Additional QA Responses for LTV HVAC UPDATED.pdf

PDF 81 KB Posted

Attached to
LTV HVAC Replacement
Solicitation number
FA910123Q0008
Issued by

View the file

Other files

File Type Posted
Combined Synopsis Solicitation LTV HVAC Replacement Updated Offer Due Date.docx DOCX document
LTV 5.jpg JPG image
Additional QA Responses for LTV HVAC.pdf PDF
Requirements Document LTV HVAC Replacement.pdf PDF
Combined Synopsis Solicitation LTV HVAC Replacement.docx DOCX document
LTV 3.jpg JPG image
LTV 1 redacted.jpg JPG image
LTV 4.jpg JPG image
LTV 2.jpg JPG image
Atch 02 FAR DFARS AFFARS Prov and Clauses LTV HVAC Replacement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Updated Q&A Responses for LTV HVAC:

1. How are the units isolated - IE disconnect, breaker, fuse etc. and what is the size of the isolation device?

• Answer: Breaker 30A

2. Are the units on the same circuit or does each have a separate circuit?

• Answer: Separate

3. What is the size of the electrical service existing in the trailer (voltage and amps)?

• Answer: 120/208 70A Diesel Generator

4. How is the trailer grounded?

• Answer: Frame

5. What is the AWG of the existing power and ground conductors?

• Answer: Not visible due to conduit

6. Is there an external remote thermostat/sensor for temperature control of the units or just the mentioned remote controller?

• Answer: Just the remote

7. What size are the existing line sets?

• Answer: 3/8 or 1/2 inch

8. What is the refrigerant type of the existing units?

• Answer: Unknown (See LTV 5.jpg in attachements)

9. How far are the runs for the refrigerant lines, drain line, and power for each unit?

• Answer: 8 1/2 feet

10. Where does the condensate line penetrate the trailer to drain the water?

• Answer: Floor

11. Can the existing wire/tube chases and wire mold be reused?

• Answer: Yes

12. Do you require flexible refrigerant tubing on both ends of each line for each unit?

• Answer: No

13. Are "Sharkbite" type push connectors acceptable or do you want all connections soldered?

• Answer: Prefer Soldererd

14. Is the existing wire mold that is covering the Mini split cables and line set constructed into the trailer of just surface mounted and can be removed?

• Answer: Surface Mounted

15. What are the dimensions of each compartment where the condensing units are located -

Length, Width, and Depth. Is the outside opening the same size as the inside box or is it smaller, if so, what is the smaller dimension?

• Answer: 10.5 ft X 2ft 2in X 2ft 7 inches total. Door opening for each unit is 2ft high by 4ft wide

16. Can you provide a picture of the nameplate of the existing units?

• Answer: Yes – see attachments (LTV5.jpg)

17. What are the dimensions of the existing condensing unit?

• Answer: 33 X 25 X 12

18. What are the dimensions of the existing evaporator/fan unit?

• Answer: 40.5W X 13H X 10.5D

19. What is the clearance between the end of the unit where power is fed and the wall or obstruction in the box?

• Answer: 1 foot

20. Where will the trailer be located for the performance of the work?

• Answer: 746th Test Squadron, Holloman AFB, NM 88330

21. In photo LTV-1 there is cable coming down from the overhead and coiling up on the line set from the Mini split. Is this cable part of the Mini split, or unrelated?

• Answer: Unrelated

22. Mini Split systems are available with different SEER ratings for the same size unit. Are you looking for a middle of the range minimum SEER rating of 20 or for a lower or higher SEER rating?

• Updated Answer: Our primary concern is form/fit/function. A lower SEER rating is acceptable.

Please contact Chuck King (charles.king.42@us.af.mil) and Brett Moore (brett.moore.6@us.af.mil) with any questions.

mailto:charles.king.42@us.af.mil mailto:brett.moore.6@us.af.mil

File details come from the government source that posted it. Updated .