Request for Qualifications
836 KB Posted
- Attached to
- I-20 at CR 249/Old Mill Road Project
- Solicitation number
- RFQ-484-03312023DB
- Issued by
- Madison County, Georgia
About this file
RFQ Summary: I-20 at CR 249/Old Mill Road Project
This Request for Qualifications (RFQ) is issued by the Georgia Department of Transportation (GDOT) to solicit design-build services for a new interchange at I-20 and CR 249/Old Mill Road located in Morgan and Walton Counties, Georgia. The procurement follows a two-phase best value selection methodology authorized under O.C.G.A. 32-2-81 and Georgia procurement regulations. GDOT seeks a qualified Design-Build Team consisting of a Lead Contractor and Lead Design Consultant to design and construct the new interchange. The project is Federally funded and requires preparation of a Category 3 schedule. The Environmental Assessment was approved by FHWA on March 8, 2023, with a Finding of No Significant Impact anticipated prior to letting. Statements of Qualifications are due April 27, 2023, at 11:00 AM. GDOT will shortlist up to five Respondents by May 19, 2023, and issue the Request for Proposals to Shortlisted Proposers on May 26, 2023. Proposals from Shortlisted Proposers are due September 21, 2023, with price proposals opening on October 13, 2023. The project goal is to achieve substantial completion on or before a specified deadline while ensuring comprehensive stakeholder outreach and construction staging coordination.
The Design-Builder will provide design and construction services on a lump sum basis with progress-based payments according to an agreed schedule and schedule of values. A Stipulated Fee of $200,000 will be offered to up to four unsuccessful Shortlisted Proposers providing responsive proposals. GDOT has established a project-specific Disadvantaged Business Enterprise (DBE) participation goal of 16% of overall design and construction costs. Respondents must demonstrate financial capacity through performance bonds and payment bonds, each in an aggregate amount of $57 million, or equivalent letters of credit from qualified financial institutions. Key Personnel positions, including Lead Contractor Project Manager, Lead Design Consultant Project Manager, Engineer of Record, Contractor Superintendent, and Quality Control Manager, must be identified by name and remain exclusive to each respondent team. Evaluation criteria emphasize experience and qualifications (75% factor) and suitability (25% factor), with assessment based on past performance, technical expertise, GDOT-specific process knowledge, project complexity experience, safety records, and organizational capability to deliver projects of similar scope and function.
Text of this file
P.I. No. 0018361 – I-20 at CR 249/Old Mill Road Project Date Posted: 3/31/2023
DMFIRM #43093676 v18
Georgia Department of Transportation
Request for Qualifications
RFQ-484-03312023DB
To Provide
Design-Build Services for I-20 at CR 249/Old Mill Road Project
P.I. No. 0018361 Morgan and Walton Counties, GA
Statements of Qualification Due: April 27, 2023
Georgia Department of Transportation One Georgia Center
600 West Peachtree Street, NW Atlanta, Georgia 30308
RFQ-484-03312023DB
TABLE OF CONTENTS
Page
I. Project Information
A. Overview of the Procurement
B. Project Goals
C. Project Status
D. Scope of Services
E. Stipulated Fee
F. PDMS
G. GPR Website
II. Procurement Rules
A. Conflicts of Interest
B. Restricted Firms and Affiliates
C. Participation on more than one Respondent Team
D. Changes in Respondent Organization
E. Restricted Communications
F. Open Records Laws
G. Disadvantaged Business Enterprise (DBE) Participation
III. Selection Process
A. Selection of Shortlisted Proposers (Phase I)
B. Selection of Team (Phase II)
IV. Procurement Schedule
V. Instructions for Preparing the Statement of Qualifications
VI. Evaluation Criteria
A. Administrative Minimum Requirements (Pass/Fail)
B. Qualifications Minimum Requirements (Pass/Fail)
C. Qualitative Evaluation Criteria (Best Value)
VII. Instructions Regarding Submission of Statements of Qualifications
VIII. Questions
IX. GDOT Terms and Conditions
A. Statement of Agreement
B. Non-Discrimination
C. Submittal Costs
D. Not an Offer; No Solicitation of Bids
E. Amendments to this RFQ
F. Substitutions, Alternates, Exceptions, and Extensions
G. Debriefing
X. Reserved Rights
RFQ 484-03312023DB
EXHIBIT I DEFINITIONS AND ABBREVIATIONS
EXHIBIT II CERTIFICATE
EXHIBIT III LOCATION MAP
FORM A PDMS ACCESS REQUEST
FORM B BASIC COMPANY INFORMATION
FORM C STATEMENTS OF DISCLOSURE (CONFLICT OF INTEREST)
FORM D RESUME FORM
FORM E INDUSTRIAL SAFETY RECORD
FORM F CERTIFICATE AND ACKNOWLEDGMENT
RFQ-484-03312023DB Page 5 of 49
REQUEST FOR QUALIFICATIONS
Design-Build Services for I-20 at CR 249/Old Mill Road Project
Two Phase Best Value
I. Project Information
A. Overview of the Procurement
The Georgia Department of Transportation (“GDOT”), an agency of the State of Georgia (the “State”), is soliciting Statements of Qualifications (“SOQs”) for a qualified Design-Build Team, to provide Design-Build services to construct a new interchange at I-20 and CR 249/Old Mill Road in Morgan and Walton Counties, Georgia (the “Project”).
This Request for Qualifications (“RFQ”) is the first step in a two phase procurement, as authorized under O.C.G.A. § 32-2-81 and Chapter 672-18 of the Rules and Regulations of the State of Georgia (the “Rules”). GDOT is procuring the Project under the two phase Best Value Design-Build selection method.
This RFQ outlines the minimum and desired qualifications for a contract counterparty (as further defined, the “Design-Builder”) to perform the scope of services described in Section I.D (Scope of Services) below. Companies, teams, joint ventures (“JVs”), partnerships or consortia submitting SOQs in response to this RFQ (“Respondents”) determined by GDOT to be responsive and that are shortlisted in response to this RFQ (the “Shortlisted Proposers”) will be deemed eligible and will be invited to offer a bid and corresponding technical proposal for these services in response to the subsequently advertised Request for Proposals (“RFP”) as the second step in the procurement.
