BLDG 1 REPLACE CONTROL REQUEST FOR PROPOSAL

PANEL ON ATS

MCAS Cherry Point, North Carolina Project No. 7034573

27 APR 2021

NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC

FACILITIES ENGINEERING AND ACQUISITION DIVISION, CHERRY POINT

POC: Joseph Schwarz, Contract Specialist (252) 466-4345

ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A PROPOSAL

FOR THIS PROJECT:

N4008520D0076

Mechworks Mechanical Contractors, Inc.

102A Professional Park Drive

Beaufort, NC 28516

(252) 504-3201

POC: Charlie Morgan estimating@mechworksinc.com

N4008520D0077

North State Mechanical, Inc.

225 Ellis Blvd

Jacksonville, NC 28540-6632

POC: Donald Dail

Tel: (910) 355-9332 dmenture@northstatemechanical.com

N4008520D0078

R&W Construction Company, Inc.

2646 Richlands Highway

Jacksonville, NC 28540

(910) 455-1830

POC: Chris Bland chris@randwconstruction.com

N4008520D0079

Siler Excavating, LLC

1217 Buffalo Road

Clairfield, TN 37715

(423) 784-0287

POC: Carroll Suggs carroll@siler.biz mailto:estimating@mechworksinc.com mailto:dmenture@northstatemechanical.com mailto:chris@randwconstruction.com mailto:carroll@siler.biz

MCAS Cherry Point, North Carolina Project No. 7034573

GENERAL REQUIREMENTS

Project No.: 7034573

(Clauses incorporated in Base Contract apply to this solicitation)

Title: Bldg 1 Replace Control Panel on ATS

NAICS Code and Standard Size: 238220, Plumbing, Heating, and Air-Conditioning

Contractors, 15.0 Million

Contract Completion Date: All work shall be completed within 120 calendar days after award

Estimated Cost Range: Between $ 25,000.00 and $100,000.00

Wage Determination: General Decision NC20200038 08/14/2020

Liquidated Damages: $62 per calendar day of delay

Basis for Award: Lowest Price

Proposal Acceptance Period: 90 calendar days after receipt of offers

Site Visit: 4 May 2021 @ 0900

Contractors are to meet at the FEAD office, Building 163, MCAS Cherry Point

This will be the ONLY Government Scheduled Site Visit for this Project.

Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4 (for projects over $150,000). An electronic copy of your bid bond must be submitted with your proposal. A hard copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) business day from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration.

In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and

FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award.

• No bonds are required for proposals less than $35K.

• Proposals valued at $35K and greater will require a payment bond only.

• Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond.

Proposal Due Date/Time: 18 May 2021 by 1200 local time

E-Mail Address for Proposals and Requests for information (RFIs):

1. roicc_chpt_ktr_bids@navy.mil

2. Joseph.Schwarz1@navy.mil

3. Ericka.J.Bishop@navy.mil

*note: Proposals must be sent to ALL of the above email addresses. Subject line should contain the project number and contractor information.

Requests for Information (RFIs): RFIs must be submitted email addresses above. The cut off for RFIs is 7 May 2021 by 0900 in order to process all inquiries by the proposal due date.

Specifications, drawings, and all associated project documents are posted in BetaSAM

(https://beta.sam.gov/)

NOTE THE FOLLOWING:

The Government intends to evaluate proposals and issue a task order without discussions.

Therefore, each initial offer should contain the offeror’s best terms from a price standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary.

Any changes to the Scope of work, Technical Specifications, or Drawings will be issued on a Standard Form (SF) 30.

This request does not constitute a notice to proceed nor shall it be considered as a commitment on the part of the Government.

Any cost incurred prior to issuance of a task order cannot be reimbursed. Offerors will not be reimbursed for any effort or proposal costs resulting from this solicitation.

Offerors are advised that funding may not become available. If funds are not available, no award will be made as a result of this solicitation.

If funding becomes available, the successful offeror will be issued a task order under their contract, as set forth in DFARS 252.216-7006, Ordering (May 2011).

General Decision Number: NC20200038 08/14/2020

Superseded General Decision Number: NC20190038

State: North Carolina

Construction Type: Building

County: Onslow County in North Carolina.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/03/2020

1 08/14/2020

* IRON0848-005 07/01/2020

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 26.00 15.80

* PLUM0421-003 07/01/2019

PIPEFITTER.......................$ 28.50 12.41

SUNC2011-019 08/24/2011

http://www.dol.gov/whd/govcontracts

BRICKLAYER.......................$ 19.00 0.00

CARPENTER (Drywall Hanging

Only)............................$ 13.83

0.00

CARPENTER (Form Work Only).......$ 13.38 1.80

CARPENTER, Excludes Drywall

Hanging, and Form Work...........$ 16.39

4.26

CEMENT MASON/CONCRETE FINISHER...$ 15.80 0.00

ELECTRICIAN......................$ 20.64 6.68

HVAC MECHANIC (HVAC Duct

Installation Only)...............$ 17.37

1.82

LABORER: Common or General......$ 11.13 0.32

LABORER: Landscape &

Irrigation.......................$ 9.13

0.28

LABORER: Pipelayer..............$ 13.35 2.80

LABORER: Mason

Tender-Brick/Cement/Concrete.....$ 12.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 18.47

2.41

OPERATOR: Bulldozer.............$ 16.00 1.87

OPERATOR: Crane.................$ 19.77 4.48

OPERATOR: Forklift..............$ 13.86 0.00

OPERATOR: Grader/Blade..........$ 15.72 1.49

OPERATOR: Loader................$ 16.17 0.25

PAINTER: Brush, Roller and

Spray............................$ 12.35

PLUMBER..........................$ 18.48 3.93

ROOFER...........................$ 11.75 1.06

SHEET METAL WORKER, Excludes

HVAC Duct Installation...........$ 15.81

1.40

TRUCK DRIVER.....................$ 13.38 1.48

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

http://www.dol.gov/whd/govcontracts

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations.

Write to:

Branch of Construction Wage

Determinations Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W. Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour

Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the

Administrative Review Board (formerly the Wage Appeals

Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

== END OF GENERAL DECISION

Company Name:____________________________________

Company Address: ________________________________

MACC Contract Number: N4008520D ______________

Date: ______________

Facilities Engineering & Acquisition Division

PSC Box 8006

MCAS Cheery Point, NC 28533-0006

Proposal for Project: 7034573 Bldg 1 Replace Control Panel on ATS

Marine Corps Air Station Cherry Point, NC

Amendments Acknowledged: No Amendments Issued or Amendments_______

Subcontractors to be used*:

Subcontractor Discipline

*Insert additional lines as needed

Proposal amounts:

Item # Amount

Total $

Comments:

REPLACE CONTROL PANEL ON ATS, BUILDING 1

MCAS CHERRY POINT, NORTH CAROLINA 28533-0006

WORK ORDER #7034573

1.1 GENERAL INTENTION

The work includes replacing control panel on Automatic

Transfer Switch (ATS) in Building 1 and incidental related work.

1.2 LOCATION

The work is located at MCAS Cherry Point, approximately as indicated. The exact location will be shown by the Contracting

Officer.

1.3 SCOPE OF WORK.

a. Contractor shall locate and replace the existing control panel in the Transfer and Bypass Isolation Switch for Emergency Systems

Zenith ATS (Serial Number 1590212-1, 277/480 Volts, 1600 Amps, 60Hz, 3-Phase) with a new control unit suitable and listed for the application to provide bypass and closed transition. The basis of design is an MX 250 Controller with an EPM6000 Meter.

b. Contractor shall program the new control panel as required.

c. Contractor shall test and verify that the new control panel will effectively transition to emergency power when normal side power is down and automatically switch back to normal side power once restored.

d. Contractor shall follow all Lock Out/Tag Out (LOTO) procedures.

The normal side power service includes solar power that must follow all LOTO procedures as well.

e. All material shall have a two (2) year parts and labor warranty provided to the Contracting Officer’s Designated Representative.

Reference attachments included: “Location Map Building 1” and

“Worksite Building 1”

1.4 SPECIAL SCHEDULING REQUIREMENTS

Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

The building will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

Permission to interrupt any activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption and in accordance with section 1.10.

1.5 CONTRACTOR ACCESS AND USE OF PREMISES

DBIDS has gone live at MCAS Cherry Point. In order to reduce wait time when exchanging your RapidGate credential, it is highly recommended each applicant pre-register at https://dbids-global.dmdc.mil/enroll#!/

Non-DoD cardholding visitors to Marine Corps Installations with a driver's license or ID issued by a state that is not compliant with the Real ID Act of 2005 will now need to provide an alternate form of acceptable identification to gain entry, or be escorted by an authorized patron of the air station.

North Carolina now issues REAL ID compliant driver’s licenses, but many drivers have yet to be issued the new license.

Drivers may get a North Carolina REAL ID driver's license at any NCDMV driver's license office.

The Act established minimum security standards for license issuance and production and prohibits Federal agencies from accepting driver's licenses and identification cards from states not meeting the Act's minimum standards.

In absence of a compliant state issued driver's license or ID, one of the following federally approved forms of identification must also be provided in addition to the non-compliant driver's license or ID:

https://dbids-global.dmdc.mil/enroll#!/

1. U.S. Passport

2. U.S. Passport Card

3. U.S. Coast Guard Merchant Mariner Card

4. Personal Identity Verification (PIV) Card

5. Personal Identity Verification - Interoperable (PIV-I)

6. U.S. State Department Driver's License

7. Veteran's Health Identification Card (Issued by the U.S.

Department of Veterans Affairs)

8. U.S. Permanent Resident Card (Form I-551)

9. U.S. Certificate of Naturalization or Certificate of Citizenship

(Form N-550)

10. Department of Homeland Security Employment Authorization

Document (Form I-766)

1.5.1 ACTIVITY REGULATIONS

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress.

Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.5.1.1 SUBCONTRACTORS AND PERSONNEL CONTACTS

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.5.1.3 INSTALLATION ACCESS

Obtain access to Navy and Marine Corps installations through participation in the Defense Biometrics Identification System

(DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial

Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor

Control Office to access an installation.

1.5.1.3.1 REGISTRATION FOR DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html. Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer that provides the purpose for access to the Base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the Base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html.

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.5.1.3.2 DBIDS ELIGIBILITY REQUIREMENTS

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the https://www.cnic.navy.mil/om/dbids.html reason for disqualification. The Government is the final authority.

1.5.1.3.3 DBIDS NOTIFICATION REQUIREMENTS

Immediately report instances of lost or stolen badges to the

Contracting Officer.

Immediately collect DBIDS credentials and notify the

Contracting Officer in writing under the following circumstances:

1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.5.1.3.4 ONE-DAY PASSES

Personnel applying for One-Day passes at the Base Visitor

Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation.

The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.5.1.4 NO SMOKING POLICY

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.5.2 WORKING HOURS

Regular working hours shall consist of weekend work for an 8

1/2 hour period normally between the hours of 5:00 pm Friday to 12:00 am Monday, excluding Government holidays.

1.5.3 WORK OUTSIDE REGULAR HOURS

Work outside regular working hours requires Contracting

Officer approval. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the

Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.5.5 OCCUPIED BUILDING

The Contractor shall be working in an existing building which is occupied. Do not enter the building without prior approval of the Contracting Officer.

The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Relocate movable furniture approximately 6 feet away from the

Contractor's working area as required to perform the work, protect the furniture, and replace the furniture in its original location upon completion of the work. Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work.

The Government will remove and relocate other Government property in the areas of the building scheduled to receive work.

1.5.6 UTILITY CUTOVERS AND INTERRUPTIONS

Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."

Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours."

Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The

Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting

Officer giving reasonable advance notice when such operation is required.

1.6 SECURITY REQUIREMENTS

1.6.1 STATION REGULATIONS

No employee or representative of the contractor will be admitted to the work site without an Identification Badge or is specifically authorized admittance to the work site by the

FEAD, Facilities Engineering & Acquisition Division.

IMPORTANT NOTE: FEAD personnel (Construction Managers, Engineers/Architects, Engineering Technicians, Contract

Specialists, or Contract Surveillance Representatives) will not receive, process, re-transmit or otherwise handle IN ANY

WAY Personally Identifiable Information.

1.6.2 CONTRACTOR ACCESS TO MCAS CHERRY POINT AND OUTLYING AREAS

Documentation requirements for granting access to MCAS Cherry Point for commercial and contract employers and employees. This document is an aid in meeting ASO 5560.6A requirements and is not a substitute for the order.

The Pass & Identification Office at Building 251 will issue credentials to authorized contractors. Sub-Contractors and suppliers must coordinate through the Prime-Contractor:

Criminal Activity. In accordance with ASO 5560.6A, the below list of criminal activities within an applicant's record are considered not in the best interest of the Marine Corps and will be grounds for automatic denial of access aboard the Installation:

a. Conviction of any felony offense.

b. Conviction of any misdemeanor offense, which was the result of a plea bargain of a felony offense.

c. Conviction of any offense involving a weapon.

d. Conviction of any drug offense involving manufacturing or trafficking.

e. More than one misdemeanor conviction of drug related offenses over the applicant's lifetime or one misdemeanor drug related offense within the last five years.

f. Conviction of any assault charge.

g. Conviction of any offense involving theft or larceny.

h. Conviction of any offense of domestic violence.

i. Conviction of any offense related to the abuse/neglect of a child.

j. Conviction of any sexual in nature related offense or registration as a sex offender.

k. Commission of any grievous criminal offense/misconduct while aboard any Federal installation, including blatant disregard for rules and regulations of the Installation, but excluding minor traffic offenses.

l. Other than Honorable, Bad Conduct, and Dishonorable discharges from the U.S. Military.

m. Those identified as undocumented citizens.

n. Those on the National Terrorist Watch List.

o. Any individual who attempts to hide or purposely fails to disclose all past criminal history during the vetting process.

p. Any individual that the Provost Marshal's Office determines to present a risk to the security and safety of the Installation and whose access is deemed not in the best interest of the

Marine Corps.

q. Any individual who has been debarred from the Installation by the Installation Commander or is currently listed as debarred from any other Federal installation.

r. Any individual with an outstanding warrant for their arrest or apprehension.

s. Any individual with a pending criminal court case that, if convicted, would result in access denial in accordance with the criteria listed above.

1.6.6 STAGING AREA

The contractor staging area will be (PM to coordinate).

Amount of material on site shall be kept to a minimum and shall only be material that is pertinent to the work currently being performed. All stockpiling of equipment and materials shall be closely coordinated with the Government and shall not disrupt activities at the site.

1.7 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required by FAR 28.307-

2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by North Carolina Law.

1.8 SUPERVISION

The complexity of this project will require one person to fill the roles of the Superintendent, Quality Control Manager, and

Site Safety and Health Officer.

1.9 SUBMITTALS

The following items shall have submittals delivered to the COR for approval by the government prior to the commencement of site work.

Control Unit Testing Plan

Control Unit Specs Sheet

1.10 PLANNED OUTAGES AND SERVICE DISRUPTIONS

Planned outages and service disruptions are requested by the contractor for approval by the Government when necessary to facilitate and/or accomplish contract work. Affected services include utilities (steam, water, waste water, and electrical service), communications (telephone, network, industrial control systems, and fire/security alarm systems, fire protection equipment, infrastructure, and road closures.

Disruption of these services cannot be allowed without written approval of the government.

The contractor is required to 1) request the outage in writing and 2) demonstrate sufficient contingency preparedness in the event that service cannot be restored due to a failure in accomplishment of contract work.

All outages require Contractor’s written request fifteen (15) days prior to commencement of such work. The request shall be submitted to the COR with the date, time, duration, and scope of the outage.

As supporting documentation for the request, the contractor is require to submit a contingency plan for all reasonably foreseen risks related to the contractor’s performance of the work that would impact disrupted services in excess of the approved outage. This plan must demonstrate the following at a minimum.

1. Understanding of key personnel and communications methods to include phone numbers.

2. Analysis of reasonable risks during the contract work that would impact disrupted services in excess of the approved outage.

3. An effective recovery plan to restore minimum essential services in the event of these risks materializing.

4. Requested government support.

The government will similarly produce risk-based contingency plans for restoration of essential services caused by reasonably foreseen factors that are not related to the performance of the contract. In these cases, the government may request the contractor make additional preparations to support essential and high risk services. Such requests are considered within the scope of this contract but will be priced and negotiated via modification as conditions warrant.

Approvals will be issued by the Public Works Officer or his/her designee and transmitted via the COR.

1.11 GOVERNMENTAL SAFETY REQUIREMENTS

Personal protective equipment (PPE) is governed in all areas by the nature of the work the employee is performing. Use personal hearing protection at all times in designated noise hazardous locations or when performing noise hazardous tasks.

Safety glasses must be worn or carried/available on each person. Mandatory PPE includes: hard hats, long pants, appropriate safety shoes, and appropriate class reflective vest.

Comply with the Safety and Health Requirements Manual (EM 385-

1-1), NFPA 70, NFPA 70E, NFPA 241, the Accident Prevention

Plan (APP), the Activity Hazard Analysis (AHA), Federal and

State OSHA regulations, and other related submittals and activity fire and safety regulations. The most stringent standard prevails.

An APP in accordance with EM 385-1-1, Appendix A, is required.

An AHA in accordance with EM 385-1-1, Section 1, is required for each activity or task.

The contractor is responsible for any required permits.

1.12 EXECUTION

If during the course of the work, conditions are encountered which are not covered in the contract or are different from conditions that would be reasonably anticipated, the contractor shall immediately notify the Contracting Officer.

If such conditions are hazardous or the continuation of work would cause a hazardous condition to develop, the contractor shall stop work and proceed as directed by the Contracting

Officer as directed by provisions contained in other sections of this specification. This may include modifications to, or the development of a new, Health and Safety Plan for this project, and alternate or additional appropriate abatement procedures.

RUNWAY 32

RUNWAY 5

RUNWAY 23

RUNWAY 14

FOXTROT

DE LTA

N E U S E R I V E R

S L O C U M C R E E K

HA

NC

OC

K C

RE

EK

G r a n t s L a n d i n gG r a n t s L a n d i n g

S l o c u mS l o c u m

L a w s o nL a w s o n

HENDERSON DR

SL4155

4044007

84A

CTR3672

45764163

39254448

GOLF COURSE

155154

3742 3673

42964201

4312 4313

1404868

153 3909

432291

4376P-8

48484183

3383 1691 unknown

4376P-25 4376P-36

MT4830

84A

MT4846

MT4829

789 805

791 795

783 827

CTR3672

4376P-9 4376P-42

739 1023

4376P-43

47424744

50475054

4171 4419

4702 3768

329305

725304

4663 906

137A

50175009

50365016

4674 4172

4691 4721

46324680

CTR0017

4638-1

4506 CTR0016

4376P-20

4376P-44

T4820

4820I

CTR0013

3148A

T4951

4859A

GISID:3704

4859D

4859C

4376P-5

4169B

4167B 4166B

4168B

FONTANA BLVD

NC 101 HWY

RAN

GE R

D

W MAIN ST

SLOCUM RD

E MAIN ST

WE

BB

B

LV

D

WOODHAVEN DR SH

IP

MA

N

RD

MILLER BLVD

BE

LL

TO

W

N

RD

ROOSEVE

LT

BLVD

CUNNINGHAM BLVD

PARK LN

MIMOSA DR

METHODIST DR

MC

CO

TT

ER

B

LV

D

GOODING DR OU

TE

R

BA

NK

S D

R

TRADER AVE

KOBE DR

PO

PL

AR

R

D

RICE LN

JERRETT LN

PIN

E

DA

LE

R D

SU

NR

IS

E L

N

VILLAGE CT

JAYCEE ST

WI

LD

W

OO

D

RD

KENNETH BLVD

FO

RE

ST

VI

EW

D

R

BA

RD

EN

D

R

MIDDLE SCHOOL LN

GL

EN

D R

BEAUFORT DR

FIR TRL

CROCKER RD

BR

YA

N

BL

VD RE

CR

EA

TIO

N

DR

JENNY LN

MA

NT

EO

C

IR

VIL

LA

GE

D

R

CHADWICK AVE

SH

EL

LB

AR

K

CTLOCUST CT

S J

AC

KS

ON D

R

DE

RR

IC

K C

IR

SHACKLEFORD DR

HIGH SCHOOL DR

ROOSEVELT BLVD

E MAIN ST

CU

NN

ING

HA

M

BL

VD

6I 9I8I7I

6J 9J

8J 7J

6L 7L 8L

6F 9F8F7F

9E 8E

7E6E

8K7K6K

9P8P7P6P

9K

7N

9D8D7D6D

9H8H7H6H

9N8N6N

11I

6O 8O

6G

9O

9G8G

7O

7G

6M 8M 9M

7M

10I 12I 13I 14I

11J

11L

12J10J 13J 14J

11F

12L10L 13L 14L

11E

11P

11K

12F10F 13F 14F

11D

11N

11H

10K

13E

12K 13K

10P 12P 13P

10E

12E 14E

14P

14K

11O

11G

10N

12H

10D

13N12N

13D12D

10H 13H 14H

14N

14D

9Q 8Q

7Q6Q

11M

10O 12O

13G10G

13O

12G 14G

14O

12M 13M10M 14M

11Q10Q 13Q12Q 14Q

5I

6C 9C7C 8C

5J

5L

5F

5E

5P

5K

5N

5H

5D

5O

5G

5M

11C10C 12C 13C 14C

5Q

5C

A ST

RO

OS

EV

EL

T B

LV

D

C ST

FONTANA BLVD

E ST

6TH AVE

MARYLOU RD

N

RA

NG

E R

D

ACCESS RD

SANDY RD

5TH AVE

F ST

MANGUS TRL

CROOKED

RD

ROGERS RD

DU

FF

Y

RD

2ND AVE

7T

H AV

E

ALPACA RD

4TH AVE

MONROE DR

CLUB DR

KA

Y R

D

FIKE ST

S R

AN

GE

R

D

MEADOWLARK RD

WILSON DR

WO

OD

SID

E D

R

HYENA RD

BOYSTOWN RD

HARRIER RD

SLOCUM RD

1ST AVE

HAWK RD

CO

OK

TR

L

ANTEATER RD

BUNCOMBE RD

LARK RD

FA

LC

ON RD

SWALLOW

RD

MADIS O N

DR

SHEEP RD

SKEET RANGE RD

CREEK RD

BORE SITE RD

SHADY GROVE LN

PICNIC RD

TYRET RLJ ST

BR

OW

N T

RL

STAG RD

ONSLOW DR

MOOSE

RD

BEAUFORT RD

LIVE OAK RD

BE

AC

HE

Y

RD

NOBLE TRL

CE

MET

ER

Y RD

FL

YIN

G FOX RD

H ST

QUAIL RD

MC

X

RD

SNIPE RD

3RD AVE

N

ALAMANCE

RD

HILLTOP R D

CALA SITE RD

LANDFILL RD

HANCOCK MARINA R D

SURVIVAL TRAINING RD

LENOIR RD

GATE SERVICE RD

ALE

XAND

ER

RD

RAVEN RD

AN

TE

LO

PE

RD

LEECH RD

JUKE RD

JONES RD

CATFISH POND RD

TICK RD

CHA

NCE R D

NA TURE TRL

FERRET RD

BARREL 2 R

D

HORNET RD

FINCH RD

PHEAS AN

T R

D

WILDLIFE TRL

SEED TREE TRL

MAGPIE RD

PA N THER S RD

LIZARD RD

OWL RD

DUPLIN LN

HOR SE R D

HANCOCKC REEK TRL

LEGAL LNDG

CARTERET RD

EA

GL

E DR

LANDFILL LOOP

EMU RD

CROW RD

WAYNE RD

TX

F S

ER

VI

CE

R

D

GREENE RD

GAZELLE RD

F ST

T T

S S

R R

Q Q

P P

O O

N N

M M

L L

K K

J J

I I

H H

G G

F F

E E

D D

C C

B B

A AMARINE CORPS AIR STATION CHERRY POINT

F

C

E

Distribution authorized to the U.S. Government and their contractors only.

Upon termination of use map must be destroyed.

Although every effort has been made to ensure the accuracy of the information, errors and conditions originating from physical sources to develop the database may be reflected in the data supplied. The user must be aware of data conditions and ultimately bear responsibility for the appropriate use of the information with respect to possible errors, original map scale, collection methodology, currency of the data, and other conditions specific to certain data.

1 in = 800 ft

Prepared 07 February 2014 By: Barbara Styron, GIS Technician Facilities Engineering, Bldg 163, 252.466.7135

Source: MCAS Cherry Point GIS Map Projection: NC State Plane (NADS83, GRS 1980)

E:\Cherry Point\FacEng\users\barbara.styron\2013Maps \BaseMap17x22_2014_Weeks.mxd

Building 1 HQ

Main Gate Entrance brian.a.taylor Oval brian.a.taylor Oval

1£:J□ttn

Building HQ 1 Electrical Room

Location (ATS inside)

File details come from the government source that posted it. Updated .