Request for Quotes for Installation of Bus Passenger Simme Seats and Electric Vehicle Chargers.pdf
PDF 2 MB Posted
- Solicitation number
- S-X33157-00014681
- Issued by
- Wasco County, Oregon
About this file
This is a Request for Quote (RFQ) issued by the Mid-Columbia Economic Development District (MCEDD) for the installation of bus passenger infrastructure in The Dalles, Oregon. The project is divided into two parts: Part I involves installing twelve bus stop poles with Simme Seats at various locations, and Part II includes installing two Ford Pro AC electric vehicle chargers at 802 Chenowith Loop Road. The RFQ was released on August 11, 2025, with quotes due by September 5, 2025, and an anticipated selection date of September 12, 2025. The project must be completed by June 30, 2026, with a budget of approximately $20,160 for the bus stop poles and $26,000 for the electric vehicle chargers.
The project is funded through a Federal Transit Administration (FTA) grant, received via the Oregon Department of Transportation Rail and Public Transit Division, with matching funds from the Statewide Transportation Improvement Fund and local sources. Contractors are required to comply with Davis-Bacon prevailing wage requirements and submit a quote including project timelines, associated costs, and references. The project is currently under review for a Categorical Exclusion determination and is subject to various federal and state regulations, including disadvantaged business regulations and NEPA review.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 14682-0 - Intent to Award Notice - Alternative Services Oregon Inc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTE
Installation of Bus Passenger Simme Seats and Electric Vehicle Chargers
Dated: August 11, 2025
Project Description
Mid-Columbia Economic Development District (MCEDD), operator of The Link public transportation system, is seeking quotes from qualified construction firms for the installation of:
• Twelve (12) bus stop poles with passenger seats attached (see https://simmeseat.com/)
• Two (2) Ford Pro AC electric vehicle chargers
The project is divided into two parts. Contractors may submit quotes for either one or both parts of the project.
Part I
MCEDD has purchased twelve (12) bus stop poles with Simme Seats at locations around the City of The
Dalles, OR. The installation will be able to utilize existing paving, and some may require concrete work.
See General Installation Instructions for additional details. The project will include:
1. Providing final design site layout.
2. Move equipment to and from sites.
3. Excavate sites for ADA compliant concrete pad where required.
4. Place new ADA compliant concrete where required.
5. Assemble and install MCEDD-provided bus stop poles with Simme Seats. See attached instructions.
The budget is approximately $20,160 and construction must be completed by June 30, 2026.
Part II
Install two (2) Ford Pro AC Chargers provided by MCEDD at 802 Chenowith Loop Road, The Dalles, OR. The project will include:
1. Providing final design site layout.
2. Excavate for conduit to supply new power to bus barn area.
3. Prepare sites for new concrete where required.
4. Installation of two electric chargers.
The budget is approximately $26,000 and construction must be completed by June 30, 2026.
Additional Requirements
This project is funded by a grant from the Federal Transit Administration (FTA), received through the
Oregon Department of Transportation Rail and Public Transit Division, with matching funds from the
Statewide Transportation Improvement Fund and local sources. This RFQ, the executed agreement for services, and the performance of the successful proposer shall be governed by the terms of the FTA https://simmeseat.com/ grant. The successful proposer must also comply with applicable state and federal requirements including, but not limited to, NEPA review, disadvantaged business regulations, and others as shown in the attached applicable federal clauses. This project is currently under review for a Categorical
Exclusion determination. This project is subject to the Davis-Bacon and Related Acts, and quotes should include paying Davis-Bacon prevailing wages.
Timeline
RFQ response due September 5, 2025.
Anticipated selection date: September 12, 2025.
Project completion by June 30, 2026.
Submission Requirements
To be considered for the award, respondents must submit a Quote that includes:
1) A proposal noting timelines for completing the work.
2) Associated costs. For purposes of the quote, assume that the two of the twelve sites require a concrete pad to be poured for installation of the bus stop pole with Simme Seat; and
3) References/reference projects.
Quotes may be modified or withdrawn until deadline stated below. In order to be considered for award, responses must be received by MCEDD by 5:00 p.m. on September 5, 2025 to:
Jesus Mendoza, Transportation Operations Manager
Mid-Columbia Economic Development District
802 Chenowith Loop Road
The Dalles, Oregon 97058 or via email to Jesus@mcedd.org.
mailto:Jesus@mcedd.org
SIMME-SEAT GENERA L INSTALLATION INSTRUC TIONS
1. For Simme-Seat installation on an existing sidewalk or other port and cement concrete paving with a minimum thickness of 4 inches, skip to Step 3.
2. For Simme-Seat installation adjacent to existing concrete or at an isolated position away from concrete paving, (Refer to Figure 1, Foundation Installation Instructions, before proceeding with Step 3).
3. With the Simme-Seat support base plate as template, mark the expansion anchor locations and use an impact drill motor and 7/ 8-inch masonry bit to drill four 2-1/ 2 inch deep holes in the concrete sidewalk or prep ared foundation.
4. Insert the four pro vided expansion anchors in to the drilled holes and complete their installation according to (Figure 2, Anchor Installation Instructions).
5. Position the Simme-Seat support in place over the expansion anchors, shim as required to level and secure with four machine bolts and flat washers provided.(Refer to Figure 3, Support Installation)
6. Attach the two seat sections to the Simme-Seat support gusset plates with 3/8-inch bolts and lock nuts provided.
(Refer to Figure 4, Seat A Assembly).
7. Insert bus stop sign post into the Simme-Seat base support tube, and mark the sign post at the top of the base support tube and at the locations of the two holes in the support tube where the securing thru-bolt connection will be made.
8. Remove the sign post from the base support tube and drill two 3/8" holes at the marked locations for the thru-bolt connection.
9. Remove the backing paper from the pro vided 1 " wide x 7-1/ 4" long piece of 3M UHM W polyethylene tape and wrap the tape around the sign post, centered at the previously marked location at the top of the support tube. Install the provided finial on top of the sign post, re-insert the sign post into the base support tube, and secure the sign post in place with the 5/ 16" x 3-1/2" bolt, flat washer and lock nut provided. (Refer to Figure 5, Sign Post Installation)
Ford Pro Charging Customer Care Team: 1-800-34-FLEET | ChargingSupport@fordpro.com
Equally adept at both commercial and home charging duties, the Ford Pro AC Charging Station can charge any standard EV. The Ford Pro AC Charging Station is ready to deploy wherever is convenient for you or your drivers.
Ford ProTM AC Charging Station (11.5 kW)1
Ford Pro AC Charging Station Install Specs for Licensed Electricians.
Application Commercial / Residential
Level 2
Voltage (Vac) 208 V / 240 V AC
Frequency (Hz)
60 Hz
Output Power 10kW at 208V
11.5kW at 240V
Current (Rms) Max. 48 A
Charging Connector
J1772, Type 1
Cable Length 25 ft
Wi-Fi Yes
Ethernet Yes
Cellular Yes, Primary
Data Protocol OCPP 1.6
Operation Temp.
-31° – 122° F
Storage Temp. -40° – 140° F
Mounting Options
Wall mount / Post mount
Wiring Type
Enclosure Level Impact Resistance Dimensions (H x W x D) Weight
Hard-wired
NEMA 4
IK 10
16.10in x 7.09in x 3.78in
17 lbs
Certification • UL 1998, UL 991
• UL 2594/CSA C22.2
No. 280
• NMX-J-677-ANCE
• UL 2231-1/CSA C22.2
No. 281.1
• NMX-J-668-1
• UL 2231-2/CSA C22.2
No.281.2/NMX-J-
668/2-ANCE
• UL 2251/CSA 22.2
• NMX-J-678-ANCE
• FCC Part 15.247
• FCC Part 15B
• FCC Part 15C
Warranty 2 Limited 3yr
Additional Details
Touch Button
Charging Status LEDs
Communication Status LEDs
Optional De-rate
Time delay, return to max power level, reset ground fault
Power, time delay, charging state, reduced power level, authentication, cold start
Connected / not connected during operation, signal strength during commissioning LEDs
40A, 32A, 24A, 16A, 12A
Energy Metering Revenue accurate, ANSI C12.20 compliant metering
Ground Fault Protection 20 mA
Voltage Protection Under voltage: 167 V (min. 80 V) / over voltage: 267 V (max. 275 V)
Over Current Protection Current +10% above configured threshold, min. +2A, 5 seconds
Operating Altitude 9,840 ft
1 All technical information subject to change 2 The Limited Warranty is being provided by Ford to the person or entity who purchased the Product from Ford (“Buyer”) and, subject to the product terms and conditions, covers any defect in the Product which can be directly and exclusively attributed to design, workmanship or material defect of the Product for a period of three (3) years (the “Warranty Period”) after the Warranty Starting Date (as hereafter defined). The “Warranty Starting Date” is the date that is the earlier of: (i)the date the Product is installed at the Buyer's site; or (ii) the date that is six (6) months after the date the Product shipped to Buyer.
mailto:ChargingSupport%40fordpro.com?subject=
| Binder1.pdf |
| Request for Quotes (RFQ)_Bus Seat and EV Charger Installation_JM2.pdf |
| General_Installation_Instructions.pdf |
| Fig-5_Signpost_Installation.pdf |
| SS-1_Existing_Installation_4-16-2025.pdf |
| Fig-1_Foundation_Installation (1).pdf |
Data Sheet - Ford Pro AC Charging Station 11.5kW (13) (1) (2).pdf
File details come from the government source that posted it. Updated .