov
8. Section H - Special Contract Requirements
H.1 Parking on Site
Parking is the responsibility of the contractor. However, GPO has a limited number of parking and may be able to provide parking at a cost to the contractor. GPO shall provide the Contractor one parking space permit for general use during the designated Contract period at the cost of $9/day or at a discounted monthly rate. The parking space shall be located at one of the GPO’s designated parking lots. The assigned parking space permit can only be used by Contractor vehicles, which must be clearly marked with Contractor's logo or name. The Contractor must display the parking permit on the vehicle driver's side dashboard. The Contractor is prohibited from reproducing the parking permit. Vehicles not in compliance are subject to being ticketed and towed at the Contractor's sole expense. In addition, the GPO may revoke Contractor's parking privileges as a result of Contractor's abuse of parking privileges. Additional parking permits can be purchased at the GPO’s Parking Office on a first come first served basis, at the Contractors expense, by making arrangements thru the COTR Contracting Officer's Technical Representatives).
H.2 Protection of Property
Contractor Responsibility: If due to the default, negligence (whether of action or omission) and/or dishonesty of the Contractor or its employees, any Government-owned or controlled property is lost or damaged as a result of the Contractor’s performance of this task order, the Contractor must be responsible to the Government for such loss or damage, and the Government at its option, may, in lieu of payment therefore, require the Contractor to replace at its own expense, all property lost or damaged.
H.3 Removal of Contractor Personnel
It is understood that all personnel assigned by the Contractor to the performance of work hereunder must be acceptable to the GPO in terms of personal and professional conduct and must successfully complete a full background investigation before obtaining access to the premises. Any person in the Contractor’s organization or in any Subcontractor’s organization, who is deemed by the Contracting Officer or the COR to conflict with the interest of the GPO, must be immediately removed from this task order. The reason for removal must be fully documented in writing by the Contracting Officer. Any security violations, denials or revocations of security clearance may be construed as grounds for immediate removal from the premises.
H.4 Potential Conflicts of Interest
The Contractor's employees assigned to work on this contract have an affirmative obligation to disclose to the Contracting Officer any personal or business relationship with Government personnel, or financial interests, which could present the appearance of an existing or potential conflict of interest. Failure to do so, if such becomes known by other means could result in a determination of non-responsibility prior to award or termination of contract after award.
H.5 Travel Regulations
As a general rule, local travel expenses will not be reimbursed under this contact. Examples of local travel which will not be subject to reimbursement are: 1) travel to and from normal job site (i.e. commuting costs) and 2) supervisory personnel traveling to a Government site or alternative facility to oversee operations. Personnel assigned to a Government site or alternative facility will consider such facility the normal job site. However, there are circumstances under which local travel reimbursement is allowable, such as when personnel are requested or required by the Government to travel to a local site which is not their normal job site, the local transportation expenses (e.g. metro, cab, parking, etc.) can be reimbursed. The COR of each contract shall make such determinations and authorizations as appropriate.
9. Section I - Contract Clauses
Solicitation Provisions
Regulation Clause Number Reference Text
MMAR 52.203-2 Certificate of Independent Price Determination MMAR 52.204-3 Taxpayer Identification MMAR 52.212-1 Instructions to Offerors—Commercial Items MMAR 52.212-2 Evaluation—Commercial Items
MMAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items
MMAR 52.212-3 Offeror Representations and Certifications—Commercial Items MMAR 52.216-1 Type of Contract MMAR 52.215-1 Instructions to Offerors—Competitive Acquisition MMAR 52.215-12 Subcontractor Certified Cost or Pricing Data
MMAR 52.215-13 Subcontractor Certified Cost or Pricing Data—Modifications MMAR 52.232-38 Submission of Electronic Funds Transfer Information with Offer MMAR 52.233-2 Service of Protest MMAR 52.222-41 Service Contract Labor Standards MMAR 52.216-6 Price Redetermination- Retroactive
52.212-5 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders
- Commercial Items (MAY 2002) 52.212-5Contract Terms and Conditions Required to Implement Statutes or Executive Orders- Commercial Items (MAY 2002)
a) The Contractor shall comply with the following MMAR clauses, which are incorporated in this contract by reference, to implement provisions of law or executive orders applicable to acquisitions of commercial items
(1) 52.222-3, Convict Labor (E.O. 11755).
(2) 52.233-3, Protest after Award (31 U.S.C. 3553).
(b) The Contractor shall comply with the MMAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items or components
X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government, with Alternate I (41 U.S.C. 253g and 10 U.S.C. 2402)(JUL 1995)
(2) 52.222-21, Prohibition of Segregated Facilities (Feb 1999)
X (4) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (38 U.S.C.4212) (DEC 2001)
X (5) 52.222-36, Affirmative Action for Workers with Disabilities (29 U.S.C. 793)
(JUN 1998)
X (6) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (38 U.S.C.4212)(DEC 2001)
X (7) 52.222-19, Child Labor-Cooperation with Authorities and Remedies.(SEP 2002)
(8)(i)52.223-9, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (42 U.S.C. 6962(c)(3)(A)(ii)). (AUG 2000)
(ii) Alternate I of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (AUG 2000)
(9) 52.225-1, Buy American Act-Supplies (41U.S.C. 10a - 10d). (MAY 2002)
(10)(i) 52.225-3, Buy American Act-North American Free Trade Agreement-
Israeli Trade Act (41 U.S.C. 10a- 10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note).
