RESOLUTE (WMEC 210B) DS BLANK Schedule B.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Dockside: USCGC RESOLUTE
- Solicitation number
- 70Z08025QMECP0030
About this file
This document is a Pricing Schedule (Schedule B) for a U.S. Coast Guard Cutter (USCGC RESOLUTE WMEC-210B) Dockside Availability project scheduled for FY2026. The comprehensive pricing document details 28 specific maintenance and repair jobs, including tank cleaning and inspections, equipment replacements, and system servicing across multiple vessel systems. The contract covers definite and optional line items with jobs ranging from aviation fuel tank cleaning to anchor chain inspections, exhaust piping renewal, and various mechanical system maintenance tasks.
The related federal contract opportunity indicates the project is for the Department of Homeland Security's U.S. Coast Guard, with a performance period from approximately 8 December 2025 to 1 February 2026. The contractor will be responsible for providing facilities, materials, equipment, and personnel to perform dockside repairs and maintenance on the 210-foot Medium Endurance Cutter. The pricing schedule includes provisions for potential over-and-above/growth work, with space for contractors to specify labor rates and material markup/handling fees, suggesting flexibility for additional scope modifications during the contract period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 70Z08025QMECP00300002.pdf | ||
| 70Z08025QMECP00300001.pdf | ||
| 70Z08025QMECP0030.pdf | ||
| Specification for DS Repairs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: |
| USCGC RESOLUTE (WMEC-210B) DOCKSIDE AVAILABILITY FY2026 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tanks, Aviation Fuel Service, Clean And Inspect | JOB | |||
| D-002 | Tanks (Aviation Fuel Stowage And Overflow), Clean And Inspect | JOB | |||
| D-003 | Chain Lockers, Clean and Inspect | JOB | |||
| D-004 | Tanks, MP Fuel Service, Clean and Inspect | JOB | |||
| D-005 | Tanks, Potable Water, Clean and Inspect | JOB | |||
| D-006 | Voids, Accessible, Clean and Inspect | JOB | |||
| D-007 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | |||
| D-008 | Propulsion Shafting, Strain Gauge Alignment, Dockside, Check | JOB | |||
| D-009 | Vent Ducts, Engine Room, Commercial Cleaning | JOB | |||
| D-010 | Vent Ducts, Galley, Commercial Cleaning | JOB | |||
| D-011 | Vent Ducts, Laundry Exhaust, Commercial Cleaning | JOB | |||
| D-012 | Anchor Chains and Ground Tackle, Inspect and Repair | JOB | |||
| D-013 | Towing Bitts, Chocks, and Fairleads; Inspect and Test | JOB | |||
| O-014 | Chain Lockers, Preserve, Partial (OPTIONAL) | JOB | |||
| D-015 | Ammunition Elevator, Service and Inspect | JOB | |||
| D-016 | Oily Water Separator, Replace | JOB | |||
| D-017 | Whistle Timer, Replace | JOB | |||
| D-018 | Vaneaxial Fan Assemblies, Overhaul or Renew | JOB | |||
| D-019 | Lower Bos’n Hold Deck Plating, Renew | JOB | |||
| D-020 | Exhaust Piping Insulation, Renew | JOB | |||
| O-021 | Tanks, Dirty Oil and Waste, Preserve, Partial (OPTIONAL) | JOB | |||
| D-022 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | JOB | |||
| D-023 | Reduction Gear Lube Oil Strainer Assembly, Replace | JOB | |||
| D-024 | Anchor Windlass Control Boxes, Renew | JOB | |||
| D-025 | Deck Bolsters and Fairleads, Renew | JOB | |||
| O-026 | Tanks, Aviation Fuel Service, Preserve, Partial (OPTIONAL) | JOB | |||
| O-027 | Tanks, Aviation Fuel Storage, Preserve, Partial (OPTIONAL) | JOB | |||
| O-028 | Tanks, Potable Water, Preserve, Partial (OPTIONAL) | JOB | |||
| O-00A | Composite Labor Rate | Hour | |||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | |||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
| Over and Above/Growth Work | |||||
| The Labor Rates and Material Markup/Handling Fee will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| **Fill in the sections highlighted below: | |||||
| OA/G-001 | Over and Above/Growth Labor Rate | Hour | 946 | $0.00 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $36,474.00 | Percent | $0.00 | |
| Total Evaluated Price of Over and Above/Growth | $0.00 |
(4/23/2025)_x000D_ Draft-2 - Page &P of &N