REVIEW_IFB-25-26-04_BID_TABULATION_Ft_Mellon_Park_Improvments.pdf
PDF 97 KB Posted
- Attached to
- Ft. Mellon Park Improvement
- Solicitation number
- IFB 25/26-04
- Issued by
- Seminole County, Florida
About this file
This is a bid tabulation document for the Ft. Mellon Park Improvement project in the City of Sanford, Florida. The project encompasses construction of comprehensive park improvements including Lake Carola enhancements, earthwork, sheet pile walls and caps, drainage infrastructure, concrete walkways and decorative paving, plaza construction, retaining walls, decorative park seating walls, pavilion coordination, electrical systems for pavilion and park lighting, and landscaping elements. The bid tabulation presents 37 line items plus one add alternate (LED Wall) with quantities ranging from single units to tens of thousands of square feet, including materials such as sheet piles (39,650 SF), concrete work (214 CY for bulkhead), reinforced steel (17,882 LB), plantings (various species totaling hundreds of individual units), and site improvements. Four contractors submitted bids: CC FLA, Charles Perry Prime Const, S.A. Casey, and an unnamed fourth bidder.
The bid tabulation reveals significant price variation across bidders, with total project costs ranging from $4,410,000.00 to $6,941,076.95. CC FLA submitted the highest bid at $6,941,076.95, while the fourth bidder submitted the lowest bid at $4,410,000.00. Charles Perry Prime Const bid $5,091,527.99 and S.A. Casey bid $6,713,112.50. Notable pricing anomalies appear in several line items where bids are listed as $1.00 (items 10, 11, 12, 15, 25, 27, 29, 30, 31, 33, and 34), suggesting either placeholder bids or clerical entries. The LED Wall add alternate is valued at $40,000.00. The document provides no information regarding contract award, payment terms, funding sources, or project timeline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Description Quantity Unit CC FLA Charles Perry Prime Const S.A. Casey
1 Mobilization, Demoblization, Bonds and Permits 1 LS $441,500.00 $100,423.88 $300,000.00 $213,053.10
2 General Conditions 1 LS $174,000.00 $320,641.00 $300,000.00 $169,936.44
3 Construction Survey Layout 1 LS $49,500.00 $125,213.43 $37,000.00 $24,484.77
4 Demolition 1 LS $95,000.00 $62,951.51 $36,500.00 $12,781.26
5 Stormwater Pollution Prevention 1 LS $80,000.00 $38,961.02 $36,500.00 $8,002.80
6 Dewatering 1 LS $100,000.00 $72,943.30 $495,000.00 $17,074.80
7 Grading 1 LS $242,950.00 $419,158.34 $51,000.00 $156,468.38
8 Stormwater Enhancements 1 LS $117,750.00 $86,193.75 $543,000.00 $61,684.69
9 Sheet Piles 39650 SF $3,409,900.00 $2,473,364.61 $3,251,300.00 $2,413,447.92
10 Concrete Class IV Bulkhead 214 CY $358,450.00 $1.00 $264,290.00 $88,981.20
11 Reinforced Steel Bulkhead 17882 LB $35,764.00 $1.00 $26,823.00 $10,621.91
12 Bridge over Existing Utilties 1 LS $18,000.00 $1.00 $19,000.00 $9,039.60
13 Elect Service 1 LS $90,000.00 $147,214.86 $90,000.00 $200,265.46
14 Light Poles 8 EA $96,000.00 $154,963.01 $96,000.00 $57,672.00
15 Lake Fountain 1 LS $65,000.00 $1.00 $5,000.00 $33,500.00
16 Oak Tree 5 EA $7,800.00 $3,449.53 $8,000.00 $6,480.00
17 Canna Lily 118 EA $6,136.00 $3,267.90 $6,136.00 $5,097.60
18 Coontie 34 EA $3,978.00 $1,695.41 $3,978.00 $3,304.80
19 Liriope 406 EA $11,774.00 $1,773.97 $11,774.00 $9,646.56
20 Herb of Grace 356 EA $13,884.00 $2,285.70 $13,884.00 $11,534.40
21 Pink Muhly Grass 356 EA $12,816.00 $2,607.25 $12,816.00 $10,765.44
22 Blue Porter Weed 356 SF $10,324.00 $2,607.25 $10,324.00 $8,458.56
23 Sod 7707 SF $6,550.95 $6,034.36 $11,560.50 $5,410.31
24 Modification of existing irrigation system 1 LS $12,740.00 $6,034.36 $18,000.00 $10,584.00
25 Pavilion Coordination on Installation 1 LS $1,500.00 $1.00 $20,000.00 $8,100.00
26 Pavilion Retaning Wall 185 LF $71,225.00 $226,529.36 $92,500.00 $30,599.37
27 Backfill for pavilion/retaining wall 300 CY $37,500.00 $1.00 $28,500.00 $11,599.20
28 Concrete pavilion concrete and sidewalk 4204 SF $44,142.00 $763,680.96 $88,284.00 $369,945.27
29 Decorative Sidewalk Paving 10927 SF $251,321.00 $1.00 $131,124.00 $236,241.74
30 12" Concrete Band 1459 LF $83,163.00 $1.00 $37,934.00 $22,847.94
31 Concrete Plaza on 1st Street 2172 SF $35,838.00 $1.00 $19,548.00 $43,396.56
32 Decorative Seatwall/Columns 219 LF $383,250.00 $1,107.88 $154,614.00 $44,356.96
33 Electrical Service 1 LS $430,000.00 $1.00 $300,000.00 $18,000.00
34 Light Poles 8 EA $96,000.00 $1.00 $112,000.00 $37,400.00
35 Podocarpus 133 EA $12,103.00 $4,781.53 $12,103.00 $10,054.80
36 Sod 39080 SF $33,218.00 $29,847.20 $58,620.00 $27,434.16
37 Modification of existing irrigation system 1 LS $2,000.00 $33,785.62 $10,000.00 $1,728.00
$6,941,076.95 $5,091,527.99 $6,713,112.50 $4,410,000.00
ADD ALTERNATE
Item Description Quantity Unit
1 LED Wall 1 LS $40,000.00
Grand Total For Items 1-37
Grand Total For Add Alternate
Sheet1