Requirements Document LTV HVAC Replacement.pdf

PDF 96 KB Posted

Attached to
LTV HVAC Replacement
Solicitation number
FA910123Q0008
Issued by

View the file

Other files

File Type Posted
Combined Synopsis Solicitation LTV HVAC Replacement Updated Offer Due Date.docx DOCX document
Additional QA Responses for LTV HVAC UPDATED.pdf PDF
LTV 5.jpg JPG image
Additional QA Responses for LTV HVAC.pdf PDF
Combined Synopsis Solicitation LTV HVAC Replacement.docx DOCX document
LTV 3.jpg JPG image
LTV 1 redacted.jpg JPG image
LTV 4.jpg JPG image
LTV 2.jpg JPG image
Atch 02 FAR DFARS AFFARS Prov and Clauses LTV HVAC Replacement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACEMENT AIR CONDITIONER/HEATERS FOR LTV

Requirements Document

For

704th Test Group/746th Test Squadron

10 Jan 2023

1.0 PURPOSE

The 704th Test Group (704 TG) mission is to be the premier provider of unique test and evaluation capabilities relevant to tomorrow’s warfighter through world-class people improving technical excellence, cost-effectiveness, and agility. The 746th Test Squadron (746 TS) is assigned to the 704 TG. The 746 TS conducts Global Positioning System (GPS) denial and Inertial Navigation System testing. Utilizing technologically advanced antennas are an integral aspect of the unit’s mission and are key to enabling test and evaluation of navigation systems, especially when evaluating system performance in challenging radio frequency environments including intentional (jamming) and unintentional interference. The 746 TS requires two replacement HVAC units in order to control environmental conditions in the Large Test Vehicle (LTV) dynamic test platform. See attached pictures for more information.

2.0 SCOPE

The Contractor shall purchase and deliver two wall mount combination 24k BTU air conditioner/heaters with all associated equipment and install them on the LTV. This must include the wall units, condensers, and all associated equipment to connect and operate the units.

2.1 Remove Existing Units

2.1.1 Recover all Freon from existing LG Mini Splits (qty 2)

2.1.2 Remove all existing equipment and dispose of it in accordance with all federal, state, and local laws

2.1.3 Remove all copper drain lines

2.2 Provide and Install two new 24k BTU Mini Splits

2.2.1 Provide and install all new copper drain lines

2.2.1.1 The copper lines are to have flex hoses for allowance of vibration while driving

2.2.1.2 Verify all copper is leak and moisture free

2.2.1.3 Verify all drain lines are clear and drain

2.3 Tie into the existing high voltage power

2.4 Condensers are to be bolted to the floor of the exterior condenser compartments

2.5 Provide 2 ea. remotes with wall brackets

2.6 Operate and verify functionality of all equipment in both heating and cooling modes.

3.0 MILESTONES

The contractor shall install and conduct an operational check out of the units no later than 30 days ARO.

4.0 DELIVERABLES

The contractor shall deliver all hardware and documentation to 746 TS/TGGOE Attn: Nathan Marcellus at 1644 Vandergrift Rd, building 1265, Holloman Air Force Base, New Mexico 88330.

1.0 PURPOSE
2.0 SCOPE
The Contractor shall purchase and deliver two wall mount combination 24k BTU air conditioner/heaters with all associated equipment and install them on the LTV. This must include the wall units, condensers, and all associated equipment to connect and o...
4.0 DELIVERABLES

File details come from the government source that posted it. Updated .