Request for Quote ASBESTOS Solicitation - N4215826QE045.pdf

PDF 2 MB Posted

Attached to
Asbestos Personnel Monitoring
Solicitation number
N4215826QE045
Issued by

About this file

This is a Request for Quote (RFQ) for asbestos personnel monitoring services at Norfolk Naval Shipyard (NNSY), issued May 5, 2026, with an offer due date of May 12, 2026 at 1:00 PM. The solicitation number is N4215826QE045, designated as a 100% women-owned small business (WOSB) set-aside with a contract value of USD 25,000.00. The acquisition is unrestricted in North American Industrial Classification Standard (NAICS) code 562910 (Remediation Services).

The contractor shall provide asbestos personnel monitoring services comprising two line items: (1) Planning Phase – 10 hours of services from August 3 to September 30, 2026, including face-to-face meetings with NNSY points of contact and all required training; and (2) Execution Phase – 162 days of services from September 1 to December 23, 2026, with two licensed/approved personnel monitoring technicians on-site during 10-hour workdays (0600-1830 hours), Monday through Friday, first shift. The work requires personal and general area air sampling for asbestos in accordance with 29 CFR 1915.1001 and EPA AHERA methodology, with final clearance sampling upon completion. The contractor must provide all sampling equipment, personal protective equipment, and materials. Key requirements include: proof of Virginia Commonwealth licensing, US citizenship with Secret Security Clearance, compliance with NNSY security protocols and Portable Electronic Device (PED) policies, participation in pre-job and pre-shift briefings, and submission of a Quality Management System for approval. Compensation is firm fixed price; payment will be made via Wide Area WorkFlow (WAWF) electronic invoicing. Work location is Norfolk Naval Shipyard, Building 276, Portsmouth, Virginia 23709. The contractor is responsible for obtaining DBIDS credentials for facility access and must comply with all applicable federal, state, local, and Navy regulations governing asbestos work, occupational safety, and security.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

Section A - Solicitation/Contract Form

Asbestos Personnel Monitoring

N4215826QE045

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

Planning Phase for asbestos personnel monitoring services in accordance with the Statement of Work (SOW) found herein.

Note: The Planning Phase for this line item 0001 includes face-face meeting times between the contractor's Project Manager and Norfolk Naval Shipyard (NNSY) points of contact which will be provided at time of award.

Pricing Arrangement: Firm Fixed Price

10 Hours

Execution Phase for asbestos personnel monitoring services in accordance with the Statement of Work found herein.

Note: The unit of issue for this line item 0002 is Day. One Day equates to two (2) licensed / approved Personnel Monitoring technicians that are on site at all times during a ten (10) hour workday Monday through Friday during 1st shift hours of 0600 to 1830.

Pricing Arrangement: Firm Fixed Price

162 Days

Section C - Description/Specifications/Statement of Work

PERSONNEL MONITORING STATEMENT OF WORK

1. Scope:

1.1. The Contractor shall provide services to accomplish personal and general area air sampling for asbestos. The Contractor will need to perform personal and general area exposure monitoring in accordance with 29 CFR 1915.1001 and delineated in section 3.4 below. Samples shall be conducted during material removal and shall include final clearance. Personal samples will need to be collected on eight individuals and be representative of both long term and excursion limit exposures as specified in OSHA regulation 29 CFR 1915.1001. Contractor shall be prepared to conduct clearance air monitoring upon job completion utilizing EPA AHERA methodology. Contractor will provide their own sampling equipment, including pumps, media, personal protective equipment, respirators, and sampling materials. Results will be provided to the contracting entity upon receipt. Contractor must have or be able to receive the appropriate clearance levels to access navy vessels.

1.2. Period of Performance:

1.2.1. The planning and execution phases of the work will be from August 2026 to December 2026.

1.2.2. The planning phase is expected to take place during the months of August and September. All NNSY provided training will occur during the planning phase. Contractors will be compensated during training periods.

1.2.3. Execution of work will occur from September 2026 to December 2026. Work will be executed at various intervals of time during this period to correspond with the project work schedule.

1.2.4. NNSY will assist with the vetting process to provide Contractors with clearances (if needed). Security clearances may take one to four months after the awarding of the contract to be provided. This period is outside the scope of the planning phase and will not be compensated for. Contractors must have a Secret Clearance Level for work execution.

