N6247326RE510
Request for Information (RFI) For Multiple Construction Projects in Bandiana, Australia This is a RFI for information to be used for preliminary planning purposes. The information received will be used within Naval Facilities Engineering Systems Command (NAVFAC) Southwest (SW) to facilitate the decision-making process and will not be disclosed outside of the agency.
No reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests. This notice does not constitute a Request for Proposal and is not to be construed as a commitment by the Government for any purpose other than market research. Respondents will not be notified of the results of this market research.
NAVFAC SW is conducting a market survey to support United States Indo-Pacific Command (INDOPACOM) posture initiatives and the critical forward provisioning of Marine Corps Forces, Pacific (MARFORPAC), United States Army Pacific (USARPAC), and Pacific Air Forces (PACAF) forces. The Government is packaging the FY26 through FY30+ requirements at Bandiana, Australia, into a single programmatic execution strategy. The estimated task order range is between $20M-$30M.
Interested sources are invited to provide responses using the RFI Form in pages 2-6 below.
Responses to this RFI announcement are due no later than 2:00 p.m. (Pacific Daylight Time) on 25 June 2026. Please provide electronic submissions by email to melissa.miranda14.civ@us.navy.mil. All NAVFAC SW solicitations are posted on the website at https://sam.gov/ and begin with “N62473.”
RFI FORM
Multiple Construction Projects in Bandiana, Australia
1. Contractor Information:
Firm Name:
Address:
UEI:
CAGE Code:
Name of POC for firm:
Phone Number of POC:
Email of POC:
2. Type of Business: (check all that apply)
3. Bonding Capacity:
Surety Name:
| Maximum bonding capacity per project: |
| $ |
| Aggregate maximum bonding capacity: |
| $ |
4. Experience:
Submit two (2) recent specific Government projects your company has completed to demonstrate your experience in high-value joint military logistics construction projects (NAICS code 236220) in Australia. A “specific” project is a single project or a single task order under an indefinite quantity contract or on-call type contract. “Recent” is defined as having been completed within the ten years prior to the submission due date of this announcement. All projects shall have a minimum construction cost of $20,000,000. Projects which do not meet these requirements may not be considered relevant. The projects submitted shall meet the first two criteria (Severe Site Constraints and Zero Organic Oversight) listed in Table 1, below. Use the forms in pages 4-5 to submit your project experience.
5. Narrative:
Submit a narrative discussing the last three criteria (Cost & Schedule Efficiency, Host Nation & Bilateral Compliance, and Specialized Submittal Experience) listed in Table 1, below, and how the firm meets these requirements. Submission shall not exceed one (1) page. Anything in excess of the page limit will not be reviewed.
Table 1:
| Market Research Criteria |
| Required Framing for SAM.gov RFI |
| Severe Site Constraints |
| Vendors must demonstrate the capability to mobilize and safely operate within a highly constrained, active construction footprint that is concurrently occupied by another prime contractor, without causing schedule interference or safety hazards. |
| Zero Organic Oversight |
| Vendors must prove the ability to execute complex ground-up and renovation construction to strict DoW standards with zero reliance on local, on-site U.S. Government Construction Management (CM) or Quality Assurance (QA) personnel. |
| Cost & Schedule Efficiency |
| Vendors must demonstrate how they can accelerate delivery schedules to meet INDOPACOM forward-provisioning mandates without incurring duplicative mobilization/demobilization costs exceeding $1.5M. |
| Host Nation & Bilateral Compliance |
| Vendors must possess demonstrated, successful experience executing construction under the United States Force Posture Initiatives (USFPI), including navigating Australian Department of Defence (ADF) Site Approvals, local Heritage and environmental regulations, and the rigorous ADF Handover/Takeover (HOTO) process. |
| Specialized Submittal Experience |
| Vendors must provide evidence of executing similar high-value joint military logistics projects, specifically demonstrating the ability to successfully integrate and reconcile complex U.S. NAVFAC design/construction submittals with Australian National Construction Codes and local standards. |
PROJECT EXPERIENCE #1
Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement.
| 2. |
| Award Date (mm/dd/yy): |
| 3. |
| Final Contract Price: |
| $ |
| Completion Date (mm/dd/yy): |
| (includes all options and mods) |
| Project is % complete (as of RFI date) |
| This is the |_| total project |_| subcontract price. |
| 4. | | |
| Type of work of overall project: | | |
| |_| New Construction | |_| Repair | |_| Renovation |
Type of work company self-performed:
|_| New Construction |_| Repair |_| Renovation
| Point of Contact Name/Title: (person with project knowledge) |
| POC Phone Number: |
| POC Email Address: |
| 6. | |
| Were you the Prime contractor for this project? | |
| |_| Yes | |_| No |
| Were you a subcontractor for this project? | |
| |_| Yes | |_| No |
| If subcontractor, who was the Prime contractor? |
| 7. |
| Type of Contract (check all that apply): |
|_| Design-Build |_| Design-Bid-Build
| If Design-Build, provide the following information: |
| |_| Design accomplished in-house |
| Lead design firm name: |
| Years working together: |
8. Percentage of work you self-performed on this project: %. Provide a detailed description of the work your firm self-performed on this project:
PROJECT EXPERIENCE #2
Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement.
| 2. |
| Award Date (mm/dd/yy): |
| 3. |
| Final Contract Price: |
| $ |
| Completion Date (mm/dd/yy): |
| (includes all options and mods) |
| Project is % complete (as of RFI date) |
| This is the |_| total project |_| subcontract price. |
| 4. | | |
| Type of work of overall project: | | |
| |_| New Construction | |_| Repair | |_| Renovation |
Type of work company self-performed:
|_| New Construction |_| Repair |_| Renovation
| Point of Contact Name/Title: (person with project knowledge) |
| POC Phone Number: |
| POC Email Address: |
| 6. | |
| Were you the Prime contractor for this project? | |
| |_| Yes | |_| No |
| Were you a subcontractor for this project? | |
| |_| Yes | |_| No |
| If subcontractor, who was the Prime contractor? |
| 7. |
| Type of Contract (check all that apply): |
|_| Design-Build |_| Design-Bid-Build
| If Design-Build, provide the following information: |
| |_| Design accomplished in-house |
| Lead design firm name: |
| Years working together: |
8. Percentage of work you self-performed on this project: %. Provide a detailed description of the work your firm self-performed on this project: