Request for Information Turn Table Final - PZ_Redacted.pdf
PDF 132 KB Posted
- Solicitation number
- PZZG51625
About this file
This Request for Information (RFI) seeks capability statements and documentation for upgrading or replacing the Benefield Anechoic Facility (BAF) turntable, a critical component of the Department of the Air Force's electromagnetic spectrum testing infrastructure. The existing 175-ton, 80-foot diameter turntable, which has been in operation for nearly four decades, is experiencing significant wear and operational risks, necessitating innovative solutions for replacement or substantial upgrade.
The USAF is specifically interested in a new system with precise angular movement capabilities (+/- 185 degrees), capable of rotating a maximum load of 375,000 pounds, and integrating with complex existing facility utilities including cooling systems, electrical systems, hydraulic systems, and control networks. Interested parties are requested to submit electronic PDF responses by June 9, 2025, providing a company profile, technical approach, technology readiness level assessment, rough order of magnitude cost estimate, and potential technical challenges. The RFI emphasizes the need for a solution that can be remotely operated from the test control room and seamlessly integrated into the current BAF infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI) Capability Statements and Documentation for
Benefield Anechoic Facility (BAF) Turntable Upgrade or Replace
1. DISCLAIMER
THIS NOTICE IS A REQUEST FOR INFORMATION ONLY. This RFI is issued solely for information and planning purposes – it does not constitute a Request for Proposal
(RFP) or a promise to issue an RFP in the future. This RFI does not commit the
Government to contract for any supply or service whatsoever. Responses will be treated as information only and will not be evaluated as a proposal. Further, the Government is not at this time seeking proposals and will not accept unsolicited proposals. A return response from the Government regarding RFI submissions is not guaranteed. The RFI responders are advised that the Government will not pay for any information or administrative costs incurred in response to the RFI; all costs associated with responding to this RFI will be solely at the interested party’s expense. Not responding to this RFI does not preclude participation from future announcements or contracts.
Respondents should indicate which portions of their response are propriety and should mark accordingly. NOTE: This RFI is not associated with any previous or ongoing RFPs or Fair Opportunity Proposal Requests issued by the DAF.
2. BACKGROUND AND OBJECTIVES
The Benefield Anechoic Facility (BAF) plays a vital role in DoD Electromagnetic
Spectrum Test and Evaluation efforts. Central to the BAF’s functionality is a 175 ton, 80-ft diameter turntable, combined with a 40-ton capacity hoist system allows the rotation of test articles ± 180° within the stationary RF test range. This setup simulates movement, providing a controlled environment for evaluating performance in the RF domain. However, the turntable is nearing the end of its operational lifespan, which presents a significant risk of failure.
The BAF turntable, in operation for almost four decades, exhibits significant wear and tear. Misalignment between the turntable rails and trucks has necessitated the closure of gaps, placing undue stress on the structure. Repeated repairs of cracked welds and broken bolts highlight the unsustainable nature of maintaining the aging system.
The USAF is interested in exploring innovative solutions to either upgrade or replace
BAF turntable. The objective is to have a system capable of precision angular movement. The desired system should be capable of remote operation from the BAF test control room and integrated into the current BAF infrastructure.
Responses to this RFI will help inform the Government’s next steps in the acquisition process.
3. SCOPE OF INTEREST
The USAF is seeking information on systems that address the following areas:
• Precision Angular movement: Ability to perform +/- 185 degrees angular movement with actual angular accuracy of 0.05 degrees, a maximum acceleration of 1 degree/second2, and variable actual velocities ranging from 0.1 degrees/ second to 2.0 degrees/second throughout the entirety of its motion profile to support data collection which shall be User Datagram Protocol (UDP) streamed by the system at 40 Hz. The system shall have an integrated 1-axis azimuth positioner offset from turntable center.
• Structure Maximum Load: The system must be capable of rotating a maximum load of 375,000 pounds without deformation or precession and maintain levelness and facilitate System Under Test (SUT) maximum wheel span footprint
(must fit within 80-foot diameter area).
• Current BAF Pit Footprint: The existing turntable is an 80-foot diameter steel structure. It consists of a central core, 70 feet in diameter, extending 70 feet below the turntable's surface. An outer ring, spanning the 70-foot to 80-foot diameter range, forms a 8-foot-high perimeter around the central core (inverted top hat shape).
• System Under Test (SUT) Entering the BAF: Ability: (1) to bring SUT into the
BAF without requiring reconfiguration of the chamber or significant moment of
Radar Absorbing Material (RAM); (2) to perform +/- 185 degrees of SUT movement after entering the BAF to ensure the aircraft nose is pointing towards the chamber west wall and facility utilities connectivity are aft of the aircraft after entry.
• System Under Test (SUT) Exiting the BAF: Ability: (1) to roll the SUT out of the
BAF without requiring reconfiguration of the chamber or significant moment of
Radar Absorbing Material (RAM); (2) to +/- 185 degrees of SUT movement during exiting to point SUT to the east wall for towing.
• Integration with Facility Control and Monitoring Connectivity: Facilitate facility control and monitoring equipment (i.e. general instrumentation) between the system and the Test Control Room (TCR), Data Analysis Center (DAC), Threat Site 1, Threat Site 2, G-32, G-34 and Facility Control Center (FCC) and cable access from the chamber floor while allowing rotation.
• Integration with BAF Utilities Systems and Equipment: Integrate with existing facility utility systems and equipment which makes the facility utilities compatible to the SUT while facilitating ease of maintenance such as inspections, routine repairs, and be accessible without requiring special tools. Hoses and cables shall be managed. The utility systems and equipment are:
a. Facility Cooling Systems:
i. Air cooling
ii. Polyalphaolefin (PAO)
iii. Ethylene Glycol Water (EGW)
iv. Coolanol
v. Chilled water
vi. Avionics Cooling Unit (ACU)
- ACU # 1
- ACU # 2
- Switch gear for ACU #1/#2 Manual Transfer Switch (MTF)
- Variable Frequency Drive (FVD) for ACU #1/# 2
- Harmonic filter for ACU #1/# 2
- ACU # 2
vii. Siemens Fiber for Controls
b. Facility Liquid Cooling Carts:
i. Polyalphaolefin (PAO) Cart
ii. Ethylene Glycol Water (EGW) Cart
iii. Coolanol Cart
iv. Chilled water pump
v. Chilled water pump for Aircraft Cooling Unit (ACU)
c. Facility Electrical Systems:
i. Pillar 115 V, 400 Hz, 3 Phase
ii. 270 Vdc
iii. 28 Vdc
iv. 208V/120V, 60Hz, 100 amp
v. 208V/120V, 60 Hz, 225-amp protected at 125 amps
− Remove 125 amps protection.
vi. 115Vac @ 60 Hz 20 amps (current 10 receptacles)
vii. 115 Vac @ 60 Hz 30 amps (2 receptacles)
viii. 208Vac 1 phase@60Hz 30 amps (2 receptacles)
ix. 240 Vac@60Hz 50 amps
x. 480Vac@60Hz
xi. 208Vac 3 phase @ 60 Hz 30 amps (2 receptacles)
e. Facility Electrical Power Supply Outlets:
i. Shall be accessible without requiring special tools.
ii. Outlets shall be concealed when not in use.
f. INSTALL NEW ELECTRICAL SYSTEM:
i. 480 panel @ 200 amps
ii. 400 Hz, 120V/208V distribution panel (for smaller test articles)
g. Facility Hydraulic Systems:
i. 2800 PSI
ii. 4200 PSI
h. Facility Hydraulic Carts:
i. Turntable Hydraulic Cart
− F-16 Hydraulic Cart
− F-22 Hydraulic Cart
i. Facility Compressed Air System.
j. Facility Air Cooling Control.
k. Facility Nitrogen System.
l. Facility Utility Hoses and Cables Management:
i. Management of hoses and cables to reduce stress and strain on the cables and simultaneously reduce tripping hazards during angular movement.
• Classified Processing Area: Ability to process classified data in an RF isolated room that is below the turntable in the proximity of the SUT.
4. Information Requested
Interested parties are requested to provide the following information:
• Company Profile: A brief overview of the company's experience and capabilities to design and manufacture in relevant areas.
• Technical Approach: A description of the proposed technical approach for meeting the requirements outlined in Section 3.
• Maturity Level: An assessment of the technology readiness level (TRL) of the proposed solution.
• Rough Order of Magnitude (ROM) Cost: An estimated cost range for developing and implementing the proposed system.
• Potential Challenges: Identification of potential technical challenges and mitigation strategies.
5. Submission Instructions
Responses to this RFI should be submitted electronically in PDF format to by 9 Jun 2025. Responses should be concise and no longer than
15 pages. Please include " Benefield Anechoic Facility (BAF) Turntable Upgrade or
Replace " in the subject line of the email.
7. Point of Contact
File details come from the government source that posted it. Updated .