1.3. Place of Performance

1.3.1. The Contractor shall bring all required tooling and equipment to accomplish all work at Norfolk Naval Shipyard (NNSY) in the Controlled industrial Area (CIA).

2. REFERENCES:

The following documents and their references shall be used in the technical requirements for performing work under this contract. The most current reference revision will be in effect at the time of award, unless otherwise specified. All work shall be performed in accordance with the drawings, documents and procedures cited below regardless of if the drawings, documents and procedures are vessel specific. The revision/change levels of any NAVSEA drawings or document utilized will be dictated by the most current revision/change unless directed otherwise via an Official Shipyard Document or other NAVSEA approved document for performing work under this Performance Work Statement (PWS). If the Contractor desires to use any drawing or technical instruction outside of these guidelines, cognizant Technical Authority concurrence must be given in writing prior to using any other reference, via a Contractor deficiency reporting process to include resolution. Any document not available to the Contractor can be obtained by request via the NNSY Contracting Officer (KO).

2.1. Local Standard Item 042-26-001 Security Requirements for Work Within Norfolk Naval Shipyard (NNSY); accomplish

2.2. Local Standard Item 042-22-001 General Requirements for Work Within Norfolk Naval Shipyard (NNSY); accomplish

2.3. OSHA Standard 29 CFR 1915.1001 - Asbestos

2.4. NNSY Standard Item 042-11-001 General Occupational Safety, Health and Environment (OSHE) Requirements for Work Within Norfolk Naval Shipyard

2.5. OPNAVINST M-5100.23 Navy Safety and Occupational Health Manual

2.6. Norfolk Naval Shipyard (NNSY) Asset Authorization Submittal Requirements

2.7. OPNAV M-5100.23 CH-3 Chapter 17 - Asbestos Control

2.8. 40 CFR763 Subpart E

3. REQUIREMENTS:

3.1. NNSY Requirements

3.1.1. NNSY will support Contractor work 10 hours a day on 1st shift (1st shift hours: 0600 to 1830). Monday through Friday, excluding government holidays. Due to overtime considerations, notification to the COR is required to support work outside of normal business hours 0600 to 1830.

Notification must be received by the close of business on Tuesday of the week prior the week additional support is needed. Support outside of normal business hours will be evaluated on a case-by-case basis. Weekends may be utilized to maintain the project schedule, but this will also be addressed on a case-by-case basis.

3.1.2. NNSY will provide power to the work locations within the Navy Submarine where work is performed. Where required, contractor may request temporary power drops to be provided by the shipyard VIA a 110kVA transformer.

3.1.3. NNSY will provide technical representative points of contact for interface. See Section 3.10

3.1.4. NNSY will supply the Contractor with towels, Tyvek, shoe covers, and gloves if entrance to a regulated asbestos work area is deemed necessary.

3.2. General Requirements:

3.2.1. The Contractor shall provide at least two licensed/approved Personnel Monitoring technicians at all times during the work day. The Contractor shall perform work in accordance with the applicable references in section 2. The contractor shall comply with all references as cited within this contract, unless authorized by the Government.

3.2.2. The Contractor shall furnish the material, services, and workspace/trailers, unless furnished by the Government under express provisions of this contract, necessary for the execution of work.

3.2.3. Contractor shall work under NNSY Radiological Oversight Services.

3.2.4. The Contractor shall comply with all laws, ordinances, and regulations of Federal, State, and Local authorities regarding licenses, permits and consents that may be necessary. For any supplies or services provided pursuant to this contract, the Contractor shall comply with all applicable laws and regulations of, but not limited to, the Commonwealth of Virginia, the Nuclear Regulatory Commission (NRC), Environmental Protection Agency (EPA), Occupational, Safety, and Health Administration (OSHA), Department of Transportation (DOT), and Toxic Substances Control Act (TSCA).

3.2.5. The Contractor shall allow inspections by NNSY representatives at all reasonable times. Inspections shall include asbestos controls, safety, and adherence to approved work procedures. Inspections may be random.

3.2.6. The Contractor shall provide a Project Manager to participate in the following meetings and conferences at NNSY request.

3.2.6.1. Project Progress meetings as requested.

3.2.6.2. Production meetings with C400/Contract Office Representative (COR) as requested.

3.2.6.3. Both a Pre-Job brief and a Pre-Shift brief with NNSY shall be accomplished before execution of approved work. The Pre-Job brief should be led by the worksite supervisor and include the mechanics and any support personnel for this job. The Pre-Job brief shall entail a review of the entire document being worked at any time before the execution of the work. A Pre-Shift brief shall entail the work to be accomplished per the approved document on the day of execution. The Pre-Shift brief should be led by the mechanic and should include participation/engagement from all personnel executing the approved work to ensure all personnel understand the scope.

3.2.6.4. Other meetings as required to cover any emergent needs that may develop over the availability.

3.3. Security Requirements:

3.3.1. All Contractors must have US citizenship and a Secret Security Clearance.

3.3.2. Contractors that don't have an appropriate clearance level will be required to submit the proper paperwork to the Defense Counterintelligence and Security Agency (DCSA) to initiate the security clearance process. NNSY will assist with the facilitation and vetting of this process.

3.3.3. The Contractor and all its employees shall conform to the security requirements that govern access to the shipboard spaces, dry dock, or other areas required to accomplish tasked work, and other miscellaneous security requirements in accordance with reference 2.1.

3.3.4. Contractors shall follow the PED policy for all electronic devices on site:

3.3.4.1. A PED is defined as any non-stationary electronic apparatus with singular or multiple capabilities of, but not limited to recording, storing, and /or transmitting data, voice, video, or photo images (E.g., cell phones, laptops, tablets, and wearable devices such as fitness bands and smart watches).

3.3.4.2. In accordance with NAVSEA 04 Ser 04/281 Implementation Plan for Allowing Camera-Portable Electronic Devices within the Controlled Industrial Area, personally owned camera enabled PEDs will be authorized inside of the Controlled Industrial Area (CIA) and all Security Islands.

Camera enabled PEDS will remain unauthorized within the Controlled Nuclear Information Areas (CNIAs), Nuclear Work Areas (NWAs) and Open Storage Areas.

3.3.4.3. Unofficial photography, filming of video, or live streaming from the camera-enabled PED remains prohibited within the CIA or any NAVSEA controlled space outside of the CIA. Further, audio recordings (both digitally or magnetically) in NAVSEA spaces is prohibited without the approval of the NNSY Code 1120 Security Director.

3.3.4.4. Submarine Specific PEDs Instructions:

3.3.3.4.1 In accordance with COMSUBLANT/COMSUBPACINST 2075.1C, the use of PEDs while in or on Department of Navy Submarines are prohibited.

3.4. Asbestos Work Requirements:

3.4.1. Upon award of the contract, Contractor must provide NNSY with proof of licensing through the Commonwealth of Virginia.

3.4.2. Contractor will perform all equipment prechecks (flow, calibration chain of custody paperwork, log, physical inspection labeling, etc.)

3.4.3. Contractor to assemble equipment stand, pumps, and monitoring cassette and provide to RIO worker under RIO Asbestos Supervisor cognizance for installation in work area. Contractor personnel will not enter any radiological work areas. Contractor equipment may be subject to radiological evaluation (e.g. frisks) after hand-off and before entering radiological areas.

3.4.4. All equipment will be visually inspected/wiped down/HEPA vacuumed at the exit of the Class I work area (RC door). The "transfer box" will be located within the CPA to allow the CPAW to evaluate (e.g. frisk) materials to turn over to contractor. Any materials failing the evaluation shall be turned over to NNSY for gamma counting; based on these results, the materials will either be cleared for release or processed for disposal. Contractor will remain on the clean side of the tunnel to visually observe and log time(s).

3.4.5. Personal samples will need to be collected on eight individuals daily and be representative of both long term and excursion limit exposures specified in OSHA regulation Reference 2.3 (29 CFR 1915.1001).

3.4.5.1. Sample quantity can vary depending on the loading of the sample cassette, but could involve up to 23-36 samples per day (not including blanks).

3.4.5.2. Samples will need to be collected using a sampling flow rate of approximately 2-4 liters/minute.

3.4.5.3. NNSY may request additional personal samples as needed to prevent having overloaded cassettes.

3.4.5.4. Contractor will assist NNL-RIO worker(s) with donning personal pump and excursion pumps (if applicable) including positioning of label cassette(s). Non-excursion pumps maybe started outside the area at the direction of the air monitoring contractor or RIO worker under RIO Asbestos Supervisor cognizance will start personal monitoring pump at the entrance to asbestos area. Contractor will not enter radiological areas.

