Request for Quote Tray Machine .docx

DOCX document 14 KB Posted

Attached to
DHS EMHC FY24 Tray Machine
Solicitation number
24-444DHS-MENTH-B-39471
Issued by
Kane County, Illinois

About this file

This document is a Request for Quote from the Elgin Mental Health Center for a Monthly Rental/Lease Dietary Tray Washer. The requested equipment includes a high-temperature, sanitizing, triple-tank tray washer with prewash, automatic tank fill, stainless steel frame, and electric immersion or steam injector tank heat. The rental/lease term includes installation and start-up service, with an option to cancel the rental/lease upon completion of the dietary building renovation and installation of new equipment, which is projected to take 18-24 months. Interested parties should contact Stacy Fleenor at Stacy.Fleenor@Illinois.gov or 847-742-1040 x2077 with any questions.

The pricing and contract details are not explicitly stated in the document. However, this opportunity is related to the "DHS EMHC FY24 Tray Machine" state and local contract, which provides further details on the rental/lease requirements, including the specific electrical specifications and amperage. There are no details provided on any set-asides, incumbents, funding sources, or other salient information.

View the file

Other files

File Type Posted
standard-terms-and-conditions FY24~11.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Quote Elgin Mental Health Center

Elgin Mental Health Center is requesting the following:

Monthly Rental /Lease Dietary Tray Washer - high temp, sanitizing, triple tank with prewash, automatic tank fill, stainless steel frame, electric immersion, or steam injector tank heat 16kw, tray unload table, 208v/60/3-ph, 67.3 amps - with installation and start up service. Option for cancellation of rental/lease upon completion of dietary building renovation /installation of new equipment, projected project completion 18-24 months.

Please contact Stacy Fleenor Stacy.Fleenor@Illinois.gov 847-742-1040 x2077 with any questions.

File details come from the government source that posted it. Updated .