All Respondents responding to this RFQ are subject to the instructions communicated in this document and are cautioned to review the entire RFQ and follow instructions carefully .
Information in this RFQ regarding the schedule, selection methodology, selection criteria, or any other items supersedes all previously publicly advertised information regarding this Project, including information in the Public Notice Advertisement (“PNA”) posted by GDOT on [date].
Capitalized terms used in this RFQ and not otherwise defined in the Design-Build Manual shall have the meanings given in Exhibit I (Definitions and Abbreviations).
B. Project Goals
The goals for the Project are to:
• Provide additional access to Frontage Road and I-20;
• Achieve substantial completion milestone on or before the substantial completion deadline;
• Ensure comprehensive stakeholder outreach;
• Ensure comprehensive approach to construction staging and traffic management; and
• Coordinate with adjacent projects and stakeholders.
RFQ-484-03312023DB Page 6 of 49
C. Project Status
1. General Project Information Resources
Certain information relating to the Project is described below. General information concerning GDOT’s Design-Build program, and weblinks to additional pages pertaining to the Project, can be found at GDOT’s Design-Build website, accessible at the following weblink:
https://www.dot.ga.gov/GDOT/pages/DesignBuild.aspx
a. Federal Status. This will be a Federally funded project.
b. Schedule. The Project will require preparation of a Category 3 schedule. High level Category 3 project schedule requirements can be found in GDOT’s Design-Build Project Scalability Memo, accessible at the following weblink:
http://www.dot.ga.gov/PartnerSmart/Innovative/DesignBuild/DBProjectScalability.pdf .
c. Environmental Permitting; NEPA Status. The Environmental Assessment (EA) was approved by FHWA on March 8, 2023. A Finding of No Significant Impact (FONSI) is anticipated prior to letting. The final requirements will be provided in the RFP.
d. Right of Way (ROW) Acquisition. ROW Acquisition is ongoing, and anticipated acquisition dates for ROW parcels will be communicated in the RFP.
e. Utility Investigation. Utility coordination is ongoing. Utility information (including executed Memorandums of Understanding (“MOUs”)) and the SUE QL-B will be made available in the RFP.
f. Coordination with Governmental Agencies and Other Third Parties and Key Stakeholders. Ongoing coordination with Morgan County, Walton County, and the local Joint Development Authority (JDA) will be required for any road closures and detours.
g. Other Due Diligence Activities. Existing site conditions and a survey control package will be included in the RFP.
A general depiction of the Project, as anticipated, is available as Exhibit III (Location Map) to this
RFQ.
All forms can be accessed on the GDOT’s Procurement Document Management System (PDMS) site at the following location: https://app-us3.e-builder.net/public/publicLanding.aspx?QS=588d45ff8da846fe9af9c9f05425ec49
These forms are now available in Word format and may be utilized by Respondents as part of the RFQ submittal package.
General project information and scope for this Project, as may be further amended above and otherwise under this RFQ, is available in the PNA, available at the following weblink:
https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=2348401PNA-484- 02032023DB&sourceSystemType=doas
Additional Project information, including the Project synopsis, may be found on GDOT’s Design- Build SharePoint site.
Instructions to review and download are as follows:
https://www.dot.ga.gov/GDOT/pages/DesignBuild.aspx http://www.dot.ga.gov/PartnerSmart/Innovative/DesignBuild/DBProjectScalability.pdf https://app-us3.e-builder.net/public/publicLanding.aspx?QS=588d45ff8da846fe9af9c9f05425ec49 https://app-us3.e-builder.net/public/publicLanding.aspx?QS=588d45ff8da846fe9af9c9f05425ec49 https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=2348401PNA-484-02032023DB&sourceSystemType=doas https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=2348401PNA-484-02032023DB&sourceSystemType=doas
RFQ-484-03312023DB Page 7 of 49
First, enter: http://mydocs.dot.ga.gov/info/designbuild/default.aspx
Then, select Project Identification Number: 0018361 – I-20 at Old Mill Road.
All Project information at the foregoing websites is provided for information only.
D. Scope of Services
1. General Description of the Scope of Work
The Design-Build Team, through the Design-Builder under contract with GDOT, will provide the Design-Build services to build a new interchange at the intersection of I-20 and Old Mill Road.
It is anticipated that the Apparent Successful Proposer will, as Design-Builder, design and construct the Project for a lump sum price, payable in accordance with progress based upon an agreed schedule and agreed schedule of values, under the terms, and subject to the conditions, within the Design-Build Agreement.
2. Quality Posture
Under the Design-Build Agreement, the Design-Build Team, through the Design-Builder, will be responsible for quality control (but not quality assurance) services in connection with all design and all construction activities. GDOT will retain a Construction Engineering and Inspection firm to perform construction inspection and testing services.
3. Design and Construction Standards
GDOT anticipates including in the RFP a set of Project-specific standards, specifications, and requirements, as well as a baseline Project definition.
4. Alternative Technical Concepts
The RFP may permit Proposers to propose, for GDOT’s consideration, alternative technical concepts, exceptions, and deviations from certain of these standards, specifications, and requirements (each an “ATC”). The ATC process, including any constraints or parameters on potential submissions, will be set forth in the RFP. All requests for deviations shall follow the requirements set forth in the RFP and the Design-Build Agreement. Respondents should note, however, that there may be restrictions on deviations from [federal and] State-mandated design and construction standards, as well as the Project definition set forth in the final Project environmental documents[ and NEPA approvals.
E. Stipulated Fee
A Stipulated Fee will be offered in the amount of $200,000 (the “Stipulated Fee”) to up to four unsuccessful Shortlisted Proposers that provide a responsive Proposal in response to the RFP.
