About this file
This document outlines specifications for a hazardous fuels reduction contract on the Gunflint Ranger District of the Superior National Forest in Minnesota. Key details include:
-
The contract involves mechanical understory fuels reduction on 152 acres across two units, Rescue and Squint, to reduce hazardous live and dead balsam fir, conifer, and other trees. Work will include cutting, piling, and crushing woody materials.
-
Pile construction specifications mandate minimum sizes of 12 feet in diameter and 10 feet in height, with smaller piles of 20 feet or less within 100 feet of roads and trails. Piles must be spaced at least 20 feet apart and located no closer than 50 feet to roads/trails or private property boundaries.
-
The contractor must have equipment such as feller bunchers, processors, harvesters or excavators capable of cutting trees at the stump. Piling must be done mechanically rather than by pushing. Non-target species may need felling to access balsam fir.
-
Work can only occur during frozen or dry non-frozen conditions as determined by the Contracting Officer's Representative. Equipment must avoid operating in conditions that could cause excessive damage or in lowlands with risk of soil damage.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Rescue_Contract_Vicinity_Map_05022022.pdf | ||
| Squint_UFR_Vicinity.pdf | ||
| Squint_UFR_Mechanical_Project_Map.pdf | ||
| Rescue_Contract_Project_Map_2022.pdf | ||
| Attachment C_FAR 52_212_1 Commercial Items (Addenda).docx | DOCX document | |
| Wage Determination 1979_1073.pdf | ||
| Rescue Squint Mechanical UFR _12363N22Q4063.docx | DOCX document | |
| Attachment D_ FAR 52_212_3.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hazardous Fuels Contract- Gunflint Ranger District, Superior National Forest, Grand Marais MN - Units: Rescue & Squint Understory Fuels Reduction- 152 Acres
Items To Be Cut and Piled:
1. Live balsam fir trees 1”-6” DBH.
2. All dead conifer trees 1”-6” DBH.
3. All other trees species that are felled to access balsam fir and dead conifers.
Pile Construction Specification:
1. Construct piles no less than 12’ diameter and 10’ in height.
2. Piles visible within 100’ of Cook County Highway 12 and all snowmobile/ski trails will be constructed no greater than 20’ in diameter.
3. Spacing between pile locations will be no less than 20’.
4. Piles will not be located within 50’ of any road, trail or private property boundary.
5. Where possible along Cook County Highway 12, locate piles behind visual screenings such as large rocks, hills and heavy concentrations of non-cut tree species. Consult with COR if screening areas are not available. Minimize where possible large openings along Gunflint Trail.
6. Piles will not be placed within 16’ of non-cut tree species including pine, cedar, spruce or tamarack greater than 5” DBH, except within 100’ of Cook County Highway 12 where piles will not be placed within 25’ of non-cut tree species. Avoid placing piles near pine, cedar, spruce or tamarack that are smaller than 5” DBH. Consult with COR if non-cut tree species require removal to create pile locations.
7. Avoid placing dirt and roots within piles.
8. Piles will be constructed in a compacted manner to allow for adequate burning. See pile example at the bottom of the sheet.
8/22/2022
Other Specifications/Capabilities:
1. Logging machinery including feller buncher, processor, harvester or excavators equipped with cutting attachments capable of severing trees at the stump will be needed.
2. Piling is the required method of pile construction. Pile construction will not take place by pushing felled trees.
3. Non-cut tree species other than balsam fir may need to be felled in order to access balsam fir.
4. Avoid unnecessary damage to non-cut tree species.
5. Operations will take place during frozen conditions or dry non-frozen conditions. COR will determine the appropriateness of site conditions prior to starting and during work.
6. If operating during non-frozen conditions, avoid lowlands where soil damage may occur.
7. Equipment shall not be operated when ground conditions are such that excessive damage will result.
8. Stumps from cut trees will not exceed 12” in height.
9. Cut material will not be left within trails, roads or utility clearings.
10. Downed live and dead trees will be crushed to a fuel bed less than 2’ high.
11. Balsam fir 1”DBH and smaller will be crushed.
12. A pre-work meeting with the COR is required prior to starting work.
13. Contractor shall not remove any flagging that marks unit boundaries.
14. Damage to roads, trails, signs, utilities and other improvements will be reported to the COR and corrected by the contractor.
15. Supplies, equipment, fuel, and maintenance shall be the contractor’s responsibility.