(ii) Alternate I of 52.225-3.
(iii) Alternate II of 52.225-3.
(11) 52.225-5, Trade Agreements (19 U.S.C. 2501, et seq., 19 U.S.C.3301 note).
(12) 52.225-13, Restriction on Certain Foreign Purchases (E.O. 12722, 12724, 13059, 13067, 13121, and 13129). (JUL 2000)
(13) 52.225-15, Sanctioned European Union Country End Products (E.O. 12849). (FEB 2000)
(14) 52.225-16, Sanctioned European Union Country Services (E.O. 12849). (FEB 2000)
X (15) 52.232-33, Payment by Electronic Funds Transfer- Central Contractor Registration (31 U.S.C. 3332). (MAY 1999)
(16) 52.232-34, Payment by Electronic Funds Transfer-Other than Central Contractor Registration (31 U.S.C. 3332). (MAY 1999)
(17) 52.232-36, Payment by Third Party (31 U.S.C. 3332). (MAY 1999)
(18) 52.239-1, Privacy or Security Safeguards (5 U.S.C. 552a). (AUG 1996)
(19) (i)52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels
(46 U.S.C.1241). (JUN 2000)
(ii) Alternate I of 52.247-64. (APR 1984)
(c) The Contractor shall comply with the MMAR clauses in this paragraph (c), applicable to commercial services, which the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items or components
(2) 52.222-41, Service Contract Act of 1965, As Amended (41 U.S.C. 351, et seq.). (MAY 1989)
(3) 52.222-42, Statement of Equivalent Rates for Federal Hires (29 U.S.C. 206 and 41
U.S.C. 351, et seq.).(MAY 1989)
(4) 52.222-43, Fair Labor Standards Act and Service Contract Act-Price Adjustment (Multiple Year and Option Contracts) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).(MAY 1989)
(5) 52.222-44, Fair Labor Standards Act and Service Contract Act-Price Adjustment (29 U.S.C. 206 and 41 U.S.C. 351, et seq.). (FEB 2002)
(6) 52.222-47, SCA Minimum Wages and Fringe Benefits Applicable to Successor Contract Pursuant to Predecessor Contractor Collective Bargaining Agreement (CBA) (41 U.S.C. 351, et seq.). (MAY 1989)
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph
(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in MMAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) or (d) of this clause, the Contractor is not required to include any MMAR clause, other than those listed below (and as may be required by an addenda to this paragraph to establish the reasonableness of prices under Part 15), in a subcontract for commercial items or commercial components
(1) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (38 U.S.C. 4212); (DEC 2001)
(2) 52.222-36, Affirmative Action for Workers with Disabilities (29 U.S.C. 793); (JUNE 1998)
(3) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (46 U.S.C. 1241) (flow down not required for subcontracts awarded beginning May 1, 1996); (JUNE 2000) and
(4) 52.222-41, Service Contract Act of 1965, As Amended (41 U.S.C 351, et seq.).
(End of clause)
52.233-2 52.233-2 Service of Protest (AUG 1996) 08 28 25
52.233 2 Service of Protest (AUG 1996)
a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Government Publishing Office Agency Acquisitions, Room A530
732 North Capitol Street, NW Washington, DC 20401
Agency protests filed with the Chief of Agency Acquisitions shall be sent to the following address: Chief of Agency Acquisitions
U.S. Government Publishing Office Agency Acquisitions, Room A530
732 North Capitol Street, NW Washington, DC 20401
b) If a protest is filed with either the Director of Acquisition Services or with the Government Accountability Office (GAO), a complete copy of the protest (including all attachments) shall be served upon the Contracting Officer and the GPO General
Counsel within one day of filing with the Managing Director, Government Publishing and Print Procurement or with the GAO. Service upon the GPO Office of the General Counsel shall be made as follows
General Counsel Office of the General Counsels. Government Publishing Office 732 North Capitol Street, NW Room C 814, Stop GC Washington, DC 20401FAX (202) 512 0076
DISPUTES DISPUTES (GPO Clause June 2008) 08 29 25
(b) This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. 601-613, and as modified by Section 1501 of Title I of Division H of the Consolidated Appropriations Act, 2008, Public Law No. 110-161).
(c) Except as provided in the Act, all disputes arising under or relating to this contract shall be resolved under this clause.
(d) "e; Claim,& quote; as used in this clause, means a written demand or written assertion by one of the contracting parties seeking, as a matter of right, the payment of money in a sum certain, the adjustment or interpretation of contract terms, or other relief arising under or relating to this contract. However, a written demand or written assertion by the Contractor seeking the payment of money exceeding $50,000 is not a claim under the Act until certified. A voucher, invoice, or other routine request for payment that is not in dispute when submitted is not a claim under the Act. The submission may be converted to a claim under the Act, by complying with the submission and certification requirements of this clause, if it is disputed either as to liability or amount or is not acted upon in a reasonable time.
(e) (1) A claim by the Contractor shall be made in writing and, unless otherwise stated in this contract, submitted within 6 years after accrual of the claim to the Contracting Officer for a written decision. A claim by the Government against the Contractor shall be subject to a written decision by the Contracting Officer.
(2)(i) The Contractor shall provide the certification specified in paragraph (d)(2)(iii) of this clause when submitting any claim exceeding $50,000.
(ii) The certification requirement does not apply to issues in controversy that have not been submitted as all or part of a claim.
(iii) The certification shall state as follows: & quote; I certify that the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .