Request for Proposal 75N91020R00035.pdf

PDF 322 KB Posted

Attached to
CISNET Consortium for Cancer Surveillance Modeling Support
Solicitation number
75N91020R00035
Issued by

View the file

Other files

File Type Posted
Attachment 10 - Proposal Summary and Data Record.pdf PDF
Attachment 22 - Electronic Invoicing Instructions Notification.pdf PDF
Attachment 08- Summary Related Activities.pdf PDF
Attachment 13 - Section K - Reps and Certs.pdf PDF
Attachment 23 - Electronic Invoicing Step-by-Step Instructions for NIH Contractors.pdf PDF
Attachment 01 - Exhibit 2 - CISNET Needs Assessment.pdf PDF
Attachment 18 - Non-Disclosure Agreement.pdf PDF
Attachment 14 - Government Property Schedule.docx DOCX document
Attachment 05 - Technical Evaluation Factors.pdf PDF
Attachment 16 - Invoice Request Instructions -FFP- NIH(RC)-2.pdf PDF
Attachment 12 - Small Business Subcontracting Plan.docx DOCX document
Attachment 17 - Invoice Request Instructions -CR- NIH(RC)-4 - FOR COST TYPE TASK ORDERS ONLY.pdf PDF
Attachment 19 - Suitability Roster.xlsx XLSX spreadsheet
Attachment 04 - Proposal Intent Response Form.pdf PDF
Attachment 09 - Additional Business Proposal Instructions.pdf PDF
Attachment 01 - Exhibit 1 - SOW (Figures only).pdf PDF
Attachment 02 - Task Order 1 - SOW.pdf PDF
Attachment 15 - Disclosure of Lobbying Activities.pdf PDF
Attachment 01 - Base IDIQ SOW.pdf PDF
Attachment 07 - Technical Proposal Cost Summary.pdf PDF
Attachment 06 - Additional Technical Proposal Instructions.pdf PDF
Attachment 11 - Offeror Points of Contact.pdf PDF
Attachment 03 - Packaging and Delivery of Proposal.pdf PDF
Attachment 20 - Employee Separation Checklist.pdf PDF
Attachment 21 - 52.204-24, 52.204-25.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- 1 -

SOLICITATION

SECTION A - SOLICITATION/CONTRACT FORM

1. Requisition or other Purchase Authority:

2. Request for Proposal (RFP) Number:

75N91020R00035

3. Issue Date:

January 15, 2021

4. Set Aside:

[X] No

[ ] Yes See Part IV Section L

5. Title : CISNET Consortium for Cancer Surveillance Modeling Support

ISSUED BY:

6. Office of Acquisitions National Cancer Institute National Institutes of Health 9609 Medical Center Drive Room 1E158, MSC 9705 Rockville, MD 20850

7. SUBMIT OFFERS TO:

See Part III, Section J, "Packaging and Delivery of the Proposal," ATTACHMENT 1 of this Solicitation.

8. Proposals for furnishing the supplies and/or services in THE SCHEDULE will be received at the place specified in, and in the number of copies specified in Attachment 3, "Packaging and Delivery of the Proposal," until 04:00 pm EST local time on February 19, 2021. Offers will be valid for 120 days unless a different period is specified by the offeror on the Attachment entitled, "Proposal Summary and Data Record, NIH 2043.

9. This solicitation requires delivery of proposals as stated in ATTACHMENT 3, "PACKAGING AND DELIVERY OF THE PROPOSAL." If proposals are required to be delivered to two different locations, the OFFICIAL POINT OF RECEIPT for determining TIMELY DELIVERY is the address provided for the OFFICE OF ACQUISITIONS.

IF YOUR PROPOSAL IS NOT RECEIVED BY THE CONTRACTING OFFICER OR HIS DESIGNEE AT THE PLACE AND TIME SPECIFIED FOR THE OFFICE OF ACQUISITIONS, THEN IT WILL BE CONSIDERED LATE AND HANDLED IN ACCORDANCE WITH HHSAR Clause 352.215-70, "Late Proposals and Revisions"

LOCATED IN SECTION L.1. OF THIS SOLICITATION.

10. Offeror must be registered in the System for Award Management (SAM) prior to award of a contract. Offerors must access the CCR through The System for Award Management (SAM) at http://www.sam.gov

11. FOR INFORMATION CALL: Angela Moore

PHONE: (240) 276-7767

e-MAIL: Angela.Moore2@nih.gov

COLLECT CALLS WILL NOT BE ACCEPTED.

Solicitation questions must be submitted in writing to the above email address by 4:00 P.M. Eastern Time on January 27, 2021. Responses to questions will be provided by Amendment. Proposal Intent due by February 3, 2021.

John Turner Contracting Officer Office of Acquisitions National Cancer Institute

RFP Number : 75N91020R00035

- 2 -

RFP TABLE OF CONTENTS

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

SECTION D - PACKAGING, MARKING AND SHIPPING

SECTION E - INSPECTION AND ACCEPTANCE

SECTION F - DELIVERIES OR PERFORMANCE

SECTION G - CONTRACT ADMINISTRATION DATA

SECTION H - SPECIAL CONTRACT REQUIREMENTS

PART II - CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J - LIST OF ATTACHMENTS