3.4.5.5. RIO worker under RIO Asbestos Supervisor cognizance will remove plug/cover from monitoring cassette and start excursion monitoring pump at start of activities relevant to excursion monitoring. RIO Asbestos Supervisor will report to contractor excursion pump start time for logging purposes.

3.4.5.6. RIO worker under RIO Asbestos Supervisor cognizance will stop excursion pump at T+30 minutes, replace cassette plug/cover and report stop time to Contractor. Excursion pump may be removed and processed out of the radiological area at this time dependent on efficiency.

Alternatively, if pump will remain on person but in an off position until worker exits the following means will be used.

At end of work cycle, RIO worker under RIO Asbestos Supervisor cognizance will exit the work area, turn off personal monitoring pump, relace cover /cap, report time to Contractor, and remove pump and cassette from person and place in "transfer box" to be evaluated by RADCON. Ideally the Contractor will be present in the clean side of the tunnel so they can visually observe this and log times.

3.4.6. General area samples will need to be collected at various inside locations (DCU, CPA, Critical Barrier for RC penetration if other than the tunnel, discharge of each HEPA filtered ventilation duct, and work area for RCUL and RCLL) and outside locations (boundary area, DCU, and work area) of the RC abatement site. All exhausts are to be monitored daily)). Samples will also be taken within the regulated area boundary if requested by removal entity or as specified in 3.4.6.4.

3.4.6.1. Contractors shall perform blanks IAW NIOSH 7400 (minimum of 2 field blanks or 10% of total samples, whichever is greater). Background samples will be used to validate final clearance.

3.4.6.2. Sample quantity can vary depending on the loading of the sample cassette but could involve up to 32 samples per day (not including blanks).

3.4.6.3. General area samples could also be necessary if a spill situation occurs to determine airborne levels and suitability for re-entry into affected spaces.

3.4.6.4. NNSY may request additional general area samples as needed.

3.4.6.5. Contractors shall consider changing out boundary sampling cassettes multiple times a day in dirty/heavy traffic areas.

3.4.6.6. RIO worker under RIO Asbestos Supervisor cognizance will remove plug/cover from monitoring cassette and start work area pump once placed in designated area. RIO Asbestos Supervisor will report to Contractor area monitoring pump start time for logging purposes

3.4.6.7. RIO worker under RIO Asbestos Supervisor cognizance will routinely inspect pump to ensure it is still operating as expected and report deficiencies to Contractor.

3.4.6.8. At the end of monitoring or if pump/cassette needs to be changed out, RIO worker under RIO Asbestos Supervisor cognizance will turn off work area pump, replace cover/cap, report time to contractor, and remove pump and/or cassette from location. Pump stand may remain in place if additional sampling is required.

3.4.7. At the conclusion of all asbestos removal, final clearance sampling shall be performed as required by reference 2.3, reference 2.7, and reference 2.8.

3.4.7.1. The Contractor will perform clearance samples at a minimum of 5 sample points inside the work area and 5 sample points outside the work area. Outside work area samples will be in the same locations as in the process boundary monitoring samples were. Air sampling will begin following a waiting period of at least 8 hours following completion of asbestos work.

3.4.8. The Contractor will turn over all air samples to an NNSY designated subcontractor for analysis.

3.4.9. Specific work requirements in addition to, and in clarification of, noted references:

3.4.9.1. Contractor shall provide dedicated Asbestos air sampling / exposure monitoring as noted.

3.4.9.2. Air sampling shall include personal exposure monitoring representative of both the time-weighted average and excursion limit daily while work operations occur. Air sampling shall be conducted on all employees associated with the asbestos work (anticipated to be 8 individuals) and verified that levels did not exceed 0.1 f/cc.

3.4.9.3. General area air sampling shall include perimeter monitoring to verify airborne levels do not exceed 0.01 f/cc outside of the asbestos regulated area (as analyzed by phase contrast microscopy). Samples shall be run continuously while the asbestos operations are ongoing, and shall include a minimum volume of 1200 liters of air and a maximum flow rate of 16 liters per minute.

3.4.9.4. Air sampling shall include general area monitoring within the RC during the asbestos removal operations to verify airborne levels do not exceed 0.01 f/cc outside of the containment or glove bag (as analyzed by phase contrast microscopy). Samples shall be run continuously while the asbestos operations are ongoing and shall include a minimum volume of 1200 liters of air.

3.4.9.5. Clearance air sampling shall be completed at the end of all asbestos removal operations and clean-up. Clearance criteria shall be as specified in 40 CFR 763, Subpart E.

3.4.9.6. Perimeter area, personal, general area, and clearance air sample results shall be turned over to a designated subcontractor for analysis with the expectation that NNSY will receive results within 24 hours of pump start time.

3.4.9.7. The exhaust for the ventilation serving the regulated work area to verify airborne levels do not exceed 0.01 f/cc at the exhaust (as analyzed by phase contrast microscopy, and to include a minimum volume of 1200 liters of air and a maximum flow rate of 16 liters per minute).

3.4.9.8. Air sampler shall also take negative pressure readings a minimum of every two hours during work operations, record values, and turn over to Code 106.21.

3.5. Asbestos Training Requirements:

3.5.1. All contractors performing asbestos air sampling must be trained, familiarized, and/or certified. Documentation is required for all training and certifications. Documentation will be provided to NNSY upon request.

3.5.1.1. Current Asbestos Worker/Asbestos Supervisor.

3.5.1.2. Documentation of training for personnel conducting air monitoring.

3.6. Personnel Qualification:

3.6.1. General:

3.6.1.1. All work under the terms of this contract will be performed in an efficient and workmanlike manner by personnel who are thoroughly familiar with the type of work being performed. The Contractor warrants that employees used on the work will, on the average, be as efficient as the average employees performing similar duties in the Contractor's own organization and will in all cases meet or exceed the minimum requirements set forth for the respective labor categories.

3.6.1.2. The Contractor will be responsible for employing appropriate professionally and technically qualified personnel to perform the tasks outlined herein. The Contractor must have the qualified personnel, organization and administrative control necessary to ensure that the finished products shall conform to each task order. If the Contracting Officer questions the qualifications or competence of any person(s) performing the contract, the burden of proof to sustain the person(s) is (are) qualified as prescribed herein will be upon the Contractor.

3.6.1.3. The level of skill, education, and experience of the personnel required to perform this effort will meet the minimums specified below.

Personnel assigned for performance of a task to be ordered under this contract shall meet the minimum qualifications for the respective labor category under which they are charged.

3.6.2. Minimum Qualifications:

3.6.2.1. Personnel assigned to or utilized by the Contractor in the performance of this contract shall, as a minimum, be fully capable of performing the contemplated functions of the respective labor categories in an efficient, reliable, and professional manner.

3.6.2.2. The Government reserves the right to request the qualifications or competence of any person performing under this contract and the burden of proof to sustain that person is qualified as prescribed herein shall be upon the Contractor.

3.6.2.3. The Contractor will be responsible for employing trained management, technical, and other personnel to perform the work outlined. The Contractor must have the personnel, organization, and administrative control necessary to ensure that the services they perform meet all requirements specified in the delivery orders. The work history of each Contractor employee shall contain experiences directly related to the tasks and functions they are intended to perform prior to performing services under the contract. Further, these prior work experiences must be of sufficient variety and duration that the employee is able to effectively and efficiently perform the tasks and functions they will be assigned.

3.6.2.4. Training and qualification requirements apply to any subcontractors in the same manner with no exceptions.

3.7. Quality Management and Assurance:

3.7.1. The Contractor shall develop and maintain a Quality Management System, compliant with Reference 2.2, which provide assurances that all contracted work submitted to the Government for acceptance conforms to contract requirements. The Contractor's Quality Management System shall be documented and shall be submitted as part of the contract award process. The Contractor's Quality Management System shall be approved by NNSY prior to start of performance and shall be subject to periodic audits by NNSY throughout the contract Period of Performance.

3.8. Required Standard of Workmanship:

3.8.1. Unless otherwise specifically provided in the contract, the quality of all services rendered hereunder shall conform to the highest standards in the relevant profession, trade or field of endeavor. All services shall be rendered by or supervised directly by individuals fully qualified in the relevant profession, trade or field, and holding any licenses required by law and regulation.

3.9. Prior Written Permission Required for All Subcontracts:

3.9.1. Any changes in subcontractors, additions of subcontractors, or change in the processes performed by subcontractors must be approved by the Contracting Officer prior to the change or addition. A Contractor's request to change or add subcontractors or subcontracted processes will include the Technical Capability Information from the solicitation, which is delineated in the 52.212-1 Instructions to Offerors provision of the solicitation, about the subcontractor(s) covered by the request.