The unsuccessful Shortlisted Proposers receiving a Stipulated Fee will be up to four responsive bids with the next highest scores below that of the Apparent Successful Proposer. The terms and conditions for the Stipulated Fee will be included in the RFP.
F. PDMS
GDOT intends to address certain correspondence and all SOQ, Proposal, and other procurement submissions by use of a PDMS.
http://mydocs.dot.ga.gov/info/designbuild/default.aspx
RFQ-484-03312023DB Page 8 of 49
In order to receive the credentials necessary to interact with GDOT on the PDMS, Respondents must register with GDOT. Respondents are highly encouraged to complete Form A (PDMS Access Request) well in advance of the deadline described in Section IV (Procurement Schedule), and GDOT will accept completed Form A (PDMS Access Request) documents as early as the posting date of this RFQ. Respondents are also encouraged to review Form A (PDMS Access Request) for further information regarding access to the PDMS. Once received, GDOT will endeavor to issue PDMS credentials within one business day of the deadline noted in Section IV (Procurement Schedule).
If Form A (PDMS Access Request) is not completed by the deadline in Section IV (Procurement Schedule), it will be rejected and the prospective Respondent will not be allowed to continue to participate in this procurement, including specifically to submit a SOQ and otherwise be considered for selection.
It is the responsibility of all Respondents interested in submitting SOQs for this advertisement to routinely check the PDMS for correspondence posted by or on behalf of GDOT.
GDOT bears no responsibility to any prospective Respondent or Respondent for its failure to receive information or review correspondence on the PDMS.
G. GPR Website
GDOT intends to make certain notifications to prospective Respondents and to Respondents by publication to the Georgia Procurement Registry website (the “GPR Website”), accessible at the following weblink: https://ssl.doas.state.ga.us/PRSapp/. A weblink to the GPR Website may also be found on the GDOT Design-Build website.
It is also the responsibility of all prospective Respondents interested in submitting SOQs to routinely check the posting on the GPR Website for any revisions to this RFQ.
GDOT bears no responsibility to any prospective Respondent or Respondent for its failure to receive information posted on the GPR Website.
II. Procurement Rules
From the advertisement date of this RFQ until the Apparent Successful Proposer is selected and a Design-Build Agreement is executed, Respondents are not allowed to communicate about this Project or its procurement with any staff of GDOT, including the Commissioner, State Transportation Board (the “Board”), and consultants supporting GDOT staff (and including those consultants listed in Section II.B (Restricted Firms and Affiliates)), except for submission of questions as instructed in this RFQ per Section VIII (Questions).
A. Conflicts of Interest
For the purposes of this RFQ, a “Conflict of Interest” has the meaning given in the Design-Build Manual available on the GDOT Design-Build website. Generally, and without limiting the foregoing definition, a Conflict of Interest exists in a situation where a person or entity who, because of other activities, secondary interests, or relationships with other persons or entities involved: 1) is unable or potentially unable to render impartial assistance or advice to GDOT;
2) is or might be otherwise impaired in its objectivity in performing the contract work; or 3) has an unfair competitive advantage. Refer to 23 C.F.R. § 636.116 regarding Design-Build Organization Conflict of Interest.
In soliciting the Design-Builder for the Project, GDOT intends to comply with all applicable laws https://ssl.doas.state.ga.us/PRSapp/
RFQ-484-03312023DB Page 9 of 49 pertaining to prevention, mitigation, and where feasible, remediation of any Conflicts of Interest, which laws include (but are not limited to):
• O.C.G.A § 45-10-1, et seq. (Codes of Ethics and Conflicts of Interest);
• GDOT Policy 3A-17 (Code of Conduct Pertaining to Conflict of Interest in the Award and Administration of Contracts);
• GDOT Policy 4020-1 (Procurement, Contract Development and Management of Professional Services for Architectural and Engineering Work);
• GDOT Policy 7115-2 (Sub-Recipient Monitoring Policy);
• 23 C.F.R. § 636.116 (What Organizational Conflict of Interest Requirements Apply to Design-Build Projects?);
• 49 C.F.R. § 18.36(b)(3) (Procurement Standards for Grantees and Subgrantees; Conflicts of Interest); and
• 49 C.F.R. § 172.7(b)(4) (regarding Conflicts of Interest).
In addition, GDOT intends, and by participating in this procurement, Respondents acknowledge the obligation, to comply with GDOT’s policies regarding Conflicts of Interest and ethics, as set forth in the Design-Build Manual.
Respondent shall, in assembling its team, identify and divulge to GDOT in its “Statements of Disclosure” any known or discovered Conflicts of Interest or potential Conflicts of Interest, both direct and indirect, and relationships, affiliations, or other involvement of an individual person or entity that appears to pose a Conflict of Interest, directly or indirectly. In submitting its SOQ, Respondent acknowledges a continuing duty through the procurement to identify and divulge any such known, discovered, potential, or perceived Conflicts of Interest, both direct and indirect. In discharging such obligation, Respondent shall identify and divulge to GDOT any such Conflicts of Interest as among Respondent and any of its team members (i.e., intended to be among the Design-Build Team and identified by name).
Respondents shall notify GDOT at the email address in Section VII (Instructions Regarding Submission of Statements of Qualifications), with written notification promptly thereafter, but in no case later than the date set forth in Section IV to the address in Section VII (Instructions Regarding Submission of Statements of Qualifications), of any such known, discovered, potential, or perceived Conflicts of Interest, both direct and indirect, with respect to any member of Respondent’s team, and include in such notification a detailed proposed course of action to remedy the identified Conflict of Interest.
If GDOT becomes aware of a conflict, the Contracting Officer (or designee) will have the right, but not the obligation, to notify the Respondent and request a response to the Contracting Officer with Respondent’s (or the affected team member’s) proposed course of action to remedy any identified conflict(s).
GDOT shall endeavor in its actions to be reasonable, consistent and act in good faith in issuing notices, warnings, grants of remedy, disqualifications, dismissals, and declarations of a Conflict of Interest. At no time shall a Respondent or any team member be allowed to continue in this procurement when Conflicts of Interest are determined to exist unless and until corrective action plans are developed, approved, and implemented, in GDOT’s discretion.
RFQ-484-03312023DB Page 10 of 49
GDOT, by and through its “Conflict Committee,” as established under the Design-Build Manual, will determine whether the proposed course of action for remedy is accepted or rejected, and will respond in writing to the Respondent, to include such other actions upon which GDOT may condition any acceptance.
Without limiting any of GDOT’s rights stated in the Design-Build Manual, Respondents acknowledge that GDOT may find a Respondent non-responsive, dismiss, or disqualify a Respondent if GDOT determines that a Respondent has not been forthcoming about any such known, discovered, potential, or perceived Conflicts of Interest, whether direct or indirect.
For avoidance of doubt, Respondent shall be obligated under this Section II.A (Conflicts of Interest) when any team member or individual person is identified by name, and affiliated with Respondent (or Respondent as Proposer) or as among the Design-Build Team, at any point in the procurement, such that determinations with respect to Conflicts of Interest can be made, and at no point may any individual person or entity be among the Design-Build Team unless a Conflicts of Interest assessment, and if applicable, determination has been made. If ultimately selected as the Design-Builder for the Project, Respondents acknowledge that they will be required to complete or update, as applicable, confidentiality and Conflict of Interest forms, and such assessments, and if applicable, determinations been completed and dispositions communicated, as a condition to execution of the Design-Build Agreement.
B. Restricted Firms and Affiliates
Further to Section II.A (Conflicts of Interest), a list of restricted firms (and to include any affiliates) known at this time include:
• ARCADIS U.S., Inc.
• Blue Cypress Consulting, LLC
• Brockington & Associates, Inc
• Corporate Environmental Risk Management, LLC
• Dranref LLC, dba Business Transformation Group
• Edwards-Pitman Environmental, Inc
• EGSci Consulting, Inc.
• Garver
• Grice Consulting Group, LLC
• Gude Management Group, LLC
• HNTB Corporation
• JAT Consulting Services
• KCI Technologies
• Kristine Fallon Associates, Inc.
• Luster International, Inc.
• Platinum Geomatics, LLC
• RLC Engineering, PLLC
• Rohadfox Construction Control Services, Inc.
• Southeastern Engineering, Inc.
• T&H Engineering, LLC
• Terracon Consultants, Inc.
• United Consulting Group, Ltd.
The above list of restricted firms (and affiliates) is intended to supplement applicable State law, including O.C.G.A §§ 45-10-20 through 45-10-28, and federal laws and regulations, including NEPA, related to organizational Conflicts of Interest. To the extent applicable to the Project, such laws may preclude certain firms and their affiliates from participating on a Respondent team.
However, this disclosure may not address all of the real or perceived conflicts that may exist at the time of the solicitation.
C. Participation on more than one Respondent Team
1. Respondent Teams
RFQ-484-03312023DB Page 11 of 49
Except as expressly permitted under this Section II.C (Participation on more than one Respondent team), and without limiting the other procurement rules set forth in this Section II (Procurement Rules), Major members of one Respondent’s team (i.e., intended to be among the Design-Build Team) are forbidden from participating, in any capacity, on another Respondent’s team during the course of the procurement.
In addition, entities that are under direct or indirect common ownership or have the same upstream parent may not be on separate Respondent teams, proposed Design-Build Teams, or act as guarantor on separate Respondent-proposed or proposed Design-Build Teams.
If a Respondent is not shortlisted following SOQ evaluations, then members of the unsuccessful Respondent’s presented Design-Build Team(s) are, thereafter, free to participate on Shortlisted Proposer Design-Build Teams, subject to the other requirements of this RFQ (e.g., not previously disqualified from participation, subject to organizational Conflicts of Interest, etc.).
Notwithstanding the foregoing,
a. Upon a Respondent’s (or potential or proposed Respondent team member’s) request, GDOT may, in its sole discretion, permit a subcontractor or subconsultant entity to participate on more than one Respondent team so long as Respondents exercise reasonable care in ensuring all other constraints and restrictions under this procurement are observed and the integrity of the procurement, by way of precluding the risk of collusion among Respondents, is maintained. Any such request shall describe the proposed roles on the Respondent team(s) and the contractual relationship relative to the Lead Contractor or the Lead Design Consultant. Respondents are advised that GDOT’s review may, in its sole discretion, involve the Conflict Committee (as defined in the Design Build Manual).
b. Subcontractors and subconsultants that are not in direct contractual privity with the Lead Contractor or the Lead Design Consultant may be identified as members of more than one Respondent team without need for GDOT’s prior permission, with similar constraints and restrictions as mentioned above (i.e., requiring that Respondents exercise reasonable care, etc.).
c. Respondents are encouraged to request review of any team member that has informed the Respondent of its intent to participate as a team member on another Respondent’s team, whether such team member is a Major team member on either team.
2. Individual Persons
Individuals serving Key Personnel roles on one Respondent’s team may not serve Key Personnel roles on another Respondent’s team.
Notwithstanding the foregoing,
a. Upon a Respondent’s request, GDOT may, in GDOT’s sole discretion, permit individuals serving non-Key Personnel roles to switch from one Respondent’s team to non-Key Personnel roles on another Respondent’s team;
b. Upon a Respondent’s request and in response to GDOT’s requests for additional information, representations, and warranties, GDOT also may, in GDOT’s sole discretion, consider allowing certain Key Personnel roles on more than one Respondent team to be filled by the same individual person;
RFQ-484-03312023DB Page 12 of 49 provided, however, that, in either case, the Lead Contractor Project Manager, Lead Design Consultant Project Manager, Engineer of Record, Contractor Superintendent, and Quality Control Manager Key Personnel roles shall be exclusive to each Respondent.
Nothing in this Section II.C (Participation on more than one Respondent team) shall be construed to supersede the restrictions relating to Conflicts of Interest and participation by any individual person or entity identified under Section II.B (Restricted Firms and Affiliates). Respondent team composition constitutes a material representation by the Respondent to GDOT.
D. Changes in Respondent Organization
Following submission of SOQs, GDOT will not permit Respondents to add, delete, or substitute team members presented to GDOT in a SOQ nor permit Respondents to reorganize or change their teams following submission of a SOQ, or to permit the same, except, in each case, with GDOT’s prior, written consent. For avoidance of doubt “team members” in this context means entities or individual persons (identified in Volume 1 of its SOQ), or both.
GDOT may, however, permit changes involving individual persons or entities (or both) on Respondent’s team in certain limited circumstances where the change would result in a Respondent team presenting persons and entities that are equal to or better than that originally presented.
Changes without GDOT’s prior, written approval will result in disqualification of the Respondent from any further participation in the procurement.
Respondent may seek GDOT’s consent by submitting a request to GDOT at the email address in Section VII (Instructions Regarding Submission of Statements of Qualifications).
GDOT will act reasonably in its determination, should any sought change be requested and arise directly out of the retirement, death, disability, incapacity, injury, or voluntary termination of employment of any individual person, or the insolvency, bankruptcy, or debarment/suspension, of any entity, in which case, Respondents seeking a change should include information both as to the proposed changed individual person or entity, but also evidence of the foregoing.
E. Restricted Communications
Respondents must conduct the preparation of their SOQs with professional integrity and free of brokering and lobbying activities. Except as specifically permitted by this RFQ, Respondents, and their respective agents and consultants are not permitted to contact or communicate either directly or indirectly regarding the subject matter of this RFQ, with:
1. representatives of GDOT and the Board;
2. any individual person in the office of the Governor of the State of Georgia; or
3. the Federal Highway Administration (FHWA).
Any verified allegation that a Respondent or an agent or consultant of the foregoing has attempted to, or has made such contact or otherwise attempted to influence the evaluation, ranking and selection of Shortlisted Proposers may be cause for GDOT, in its sole discretion, to disqualify the Respondent from submitting a SOQ, to disallow any such agent or consultant from further participation with the Respondent’s team, or to discontinue further consideration of such Respondent and to return its SOQ.
RFQ-484-03312023DB Page 13 of 49
Following the selection of the Shortlisted Proposers, GDOT may permit certain communications and contacts. The RFP and other written communications from GDOT will specify the rules and parameters of such permitted contacts and communications. To the extent that any Respondent intends at any time to initiate contact with the general public, other agencies or authorities regarding the Project, the nature and substance of such intended contact must be approved in writing by GDOT (to be obtained through the Contracting Officer at the email address set forth in Section VII (Instructions Regarding Submission of Statements of Qualifications)) prior to the commencement of such activities.
For purposes of clarity, Respondents may, however, contact utility owners and other stakeholders, not otherwise restricted under this Section II.E (Restricted Communications), in an effort to develop its SOQ.
F. Open Records Laws
Respondents should obtain and thoroughly familiarize themselves with the Georgia Open Records Act (O.C.G.A. §§ 50-18-70 et seq.) and other State and federal laws pertaining to “trade secrets”, exceptions to disclosure, confidentiality, and public information (collectively, the “Open Records Laws”). GDOT will not advise a Respondent as to the nature or content of documents or other records entitled to protection from disclosure under the Open Records Laws, as to the interpretation of such laws, or as to the definition of “trade secret”. Each Respondent will be solely responsible for all determinations made by it under applicable laws. Each Respondent is advised to contact its own legal counsel concerning the effect of applicable Open Records Laws to that Respondent’s own circumstances.
All documents, papers, letters, maps, books, tapes, photographs, computer based or generated information, data, data fields, or similar material prepared and maintained or received written correspondence, exhibits, data fields, or similar material submitted to GDOT (“Records”) during the procurement, including any part of the SOQs, are the property of the State, will not be returned to the submitting parties, and are subject to the Open Records Laws.
In no event will the State or GDOT, or any of their officers, advisors, or representatives, be liable to a Respondent or any team member, or any of their respective members, managers, officers, advisors, or representatives, for the disclosure of all or a portion of any Record(s) submitted in response to this RFQ.
Nothing contained in this provision shall modify or amend requirements and obligations imposed on GDOT or any other State entity by the Open Records Laws or other applicable law, and the provisions of the Open Records Laws or other laws shall control if there is a conflict between the procedures described above and the applicable law.
G. Disadvantaged Business Enterprise (DBE) Participation
It is the policy of GDOT to promote and encourage the use of small business enterprises owned and controlled by socially and economically disadvantaged individuals (collectively referred to herein as “DBEs”), consistent with applicable laws and regulations. Therefore, GDOT encourages all DBEs to participate in the business activities of GDOT as service providers, vendors, contractors, subcontractors, advisors, consultants, and subconsultants. This desire on the part of GDOT is not intended to restrict or limit competitive proposals or to increase the cost of work. GDOT supports a healthy free market system that seeks to include responsible businesses and provides ample opportunity for business growth and development. GDOT has adopted the DBE definition set forth in 49 C.F.R. § 26.5. The DBE policy of GDOT applies to all GDOT contracts and purchases paid with any funds received from the U.S. Department of
RFQ-484-03312023DB Page 14 of 49
Transportation through the Federal Highway Administration, the Federal Transit Administration, and the Federal Aviation Administration.
GDOT has adopted a 15% overall annual goal for DBE participation on all federally funded projects, as specified in accordance with the objectives in 49 C.F.R. Part 26. This goal is not to be considered as a fixed quota, set aside, or preference. The DBE goal can be met by lead contracting, subcontracting, consultant, subconsultant, joint-venture, or mentor/protégé relationship.
GDOT's project specific DBE goal for this Design-Build services contract is 16% of the overall Project design and construction costs. Additional information regarding DBE requirements and goals for the Project will be included in the RFP. Only GDOT-certified DBE firms will count towards the DBE goal. Information on the certification process, including how long the certification process may take, is accessible at the following weblink:
http://www.dot.ga.gov/PS/Business/DBE or from the DBE Program personnel at the contact listed below.
In general terms, and as further described in the RFP documents, “Good Faith Effort” is a showing by the Shortlisted Proposer of all necessary and reasonable steps it took to achieve the DBE goal attached to the subject contract. The steps, as described, should demonstrate the scope, intensity, and appropriateness of the effort undertaken to obtain sufficient DBE participation.
For more information on the GDOT DBE Program, contact:
Georgia Department of Transportation Equal Opportunity Division
One Georgia Center, 7th Floor 600 West Peachtree Street, NW
Atlanta, Georgia 30308 Phone: (404) 631-1273
III. Selection Process
A two phase, Best Value selection process will be used to award the Project to the Apparent Successful Proposer from among the Shortlisted Proposers.
A. Selection of Shortlisted Proposers (Phase I)
A “Technical Review Committee”, consisting of qualified representatives of GDOT, will evaluate the SOQs submitted in response to this RFQ in accordance with selection criteria published in this RFQ. To be eligible for evaluation, Respondents must first meet the minimum requirements stated in Section V (Instructions for Preparing the Statement of Qualifications) (i.e., be responsive to this RFQ), and if responsive, must pass all pass/fail criteria listed in Section VI.A (Administrative Minimum Requirements (Pass/Fail)) and Section VI.B (Qualifications Minimum Requirements (Pass/Fail)).
If responsive, and if the SOQ passes all pass/fail criteria, then GDOT will evaluate the SOQ substantively against the qualitative evaluation criteria set forth in Section VI.C (Qualitative Evaluation Criteria (Best Value)). Evaluators, as members of the Technical Review Committee, will assign points for each category using the criteria identified in Section VI.C (Qualitative Evaluation Criteria (Best Value)). The scores of all evaluators will be totaled for each SOQ to determine a final ranking. GDOT will shortlist up to five Shortlisted Proposers. The Shortlisted Proposers will be the highest ranked Respondents.
RFQ-484-03312023DB Page 15 of 49
Upon concurrence of the Chief Engineer of the selection of Shortlisted Proposers, the list of Shortlisted Proposers will be published to the GPR Website.
Each Shortlisted Proposer will be eligible to submit an Administrative Proposal, Technical Proposal and Price Proposal in response to, and as defined under, the RFP.
B. Selection of Team (Phase II)
The identification of the Apparent Successful Proposer (as defined under the RFP) will be based on the highest overall score as among Shortlisted Proposer who presented Proposals meeting the requirements described in Rules 672-18.01 through 672-18.13.
If supporting substantive technical information sought by the RFP (“Technical Proposal”) is responsive and also passes all pass/fail criteria presented under the RFP, then GDOT will evaluate the Technical Proposal substantively against the qualitative evaluation criteria set forth in the RFP. Evaluators, as members of the Technical Review Committee, will assign points for each category using the criteria identified in the RFP. The scores of all evaluators will be totaled for each Technical Proposal and entered into the “Best Value Evaluation Spreadsheet” (as defined in the RFP).
Thereafter, GDOT will conduct a public opening of Price Proposals, whereupon the Price Proposal values will be entered into the “Best Value Evaluation Spreadsheet” (as defined in the RFP), alongside each Shortlisted Proposer’s Technical Proposal evaluation score, where such Proposer’s Technical Proposal was responsive and passed all pass/fail criteria. Upon verification of the calculations within such spreadsheet, GDOT will announce the “Best Value Scores” in order of highest to lowest. The identification of the “Apparent Successful Proposer” (as defined under the RFP) will be based on the highest “Best Value Score”, which adds the weighted Technical Proposal score and the weighted Price Proposal score, as described in Rule 672- 18.09, all as more specifically set forth in the RFP.
The Technical Review Committee will provide an award recommendation to GDOT, which will take the recommendation under advisement when making the final decision for award of the Design-Build Agreement.
Upon concurrence of the Chief Engineer of the selection of the Apparent Successful Proposer, the Apparent Successful Proposer will be identified and published both to the GPR Website and GDOT’s Design-Build website.
IV. Procurement Schedule
The following Procurement Schedule represents GDOT’s best estimate of the schedule that will be followed. All times indicated are prevailing times in Atlanta, Georgia.
PROCUREMENT SCHEDULE
a. GDOT issues Public Notice Advertisement (PNA) 02/03/2023 ----------
b. GDOT issues Request for Qualifications (RFQ) 03/31/2023 -----------
c. Deadline for the submission of written questions 04/14/2023 2:00 PM
d. Deadline for submission of known, discovered, potential, or perceived Conflicts of Interest, both direct and indirect, with respect to any member of Respondent’s team1
04/14/2023 2:00 PM
1 This does not abrogate the continuing duty described in Section II.A (Conflicts of Interest).
RFQ-484-03312023DB Page 16 of 49
PROCUREMENT SCHEDULE
e. Deadline for PDMS Access Requests (Form A) 04/21/2023 2:00 PM
f. Deadline for submission of Statements of Qualification (SOQs)
04/27/2023 11:00 AM
g. GDOT issues the list of Shortlisted Proposers 05/19/2023 -----------
h. GDOT issues Request for Proposals (RFP) to the Shortlisted Proposers
05/26/2023 -----------
i. Receipt of Proposals from Shortlisted Proposers 09/21/2023 11:00 AM
j. Opening of Price Proposals 10/13/2023 11:00 AM
V. Instructions for Preparing the Statement of Qualifications
Generally, each SOQ shall be prepared simply and economically, providing straightforward, concise delineation of the Respondent’s capabilities. Colored displays and promotional materials are not desired and will not be evaluated. Emphasis must be on completeness, relevance, and clarity of content.
The Statement of Qualifications must be organized and assembled in the following sequence.