SOLICITATION ATTACHMENTS

TECHNICAL PROPOSAL ATTACHMENTS

BUSINESS PROPOSAL ATTACHMENTS

INFORMATIONAL ATTACHMENTS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1. GENERAL INFORMATION

a. INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION

b. NAICS CODE AND SIZE STANDARD

c. TYPE OF CONTRACT AND NUMBER OF AWARDS

d. COMMITMENT OF PUBLIC FUNDS

e. PROMOTING EFFICIENT SPENDING

f. COMMUNICATIONS PRIOR TO CONTRACT AWARD

g. RELEASE OF INFORMATION

h. PREPARATION COSTS

i. SERVICE OF PROTEST

j. LATE PROPOSALS AND REVISIONS

2. INSTRUCTIONS TO OFFERORS

a. GENERAL INSTRUCTIONS

1. Contract Type and General Clauses

2. Authorized Official and Submission of Proposal

3. Proposal Summary and Data Record (NIH-2043)

4. Separation of Technical and Business Proposals

5. Alternate Proposals

6. Evaluation of Proposals

7. Potential Award Without Discussions

8. Use of the Metric System of Measurement

9. Standards for Privacy of Individually Identifiable Health Information

10. Privacy Act - Treatment of Proposal Information

- 3 -

11. Selection of Offerors

12. Past Performance Information

14. Electronic Information Technology Accessibility Notice, HHSAR 352.239-73 (December 2015)

15. Solicitation Provisions Incorporated by Reference

b. TECHNICAL PROPOSAL INSTRUCTIONS

1. Technical Discussions

2. Other Considerations

3. Technical Evaluation

4. Obtaining and Disseminating Biomedical Research Resources

c. BUSINESS PROPOSAL INSTRUCTIONS

1. Basic Cost/Price Information

2. Salary Rate Limitation

3. HUBZone Small Business Concerns

4. Total Compensation Plan

5. Other Administrative Data

6. Qualifications of the Offeror

7. Subcontractors

8. Proposer's Annual Financial Report

9. Travel Costs/Travel Policy

SECTION M - EVALUATION FACTORS FOR AWARD

1. GENERAL

2. COST/PRICE EVALUATION

3. EVALUATION OF OPTIONS

4. TECHNICAL EVALUATION FACTORS

5. PAST PERFORMANCE FACTOR

- 4 -

PART I - THE SCHEDULE

THE INFORMATION SET FORTH IN SECTION A - SOLICITATION/CONTRACT FORM, HEREIN CONTAINS IMPORTANT INFORMATION FOR ANY OFFEROR INTERESTED IN RESPONDING TO THIS SOLICITATION.

ANY CONTRACT RESULTING FROM THIS SOLICITATION WILL INCLUDE IN ITS SECTION A - SOLICITATION/ CONTRACT FORM, ACCOUNTING, APPROPRIATION AND GENERAL INFORMATION APPLICABLE TO THE

CONTRACT AWARD.

THE CONTRACT SCHEDULE SET FORTH IN SECTIONS B THROUGH H, HEREIN, CONTAINS CONTRACTUAL INFORMATION PERTINENT TO THIS SOLICITATION. IT IS NOT AN EXACT REPRESENTATION OF THE CONTRACT DOCUMENT THAT WILL BE AWARDED AS A RESULT OF THIS SOLICITATION. THE CONTRACT COST OR PRICE AND OTHER CONTRACTUAL PROVISIONS PERTINENT TO THE OFFEROR (i.e., those relating to the organizational structure [e.g., Non-Profit, Commercial] and specific cost authorizations unique to the Offeror's proposal and requiring Contracting Officer Prior Approval) WILL BE DISCUSSED IN THE NEGOTIATION PROCESS AND WILL BE INCLUDED IN THE RESULTANT CONTRACT. THE ENCLOSED CONTRACT SCHEDULE IS

INTENDED TO PROVIDE THE OFFEROR WITH THE NECESSARY INFORMATION TO UNDERSTAND THE

TERMS AND CONDITIONS OF THE RESULTANT CONTRACT.

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

ARTICLE B.1. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES

To provide technical and logistical support to facilitate collaborative efforts of the CISNET Consortium in cancer surveillance, including cancer simulation modeling using a multi-cohort approach, flexible broad-based natural history models of cancer, and comparative modeling managed through a web-based Knowledge Management System with adaptable data structures.

ARTICLE B.2. PRICES/COSTS

a. This is an Indefinite Quantity contract as contemplated by FAR 16.504. The Contractor shall be reimbursed by the Government in an amount not less than a total of $1,000 (minimum) nor more than a total of $3,000,000 (maximum) for successful performance of this contract.

b. The prices set forth in this ARTICLE will cover the contract period 04/01/2021 through 03/31/2026.

c. The Government will issue Task Orders based on the work described in SECTION C of this contract.

ARTICLE B.3. PROVISIONS APPLICABLE TO DIRECT COSTS

For Cost Reimbursement or Time and Material type task orders the use of contract funds for the following items is prohibited, unless otherwise approved by the Contracting Officer. The following is a list of items that may be included in the resultant contract as applicable. 1) Conferences & Meetings, 2) Food for Meals, Light Refreshments & Beverages, 3) Promotional Items, 4) Acquisition, by purchase or lease, of any interest in real property; 5) Special rearrangement or alteration of facilities; 6) Purchase or lease of any item of general purpose office furniture or office equipment regardless of dollar value; 7) Travel Costs including Foreign Travel; 8) Consultant Costs;

9) Subcontract costs that require consent under FAR Subpart 44.2; 10) Patient Care Costs; 11) Accountable Government Property; 12) Printing costs; and 13) Research Funding.

- 5 -

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

ARTICLE C.1. STATEMENT OF WORK

a. The Base Statement of Work dated November 23,2020 is attached hereto and made a part of this Solicitation (See SECTION J – List of Attachments). The Base Statement of Work describes the general scope, nature, complexity, and purpose of the services the Government may acquire under this contract during the specified period.

The specific requirements will be identified in each Task Order Statement of Work. Independently and not as an agent of the Governnment, the Contractor shall be required to furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government as needed to perform each Task Order Statement of Work.

b. The applicable Privacy Act System of Records Number will be specified and sha be used in any design, development, or operation work to be performed under the resultant contract. Disposition of records shall be in accordance with SECTION C of the contract, and by direction of the Contracting Officer's Representative (COR).

ARTICLE C.2. REPORTING REQUIREMENTS

IDIQ Contract Deliverables: Deliverables shall be submited in accordance with the DELIVERIES Article in SECTION F of this contract.

Task Order Deliverables: The frequency and specific content of these deliverables will be determined within each individual Task Order. Deliverables shall be submitted in accordance with the DELIVERIES Article in SECTION F of this contract and with the requirements of the Task Orders issued here under.

All reports required herein shall be submitted in electronic format via e-mail to both the Contracting Officer and to the Branch B Invoice and Deliverables Mailbox at ncibranchbinvoices@mail.nih.gov.

All electronic reports submitted shall be compliant with Section 508 of the Rehabilitation Act of 1973. Additional information about testing documents for Section 508 compliance, including guidance and specific checklists, by application, can be found at: http://www.hhs.gov/web/508/index.html under "Making Files Accessible."

a. Reports/Deliverables

1.1.Transition-In Plan A final version of the draft Transition-In Plan submitted as part of the Offeror’s proposal, shall be due to the Contracting Officer (CO) and the Contracting Officer’s Representative (COR) within thirty (30) calendar days of contract award. The finalized Transition-In Plan shall include a detailed plan of how the Contractor will coordinate and implement an orderly, secure, and efficient transition of all activities, materials, data, and other documents from the incumbent contractor.

2. Draft Transition-Out Plan Six (6) months prior to the expiration date of the task order and/or contract, the Contractor shall submit a draft Transition-Out Plan which shall include the plan for transfer of all contract materials, files, documents, newly developed programs, source and object codes, system documentation, working papers, and all related information gathered or developed during the contract period of performance.

- 6 -

3. Final Transition-Out Plan Within 30 calendar days of receipt of comments from the Government regarding the draft Transition-Out Plan, the Contractor shall submit a Final Transition-Out Plan.

4. Bi-Monthly Task Order Progress Report (every 2 months) The Contractor shall provide technical bi-monthly progress reports. These reports shall include a summary of the progress in the Statement of Work items 1-8, including a description of work on each cancer surveillance project within each item. The report shall also include a description of any new features added to the Knowledge Management System, Project Profiler, Project Registration System and Model Interfaces.

The following format shall be used for each report:

1) A cover page containing the title of each of the Statement of Work items 1-8.

2) Narrative which states each Statement of Work item (1-8), along with the following for each item:

a. Summary of progress/accomplishments during this reporting period;

b. New features/updates on all systems during this reporting period;

Each Bi -Monthly Progress Report shall include a report of Vulnerability Scanning on all systems being used for this contract. Each reporting period shall consist of two (2) calendar months. An electronic copy of the report shall be delivered to the Contracting Officer's Representative (COR) and Contracting Officer within 15 calendar days of the end of each reporting period. The Bi-Monthly Progress Report is not required for the period that the Final Report is due.

5. Annual Task Order Progress Report When this report is required, the frequency and specific content will be specified within each individual Task Order.

6. Final Task Order Report When this report is required, the frequency and specific content will be specified within each individual Task Order.

7. Source Code and Object Code Unless otherwise specified herein, the Contractor shall deliver to the Government, upon the expiration date of the contract, all source code and object code developed, modified, and/or enhanced under the Task Order.

8. List of Completion of Online information Security Awareness Training Due within thirty (30) days after task order award, and annually thereafter, or as requested.

b. Other Reports/Deliverables

Information Security and Physical Access Reporting Requirements: (Reference Article F.2 Deliveries and Article H )

9. Roster of Employees Requiring Suitability Investigations When required, the frequency and specific content of this deliverable with be determined within each individual Task Order.

10. Reporting of New and Departing Employees The Contractor shall notify the Contracting Officer's Representative (COR) and Contracting Officer within fifteen (15) calendar days of staffing changes for positions that require suitability determinations as follows:

a. New Employees who have or will have access to HHS Information systems or data: Provide the name, position title, e-mail address, and phone number of the new employee. Provide the name, position title and suitability

- 7 -level held by the former incumbent. If the employee is filling a new position, provide a description of the position and the Government will determine the appropriate security level.

b. Departing Employees: Due within fifteen (15) calendar days before an employee stops working on the task order. 1) Provide the name, position title, and security clearance level held by or pending for the individual; and

2) Perform and document the actions identified in the "Employee Separation Checklist", attached in Section J, ATTACHMENTS of this contract, when a Contractor/Subcontractor employee terminates work under this contract. All documentation shall be made available to the COR and/or Contracting Officer upon request.

(Reference the INFORMATION AND PHYSICAL ACCESS SECURITY Article in SECTION H of this contract.)

11. Contractor-Employee Non-Disclosure Agreement The contractor shall complete and submit a signed and witnessed “Commitment to Protect Non-Public Information

– Contractor Agreement” form for each contractor and subcontractor employee who may have access to non-public Department information under this contract. (See Section J – Attachments)

Reference subparagraph A.11. INFORMATION AND PHYSICAL ACCESS SECURITY Article in Section H of this contract.)

12. Privacy Impact Assessment When required, the frequency and specific content of this deliverable will be determined within each individual Task

13. Employee Separation Checklist Due no later than two (2) business days upon employee’s exit.

Security Assessment and Authorization (SA&A) Package – Includes Deliverable Items 14-19

14. System Security Plan (SSP) When required, the frequency and specific content of this deliverable will be determined within each individual Task

15. Security Assessment Plan/Report (SAP/SAR) When required, the frequency and specific content of this deliverable will be determined within each individual Task

16. Independent Assessment When required, the frequency and specific content of this deliverable will be determined within each individual Task

17. Plan of Action and Milestones (POA&M) When required, the frequency and specific content of this deliverable will be determined within each individual Task

18. Contingency Plan and Contingency Plan Test When required, the frequency and specific content of this deliverable will be determined within each individual Task

19. E-Authentication Questionnaire

- 8 -

When required, the frequency and specific content of this deliverable will be determined within each individual Task

20. Annual Assessment/Penetration Testing When required, the frequency and specific content of this deliverable will be determined within each individual Task

21. Asset Management When required, the frequency and specific content of this deliverable will be determined within each individual Task

22. Configuration Management When required, the frequency and specific content of this deliverable will be determined within each individual Task

23. Vulnerability Scanning Reports When required, the frequency and specific content of this deliverable will be determined within each individual Task

24. Section 508 Annual Report The contractor shall submit an annual Section 508 report in accordance with the schedule set forth by the Contracting Officer (CO)/Contracting Officer's Representative (COR). The Section 508 Report Template and

Instructions for completing the report are available at: http://www.hhs.gov/web/508/contracting/ technology/vendors.html under "Vendor Information and Documents."

HHS SECURITY AND PRIVACY LANGUAGE FOR INFORMATION AND IT PROCUREMENTS

INFORMATION AND/OR PHYSICAL SECURITY

A. Security Assessment and Authorization (SA&A)- A valid authority to operate (ATO) certifies that the Contractor's information system meets the contract's requirements to protect the agency data. If the system under this contract does not have a valid ATO, the Contractor (and/or any subcontractor) shall work with the agency and supply the deliverables required to complete the ATO within the specified timeline(s) within ninety

(90) days after contract award, or as specified by the COR. The Contractor shall conduct the SA&A requirements in accordance with HHS IS2P, NIST SP 800-37, Guide for Applying the Risk Management Framework to Federal Information Systems: A Security Life Cycle Approach (latest revision).

For an existing ATO, Contracting Officer Representative must make a determination if the existing ATO provides appropriate safeguards or if an additional ATO is required for the performance of the contract and state as such.

NIH acceptance of the ATO does not alleviate the Contractor's responsibility to ensure the system security and privacy controls are implemented and operating effectively.

B. SA&A Package Deliverables - The Contractor (and/or any subcontractor) shall provide an SA&A package within ninety (90) days of contract award, unless otherwise specified by the COR to the CO and/or COR. The following SA&A deliverables are required to complete the SA&A package.

● System Security Plan (SSP) - due within ninety (90) days of contract award, unless otherwise specified by the COR . The SSP shall comply with the NIST SP 800-18, Guide for Developing Security Plans for Federal Information Systems, the Federal Information Processing Standard (FIPS) 200, Recommended Security Controls for Federal Information Systems, and NIST SP 800-53, Security and Privacy Controls for Federal Information Systems and Organizations applicable baseline requirements, and other applicable NIST guidance

- 9 -as well as HHS and NIH policies and other guidance. The SSP shall be consistent with and detail the approach to IT security contained in the Contractor's bid or proposal that resulted in the award of this contract. The SSP shall provide an overview of the system environment and security requirements to protect the information system as well as describe all applicable security controls in place or planned for meeting those requirements. It should provide a structured process for planning adequate, cost-effective security protection for a system. The Contractor shall update the SSP at least annually thereafter.

● Security Assessment Plan/Report (SAP/SAR) - due within ninety (90) days of contract award, unless otherwise specified by the COR . The security assessment shall be conducted by the assessor and be consistent with NIST SP 800-53A, NIST SP 800-30, and HHS and NIH policies. The assessor will document the assessment results in the SAR.

Thereafter, the Contractor, in coordination with the NIH shall conduct/assist in the assessment of the security controls and update the SAR at least annually.

● Independent Assessment - due within ninety (90) days of contract award, unless otherwise specified by the COR . The Contractor (and/or subcontractor) shall have an independent third-party validate the security and privacy controls in place for the system(s). The independent third party shall review and analyze the Security Authorization package, and report on technical, operational, and management level deficiencies as outlined in NIST SP 800-53. The Contractor shall address all "high" deficiencies before submitting the package to the Government for acceptance. All remaining deficiencies must be documented in a system Plan of Actions and Milestones (POA&M).

● POA&M - due within ninety (90) days of contract award, unless otherwise specified by the COR. The POA&M shall be documented consistent with the HHS Standard for Plan of Action and Milestones and NIH policies. All high-risk weaknesses must be mitigated within 30 days and all medium weaknesses must be mitigated within 60 days from the date the weaknesses are formally identified and documented. The NIH will determine the risk rating of vulnerabilities. Identified risks stemming from deficiencies related to the security control baseline implementation, assessment, continuous monitoring, vulnerability scanning, and other security reviews and sources, as documented in the SAR, shall be documented and tracked by the Contractor for mitigation in the POA&M document. Depending on the severity of the risks, NIH may require designated POAM weaknesses to be remediated before an ATO is issued. Thereafter, the POA&M shall be updated at least quarterly.

