This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the USCGC RESOLUTE FY26 DS project. The amendment addresses technical errors in paragraph numbering for multiple work items and clarifies specifications. Specifically, the amendment resolves discrepancies in Work Items 2, 20, and 21, where paragraph numbers were incorrectly duplicated or misaligned.

For Work Item 25, the amendment provides guidance on component repairs, allowing contractors to re-use existing castings pending inspections. Contractors are permitted to make repairs using doubler plates or inserts, provided they do not interfere with chain movement. Contractors must conduct and submit ultrasonic testing (UT) surveys of components along with proposed repairs for Coast Guard review. The closing date remains Friday, September 12, at 3:00 PM EDT, and the purpose of the amendment is to provide clarification to offerors' questions.

View the file

Other files

File Type Posted
70Z08025QMECP00300001.pdf PDF
Specification for DS Repairs.pdf PDF
RESOLUTE (WMEC 210B) DS BLANK Schedule B.xlsx XLSX spreadsheet
70Z08025QMECP0030.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

70Z08025QMECP00300002

Summary of Changes

Section IV: List of Documents, Exhibits, and other Attachments

Amendment specific attachments:

File Attachments:

Title Description File Name Entity Reference

AMENDMENT

70Z08025QME

CP00300002

AMENDMENT

70Z08025QMECP00300002

.pdf

Header

AMENDMENT 70Z08025QMECP00300002

CGC RESOLUTE FY26 DS

Q1. I’ve noticed some discrepancies in the specification for USCGC RESOLUTE FY26 DS2, NOTICE ID#70Z08025QMECP0030. Please see the following examples:

ITEM#2 skipped paragraph 3.7 ITEM# 20 repeat paragraph 3.4 Surface preparation & 3.4 Touch-up preservation ITEM#21 repeat paragraph 3.3 Surface preparation & 3.3 In-process quality control Some are the same paragraph number but a different work item. Please advise.

A1. WI 2: Technical error caused 3.7 to be numbered 3.8. There is not an additional 3.7.

WI 20: Technical error with numbering created a duplicate 3.4 “Touch-up preservation”.

This should be addressed as 3.7 by the contractor.

WI 21: Same numbering issue as above, the duplicate 3.3 “In-process quality control” should be numbered 3.4 and should be addressed as 3.4 by the contractor.

Q2. Regarding Work Item 25, is it possible to repair what is already in place?

A2. Paragraph 3.2.2 allows re-using castings pending inspections, avoiding the need to use a foundry. KTRs should not be trying to cast entire assemblies. Repairs via doubler plates or inserts are acceptable, provided they don’t interfere with chain movement. KTR’s will need to conduct and submit UT surveys of the components along with proposed repairs for CG review.

70Z08025QMECP00300002_US.pdf
AMENDMENT 70Z08025QMECP00300002
Text52:
Text54: 1
TOTAL_NO_OF_PAGES: 2
CUST_PROJ_CODE:
DOCUMENT_NUMBER: 70Z08025QMECP00300002
EFFECTIVE_DATE:
REF_PR_NUM_T: 52000PR250019067
SOL_DOCUMENT_NUMBER: 70Z08025QMECP0030
SOL_OPEN_BID_DATE: 2025-09-04T08:34:54.000-04:00
NO_OF_COPIES:
Check Box91: Yes
Check Box92: Off
MANUAL_EXTEND_FLAG: N
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text1: AMENDMENT CONTROL NUMBER :
HDR_DOCUMENT_NUMBER: 70Z08025QMECP0030
Text134: SUMMARY OF CHANGES :
AMENDMENT_DESCRIPTION: AMEND-1. The purpose of this amendment is to provide clarification to offeror's questions. 2. The closing date remains the same for 70Z08025QMECP0030, Friday, September 12, 3:00PM, EDT.