3.10 NNSY Points of Contact

TBD

SECIRUTY STATEMENTS FOR STATEMENTS OF WORK

The security requirements listed below are to be utilized as needed in the generation of a Statement of Work (SOW), Performance of Work (PWS) Package, E-Spec, or other such documents which dictate the parameters of work and expected actions of contractors working at Norfolk Naval Shipyard (NNSY).

Defense Biometric Identification System and NAVSEA Badging (REQUIRED FOR ALL CONTRACTS)

All contractors, with the exception of permanent party (or "seated" contractors with Common Access Cards (CACs), will be required to obtain a DBIDS card to gain access to NNSY.

Procedure for receiving a DBIDS card:

a. Contractor will complete the SECNAV 5512 form(s) and forward them to their NNSY Sponsor/Contracting Officer's Representative (COR).

b. The sponsor will complete the CVS spreadsheet utilizing the information on the completed SECNAV5512 forms and forward all documents to Commander Navy region Mid-Atlantic (CNRMA) for vetting.

c. CNRMA will add the contractor to the "179-Day List" which is utilized by the Pass and ID office to create the DBIDS card.

d. Once on the 179-Day List, the contractor may go to Pass and ID to have their DBIDS card generated.

e. Green NAVSEA access badges can be generated at this point with contractors providing proof of U.S. Citizenship (Birth Certificate/ US Passport).

Portable Electronic Devices (PEDs) (REQUIRED FOR ALL CONTRACTS)

A PED is defined as any non-stationary electronic apparatus with singular or multiple capabilities of, but not limited to recording, storing, and/or transmitting data, voice, video, or photo images (e.g., cell phones, laptops, tablets and wearable devices such as fitness bands and smart watches).

a. NAVSEA 04 Ser 04/281 IMPLEMENTATION PLAN FOR ALLOWING CAMERA-PORTABLE ELECTRONIC DEVICES WITHIN THE

CONTROLLED INDSUTRIAL AREA

b. NAVSEAINST 2200.1A PORTABLE ELECTRONIC DEVICES POLICY

c. SECPROMAN Vol 1 5510.36 Rev E

In accordance with ref (a), personally owned camera enabled PEDs will be authorized inside of the Controlled Industrial Area (CIA) and all

Security Islands. Camera enabled PEDs will remain unauthorized within Controlled Nuclear Information Areas (CNIAs), Nuclear Work Areas (NWAs) and Open Storage Areas.

All PEDs, camera enabled or not, are still prohibited within NWAs and Open Storage Areas.

The allowance of camera enabled PEDs inside of the CIA and Security Islands does not negate existing photography policies. Unofficial photography, filming of video, or live streaming from the camera-enabled PED remains prohibited within the CIA or any NAVSEA controlled space outside of the CIA. Further, audio recordings (both digitally or magnetically) in NAVSEA spaces is prohibited without the approval of the Code 1120 Security Director.

Submarine SPECIFIC PEDs Instructions: In accordance with COMSUBLANT/ COMSUBPACINST 2075.1C, the use of PEDs while in or on Department of Navy Submarines are prohibited.

Access to Classified Information or Spaces

All contractors executing this contract are required to have a minimum security clearance of ___________ (Completed by SME).

All contractors requiring access to classified information, or those spaces containing un-sanitized classified information, shall possess a final security clearance.

In addition to completing the steps above, if the contractor requires access to classified information, spaces, or equipment in accordance with the requirements of the contract, the contracting company's Facility Security Officer is required to submit a visit request in the Defense Information System for Security (DISS) to Security Management Office (SMO) Code 001816.

The SMO Code(s) of the ship or command the contractor is visiting are not to be utilized.

After receiving a DBIDS card, their visit request, security clearance and access permissions (verified in DISS) are reviewed to ensure they meet the minimum security requirements set forth in the contract. Once verified, the contractor will receive the appropriate NAVSEA access badge.

RESTRICTED DATA SPECIFIC

All contractors requiring a red NAVSEA badge and access to Restricted Data (RD) shall have a final security clearance.

Red NAVSEA badge personnel may require access to Nuclear Areas, Nuclear Information, Nuclear equipment, Naval Nuclear Propulsion Information (NNPI), RD, and Not Releasable to Foreign Nationals (NOFORN) data due to the nature of the work being performed on Naval Nuclear propulsion systems.

A red NAVSEA badge is necessary for the execution of nuclear and some non-nuclear work; inclusive of the propulsion plant and secondary spaces as well as those systems which support the propulsion plants which may not be located in the propulsion plant when any of those spaces can't be sanitized.

Access to RD and the issuance of red NAVSEA badges will be issued in accordance with NAVSEA M-5510.2.

CONTROLLED UNCLASSIFIED INFORMATION ACCESS

The DoD will provide information to contractors and will identify all information which is Controlled Unclassified Information (CUI) via the contracting vehicle, in whole or part, and will mark such documents, material, or media in accordance with this issuance.

When CUI is generated by non-DoD entities protective measures and dissemination controls, including those directed by relevant law, regulation, or government-wide policy, will be articulated in the contract, grant, or other legal agreement, as appropriate.

DoD contracts must require contractors to monitor CUI for aggregation and compilation based on the potential to generate classified information pursuant to security classification guidance addressing the accumulation of unclassified data or information. DoD contracts require contractors to report the potential classification of aggregated or compiled CUI to a DoD representative.

Contractors, pursuant to mandatory DoD contract provisions, will submit unclassified DoD information for review and approval for release in accordance with the standard DoD Component processes and DoDI 5230.09.

All CUI records must follow the approved mandatory disposition authorities whenever the DoD provides CUI to, or CUI is generated by, non-DoD entities in accordance with Section 1220-1236 of Title 36, CFR, Section 3301a of Title 44, U.S.C., and this issuance.

SEATED CONTRACTOR SPECIFIC

All contractors who receive CACs and are granted access to Navy or NNSY information technology systems and are stationed at NNSY as their permanent work location are considered to be "seated" contractors.

All seated contractors will be required to report to BLDG 1502, 2nd floor to the Personnel Security Office (Code 1127) for check-in. Code 1127 will own the seated contractor in the system of record and will be responsible for the maintenance for the contractor's security profile.

All seated contractors will be required to attend, at a minimum, the security education portion of NNSY New Employee Orientation.

The security education portion will contain, but is not limited to, Antiterrorism Level 1, Combatting Trafficking in Persons, Active Shooter training, Information Security, Personnel Security, and Operations Security Awareness training.

Further, all seated contractors will be required to complete all annual computer based security refresher training, which is tracked and verified by the training coordinator for the code to which the contractor is assigned.

Requirements Statement of Work Personnel Asbestos Monitoring CLIN 0001 and CLIN 0002

Section D - Packaging and Marking

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-1 Contractor Inspection Requirements. Apr 1984

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

TBD, TBD

Email: TBD Telephone: TBD

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: N42158

N42158

1 NORFOLK NAVAL SHIPYARD BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

TBD, TBD

Email: TBD Telephone: TBD

Section F - Deliveries or Performance ACCESS to NNSY

REQUIREMENTS FOR ACCESS TO NNSY

Commander, Navy Installations Command (CNIC), has established the Defense Biometric Identification System, (DBIDS), a standardized process for granting unescorted access privileges to vendors, contractors, suppliers and service providers not otherwise entitled to the issuance of a Common Access Card (CAC) who seek access to and can provide justification to enter Navy installations and facilities. Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS. Alternatively, if the vendor so chooses, it may voluntarily elect to obtain long-term credentials through enrollment, registration, background vetting, screening, issuance of credentials, and electronic validation of credentials. Further information regarding DBIDS can be found at https://www.cnic.navy.mil/om/dbids.html.

NOTE: Building 276 TELEPHONE: 757-396-5815 (or 5095)

Overall Contract Delivery Period

Contractor Destination

Line Item Delivery Schedule Quantity Address and POC

Delivery Period From 03 Aug 2026 to 30 Sep 2026

Period of Performance From 03 Aug 2026 To 23 Dec 2026

10 Hours Service Performance Site DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

TBD, TBD

Email: TBD Telephone: TBD

Delivery Period From 01 Sep 2026 to 23 Dec 2026

Period of Performance From 03 Aug 2026 To 23 Dec 2026

162 Days Service Performance Site DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

TBD, TBD

Email: TBD Telephone: TBD

Section G - Contract Administration Data Safety Office points of contact:

Code 970 Dispatch 1-757-396-5895 Shipyard -Emergency 1-757-396-3333 Shipyard - Non-Emergency 1-757-396-3335 OCCUPATIONAL SAFETY, HEALTH, & ENVIRONMENT (OSHE) PROGRAMS -Code 106 757-396-7231

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.

WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Not Applicable

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2 in 1

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.

when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC N50082

Issue By DoDAAC N42158

Admin DoDAAC N42158

Inspect By DoDAAC N42158

Ship To Code N42158

Ship From Code ____

Mark For Code TBD

Service Approver (DoDAAC) N42158

Service Acceptor (DoDAAC) N42158

Accept at Other DoDAAC ____

LPO DoDAAC N42158

DCAA Auditor DoDAAC ____

Other DoDAAC(s) 050120

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Additional Regulation or Supplemental Clauses Incorporated by Full Text

G-232-H002 H002 PAYMENT INSTRUCTIONS (NAVSEA) (FEB 2024) (Feb 2024)

Payment office allocation methods can be found in the table at DFARS PGI 204.7108(b)(2) (https://www.acq.osd.mil/dpap /dars/pgi/pgi_htm/current/PGI204_71.htm#payment_instructions).

This procurement is for firm fixed priced items.

(End of text)

G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021) (Jul 2021)

(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor's expense with no cost or liability to the U.

S. Government.

(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.

(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent

N4215826QE045

https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.

(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company's established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.

(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.

(f) The hours of operation are as follows:

AREA FROM TO

Norfolk Naval Shipyard 0700 1630

(g) All deliveries to the Receiving Officer, Norfolk Naval Shipyard, Bldg. 276, Portsmouth, VA 23709, shall be made Monday through Friday from 0700 to 1630 local time. No deliveries will be accepted after 1630, local time. No deliveries will be accepted on federal government holidays.

(End of Text)

G-242-H001 GOVERNMENT CONTRACTADMINISTRATION POINTS-OF-CONTACT AND

RESPONSIBILITIES (NAVSEA) (OCT 2023)

(Oct 2023)

(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.

(b) The contracting officer is the only person authorized to change this contract, or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.

The points of contact are as follows:

The Procuring Contracting Officer (PCO) is:

Chad Godwin Norfolk Naval Shipyard, Bldg. 65, Floor 1 Portsmouth, VA 23709 1-757-396-8360 office chad.r.godwin.civ@us.navy.mil

The Contract Specialist is:

Eliot Faircloth Norfolk Naval Shipyard, Bldg. 65, Floor 1 Portsmouth, VA 23709 1-757-396-8673 john.e.faircloth2.civ@us.navy.mil

The Administrative Contracting Officer (ACO) is:

Chad Godwin Norfolk Naval Shipyard, Bldg. 65, Floor 1 Portsmouth, VA 23709 1-757-396-8360 office chad.r.godwin.civ@us.navy.mil

(c) The Contracting Officer’s Representative (COR) is the contracting officer’s appointed representative for technical matters. The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.

Not Applicable

(d) The Alternate Contracting Officer’s Representative (ACOR) is responsible for COR responsibilities and functions in the event that the COR is unavailable due to leave, illness, or other official business. The ACOR is appointed by the contracting officer; a copy of the ACOR appointment will be provided upon award of this contract.

Not Applicable

(e) The Technical Point of Contact (TPOC) is the contracting officer’s representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.

The Technical Point of Contact (TPOC) is:

TBD

(f) The Alternate Technical Point of Contact (ATPOC) is responsible for TPOC responsibilities and functions in the event that the TPOC is unavailable due to leave, illness, or other official business.

Not Applicable

(g) The Ombudsman will review complaints from the contractors and ensure that all contractors are afforded a fair opportunity to be considered, consistent with the procedures in the contract.

Not Applicable

(h) The Authorized Ordering Person(s) for Per-Call Maintenance is responsible for issuing and maintaining records for any per-call orders for remedial maintenance placed under this contract. No per-call order shall be placed outside the scope of this contract and the cumulative total of all orders shall not be in excess of any not-to-exceed amount specified in the contract. Per-call orders shall not, in any way, modify any terms and conditions of the contract.

Not Applicable

(i) The Contractor's point of contact for performance under this contract is:

TBD

(End of text)

(End of Text)

Section H - Special Contract Requirements

Section I - Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026- O0038)

Feb 2026

52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation 2026- O0038)

Feb 2026

52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026-O0038) Feb 2026 52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026-O0038) Feb 2026 52.222-41 Service Contract Labor Standards. (Deviation 2026-O0038) Feb 2026 52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038) Feb 2026 52.222-90 Addressing DEI Discrimination by Federal Contractors. (Deviation 2026-O0038) Apr 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .