1 | P a g e

Statement of Work Repair/Recoat of Main Street, ARO, ATM and

USS Arleigh Burke Areas 9609020900/U09

1.0 INTRODUCTION

1.1 Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of; Repair/Recoat of Main Street, ARO, ATM and USS Arleigh Burke areas.

2.0 GENERAL REQUIREMENTS/DELIVERABLES

2.1 The Contractor shall supply and deliver all services and materials listed below complying with the following specifications:

1. Removing failing concrete and epoxy patches on Main Street and ARO areas.

Replace failed concrete with a self-leveling epoxy concrete. Apply a rust preventive to exposed re-re-bar and grind cured epoxy concrete to acquire a level floor smooth surface.

2. Apply epoxy patches to the USS Arleigh Burke p-way, and the area in from of power plant testing.

3. Remove old coatings in the ARO area, grind smooth concrete to prepare concrete to receive a coating.

4. Prepare all above areas to receive a pigmented Tennant Multi Surface Epoxy coat

5. Apply via squeegee and back roll method, a thick coat of pigmented Tennant Multi

Surface Epoxy (ECO-MPE) . ECO-MPE has 100% solids and is self- leveling. ECO- MPE will fill current holes and depressions to a somewhat smooth surface. ECO-MPE is chemically resistant to JP-4, Skydrol, hydrochloric acid and most petroleum products with no adverse effect.

6. Apply pigmented topcoat of Tennant High Traffic System (ECO-HTS100). ECO-HTS

100 is an abrasion resistant moisture cure urethane with superior abrasion resistance and low voc’s (86 g/l). ECO-HTS complies with SCAQMD VOC regulations. LEED credits available. ECO-HTS has excellent chemical resistance to jet fuel (JP-4), xylene, brake fluid, skydrol 500 B, skydrol LD4 and most petroleum products with no adverse effect based on 7-day spot testing.

2 | P a g e

This proposal will require the customer and/or building occupant to provide electricity, lighting, staging area within the CEP 200 complex. The customer and/or building occupants will provide a location for the disposal of all removed concrete and coating tailings. Work will be performed on the weekends with work beginning around 1300 on Friday and the floor will be ready for traffic by 0500 Monday morning. The entire process will take 2 to 3 weekends depending on the weather.

2.2 All material to be in accordance with drawing number(s) specified in this SOW.

3.0 DELIVERY/SHIPPING TERMS

3.1 Required Date of Delivery: (POP 05/15/2022 to 07/31/2022)

3.2 Shipping Terms: FOB DESTINATION

3.3 Delivery Address: MARMC BLDG. CEP-200 RECEIVING, 9170 2ND STREET, NORFOLK, VA. 23511.

3.4 Delivery POC: PO2 CALVIN JACKSON, 400-2298, calvin.jackson3@navy.mil