C. Contingency Plan and Contingency Plan Test - due within ninety (90) days of contract award, unless otherwise specified by the COR. The Contingency Plan must be developed in accordance with NIST SP 800-34, Contingency Planning Guide for Federal Information Systems, and be consistent with HHS and NIH policies.

Upon acceptance by the System Owner, the Contractor, in coordination with the System Owner, shall test the Contingency Plan and prepare a Contingency Plan Test Report that includes the test results, lessons learned and any action items that need to be addressed. Thereafter, the Contractor shall update and test the Contingency Plan at least annually.

● E-Authentication Questionnaire - The contractor (and/or any subcontractor) shall collaborate with government personnel to ensure that an E-Authentication Threshold Analysis (E-auth TA) is completed to determine if a full E-Authentication Risk Assessment (E-auth RA) is necessary. System documentation developed for a system using E-auth TA/E-auth RA methods shall follow OMB 04-04 and NIST SP 800-63, Rev. 2, Electronic Authentication Guidelines.

Based on the level of assurance determined by the E-Auth, the Contractor (and/or subcontractor) must ensure appropriate authentication to the system, including remote authentication, is in-place in accordance with the assurance level determined by the E-Auth (when required) in accordance with HHS policies.

D. POSITION SENSITIVITY DESIGNATIONS

All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR). The following position sensitivity designation levels apply to this solicitation/contract:

- 10 -

[ ] Level 6: Public Trust - High Risk. Contractor/subcontractor employees assigned to Level 6 positions shall undergo a Suitability Determination and Background Investigation (MBI).

[ ] Level 5: Public Trust - Moderate Risk. Contractor/subcontractor employees assigned to Level 5 positions with no previous investigation and approval shall undergo a Suitability Determination and a Minimum Background Investigation (MBI), or a Limited Background Investigation (LBI).

[X] Level 1: Non-Sensitive. Contractor/subcontractor employees assigned to Level 1 positions shall undergo a Suitability Determination and National Check and Inquiry Investigation (NACI).

1. HOMELAND SECURITY PRESIDENTIAL DIRECTIVE (HSPD)-12

Roster-

a. The Contractor (and/or any subcontractor) shall submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s). The roster shall be submitted to the COR and/or CO within fourteen (14) calendar days after the effective date of this contract. Any revisions to the roster as a result of staffing changes shall be submitted within seven (7) calendar days of the change.

The COR will notify the Contractor of the appropriate level of investigation required for each staff member. An electronic template, "Roster of Employees Requiring Suitability Investigations," is available for contractor use at:

https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/SuitabilityRoster_10-15-12.xlsx.

b. If the Contractor is filling a new position, the Contractor shall provide a position description and the Government will determine the appropriate suitability level. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.

c. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.

d. The Contractor shall notify the Contracting Officer in advance when any new personnel, who are subject to a background check/investigation, will work under the contract and if they have previously been the subject of national agency checks or background investigations.

e. All contractor and subcontractor employees shall comply with the conditions established for their designated position sensitivity level prior to performing any work under this contract. Contractors may begin work after the fingerprint check has been completed.

f. Investigations are expensive and may delay performance, regardless of the outcome of the investigation. Delays associated with rejections and consequent re-investigations may not be excusable in accordance with the FAR clause, Excusable Delays - see FAR 52.249-14. Accordingly, the Contractor shall ensure that any additional employees whose names it submits for work under this contract have a reasonable chance for approval.

g. Typically, the Government investigates personnel at no cost to the Contractor. However, multiple investigations for the same position may, at the Contracting Officer's discretion, justify reduction(s) in the contract price of no more that the cost of the additional investigation(s).

h. The Contractor shall include language similar to this "HHS Controlled Facilities and Information Systems Security" language in all subcontracts that require subcontractor personnel to have the same frequency and duration of (1) physical access to an HHS-controlled facility; (2) logical access to an HHS-controlled information system; (3) access to sensitive HHS data/information, whether in an HHS-controlled information system or in hard copy; or (4) any combination of circumstances (1) through (3).

i. The Contractor shall direct inquiries, including requests for forms and assistance, to the Contracting Officer or designee.

- 11 -

j. Within 7 calendar days after the Government's final acceptance of the work under this contract, or upon termination of the contract, the Contractor shall return all identification badges to the Contracting Officer or

E. CONTRACT INITIATION AND EXPIRATION

1. General Security Requirements- The Contractor (and/or any subcontractor) shall comply with information security and privacy requirements, Enterprise Performance Life Cycle (EPLC) processes, HHS Enterprise Architecture requirements to ensure information is appropriately protected from initiation to expiration of the contract. All information systems development or enhancement tasks supported by the contractor shall follow the HHS EPLC framework and methodology or and in accordance with the HHS Contract Closeout Guide (2012).

HHS EA requirements may be located here: https://www.hhs.gov/ocio/ea/documents/proplans.html

2. System Documentation- Contractors (and/or any subcontractors) must follow and adhere to NIST SP 800-64, Security Considerations in the System Development Life Cycle, at a minimum, for system development and provide system documentation at designated intervals (specifically, at the expiration of the contract) within the EPLC that require artifact review and approval.

3. Sanitization of Government Files and Information- As part of contract closeout and at expiration of the contract, the Contractor (and/or any subcontractor) shall provide all required documentation in accordance with the NIH Media Sanitization and Disposal Policy to the CO and/or COR to certify that, at the government's direction, all electronic and paper records are appropriately disposed of and all devices and media are sanitized in accordance with NIST SP 800-88, Guidelines for Media Sanitization.

4. Notification- The Contractor (and/or any subcontractor) shall notify the CO and/or COR and system ISSO within fifteen days before an employee stops working under this contract.

5. Contractor Responsibilities Upon Physical Completion of the Contract- The contractor (and/or any subcontractors) shall return all government information and IT resources (i.e., government information in non-government-owned systems, media, and backup systems) acquired during the term of this contract to the CO and/or COR. Additionally, the Contractor shall provide a certification that all government information has been properly sanitized and purged from Contractor-owned systems, including backup systems and media used during contract performance, in accordance with HHS and/or NIH policies.

6. The Contractor (and/or any subcontractor) shall perform and document the actions identified in the NIH Contractor Employee Separation Checklist https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/ Emp-sep-checklist.pdf when an employee terminates work under this contract within 2 days of the employee's exit from the contract. All documentation shall be made available to the CO and/or COR upon request.

F. Contractor Non-Disclosure Agreement (NDA)- Each Contractor (and/or any subcontractor) employee having access to non-public government information under this contract shall complete the NIH non-disclosure agreement https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Nondisclosure.pdf , as applicable. A copy of each signed and witnessed NDA shall be submitted to the Contracting Officer (CO) and/or CO Representative (COR) prior to performing any work under this acquisition.

G. Vulnerability Scanning Reports The Contractor shall report the results of the required monthly special vulnerability scans no later than 10 days following the end of each reporting period. This report may be included as part of the Bi-Monthly Technical Progress Report. Otherwise, this report shall be submitted under a separate cover on bi-monthly basis.

H. Government Access for Security Assessment. In addition to the Inspection Clause in the contract, the Contractor (and/or any subcontractor) shall afford the Government access to the Contractor's facilities, installations, operations, documentation, information systems, and personnel used in performance of this contract to the extent required to carry out a program of security assessment (to include vulnerability testing), investigation, and audit to safeguard against threats and hazards to the confidentiality, integrity, and availability

- 12 -of federal data or to the protection of information systems operated on behalf of HHS, including but are not limited to:

a. At any tier handling or accessing information, consent to and allow the Government, or an independent third party working at the Government's direction, without notice at any time during a weekday during regular business hours contractor local time, to access contractor and subcontractor installations, facilities, infrastructure, data centers, equipment (including but not limited to all servers, computing devices, and portable media), operations, documentation (whether in electronic, paper, or other forms), databases, and personnel which are used in performance of the contract.

The Government includes but is not limited to the U.S. Department of Justice, U.S. Government Accountability Office, and the HHS Office of the Inspector General (OIG). The purpose of the access is to facilitate performance inspections and reviews, security and compliance audits, and law enforcement investigations. For security audits, the audit may include but not be limited to such items as buffer overflows, open ports, unnecessary services, lack of user input filtering, cross site scripting vulnerabilities, SQL injection vulnerabilities, and any other known vulnerabilities.

b. At any tier handling or accessing protected information, fully cooperate with all audits, inspections, investigations, forensic analysis, or other reviews or requirements needed to carry out requirements presented in applicable law or policy. Beyond providing access, full cooperation also includes, but is not limited to, disclosure to investigators of information sufficient to identify the nature and extent of any criminal or fraudulent activity and the individuals responsible for that activity. It includes timely and complete production of requested data, metadata, information, and records relevant to any inspection, audit, investigation, or review, and making employees of the contractor available for interview by inspectors, auditors, and investigators upon request. Full cooperation also includes allowing the Government to make reproductions or copies of information and equipment, including, if necessary, collecting a machine or system image capture.

c. Segregate Government protected information and metadata on the handling of Government protected information from other information. Commingling of information is prohibited. Inspectors, auditors, and investigators will not be precluded from having access to the sought information if sought information is commingled with other information.

d. Cooperate with inspections, audits, investigations, and reviews.

- 13 -

SECTION D - PACKAGING, MARKING AND SHIPPING

All deliverables required under this contract shall be packaged, marked and shipped in accordance with Government specifications. At a minimum, all deliverables shall be marked with the contract number and Contractor name. The Contractor shall guarantee that all required materials shall be delivered in immediate usable and acceptable condition.

- 14 -

SECTION E - INSPECTION AND ACCEPTANCE

a. The Contracting Officer or the duly authorized representative will perform inspection and acceptance of materials and services to be provided.

b. For the purpose of this SECTION, the Contracting Officer's Representative is the authorized representative of the Contracting Officer.

c. Inspection and acceptance will be performed at:

National Cancer Institute 9609 Medical Center Drive

MSC 9705

Rockville, MD 20850

Acceptance may be presumed unless otherwise indicated in writing by the Contracting Officer or the duly authorized representative within 60 days of receipt.

d. This contract incorporates the following clause by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available.

FAR Clause 52.246-4, Inspection of Services - Fixed Price (August 1996).

FAR Clause 52.246-5, Inspection of Services - Cost-Reimbursement (April 1984).

FAR Clause 52.246-6, Inspection Time-and Material and Labor Hour (May 2001).

Alternate I (April 1984) is not applicable to this contract.

