RESOLUTE (WMEC 210B) DS BLANK Schedule B.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Dockside: USCGC RESOLUTE
Solicitation number
70Z08025QMECP0030
Issued by

About this file

This document is a Pricing Schedule (Schedule B) for a U.S. Coast Guard Cutter (USCGC RESOLUTE WMEC-210B) Dockside Availability project scheduled for FY2026. The comprehensive pricing document details 28 specific maintenance and repair jobs, including tank cleaning and inspections, equipment replacements, and system servicing across multiple vessel systems. The contract covers definite and optional line items with jobs ranging from aviation fuel tank cleaning to anchor chain inspections, exhaust piping renewal, and various mechanical system maintenance tasks.

The related federal contract opportunity indicates the project is for the Department of Homeland Security's U.S. Coast Guard, with a performance period from approximately 8 December 2025 to 1 February 2026. The contractor will be responsible for providing facilities, materials, equipment, and personnel to perform dockside repairs and maintenance on the 210-foot Medium Endurance Cutter. The pricing schedule includes provisions for potential over-and-above/growth work, with space for contractors to specify labor rates and material markup/handling fees, suggesting flexibility for additional scope modifications during the contract period.

View the file

Other files

File Type Posted
AMENDMENT 70Z08025QMECP00300002.pdf PDF
70Z08025QMECP00300001.pdf PDF
70Z08025QMECP0030.pdf PDF
Specification for DS Repairs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC RESOLUTE (WMEC-210B) DOCKSIDE AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Tanks, Aviation Fuel Service, Clean And InspectJOB
D-002Tanks (Aviation Fuel Stowage And Overflow), Clean And InspectJOB
D-003Chain Lockers, Clean and InspectJOB
D-004Tanks, MP Fuel Service, Clean and InspectJOB
D-005Tanks, Potable Water, Clean and InspectJOB
D-006Voids, Accessible, Clean and InspectJOB
D-007Tanks, Dirty Oil and Waste, Clean and InspectJOB
D-008Propulsion Shafting, Strain Gauge Alignment, Dockside, CheckJOB
D-009Vent Ducts, Engine Room, Commercial CleaningJOB
D-010Vent Ducts, Galley, Commercial CleaningJOB
D-011Vent Ducts, Laundry Exhaust, Commercial CleaningJOB
D-012Anchor Chains and Ground Tackle, Inspect and RepairJOB
D-013Towing Bitts, Chocks, and Fairleads; Inspect and TestJOB
O-014Chain Lockers, Preserve, Partial (OPTIONAL)JOB
D-015Ammunition Elevator, Service and InspectJOB
D-016Oily Water Separator, ReplaceJOB
D-017Whistle Timer, ReplaceJOB
D-018Vaneaxial Fan Assemblies, Overhaul or RenewJOB
D-019Lower Bos’n Hold Deck Plating, RenewJOB
D-020Exhaust Piping Insulation, RenewJOB
O-021Tanks, Dirty Oil and Waste, Preserve, Partial (OPTIONAL)JOB
D-022Tanks, MP Fuel Stowage and Overflow, Clean and InspectJOB
D-023Reduction Gear Lube Oil Strainer Assembly, ReplaceJOB
D-024Anchor Windlass Control Boxes, RenewJOB
D-025Deck Bolsters and Fairleads, RenewJOB
O-026Tanks, Aviation Fuel Service, Preserve, Partial (OPTIONAL)JOB
O-027Tanks, Aviation Fuel Storage, Preserve, Partial (OPTIONAL)JOB
O-028Tanks, Potable Water, Preserve, Partial (OPTIONAL)JOB
O-00AComposite Labor RateHour
D-00BGFP ReportNSPEANSP
D-00CTravel and PerdiemJOB
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
Over and Above/Growth Work
The Labor Rates and Material Markup/Handling Fee will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price.
**Fill in the sections highlighted below:
OA/G-001Over and Above/Growth Labor RateHour946$0.00
OA/G-002Over and Above/Growth Material Markup/Handling Fee$36,474.00Percent$0.00
Total Evaluated Price of Over and Above/Growth$0.00

(4/23/2025)_x000D_ Draft-2 - Page &P of &N

File details come from the government source that posted it. Updated .