Section Reference
Description Page limit
VII.2.d Cover 1 VII.2.d Transmittal letter 2
VII.2.d Table of Contents 1
Administrative Minimum Requirements Tab VI.A.5 Form B (Basic Company Information)
Respondent basic company information 1 (or 1 for each consortium or JV member, or 1 for each joint bidder)
VI.A.5 Form B (Basic Company Information) Lead Contractor basic company information
1 (or 1 for each consortium or JV member, or 1 for each joint bidder)
VI.A.5 Form B (Basic Company Information) Lead Design Consultant basic company information
1 (or 1 for each consortium or JV member, or 1 for each joint bidder)
VI.A.1 Contractor Certificate (s) of Qualification As required; for all qualifying firms
VI.A.3 Matrix listing GDOT Prequalified Area Classes by Respondent team firm
As required; for all qualifying firms
VI.A.2 Notice of Professional Consultant Qualifications As required; for all qualifying firms
VI.A.4 Certificate (Exhibit II) 1 (Lead Contractor – or 1 for each JV member, or 1 for each joint bidder)
VI.A.4 Certificate (Exhibit II) 1 (Lead Design Consultant – or 1 for
RFQ-484-03312023DB Page 17 of 49
Section Reference
Description Page limit each JV member, or 1 for each joint bidder)
VI.A.6 Form C (Statements of Disclosure (Conflict of Interest)) for Lead Contractor, Lead Design Consultant, and any Major subcontractors and/or Major subconsultants
As required; per each firm
VI.A.7 Form E (Industrial Safety Record) No more than 2 pages for each entity
Qualifications Minimum Requirements Tab
VI.B.1 Organization chart 1 (may be no larger than 11x17)
VI.B.2 Organizational narrative 1
VI.B.3 Form D (Resume Form) No more than 3 pages for each Key Personnel
VI.B.3 Key Personnel availability statement 1 page from each firm with respect to its Key Personnel
VI.B.4 Lead Contractor experience and qualifications 3
VI.B.5 Lead Design Consultant experience and qualifications
VI.B.9 Form G (Financial Capacity, Strength, and Ability Certificate) - Letters regarding the financial capacity of the Respondent, the Lead Contractor, and the Lead Design Consultant, and each Major subcontractor and Major subconsultant (see notes within section reference, if Lead Contractor or Lead Design Consultant are the Respondent)
1 page for each entity (or 1 for each consortium or JV member for each entity, or 1 for each joint bidder)
VI.B.10 Certificate and Acknowledgment (bond), in Form F (Certificate and Acknowledgment); or letter from bank or financial institution
1 page for each, and for each entity, with additional pages evincing rating
Suitability Tab VI.B.6.a Narrative regarding DBE 1
VI.B.7 Narrative regarding risks and approach 2 VI.B.8 Narrative regarding suitability 1
Back cover 1
VI. Evaluation Criteria
Further to the evaluation process described in Section III (Selection Process), SOQs will first be evaluated for responsiveness (i.e., generally that the SOQ conforms to the instructions regarding content, organization, assembly, and format). Those SOQs not responsive to this RFQ may be excluded from further consideration, and the Respondent will be so notified.
Responsive SOQs will be evaluated against the pass/fail criteria set forth below. GDOT may elect, in its sole discretion, to evaluate SOQ responsiveness and SOQs against the pass/fail
RFQ-484-03312023DB Page 18 of 49 criteria separately or in conjunction with each effort. GDOT may also exclude from consideration any Respondent that submitted a SOQ that contains a material misrepresentation.
SOQs must pass all of the pass/fail criteria, in order for the submitting Respondent to be further evaluated in accordance with the qualitative criteria described below and eligible to be shortlisted.
Upon review of the SOQs, GDOT, in its sole discretion, will determine whether Respondent’s qualifications, as reflected in its SOQ and with respect to the evaluation criteria (pass/fail and substantive), as stated herein, are in the best interests of GDOT for this Project. GDOT reserves the right to revise the evaluation criteria or methodology by issuing an amendment prior to the deadline for submission of the SOQ.
A. Administrative Minimum Requirements (Pass/Fail)
Without limiting the requirements pertaining to the content, organization, assembly, and format outlined above, Respondents must:
1. Submit with the SOQ the “Certificate(s) of Qualification” for (a) (if an entity or if a JV certified by GDOT1) the Lead Contractor or, if Lead Contractor is a JV not certified by GDOT, then for each JV member of Lead Contractor, and (b) all Major subcontractors of the Design-Build Team listed in the Respondent’s SOQ. Such Certificate(s) of Qualifications must be current by the deadline for submission of the SOQ.
2. Submit with the SOQ the “Notice of Professional Consultant Qualifications” for (a) the Lead Design Consultant (or each of its JV members) and (b) all subconsultants of the Design-Build Team listed in the Respondent’s SOQ. Such Notice of Professional Consultant Qualifications must be current by the deadline for submission of the SOQ.
3. Submit a matrix listing which members of the Respondent’s team (proposed Design-Build Team) are prequalified under each GDOT Prequalified Area Class.
a. The Lead Design Consultant must be prequalified by GDOT in the Area Class(es) listed below:
Number GDOT Prequalified Area Class
3.05 Urban Interstate Highway Design
b. The Lead Contractor (see Section VI.A.5), Lead Design Consultant, and/or one or more of the subconsultant or subcontractor team members must be prequalified by GDOT in the Area Classes listed below:
Number GDOT Prequalified Area Class
1.06(a) NEPA Documentation
1.06(b) History 1.06(c) Air Studies
1.06(d) Noise Studies 1.06(e) Ecology
1.06(f) Archaeology
1.07 Attitude, Opinion, and Community Value Studies
3.02 Urban Roadway Design
1 A Lead Contractor may be a consortium of joint bidders as permitted by Rule 672-5-.13, or a JV, each subject to the submittal requirements identified in this RFQ (i.e., each member must submit all forms, meet all qualifications/prequalifications, etc. , for “the” Lead Contractor).
RFQ-484-03312023DB Page 19 of 49
Number GDOT Prequalified Area Class
3.04 Rural Interstate Highway Design
3.06 Traffic Operations Studies
3.07 Traffic Operations Design
3.10 Utility Coordination
3.12 Hydraulic and Hydrological Studies (Roadway)
3.13 Bicycle and Pedestrian Facility Design
3.15 Highway Lighting and Outdoor Lighting
4.01(a) Minor Bridge Design
5.01 Land Surveying
5.02 Engineering Surveying
5.08 Overhead/Subsurface Utility Engineering (SUE)
6.01(a) Soil Survey Studies
6.02 Bridge Foundation Studies
6.03 Hydraulic and Hydrologic Studies (Soils & Foundation)
6.05 Hazardous Waste Site Assessment Studies
9.01 Erosion, Sedimentation, and Pollution Control Plan (ESPCP) Preparation
9.02 Rainfall and Runoff Reporting
9.03 Field Inspections for Compliance of Erosion and Sedimentation Control Device Installations
Notes:
• Prequalification information may be found as follows:
• general information is accessible at the following weblink:
https://www.dot.ga.gov/GDOT/pages/prequalification.aspx
• information for contractors is accessible at the following weblink:
https://www.dot.ga.gov/GDOT/pages/ConstructionContractors.aspx
• information for engineers is accessible at the following weblink:
https://www.dot.ga.gov/GDOT/pages/EngineeringConsultantQualification.aspx
• information for ROW specialty services is accessible at the following weblink:
https://www.dot.ga.gov/GDOT/pages/Rightofway.aspx
• Prequalification will be required to be current during the term of the Design-Build Agreement, and no prequalifications may expire prior to the date for receipt of Proposals (as described in Section IV (Procurement Schedule), as may be adjusted in the RFP), and through the term of the Design-Build Agreement.
• Respondent’s team must have an identified team member (to be among the Design-Build Team) that is prequalified for each of the foregoing GDOT Prequalified Area Classes.
• The ultimate Design-Builder, if a special purpose vehicle, may not need to be prequalified in any of the foregoing GDOT Prequalified Area Classes, as determined by GDOT in its sole discretion.
https://www.dot.ga.gov/GDOT/pages/prequalification.aspx https://www.dot.ga.gov/GDOT/pages/ConstructionContractors.aspx https://www.dot.ga.gov/GDOT/pages/EngineeringConsultantQualification.aspx https://www.dot.ga.gov/GDOT/pages/Rightofway.aspx
RFQ-484-03312023DB Page 20 of 49
4. Complete and submit the Certificate (Exhibit II) for the Lead Contractor and the Lead Design Consultant, in each case which shall include one for each JV member, or one for each joint bidder, as applicable, and provide a notarized copy(ies) in the electronic SOQ package.
5. Provide basic company information for the Respondent, the Lead Contractor and for the Lead Design Consultant by submitting a completed Form B (Basic Company Information) for each such entity. For JV entities that have not undertaken at least two projects together, each entity should submit its qualifications separately. JV submittals are subject to the page limit identified in Section V (Instructions for Preparing the Statement of Qualifications).
GDOT reserves the right to require Respondent to provide, or obtain and provide, additional information on JV submittals, as well as other organizational documents, certificates, resolutions, or other information relating to any of the foregoing for any entity on Respondent’s team. If solicited, and without limiting the provisions Section II.F (Open Records Laws), Respondent shall provide, or shall cause its relevant team member(s) to provide, all such information in compliance with, and within the period stated, in the solicitation by GDOT.
6. Provide Statements of Disclosure from their Lead Contractor, Lead Design Consultant, and any Major subcontractors and/or Major subconsultants, which will allow GDOT to evaluate possible Conflicts of Interest. Respondents must provide, in their own format, a statement of all actual or potential legal or other Conflicts of Interest possibly created by participation in the selection process or by other involvement in the Project. Respondents shall provide information as to the nature of their relationship(s) with any parties with whom there may exist a potential conflict. See Form C (Statements of Disclosure (Conflict of Interest)). A list of restricted firms (to include affiliates) known at this time is included in Section II.B (Restricted Firms and Affiliates). For more information, see Section II.A (Conflicts of Interest).
Respondents are advised, both on Form C (Statements of Disclosure (Conflict of Interest)) and in such Section II.A (Conflicts of Interest) of its continuing disclosure obligation.
7. Provide a completed Form E (Industrial Safety Record) for each of the Lead Contractor and any Major subcontractor anticipated to perform any construction work for the Project, if selected, in each case not to exceed two pages.
B. Qualifications Minimum Requirements (Pass/Fail)
Respondents must provide the following:
1. An organization chart indicating proposed participating team member firms and identified personnel (including Key Personnel and their proposed role in the Project and reporting structures). All Key Personnel must be identified by name and team member firm, and his/her function indicated (see below). All Key Personnel must be separate individual people unless specified below.
The Lead Design Consultant Project Manager and the Engineer of Record must be licensed as a Professional Engineer (PE) in Georgia and expressly identified as such on the organizational chart and related materials.
Respondents must include the employee names and resumes forms for each of the Key Personnel listed below, whose roles and responsibilities will be further defined in the RFP (which, where within, generally conform to those in the Design-Build Manual):
a. one individual person to act as the Lead Contractor Project Manager, who shall be assigned to the project on a full-time basis starting with the issuance of NTP1 through
RFQ-484-03312023DB Page 21 of 49
Substantial Completion (as defined under the RFP). See the forthcoming RFP for additional requirements.
b. one individual person to act as the Lead Design Consultant Project Manager, who shall be assigned to the project on a full-time basis starting with the issuance of NTP1 until NTP3, then as needed to perform his or her duties until Final Acceptance (as defined in the RFP). See the forthcoming RFP for additional requirements.
c. one individual person to act as the Engineer of Record, who may also be the Lead Design Consultant Project Manager, who shall be assigned to the project on a full-time basis starting with the issuance of NTP1 until NTP3, then as needed to perform his or her duties until Final…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Notice | — | |
| Selection of Finalists | — | |
| Bid Opening Dashboard | — | |
| Award Announcement | — | |
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .