About this file

This Request for Information (RFI) Notice N62470-25-R-0006 is for a Military Construction Project (MILCON) P732 Design-Bid-Build Electrical Distribution System Upgrade at Norfolk Naval Shipyard in Portsmouth, Virginia. The project specifically involves electrical distribution system upgrades at the Gosport Substation. The Navy is conducting market research to gather early contractor feedback on draft drawings and specifications, with anticipated requirements including project labor agreements and specific Federal Acquisition Regulation (FAR) clauses.

Interested contractors must contact Contract Specialist Daniel Rocha via email to receive draft drawings and specifications, which will be provided through DoDSAFE after submitting a completed DOD CUI Non-Disclosure Agreement. The solicitation includes liquidated damages provisions of $6,786.85 per calendar day of delay if contract timelines are not met. Contractors can submit written inquiries using the provided Pre-Proposal Inquiry Log Template, with the understanding that the government reserves the right to cancel the acquisition at any time and is not responsible for any contractor costs incurred during the process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI) NOTICE REFERENCE NUMBER N62470-25-R-

Title: Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution

System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.

This RFI is being used as a market research tool to allow prospective contractors the opportunity to provide early feedback on the draft drawings and specifications and other details that are being considered for the solicitation.

It is anticipated that this solicitation will require the use of project labor agreements and include

FAR 52.222-33 and FAR 52.222-34.

1) Draft Drawings and Specifications:

Interested contractors should reach out to the Contract Specialist, Daniel Rocha, via email at daniel.r.rocha2.civ@us.navy.mil and provide a completed DOD CUI Non- Disclosure

Agreement (Attachment 1). Contractors can expect the drawings and specifications to be provided via DoDSAFE within 24 hours of confirmation of receipt.

2) LIQUIDATED DAMAGES-CONSTRUCTION (SEPT 2000):

(a) If the Contractor fails to complete the work within the time specified in the contract, the

Contractor shall pay liquidated damages to the Government in the amount of $6,786.85 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

3) Submittal of Questions:

All inquiries must be submitted in writing, and a Pre-Proposal Inquiry Log Template

(Attachment 2) is provided for this purpose. Please utilize the template and submit all inquiries to, Daniel Rocha, via email at daniel.r.rocha2.civ@us.navy.mil. Submission of inquiries does not obligate the government to response at this stage.

mailto:daniel.r.rocha2.civ@us.navy.mil.

NOTE: THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS

ACQUISITION AT ANY TIME. THE GOVERNMENT IS NOT RESPONSIBLE FOR

ANY COSTS INCURRED IN ORDER TO PARTICIPATE IN THIS PROCESS. ALL

INFORMATION SUBMITTED IS AT THE OFFEROR’S OWN EXPENSE. ANY

RECOMMENDATIONS OR SUGGESTIONS PROVIDED IN RESPONSE TO THIS

NOTICE MAY BE UTILIZED WITHOUT ANY RESTRICTIONS WHATSOEVER

OR COST TO THE GOVERNMENT AND MAY BE INCLUDED IN ANY

RESULTANT SOLICITATION.

We appreciate your interest and thank you in advance for responding to this notice.