Request for Bids- MCIC Exterior Door Project.pdf

PDF 129 KB Posted

Attached to
MCIC Exterior Door Replacement
Solicitation number
RFP GIS 200000000731 3
Issued by
Genesee County, Michigan

About this file

This is a Request for Bids issued by Genesee Intermediate School District for the MCIC Door & Hardware Replacement project, with project administration by MAYOTTEgroup Architects. The project involves the replacement of selected doors, frames, and hardware at the MCIC Building located at 3330 Luce Road, Flushing, Michigan. A highly recommended pre-bid meeting is scheduled for Thursday, January 16, 2020, at 1:00 pm at the MCIC Building. Sealed bids must be received by 2:00 pm on Thursday, January 30, 2020, at the Genesee Intermediate School District Davis Education Center, 2413 W. Maple Ave., Flint, Michigan 48507. Bids received after the deadline will be returned unopened and not considered. Proposals will be publicly opened and read aloud at the time and place of the bid due date. The Owner anticipates awarding the contract to the successful bidder within 30 days of the bid due date. Contract documents are available from MAYOTTEgroup Architects after January 14, 2020, and can be requested via email to mcgaughey@mayottearchitects.com.

Each bidder must submit a bid bond equal to 5% of the bid amount as bid security. All bids must be submitted on forms provided in the Contract Specifications; facsimile bids will not be accepted. Documentation required with each bid includes a notarized Familial Disclosure statement in compliance with MCL 380.1267 disclosing any familial relationships between the bidder or bidder's employees and members of the school district board, superintendent, or school district employees, and a completed and notarized Vendor Certification Form. No bid will be accepted without these sworn and notarized disclosure statements. The Owner reserves the right to reject any and all proposals, award the bid to other than the low bidder, and waive informalities, irregularities, and errors in bid proposals. All questions regarding bidding procedures and specifications must be directed to MAYOTTEgroup Architects before 2:00 pm on January 24, 2020.

View the file

Other files

File Type Posted
099113 - EXTERIOR PAINTING.pdf PDF
2020-01-24 Addendum No 1.pdf PDF
2020-01-16 Pre-Bid Sign-In.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR BIDS

GENESEE INTERMEDIATE SCHOOLDISTRICT

MCIC DOOR & HARDWARE REPLACEMENT

Project Information

Sealed bids for the replacement of selected doors, frames and hardware will be accepted from qualified contractors by Genesee Intermediate School District for the MCIC – Door & Hardware Replacement project. Bids may be mailed or delivered to:

Genesee Intermediate School District Attn: Cynthia McCain 2413 W. Maple Ave. Flint, MI 48507

Bid Information

A highly recommended pre-bid meeting will be held on Thursday, January 16 at 1:00 pm at the MCIC Building 3330 Luce Road, Flushing, MI 48433. Proposals must be received by 2:00 pm on Thursday, January 30, 2020 at the GISD Davis Education Center, 2413 W. Maple Ave., Flint, MI 48507. Proposals will be publicly opened and read aloud at that time and place. Any bids received after 2:00 pm will be returned to the bidder unopened and will not be considered.

Proposal and Award

The Contract for this project will be direct with the Owner, Genesee Intermediate School District. Overall administration of the project will be the responsibility of the Project Consultant, MAYOTTEgroup Architects.

The Owner is expecting to award the contract to the successful bidder within 30 days of the Bid Due date. All bids will be submitted on forms provided in the Contract Specifications. Facsimile bids will not be accepted.

Bid Security

Each bidder shall submit bid bond in the amount of 5% of the amount of the bid.

Contract Documents

Requests by Contractors for inclusion as Bidders will be addressed to the Project Consultant, MAYOTTEgroup Architects. Contact Matthew McGaughey, AIA at mcgaughey@mayottearchitects.com.

Contract documents will be available at the pre-bid meeting or after January 14, 2020 from MAYOTTEgroup Architects. Request documents by email to mcgaughey@mayottearchitects.com. All questions regarding the bidding procedures and specifications are to be directed to MAYOTTEgroup Architects before 2:00 pm on January 24, 2020.

mailto:mcgaughey@mayottearchitects.com mailto:mcgaughey@mayottearchitects.com mailto:mcgaughey@mayottearchitects.com

Page 2 of 2 Genesee Intermediate School District

Request for Bids

MCIC – Door & Hardware Replacement

Documentation Required with Bid

1. Familial Disclosure (Attachment C) in compliance with MCL 380.1267; a sworn and notarized statement disclosing any familial relationship that exists between the Owner or the employee of the bidder and any member of the school district board, superintendent, or employee of the school district.

2. Vendor Certification Form (Attachment D) and attach this information to the bid.

No bid will be accepted that does not include these sworn and notarized disclosure statements.

Owner’s Rights

The Owner reserves the right to reject any and all proposals, award the bid to other than low bidder and to waive informalities, irregularities, and/or errors in the bid proposals, which the Owner feels to be in his best interest.

Accessibility Report

Filename:

Request for Bids - MCIC Exterior Door Project.pdf

Report created by:

Organization:

[Enter personal and organization information through the Preferences > Identity dialog.]

Summary

The checker found no problems in this document.

Needs manual check: 0

Passed manually: 2

Failed manually: 0

Skipped: 1

Passed: 29

Failed: 0

Detailed Report

Document

Rule Name Status Description

Accessibility permission flag Passed Accessibility permission flag must be set

Image-only PDF Passed Document is not image-only PDF

Tagged PDF Passed Document is tagged PDF

Logical Reading Order Passed manually Document structure provides a logical reading order

Primary language Passed Text language is specified

Title Passed Document title is showing in title bar

Bookmarks Passed Bookmarks are present in large documents

Color contrast Passed manually Document has appropriate color contrast

Page Content

Rule Name Status Description

Tagged content Passed All page content is tagged

Tagged annotations Passed All annotations are tagged

Tab order Passed Tab order is consistent with structure order

Character encoding Passed Reliable character encoding is provided

Tagged multimedia Passed All multimedia objects are tagged

Screen flicker Passed Page will not cause screen flicker

Scripts Passed No inaccessible scripts

Timed responses Passed Page does not require timed responses

Navigation links Passed Navigation links are not repetitive

Forms

Rule Name Status Description

Tagged form fields Passed All form fields are tagged

Field descriptions Passed All form fields have description

Alternate Text

Rule Name Status Description

Figures alternate text Passed Figures require alternate text

Nested alternate text Passed Alternate text that will never be read

Associated with content Passed Alternate text must be associated with some content

Hides annotation Passed Alternate text should not hide annotation

Other elements alternate text Passed Other elements that require alternate text

Tables

Rule Name Status Description

Rows Passed TR must be a child of Table, THead, TBody, or TFoot

TH and TD Passed TH and TD must be children of TR

Headers Passed Tables should have headers

Regularity Passed Tables must contain the same number of columns in each row and rows in each column

Summary Skipped Tables must have a summary

Lists

Rule Name Status Description

List items Passed LI must be a child of L

Lbl and LBody Passed Lbl and LBody must be children of LI

Headings

Rule Name Status Description

Appropriate nesting Passed Appropriate nesting

Back to Top

File details come from the government source that posted it. Updated .