- 15 -

SECTION F - DELIVERIES OR PERFORMANCE

ARTICLE F.1. PERIOD OF PERFORMANCE

a. The period of performance of this contract shall be from 4/1/2021 through 03/31/2022.

b. If the Government exercises its option(s) pursuant to the OPTION PROVISION Article in Section H of this contract, the period of performance will be increased as listed below:

Option Option Period Option Period 1 04/01/2022 - 03/31/2023 Option Period 2 04/01/2023 - 03/31/2024 Option Period 3 04/01/2024 - 03/31/2025 Option Period 4 04/01/2025 - 03/31/2026

ARTICLE F.2. DELIVERIES

Satisfactory performance of the final contract shall be deemed to occur upon performance of the work described in the Statement of Work Article in SECTION C of this contract and upon delivery and acceptance by the Contracting Officer, or the duly authorized representative, of the following items in accordance with the stated delivery schedule:

a. The items specified below as described in the REPORTING REQUIREMENTS Article in SECTION C of this contract will be required to be delivered F.o.b. Destination as set forth in FAR 52.247-35, F.o.b. DESTINATION, WITHIN CONSIGNEES PREMISES (APRIL 1984), and in accordance with and by the date(s) specified below [and any specifications stated in SECTION D, PACKAGING, MARKING AND SHIPPING, of this contract]:

b.

Item Description Delivery Schedule

Technical Reports

(1) Bi-Monthly Task Order Progress

Report Due no later than fifteen (15) calendar days following each full month, or as specified in the Task Order. The Bi-Monthly Progress Report is not required for the month that the Annual Progress Report or Final Progress Report is due.

(2) Annual Task Order Progress Report Due no later than the thirty (30) calendar days following the anniversary date of each task order.

The Annual Report is not required when the Final Task Order Progress Report is due.

(3) Final Task Order Report Due prior to the expiration date of the task order.

(4) Transition-In Plan Due no later than thirty (30) calendar days from the effective date of the task order.

(5) Draft Transition Out-Plan Due six (6) months prior to the expiration date of the task order and/ or contract.

- 16 -

Item Description Delivery Schedule

(6) Final Transition-Out Plan Due thirty (30) calendar days after receipt of COR’s comments on Draft Transition-Out Plan.

Other Reports/Deliverables

(7) Source Code and Object Code Due prior to the expiration date of the task order

(8) List of Completion of Online

Information Security Awareness Training

Due within thirty (30) days after task order award and annually thereafter.

Or as requested.

Information Security Deliverables Reference Article H and Section L “Information Security and/or Physical Access Security “

(9) Roster of Employees Requiring Suitability Investigations

Due no later than fourteen (14) calendar days of the effective date of the task order. Roster revisions for staffing changes are due within seven (7) calendar days of the change.

(10) Reporting of New and Departing Employees

Due no later than (15) calendar days of staffing changes

(11) Contractor-Employee Non- Disclosure Agreement

Due prior to commencement of work.

(12) Privacy Impact Assessment Due within sixty (60) calendar days after task order award, unless otherwise specified by the COR

(See Article H)

(13) Employee Separation Checklist Due no later than two (2) business days upon employee’s exit.

Security Assessment and

Authorization (SA&A) Due within ninety (90) calendar days of task order award, unless otherwise specified by the COR.

SA&A PACKAGE DELIVERABLES

INCLUDE:

(14) System Security Plan (SSP) Due within ninety (90) calendar days after task order award, unless otherwise specified by the COR.

(15)

Security Assessment Plan/Report

(SAP/SAR)

Due ninety (90) calendar days after the task order award, unless otherwise specified by the COR.

Thereafter, the SAR shall be updated at least annually.

(16) Independent Assessment Due ninety (90) calendar days after task order award,

- 17 -

Item Description Delivery Schedule unless otherwise specified by the

COR.

(17) Plan of Action and Milestones

(POA&M)

Due ninety (90) calendar days after task order award, unless otherwise specified by the COR. Thereafter, the POA&M shall be updated at least quarterly.

(18) Contingency Plan and Contingency Plan Test

Due ninety (90) calendar days after task order award, and annually thereafter.

(19) E-Authentication Questionnaire Due thirty (30) calendar days after task order award, unless otherwise specified by the

COR.

OTHER INFORMATION SECURITY

DELIVERABLES

(20) Annual Assessment/ Penetration Test

Due annually as required by the task order, unless otherwise specified by the COR

(21) Asset Management Due within ninety (60) days after task order award, unless otherwise specified by the COR.

(22) Configuration Management Due within 60 days of request, if required by the Task Order.

(23) Vulnerability Management Due within 30 days of task order award, unless otherwise specified by the COR.

(24) Vulnerability Scanning Reports Due with Bi-Monthly Progress Report if required by the Task Order.

(25) Section 508 Annual Report Due no later than thirty (30) days after the end of each twelve (12) month period for each Task Order.

c. The above items shall be addressed and delivered to:

Addressee Deliverable Item No Quantity Contracting Officer's Representative (COR) [To be named] Division of Cancer Control and Population Sciences Statistical Methodology and Applications Branch National Cancer Institute 9609 Medical Center Drive, Room___ Rockville, MD 20850 E-mail address to be provided

TBD See quantity for each item above

- 18 -

Addressee Deliverable Item No Quantity Contracting Officer (CO) [To be named] Office of Acquisitions (OA) National Cancer Institute 9609 Medical Center Drive, MSC 9705, Room_____ Rockville, MD 20850 E-mail address to be provided

TBD See quantity for each item above

ARTICLE F.3. CLAUSES INCORPORATED BY REFERENCE, FAR 52.252-2 (FEBRUARY

1998)

This contract incorporates the following clause(s) by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/?q=browsefar.

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSE:

52.242-15, Stop Work Order (August 1989)

Alternate I (April 1984) is applicable to this contract EXCEPT for Fixed-Price task orders.

52.242-17, Government Delay of Work (April 1984).

- 19 -

SECTION G - CONTRACT ADMINISTRATION DATA

ARTICLE G.1. CONTRACTING OFFICER'S REPRESENTATIVE (COR)

The following Contracting Officer's Representative (COR) will represent the Government for the purpose of this contract:

To be specified prior to award.

The COR is responsible for: (1) monitoring the Contractor's technical progress, including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements; (2) interpreting the statement of work and any other technical performance requirements; (3) performing technical evaluation as required; (4) performing technical inspections and acceptances required by this contract; and (5) assisting in the resolution of technical problems encountered during performance.

An alternate COR may be appointed and ,in such case, then he/she is responsible for carrying out the duties of the COR only in the event that the COR can no longer perform his/her duties as assigned.

The Contracting Officer is the only person with authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the statement of work; (2) modify or extend the period of performance; (3) change the delivery schedule; (4) authorize reimbursement to the Contractor for any costs incurred during the performance of this contract; (5) otherwise change any terms and conditions of this contract; or (6) sign written licensing agreements. Any signed agreement shall be incorporated by reference in Section K of the contract

The Government may unilaterally change its COR designation.

ARTICLE G.2. KEY PERSONNEL, HHSAR 352.237-75 (December 2015)

The key personnel specified in this contract are considered to be essential to work performance. At least 30 days prior to the contractor voluntarily diverting any of the specified individuals to other programs or contracts the Contractor shall notify the Contracting Officer and shall submit a justification for the diversion or replacement and a request to replace the individual. The request must identify the proposed replacement and provide an explanation of how the replacement's skills, experience, and credentials meet or exceed the requirements of the contract (including, when applicable, Human Subjects Testing requirements). If the employee of the contractor is terminated for cause or separates from the contractor voluntarily with less than thirty days notice, the Contractor shall provide the maximum notice practicable under the circumstances. The Contractor shall not divert, replace, or announce any such change to key personnel without the written consent of the Contracting Officer. The contract will be modified to add or delete key personnel as necessary to reflect the agreement of the parties.

(End of Clause)

The following individual(s) is/are considered to be essential to the work being performed hereunder:

Name Title

To be identified TBD

ARTICLE G.3. TASK ORDER PROCEDURE

This contract provides for the issuance of Task Orders on a negotiated basis as follows:

- 20 -

a. General

Only the Contracting Officer may issue Task Orders to the Contractor, providing specific authorization or direction to perform work within the scope of the contract and as specified in the Statement of Work. Unless specifically authorized by the Contracting Officer, the Contractor shall not commence work until a fully executed Task Order has been awarded. The Contractor may incur costs under this contract in performance of task orders and task order modifications issued in accordance with this ARTICLE.

No other costs are authorized unless otherwise specified in the contract or expressly authorized by the Contracting Officer.

b. Requesting Task Order Proposals.

The Contracting Officer or a designated individual may solicit responses to requirements from Contractors within a technical area covered by a task order requirement in writing. A Task Order Request for Proposals (TORFP) will be prepared and issued for each task order requirement.

Generally, the Task Order Request for Proposal (TORFP) will include but is not limited to the following:

1. Statement of Work;

2. Reporting Requirements and Deliverables;

3. Proposal Due Date and Location to Deliver Proposals;

4. Period of Performance of Task Order;

5. Anticipated type of Task Order;

6. Technical Proposal Instructions;

7. Business proposal Instructions

8. Evaluation Factors for Award

All contract clauses contained in this contract are hereby incorporated in the TORFP and the resultant task order. If conflicts exist between the contract clauses and the information outlined in the task order, the contract language takes precedence over the information in the task order.

c. Evaluation and Award of Task Order Proposals

The Government will evaluate the Task Order proposals against the requirements of the TORFP.

Specifically, the technical evaluation factors, cost/price, past performance and any other factor specifically identified in the TORFP will be used for evaluation of each proposal. In addition, the TORFP will identify the basis for award. Generally, technical factors will be significantly more important than cost or price However, each TORFP will specify how the award decision will be made.

Upon completion of evaluations, the Contracting Officer will issue a task order to the Contractor.

ARTICLE G.4. INVOICE SUBMISSION

a. Invoice Instructions for NIH Fixed-Price Type Contracts, NIH(RC)-2, are attached and made part of this contract (See Section J – Attachments) .

In addition, Invoice Submission/Contract Financing Request and Contract Financial Reporting, NIH (RC)-4, for NIH Cost-Reimbursement Type Contracts are attached and made part of this IDIQ Contract in the case that any Cost-Type Task Orders are awarded. (See Section J – Attachments).

- 21 -

The Contractor shall follow the appropriate invoice instructions based on Task Order contract type and submission procedures specified below to meet the requirements of a "proper invoice" pursuant to FAR Subpart 32.9, Prompt Payment.

1. Payment requests shall be submitted to the offices identified below. Do not submit supporting documentation (e.g., receipts, time sheets, vendor invoices, etc.) with your payment request unless specified elsewhere in the contract or requested by the Contracting Officer.

a. The original invoice shall be submitted to the designated billing office as follows:

The Contractor shall submit invoice to the National Institutes of Health (NIH)/Office of Financial Management (OFM) via email at invoicing@nih.gov with a copy to the approving official, as directed below. The Contractor must follow step-by-step instructions as stated in the NIH/OFM Electronic Invoicing Instructions for NIH Contractors/Vendors, which is included as an attachment in Section J of this contract.

The invoice shall be transmitted as an attachment via email to the address listed above in one of the following formats: Word, or Adobe Portable Document Format (PDF). The Contractor must submit only one invoice per email.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .