This is a Question and Answers clarification document for a carpet removal and installation project at Union Theater, issued by ALPLM (Abraham Lincoln Presidential Library and Museum). The project involves removal and installation of carpet throughout the theater, including stair lighting work, and encompasses two work sections: Section 1 (top seating area with 4 rows of seats, door entrance areas, and walkway) and Section 2 (bottom seating area with 5 rows of seats and walkway to stage). Work is scheduled to begin Monday, November 3, 2025, and must be completed by end of day Saturday, November 15, 2025, representing a 13-day project window. A temporary platform extending from the stage will be removed on the morning of November 11, with carpet installation permitted to begin immediately thereafter. ALPLM staff requires three days between completion of Section 1 and removal of the bottom half of seats in Section 2, though vendors will be notified if removal occurs sooner. The lighting work involves removal, wiring, and installation only, as lights have been pre-purchased as direct replacements with no new wire channels required.
The vendor must supply adhesive using the monolithic carpet tile installation method with Taylor 2025 Primer tile adhesive or equivalent, doorway transition tracks and T-molding in black, stair nose epoxy adhesive, and 2-sided black stair nosing. No molding cutting is necessary as all materials are pre-ordered in required sizes. Bars in front of the last row of seats in Section 1 will remain in place; all seats will be removed with cabling performed in-house, leaving blank sections with bolts. Handrails along exterior walls of Section 2 will not be removed. This is a state-funded, prevailing wage and certified payroll project, requiring that all labor and material costs, including overtime, be included in the bid quote.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for Quote.Union Theater Carpet Installation~4.docx | DOCX document | |
| Standard Illinois Certifications~11.pdf | ||
| Amendment 1 - Request for Quote.Union Theater Carpet Installation.docx | DOCX document | |
| Union Theater Drawing.pdf | ||
| standard terms and conditions~88.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Removal and Installation of Carpet in Union Theater
26-506ALPLM-ALPLM-B-49096
Question & Answers
Clarifications
At the pre-bid meeting, the ALPLM provided clarification that the seats will be removed in two sections and the carpet installation will occur in two sections which are noted on the Union Theater drawings in the attachments. The ALPLM staff will require three days in between the completion of the section 1 to remove the bottom half of the seats in section two. ALPLM staff will notify the vendor if the removal of the bottom row of seats is completed in less than 3 days.
Question and Answers
1. Please confirm the following carpet and stair lighting demolition & installation schedule details as well as project deadlines questioned below. All work is to be started on Monday, November 3rd, 2025, and completed by end of day Saturday, November 15th, 2025, and the project will be limited to 3 separate work phases/ mobilizations.
• Phase 1: Top seating section consisting of 4 rows of seating and possibly to include both double door entrance areas as well as the walkway between Top Section Seating and Bottom Section Seating consisting of 5 rows of seating.
• Phase 2: Bottom seating section consisting of 5 rows of seating and possibly to include both double door entrances areas as well as walkway between Top Section Seating and Bottom Section Seating consisting of 5 rows of seating.
• Phase 3: Ground Floor Section where temporary wooden stage exists located between bottom seating section and stage.
• All over time labor is to be included in Bid Quote for dates ranging 11/3/2025 thru 11/15/2025. (Answered in #11.)
a. The project is not broken down into phases. There are 2 sections that will need carpet removal and installation. The top, section 1, consists of 4 rows of seating, the door entrance areas, and the walkway between the Top Section Seating and Bottom Seating in section 1 consisting of 5 rows of seating.
b. The Bottom, section 2, consists of 5 rows of seating as well as the walkway between the bottom row of seats and the stage.
c. The project will begin on Monday, November 3, 2025, and be completed by the end of day on Saturday, November 15, 2025.
2. When will the temporary platform extended from the stage be removed?
The temporary platform will be removed on the morning of November 11.
Carpet installation may begin in this area immediately upon removal. Agency will contact/inform the vendor immediately upon removal.
3. Were the lights purchased and are they just removed and installed with new lights?
Yes – only removal, wiring and installation of lights are included in the contract. The stair lights are a direct replacement.
4. Define section one and two.
The Union Theater drawing in the attachments will define section 1 (top half of the seat) and section 2 (bottom half of the seats).
5. Are the bars in front of the last row of seats in section 1 being removed?
No – the bars will not be removed. The seats will all be removed and the cabling will be performed in house. There will be a blank section with bolts in the floor. The handrails along the exterior walls of section 2 will not be removed.
6. Is this a prevailing wage/certified payroll project?
Yes.
7. Is the project state funded?
Yes.
8. Are there new wire channels?
Wires included in the items purchased
9. Is the molding pre-cut.
No cutting is needed – ordered in the sizes required.
10. What are the required items that the vendor must supply:
a. Adhesive - recommends monolithic carpet tile installation method with Taylor 2025 Primer tile adhesive or equivalent.
b. Doorway transition tracks and T-molding (black)
c. Stair nose epoxy adhesive
d. 2-sided stair nosing (black)
11. Should overtime be included in the bid?
All labor and material costs should be included in the bid.