Request for Information (RFI).pdf
PDF 168 KB Posted
- Attached to
- 70Z03025QCLEV0141 - U. S. Coast Guard Station Lorain Exterior and Interior Painting Project
- Solicitation number
- 70Z03025QCLEV0141
About this file
This document is a U.S. Coast Guard Base Cleveland Request for Information (RFI) form, designed to facilitate communication between requestors and the Contracts Officer regarding a potential solicitation. The form provides a standardized template for submitting inquiries about a project, with sections for the solicitation number, project location, specific information requested, and contact details. The form allows the requestor to specify whether the information sought is a clarification of existing solicitation terms or a proposed change that would require an amendment. The form is dated for revision in March 2025 and includes fields for response tracking, such as who prepared the response, the Contractor Officer's Representative (COR), and on-site inspector information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Reference Information Sheet.pdf | ||
| Wage Determinations - Lorain County OH.txt | TXT text file | |
| Solicitation 70Z03025QCLEV0141 - SF 1442.pdf | ||
| Solicitation 70Z03025QCLEV0141.docx | DOCX document | |
| Solicitation 70Z03025QCLEV0141 - Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
This form shall be submitted to the
Contracting Specialist/Contracting Officer.
From:
Date:
To: Contracting Officer
Attn: ______________________________
U.S. Coast Guard Base Cleveland
1. Solicitation Number:
2. Location of Project:
3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)
Attachments:
Date Response Required:
By:
Title:
Requestor's FAX Number:
Requestor's Telephone Number:
To:
Date:
Response:
Response Prepared By:________________________________
COR:__________ On-Site Inspector:________
This information is a clarification of the solicitation and does not change the terms or conditions in any way.
This information is a proposed change to the solicitation. An amendment will be issued.
Contracting Officer:
Previous versions are useable U.S. COAST GUARD BASE CLEVELAND REQUEST FOR INFORMATION FORM (Revision Mar 2025)
File details come from the government source that posted it. Updated .