Residential_Plumbing_Services.pdf
PDF 360 KB Posted
- Attached to
- Residential Plumbing Services
- Solicitation number
- IFB-604734-24/MHH
- Issued by
- Seminole County, Florida
About this file
This is an Invitation for Bid (IFB) issued by Seminole County, Florida for Residential Plumbing Services, soliciting bids from certified plumbing or septic tank contractors to provide comprehensive plumbing and related services for residential properties throughout the county. The IFB seeks a contractor capable of performing a wide range of services including general maintenance, repair, replacement of domestic and sewer piping systems, leak detection and repair, installation of plumbing fixtures and equipment, water heater installations, gas line repairs, and other residential plumbing work. The bid was released on February 9, 2024, with a deadline for questions on March 4, 2024, and a response deadline of March 13, 2024, at 2:00 pm. Bids must be submitted electronically through the county's e-Procurement Portal.
The contract requires the selected contractor to be a State of Florida Certified Plumbing Contractor with master and journeyman licenses, capable of servicing multiple locations simultaneously. The contractor will be responsible for all permits, labor, materials, transportation, and equipment needed to complete the work. Pricing will be determined through a line-item bid form, with the county reserving the right to make multiple awards, partial awards, or reject all bids. The evaluation will be based on a pass/fail assessment of the bidder's ability, capacity, skill, character, integrity, reputation, and previous performance, with reference checks playing a crucial role. The contract aims to establish a reliable service agreement for residential plumbing services, with the county maintaining flexibility in purchasing quantities and service requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT_Agreement_with_Exhibits_-_IFB-604734-24_MHH.pdf | ||
| Exhibit_C_-_Pricing_Bid_Form_-_IFB-604734-24.xlsx | XLSX spreadsheet | |
| Seminole_County_Rehabilitation_Standards_and_General_Conditions.pdf | ||
| FEMA_REQUIREMENTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
IFB-604734-24/MHH
RESIDENTIAL PLUMBING SERVICES
1301 East Second St.
Sanford, FL 32771
RELEASE DATE: February 9, 2024
DEADLINE FOR QUESTIONS: March 4, 2024
RESPONSE DEADLINE: March 13, 2024, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/seminolefl https://secure.procurenow.com/portal/%7bproject.government.code%7d
Seminole County
IFB #IFB-604734-24/MHH
Residential Plumbing Services
TABLE OF CONTENTS
I. Introduction II. Scope of Services
III. Instructions to Bidders IV. Instructions for the Preparation of Bids V. Evaluation Phases
Attachments:
B - Seminole County Rehabilitation Standards and General Conditions
C - Exhibit C - Pricing Bid Form - IFB-604734-24
D - DRAFT Agreement with Exhibits - IFB-604734-24_MHH
Title: Residential Plumbing Services
1. Introduction
The Bidder is expected to completely analyze the information contained in this Invitation for Bid
(IFB) as guidance for the preparation of their written submittal. The Bidder’s written bid should be specific, detailed, and complete to demonstrate the Bidder’s understanding of the requested work clearly and fully and/or delivery requirements.
1.1. Summary
The purpose of this IFB is to establish a service contract with a certified plumbing or septic tank contractor in the State of Florida who shall provide plumbing, septic and related work for Seminole
County in a reliable and timely manner. The Contractor shall have the capability to service multiple locations throughout Seminole County at any given time. The majority of work under this contract will be plumbing work for residential properties.
1.2. Background
Contractor must be a State of Florida Certified Plumbing Contractor and State of Florida Certified
Septic Tank Contractor or a State of Florida Certified Plumbing Contractor certified under
489.105(3)(m), F.S., who is eligible under s.489.553(5)(a) and (b).
Contractor shall conduct all work during normal working hours unless authorized in writing by the
County.
Contractor shall only utilize licensed, trained and experienced employees to perform the work required. Contractor shall have plumbers on staff who possess both master and journeyman licenses in good standing with the State of Florida.
1.3. Contact Information
Michael Hall Senior Procurement Analyst 1301 E. Second Street Sanford, FL 32771 Email: mhall02@seminolecountyfl.gov Phone: (407) 665-7115
Department:
Community Services - Community Development
1.4. Timeline
Release Project Date February 9, 2024
Question Submission Deadline March 4, 2024, 5:00pm
Proposal Submission Deadline March 13, 2024, 2:00pm mailto:mhall02@seminolecountyfl.gov tel:(407)665-7115
2. Scope of Services
2.1. Service Requirements
The Contractor shall provide all permits, labor, material, supplies, transportation, insurance, incidentals and equipment to provide emergency and routine repair service in order to provide essential plumbing services in residential properties as directed by the County. The scope of work may include, but is not limited to:
• General maintenance, repair, or replacement of existing domestic and sewer piping systems;
• Location and repair of leaks within concrete walls, frame walls, or floors slabs and replacement of material that was removed;
• Provide and install plumbing specialties, plumbing fixtures and plumbing equipment to repair or replace existing installations;
• Replacement of fixtures, tile, and other equipment in residential properties;
• Provision and installation of all piping systems, plumbing specialties, plumbing fixtures, and plumbing equipment to complete rehabilitation of residential properties;
• Complete revision of the plumbing system in a residential structure;
• Install/repair hot water heat pumps, chilled water pumps, sump pumps and sewage pumps;
• Troubleshoot and repair steam, water and gas utility distribution systems;
• Repair/replace pneumatic steam valves, radiator valves. Traps and steam and condensate pipes;
• Electric and gas water heater installation;
• Repair/replace domestic hot and cold water lines;
• Caulking of newly installed fixtures; • Locate, repair and replace water and sewer pipes, galvanized pipes and copper tubing with leaks;
• Unclog sewer lines
• Repair/replace gas lines;
• Repair/replace fittings, boilers and chillers
• Remove and replace existing residential exterior/interior doors and windows
2.2. Installation of New or Replacement Equipment
The Contractor shall visit the job site at a time agreed to by the homeowner with the Community
Development Project Manager to assess the extent of the repairs and mutually agree to the types and quantities of items required for the work. The Contractor shall submit a quote to the
Community Development Project Manager in the following manner:
• Description of work to include its specified location.
• Detailed pricing of each requirement including labor and materials in accordance with
Agreement price schedule.
• Performance period in calendar days mutually agreed to by the County and the Contractor.
• Upon installation of new equipment, the Contractor shall provide a manual that includes the manufacturer's maintenance and operating instructions, parts list and serial numbers for all operating equipment to the owner of the property on which the equipment was installed.
• Upon completion of work, the contractor shall put the systems into service. The contractor shall be entirely responsible for the equipment during all testing operations.
2.3. Contractor’s Responsibilities
A. A detailed scope of services will be sent by the County Project Manager to the Contractor.
The Contractor will provide a written estimate of the permitting, labor, and materials required to complete the work.
B. If, during the course of performing the work, the Contractor encounters unforeseen conditions which impact the work and which could not initially be evaluated, the Contractor shall notify the Community Development Project Manager immediately. The Contractor may not proceed with any additional work which would result in additional cost to Seminole
County without written authorization from the Community Development Project Manager or designated representative(s).
C. The Contractor shall have appropriate transportation and an adequate inventory of tools and equipment to perform work in a timely manner.
D. Materials and equipment installed shall be new, unless otherwise specified and meet or exceed the applicable specifications or standards.
E. The Contractor's time shall start on the job site. Any travel time and expenses shall be the responsibility of the Contractor and will not be reimbursed by the County.
F. The Contractor shall, in addition to all other guarantees, be responsible for faulty labor or workmanship and shall promptly correct improper work, without cost to the County or homeowner, within a reasonable period after receipt of notification of such faulty labor or workmanship. Payments in full or otherwise do not constitute a waiver of this guarantee.
The guarantee period shall be effective for one (1) year after acceptance of the work by the County.
G. The Contractor shall conform to all Federal, State and City regulations during the performance of the Contract. Any fines levied due to inadequacies or failure to comply with any and all requirements shall be the sole responsibility of the Contractor. Any person found not in conformance with any laws, statutes, rules or regulations will not be allowed on the job site. Continued violations by a Contractor shall constitute cause for immediate termination of the Contract.
H. All existing structures, utilities, services, trees, shrubbery, etc., shall be protected against damage at all times by the Contractor during the term of specific Purchase Orders, and the Contractor shall be held responsible for any damage to property caused by reason of his operations on the property.
I. The Contractor shall ensure that all construction debris and waste is cleaned up after work is completed daily and that the work area is returned to its original condition.
J. The Contractor shall ensure that all persons assigned to installation and repair work for the County carry proper identification.
K. Contractor’s personnel shall be neat and conduct all work in a professional and efficient manner. If any employee of a contractor is deemed unacceptable by the County, Contractors shall immediately replace such personnel with an acceptable substitute to the
County within two (2) business days.
L. The Contractor shall be able to provide all required services; including, but not limited to, plumbing and septic work that includes replacement or rehabilitation in residences, building permits, lifting and delivery of equipment.
M. The Contractor shall employ a competent supervisor on the job throughout the entire contract period. The supervisor shall have a thorough knowledge of the work to be installed and repaired under this contract.
N. Workmanship throughout the contract period shall correspond to the standard of best practice, and all labor employed must be competent to do the work required.
O. The Contractor shall be responsible for all required permits and inspections for the Work.
A copy shall be given to the designated County Representative.
P. The designated County Representative must be notified immediately if a supervisor/contact person is replaced. The name and telephone number of the new supervisor/contact person shall be furnished at that time.
2.4. Completion of the Work
A. The Contractor acknowledges that time is of the essence to complete the work as specified in each Purchase Order.
B. The Contractor agrees that all work shall be performed regularly and diligently at such a rate of progress as will ensure full completion thereof within the time specified in each and every Purchase Order.
C. Overtime is not allowed unless authorized in writing by the Community Development
Project Manager or designee.
D. After the work called for in a Purchase Order has been completed, the Contractor shall provide the following information in writing to the Community Development Project
Manager:
o Actual hours used to perform the work (by category of personnel);
o Date and time the work was initiated and completed;
o Contractor's certification that the work has been completed;
o Copy of signed-off permit(s);
o A detailed breakdown of the materials used to complete the work, including applicable recipients for materials used;
o Craftsman notes as to work performed and observations made.
Acceptance of completed services will be accomplished by the Community Development Project
Manager or designated County representative(s).
2.5. Warranty
The Contractor shall fully warrant all equipment furnished hereunder against defect in materials and/or workmanship for a period of twelve (12) months from date of delivery/acceptance by the
County. Should any defect in materials or workmanship, except ordinary wear and tear, appear during the above stated warranty period, the Contractor shall repair or replace same at no cost to the County, immediately upon written notice from the Community Development Project Manager or County's authorized representative. The Contractor shall be responsible for either repairing the equipment on site or transporting the equipment to his/her repair facility at no cost to the
County. All warranty provisions of the Uniform Commercial Code shall additionally apply.
Contractor shall guarantee all work meets and passes the County inspections. Should a plumbing repair or installation made by the Contractor not pass inspection, Contractor shall make all repairs necessary to ensure the installation or repair passes inspection at no additional cost to the County.
2.6. Safety and Protection
Contractor shall be solely and completely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to all employees on the Work and other persons (including but not limited to the general public or employees of the Owner) who may be affected thereby; all the Work and all materials or equipment to be incorporated therein, whether in storage on or off the site; and other property at the site, adjacent thereto, or utilized by Contractor. Contractor's duties and responsibilities for the safety and protection of the Work shall continue until such time the Work is acceptable to the County.
All damage, injury or loss to any property caused, directly or indirectly, in whole or in part, by
Contractor, any Subcontractor, Supplier or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, shall be remedied by Contractor at his sole cost.
Contractor shall comply with all applicable Laws and Regulations of any governmental entity having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss including, but not limited to, OSHA (Public Law 91-596) and the Contract Work Hours and
Safety Standards Act (Public Law 91-54); and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall designate a responsible member of his organization at the site whose duties shall be preventing accidents and insuring compliance with all applicable safety regulations.
At all times Contractor shall, and shall cause his Subcontractors and Suppliers to, carefully protect its and their Work, materials, equipment, and supplies against damage or injury from the weather. If in the opinion of County any of the above has been damaged or injured by reason of failure on the part of Contractor, any Subcontractor or Supplier to perform according to the requirements of this provision, said Work, materials, equipment and supplies shall be removed and replaced at the expense of Contractor.
Contractor shall notify the County of any job site injuries at the project site. Serious injuries shall be verbally reported to the County within two (2) hours of occurrence of the incident. Contractor shall submit a written report of each serious injury to the County within twenty-four (24) hours of occurrence of the incident. Contractor shall prepare injury reports regardless of whether the injury is to the Contractor's personnel, subcontractors, County personnel or other persons.
2.7. Coordination with Other Contractors
The Contractor shall coordinate and arrange his Work and dispose of his Materials so as not to interfere with operations of other contractors engaged upon adjacent work and to join his Work to that of others in a proper manner, in accordance with rules and regulations, and to perform his
Work in the proper sequence in relation to that of other contractors. Each contractor shall be responsible for any damage done by him or his agents to the work performed by another contractor.
2.8. Applicable Codes and Standards
All work must be performed in accordance with the requirements of pertinent Federal, County and
State codes. All work shall comply with the following codes: Florida Building Code, NFPA 101
Life Safety Code, Local authority having jurisdiction and any and all applicable laws and regulations. Contractor shall comply with the Seminole County Rehabilitation Standards and
General Conditions, Attachment B of the IFB documents.
2.9. Section 3 Clause
All contracts subject to the Section 3 requirements will include the following clause:
A. The work to be performed under this contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 170lu
(Section 3). The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by
Section 3 shall, to the greatest extent feasible, be directed to low and very low-income persons, particularly persons who are recipients of HUD assistance for housing.
B. The parties to this contract agree to comply with HUD's regulations in 24 CFR Part 135, which implement Section 3. As evidenced by their execution of this contract, the parties to this contract certify that they are under no contractual or other impediment that would prevent them from complying with part 135 of the regulations.
C. The contractor agrees to send to each labor organization or representative of workers with which the contractor has a collective bargaining agreement or other understanding, if any, a notice advising the labor organization or worker's representative of the contractor's commitments under this Section 3 clause, and will post copies of the notice in conspicuous places at the work site where both employees and applicants for training and employment positions can see the notice. The notice shall describe the Section 3 preference, shall set forth minimum number and job titles subject to hire, availability of apprenticeship and training positions, the qualifications for each; and the name and location of the person(s) taking applications for each of the positions; and the anticipated date the work shall begin.
D. The contractor agrees to include this Section 3 clause in every subcontract subject to compliance with regulations in 24 CFR Part 135, and agrees to take appropriate action, as provided in an applicable provision of the subcontract or in this Section 3 clause, upon a finding that the subcontractor is in violation of the regulations in 24 CFR Part
135. The contractor will not subcontract with any subcontractor when the contractor has notice or knowledge that the subcontractor has been found in violation of the regulations in 24 CFR p Compliance Office of Planning/Program Support Art 135.
E. The contractor will certify that any vacant employment positions, including training positions, that are filled (1) after the contractor is selected but before the contract is executed, and (2) with persons other than those to whom the regulations of 24 CFR Part
135 require employment opportunities to be directed were not filled to circumvent the contractor's obligations under 24 CFR Part 135.
F. Noncompliance with HUD's regulations in 24 CFR Part 135 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts.
All contractors and subcontractors participating in this activity will adhere to all regulations pertaining to Federal or State grant funding sources utilized, which include, but not limited to, the following:
• 24 Code of Federal Regulations Part 570 (regarding the Community Development Block
Grant Program)
• Florida State Statute 420.907 – 9079
• Florida Administrative Code Rule 67-37
• 24 Code of Federal Regulations Part 135 (regarding the treatment of lead-based paint)
2.10. Pricing
Contractors shall utilize the Pricing Form provided by the County under the Attachments Section titled "Exhibit C - Pricing Bid Form" and include it in their bid submittal.
3. Instructions to Bidders
3.1. Contact
All prospective Bidders are hereby instructed not to contact any member of the Seminole
County Board of County Commissioners, the County Manager or Deputy Manager, or any
Seminole County Staff members other than the noted Purchasing & Contracts Division (herein referred to as ‘PCD’) Contact Person, Michael Hall, regarding this IFB or their written bid at any time prior to the posting on the COUNTY’S Website of the recommendation and intent to award by County staff for this project. Any such contact shall be cause for rejection of your bid.
Interpretation of this clause will be solely at the discretion of the COUNTY.
3.2. Pre-Proposal Conference
There will not be a Pre-Proposal Conference for this IFB.
3.3. Public Opening
Electronic bids shall be received by PCD online in accordance with the instructions in this solicitation documents, unless otherwise revised via posted Addenda. Persons with disabilities needing assistance to participate in the Public Opening should call the noted PCD Contact
Person at least forty-eight (48) hours in advance of the Public Opening at (407) 665-7115.The
Public Opening via ZOOM https://us06web.zoom.us/j/84499184101?pwd=UVhDbk9IS3lnZkZUMW9WV01vWlp3UT09 /
Meeting ID: 844 9918 4101 / Passcode: 760550
3.4. Delays
The COUNTY, at its sole discretion, may delay the scheduled due date and time for submission, if it is to the advantage of the COUNTY to do so. The COUNTY will post all changes in the scheduled due date and time for submission by written addendum posted to the COUNTY’s
Website: (https://secure.procurenow.com/portal/seminolefl)
3.5. Bid Submission and Withdrawal
The COUNTY will accept bids electronically via the COUNTY’s e-Procurement Portal until 2:00 pm on Wednesday, March 13, 2024. Bids received after the scheduled due date and time for submission shall not be considered. Bids submitted in any other format other than via the
COUNTY’S e-Procurement Portal, including but not limited to, hard copy (mailed or hand delivered), facsimile, or emailed submittals, will not be accepted, nor considered. The scheduled due date and time for submission will be scrupulously observed. Companies shall register on the COUNTY’S e-Procurement Portal. Once registered, Companies may view and click "Follow" to be a prospective Bidder for this solicitation and will appear on the Follower’s list. Bidders that fail to Follow this project will not receive automatic addenda notifications, nor will they be able to draft a response in the COUNTY’S e-Procurement Portal, and therefore will be unable to participate or be considered for this IFB. If a Bidder encounters technical difficulties using the
COUNTY’S e-Procurement Portal, or needs assistance using the Portal, Bidders may access the Help Center for vendor training guides provided by OpenGov-Procurement, the Software
Administrator. Proposers may also contact the Software Administrator using the real-time chat http://help.procurenow.com/en/articles/5815468-opengov-procurement-vendor-training function on the COUNTY’S e-Procurement Portal (located in lower right-hand corner of the screen), or via email at support@procurenow.com for support.
The COUNTY will not be responsible for untimely submissions due to personal or company internet or hardware limitations, settings or restrictions, internet speed, power outage, network connection, or use of a malfunctioning electronic device, or the like, neither the COUNTY, nor the Software Administrator, will be held responsible. Bidders shall be solely responsible for ensuring the capability of their computer system while responding to this solicitation, and for the stability of their internet service. Uploading large documents may take significant time depending on the size of the file(s) and the Internet connection speed that the Bidder is using to submit a response. Failure of the Bidder to successfully submit an electronic proposal before the deadline indicated herein shall be at the Bidder's sole risk, and no relief will be given for late and/or improperly submitted bids. Once file(s) have been uploaded and the Submission Status shows as “Submitted” the submission is complete. At that point, the Bidder will also receive an email confirmation from the COUNTY’s e-Procurement Portal. Telephone confirmation of timely receipt of any submittal should be made by calling (407) 665-7115, before the 2:00 pm deadline.
The Bidder is required to submit ONE (1) ELECTRONIC FORMATTED file of their complete written bid.
Bidders may withdraw their bid electronically via the COUNTY’S e-Procurement Portal at any time prior to the scheduled due date and time for submission.
3.6. Inquiries
All Bidders should carefully examine the IFB documents. Any ambiguities or inconsistencies shall be brought to the attention of PCD Contact Person in writing via the Q&A tab in the
COUNTY’S e-Procurement Portal prior to the scheduled due date and time for submission.
Failure to do so, on the part of the Bidder, shall constitute an acceptance by the Bidder of any subsequent decision made by the COUNTY. Any questions concerning the intent, meaning and interpretations of the IFB documents including the attached Draft Agreement, shall be requested in writing, and received no later than 5:00 pm on Monday, March 4, 2024. Written requests shall be submitted via the COUNTY’S e-Procurement Portal The COUNTY will not be responsible for oral instructions made by employees of the COUNTY or its authorized representatives in regard to this IFB. If the Q&A deadline has passed, a Bidder may contact the COUNTY directly if necessary at mhall02@seminolecountyfl.gov. The COUNTY reserves the right to reject any questions sent after the Q&A deadline.
3.7. Addenda
Should revisions to the IFB documents become necessary, the COUNTY will post Addenda information on the COUNTY's e-Procurement Portal. The COUNTY’s e-Procurement Portal will issue an automated email notification to all “Followers” on the IFB’s Followers list. All Bidders should check the COUNTY's Website or notify Michael Hall to verify information regarding
Addenda. Failure to do so may result in rejection of the Bidder’s submitted bid and a determination as “Non-Responsive”. By execution of the Formal Notice for this IFB, the Bidder acknowledges receipt of all Addenda issued under this solicitation. Addenda information will be posted on the COUNTY’s Website (https://secure.procurenow.com/portal/seminolefl). It is the sole responsibility of the Bidder to ensure that they obtain information related to any Addenda.
3.8. Selection Process and Award
The award will be made in the best interest of the COUNTY, as determined by the COUNTY, based upon the low total price and/or line-item by line-item, to the Lowest Responsible Bidder(s) that meet the requirements listed in this solicitation. The COUNTY will determine the method that will more benefit the organization. The Bidder(s) understands that this Bid does not constitute an agreement or a contract with the Bidder. The COUNTY reserves the right to reject all bids/proposals, make multiple awards (award to more than one vendor), make a partial award, to waive formalities, to re-solicit and advertise for new bids/proposals, or to cancel the project in its entirety. In evaluating Bids, the COUNTY shall consider the information provided by the Apparent Low Bidder as described in these "INSTRUCTIONS TO BIDDERS." Any of the following causes may be considered as sufficient grounds for disqualification of a Bidder or the rejection of a Bid:
(a) Submission of more than one (1) Bid for the same Work by any entity under the same or different names.
(b) Evidence of collusion among Bidders.
(c) Submission of an unbalanced Bid in which prices quoted for some items are out of proportion to the prices quoted for other or similar items in the same Bid.
(d) Lack of responsibility as shown by past Work from the standpoint of life safety including, but not limited to, strict adherence to all maintenance of traffic requirements of COUNTY, workmanship, progress and financial irresponsibility.
(e) Uncompleted Work for which the Apparent Low Bidder is committed by contract which might hinder or prevent the prompt completion of Work under this Bid if an Agreement would have been awarded to the Apparent Low Bidder.
(f) Falsification of any entry made on the Bid Documents shall be deemed a material irregularity and will be grounds, at the COUNTY's option, for disqualification of the Apparent Low Bidder or rejection of the Bid.
(g) This section shall be construed liberally to benefit the public and not the Apparent Low
Bidder; however, any other evidence which may hinder or otherwise delay completion of the
Project may be grounds for disqualification.
(h) Non-compliance with the submittal requirements of these Instructions to Bidders.
AWARD CRITERIA: The recommendation of award will be based on, but not limited to the following criteria:
(a) The ability, capacity, and skill of the Apparent Low Bidder to perform the Work.
(b) Whether the Apparent Low Bidder can perform the Work promptly, or within the time specified, without delay or interference.
(c) The character, integrity, reputation, judgment, and efficiency of the Apparent Low Bidder.
(d) The quality of performance of previous contracts or services to Seminole County or any other agency or client.
(e) The previous and existing compliance by the Apparent Low Bidder with Chapter 220, Seminole County Purchasing Code & Procedures, the life safety requirements of COUNTY, and other laws and ordinances, regulations.
(f) The sufficiency of the financial resources and ability of the Apparent Low Bidder to perform the Work.
(g) The quantity, availability, and adaptability of the Apparent Low Bidder to perform the
Agreement or service to the particular needs of the COUNTY.
(h) The ability of the Apparent Low Bidder to retain employees for the purpose of this Work.
(i) The experience of the Apparent Low Bidder performing in a similar manner as required by this Agreement. Minimum of three (3) satisfactory years shall be required.
(j) The type, structure, and experience of the local or branch management proposed.
(k) Quality Control Program.
(l) Claims and Litigation filed against the Apparent Low Bidder or filed by the Apparent Low
Bidder for equitable adjustment, contract claim or litigation in the past five (5) years.
(m) Reprimand of any nature or suspension by the Department of professional Regulation or any other regulatory agency or professional association within the last five (5) years.
3.9. Bid Preparation Costs
Neither the COUNTY nor its representatives shall be liable for any expenses incurred in connection with preparation of a response to this IFB. Proposers should prepare their proposals simply and economically, providing a straightforward and concise description of the Proposer's ability to meet the requirements of this IFB
3.10. Accuracy of Bid Information
By submission of a bid, Bidder acknowledges that they have carefully examined the IFB documents and agrees to furnish the services/products specified in the solicitation at the prices, rates or discounts as proposed. Bidders agree that their bid will remain firm for a period of up to one hundred twenty (120) days to allow the County adequate time to evaluate the submittals.
By submission of a bid, Bidder agrees to abide by all conditions of this bid and understands that a background investigation may be conducted by the Seminole County Sheriff’s Department prior to award. Bidder certifies that all information contained in their bid is truthful to the best of their knowledge and belief. Bidder further certifies that they are duly authorized to submit this bid on behalf of the vendor/Bidder as its act and deed and that the vendor/Bidder is ready, willing, and able to perform if selected.
3.11. Insurance
A misstatement or omission of a material fact, whether intentional or not, regarding the
Proposer's insurance coverage, policies or capabilities may be grounds for rejection of the
Bidder’s submitted proposal and rescission of any ensuing Award Agreement.
The COUNTY recommends that all Bidders review the insurance requirements listed within the Draft Term Contract with their insurance carriers. A copy of the insurance certificate shall be furnished to the COUNTY prior to the final execution of the COUNTY’s
Award Term Contract. The COUNTY reserves the right to reject the award to any Bidder that fails to provide the insurance as required within the COUNTY’s Term Contract.
3.12. Licenses
Bidders, both corporate and individual, must be fully licensed and certified for the type of work to be performed in the State of Florida at the time of submittal of Bid. Should the Bidder not be fully licensed and certified, its bid shall be rejected. Any permits, licenses, or fees required shall be the responsibility of the Bidder. No separate or additional payment will be made for these costs.
Adherence to all applicable code regulations, Federal, State, County, City, etc., are the responsibility of the Bidder.
The following licensing requirements shall apply when the applicable Florida Statute mandates specific licensing for Contractors engaged in the type of work covered by this solicitation. (a)
State of Florida, Department of Professional Regulation, Construction Industries Licensing
Board and licensed by other federal, state, regional, county or municipal agencies having jurisdiction over the specified construction work; (b) Said licenses shall be in the Bidder's name as it appears on the Official Bid Form. Bidder shall supply appropriate license numbers, with expiration dates, as part of their bid. Failure to hold and provide proof of proper licensing, certification and registration may be grounds for rejection of the bid; (c) Bidder shall provide copies of all applicable licenses with their Bid Proposal; and (d) Subcontractors contracted by the Prime Contractor shall be licensed in their respective fields to obtain construction permits from the County.
3.13. Occupational Safety and Health Act (O.S.H.A.)
In instances where such is applicable due to the nature of the bid matter with which this bid package is concerned, all material, equipment, etc., as proposed and offered by Bidders must meet and conform to all O.S.H.A. requirements; the Bidder's signature upon the bid proposal form being by this reference considered a certification of such fact.
3.14. Posting of the IFB's Recommendation and Intent to Award
The recommendation and intent to award for this IFB will be posted on the COUNTY’s Website
(https://procurement.opengov.com/portal/seminolefl) prior to submission for final approval of award. Failure to file a protest with the COUNTY’s Purchasing & Contracts Manager within the time prescribed in the COUNTY's Purchasing Code, Policies and Procedures shall constitute a waiver of proceedings.
3.15. Public Records
Upon recommendation and intent to award this IFB as posted to the COUNTY’s website or thirty
(30) calendar days after closing, bids are considered “public records" and shall be subject to the public disclosure regulations consistent with Chapter 119, Florida Statutes. Bidders must invoke the exemptions to disclosure provided by law in their response to the solicitation and must identify the data or other materials to be protected by separate envelope, and must state the reasons why such exclusion from public disclosure is necessary pursuant to the COUNTY’s, “Compliance With Public Records Law” Form, which is required as part of the IFB documents.
Ownership of all data, material, and documentation originated and prepared for the County pursuant to the IFB shall belong exclusively to the County and be subject to public inspection in accordance with the Public Records Law. Trade secrets or proprietary information submitted by a Bidder shall not be subject to public disclosure under the Public Records Law; however, the
Bidder must invoke the protection of this section prior to or upon submission of the data or other materials, and must identify the data or other materials to be protected and state the reasons why protection is necessary.
3.16. Prohibition Against Contingent Fees
It shall be unethical for any person to be retained, or to retain any company or person, other than a bona fide employee working solely for the Bidder to solicit or secure the Term Contract for this IFB, and that it has not paid or agreed to pay any person, company, corporation, individual or firm, other than a bona fide employee working solely for the Bidder, any fee, commission, percentage, gift, or other consideration contingent upon or resulting from award or making of this Term Contract. For the breach or violation of this provision, the COUNTY shall have the right to terminate the Term Contract at its sole discretion, without liability and to deduct from the Term Contract price, or otherwise recover, the full amount of such fee, commission, percentage, gift, or consideration.
3.17. Acceptance/Rejection/Disqualification
The COUNTY reserves the right to accept and make award to those Bidders, who in the opinion of the COUNTY, will be in the best interest of and/or the most advantageous to the COUNTY.
The COUNTY reserves the right to reject all bids/proposals, make multiple awards (award to more than one vendor), make a partial award, to re-solicit and advertise for new bids/proposals, or to cancel the project in its entirety. The COUNTY reserves the right to reject the bid of any
Bidder who has previously failed in the proper performance of an award or to deliver on time agreements of a similar nature or who, in the COUNTY's opinion, is not in a position to perform properly under this award. The COUNTY reserves the right to inspect all facilities of Bidders to make a determination as to the available resources to perform properly under this award. The
COUNTY reserves the right to waive any irregularities, informalities, and technicalities and may, at its discretion, issue a re-procurement.
More than one (1) bid from an individual, firm, partnership, corporation, or association under the same or different names will not be considered. Reasonable grounds for believing that a Bidder is involved in more than one proposal submittal will be cause for rejection of all bids in which such Bidders are believed to be involved. Any or all bids will be rejected if there is reason to believe that collusion exists between Bidders. Bids in which the prices obviously are unbalanced will be subject to rejection.
3.18. Additional Terms and Conditions
Unless expressly accepted by the County, only the terms and conditions in this document shall apply: No additional terms and conditions included with the bid response shall be considered.
Any and all such additional terms and conditions shall have no force and effect, and are inapplicable to this bid if submitted either purposely through intent or design, or inadvertently appearing separately in transmittal letters, specifications, literature, price lists or warranties. It is understood and agreed that the general and/or any special conditions in these Bid Documents and any addenda issued under this solicitation are the only conditions applicable to this bid and the Bidder's authorized signature on the Bid Response Form attests to this. Exceptions to the terms and conditions will not be accepted.
3.19. Responsibility
The County reserves the right, before award, to require a Bidder to submit such evidence of his qualifications as it may deem necessary, and may consider any evidence available such as financial, technical, and other qualifications and abilities of the Bidder, including past performance and experience with the County. This information may be used to determine the
Bidder’s responsibility.
3.20. Bids to Remain Firm
All Bids shall remain firm for a minimum of one hundred twenty (120) days after the day of the
Bid opening to allow for the evaluation and selection process and proper execution of the
Agreement. Extensions of time when Bids shall remain opened beyond the one hundred twenty-day period may be made only by mutual agreement between Seminole County and the Selected
Bidder. The successful Contractor must maintain the bid prices firm for a minimum of one (1) year after the contract is executed. No cost increase will be authorized during the first year of the agreement.
3.21. Purchasing Code
Seminole County Code Chapter 220 (Purchasing Code), Administrative Code Section 3.55
(Purchasing Policy), and County Manager Policies apply to this IFB in their entirety.
3.22. Affirmation
By submission of a bid, the Bidder affirms that their bid is made without prior understanding, agreement or connection with any corporation, firm, or person submitting a bid for the same materials, supplies, equipment or services, and is in all respects fair and without collusion or fraud. The Bidder agrees to abide by all conditions of this IFB and the resulting Term Contract.
3.23. Mistakes in the Bid
Bidders are expected to examine the terms and conditions, specifications, delivery schedule, bid prices, extensions and all instructions pertaining to supplies and services. Failure to do so will be at Bidder's risk. In the event of extension error(s), the unit price will prevail, and the Bidder's total offer will be corrected accordingly. Written amounts shall take precedence over numerical amounts. In the event of addition errors(s), the unit price, and extension thereof, will prevail and the Bidder's total offer will be corrected accordingly. Bids having erasures or corrections must be initialed in ink by the Bidder.
3.24. Governmental Restrictions
In the event that any governmental restrictions are imposed which would necessitate alteration of the material quality, workmanship or performance of the items offered on this bid prior to their delivery, it shall be the responsibility of the Bidder to notify the Purchasing and Contracts
Division at once, indicating in his/her letter the specific regulation which required an alteration, including any price adjustments occasioned thereby. The County reserves the right to accept such alteration or to cancel the contract or purchase order at no further expense to the County.
3.25. Drug-Free WorkPlace Compliance
Bidder shall comply with Section 287.087, Florida Statutes, and failure to comply shall result in rejection/disqualification of the bid and all agreements as a result of this solicitation.
3.26. Public Entity Crime
Any Person or affiliate, as defined in Section 287.133, Florida Statutes, shall not be allowed to contract with the COUNTY, nor be allowed to enter into a subcontract for Work on this Project, if such a person or affiliate has been convicted of a public entity crime within three (3) years from the date this Project was advertised for Proposal, or if such person or affiliate was listed on the
State's convicted vendor list, within three (3) years of the date this Project was advertised, whichever time period is greater. A public entity crime means a violation of any state or federal law with respect to and directly related to the transaction of business with any public entity or agency (federal, state or local), including but not limited to, any contract for the construction or repair of a public building or public work involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, forgery, falsification of records, receiving stolen property or material misrepresentation. Any Agreement with the COUNTY obtained in violation of this Section shall be subject to termination for cause. A sub-contractor who obtains a subcontract in violation of this Section shall be removed from the Project and promptly replaced by a sub-contractor acceptable to the COUNTY.
3.27. Uniform Commercial Code
The Uniform Commercial Code (Florida Statutes, Chapter 672) shall prevail as the basis for contractual obligations between the Bidder and the County for any terms and conditions not specifically stated in this solicitation.
3.28. Proprietary/Restrictive Specifications
Bidder, who feels the specifications contained herein are proprietary or restrictive in nature, thus potentially resulting in reduced competition, must notify the Purchasing and Contracts Division of their rejection upon receipt of this IFB and prior to the due date.
3.29. Payment Terms/Discounts
The County’s payment terms are in accordance with Section 218, Part VII, Florida Statutes, Florida Prompt Payment Act. Cash discounts for prompt payment shall not be considered in determining the lowest net cost for evaluation purposes.
3.30. Price Redeterminations
1. During the Renewal Term: Petitions for price redeterminations must be made at the time of
County’s notification to the Contractor of the renewal period. Any such petition must be made pursuant to the provisions of this Section and only for those price redetermination categories specified herein. Unless otherwise expressly set forth in this document, no other price redeterminations will be allowed. All price redeterminations will be approved by a duly executed amendment to the Contract to reflect the new prices for the renewal term.
2. Outside the Renewal Term: Petitions for price redeterminations must be made within thirty
(30) days of the anniversary date of the Contract. Any such petition must be made pursuant to the provisions of this Section and only for those price redetermination categories specified herein. Unless otherwise expressly set forth in this document, no other price redeterminations will be allowed. All price redeterminations will be approved by a duly executed amendment to the Contract.
BASIS FOR PRICE REDETERMINATIONS. The Contractor may petition the Purchasing and
Contracts Division for price redetermination based on the increased costs of wages, fuel, or materials. Price redeterminations will be based solely upon changes in pricing or costs documented by either the Employment Cost Index (ECI) or Producer Price Index (PPI), whichever is applicable, as published by the Bureau of Labor Statistics. The base index number for the ECI will be for the quarter in which the solicitation opens. The base index number for the
PPI will be for the month the solicitation opens. Any subsequent price redeterminations will use the last price redetermination approved for that price redetermination category as the "base index number." The County shall have the right to audit the Contractor's records, including, but not limited to, payroll, materials, and fuel cost records, to verify or otherwise investigate the validity of any price redetermination request.
WAGE PRICE REDETERMINATION. When requesting a price redetermination based upon an increase in wage costs, the Contractor shall refer to and utilize the Pay & Benefits, Employment
Cost Index, Private Industry, Compensation as prepared by the Bureau of Labor Statistics in the
U.S. Department of Labor available at www.bls.gov.
MINIMUM WAGE PRICE REDETERMINATION. If the minimum wage increases during the term of the Contract, including any renewal or extension period thereunder, the Contractor may petition the Purchasing and Contracts Division for price redetermination for those job categories where the pay to the Contractor's employee(s) is the current minimum wage. Upon verification of the information provided, the County will grant an increase of exactly the amount of the minimum wage increase (not the percentage increase). The Contractor must increase the pay to the employee(s) by the amount the Contractor has requested, which shall not exceed the amount of the minimum wage increase. The amount paid to the Contractor will be the increase plus any written and documented increase in FICA, Medicare, and Workers' Compensation insurance. The Contractor must supply written documentation of any other increase that is beyond the scope and control of the Contractor. All written documentation must satisfy the reasonable expectations of the Purchasing and Contracts Division.
• Example: Minimum wage increases from $7.31 to $7.56 per hour. The Contractor may petition for an increase of $0.25 per hour to be paid to the affected employee(s) and shall provide written and documented cost increases for FICA, Medicare and Workers' Compensation. The resulting increase in costs shall be incorporated into fees/rates billed to the County.
If the Contractor bills the County at a higher price according to any price redetermination granted by the County, and the Contractor fails to increase the hourly rate paid to the employee for the same period, the Contractor will be considered in Contract default and the Contract will be immediately terminated.
FUEL PRICE REDETERMINATION. If and when the price of fuel increases by a minimum of ten (10%) percent, the Contractor may petition the Purchasing and Contracts Division for a fuel price redetermination. As a condition of petitioning for a fuel price increase, the Contractor shall be required to petition for a fuel price redetermination decrease if and when the price of fuel decreases by a minimum often (10%) percent. Failure to make such petition may be grounds for
Contract termination and shall entitle the County to a refund of the cumulative increase in pay to the Contractor due to any prior fuel price redetermination increase(s). Fuel price redetermination must be based solely upon changes as documented by the Producer Price Index (PPI) for the commodity "Gasoline - WPU057".
MATERIALS PRICE REDETERMINATION. At the anniversary date of the Agreement, the
Contractor may petition the Purchasing and Contracts Division for a materials price redetermination. As a condition of petitioning for a materials price increase, the Contractor shall be required to petition for a materials price redetermination decrease if/when the price of materials used by the Contractor in connection with the Contract decreases. Failure to make such petition may be grounds for Contract termination and shall entitle the County to a refund of the cumulative increase in pay to the Contractor due to any prior materials price redetermination increase(s). Materials price redetermination must be based solely upon changes as documented by the Producer Price Index (PPI) under Inflation & Prices, Industry Data, Construction Machinery Mfg. PCU 333120333120, as published by the Bureau of Labor
Statistics.
PRICE REDETERMINATION CALCULATION. All Price Redeterminations shall be calculated as follows:
Example: Contractor indicated on the Submittal Form that fourteen percent (14%) of the cost to provide the product/service is directly attributed to the redetermination category (wages, fuel, or materials).
PPI in the month the solicitation closed was 158.73 264.52
Current PPI is 264.52 -158.73
105.79
105.79 divided by 158.73 = .666%
The unit cost of the service is $100.00
14% of $100.00 = $14.00
$14.00 x .666 = $9.32
The New Unit Price for the service is $109.32 ($100.00 + $9.32)
EXPIRATION UPON FAILURE TO AGREE TO PRICE REDETERMINATION. If the County and the Contractor cannot agree to a price redetermination pursuant to the terms and conditions of this…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .