Released Award N6274224C6725_Resized.pdf
PDF 16 MB Posted
- Attached to
- D/B Training Facility, Earth Covered Magazine (ECM), and Range Renovation, Lopburi Thailand
- Solicitation number
- N6274224C6725
About this file
This document is an Award Notice for Contract N6274224C6725, awarded by the Department of the Navy Naval Facilities Engineering Command to PLANNING ENGINEERING DEVELOPMENT CO LTD in the amount of $974,733.91 on September 16, 2024. The contract is for the Design/Build of a Training Facility, Earth Covered Magazine (ECM), and Range Renovation in Lopburi, Thailand. The Award Notice provides details on the awarded contractor, contract value, and award date.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR6066388
REQUEST FOR PROPOSAL N6274224R6725
Project Title: D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
a. This project is being solicited utilizing Low est Price Technically Acceptable (LPTA) Source Selection procedures. Offers are required to submit both price and technical proposals for this solicitation per instructions w ithin.
b. Part 1: Proposal Form and Documents
(1) Section 001000 – Section Form 1442
(2) Section 002100 – Instructions
(3) Section 002200 – Supplementary Instructions
(4) Section 004500 – Representations and Certif ications
(5) Section 007000 – Condition of the Contract
(6) Section 007300 – Supplementary Conditions
c. Standard Form (SF) 1442 Attachments:
(1) Part 2: General Requirements
(2) Part 3: Statement of Work/Project Program
(3) Part 4: Minimum Materials, Engineering and Construction Requirement
(4) Part 6: Attachments
NITIWATE DISSANONT 662-287-1036 EXT. 121
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
16-Sep-2024
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________550 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________27 Aug 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
N6274224C6725
7. ISSUED BY CODE
NAVFAC ROICC THAILAND (US EMBASSY)
7 SATHORN TAI ROAD
BANGKOK THAILAND 10120
N62742
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
11:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N6274224R67250002 19
See Item 7
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE
SDES2
FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
SEE SCHEDULE
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
$974,733.91 See Schedule
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE N6873227. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
DEFENSE FINANCE AND ACCOUNTING SERVICE
DFAS-CLEVELAND
PACIFIC ACCOUNTS PAYABLE
PO BOX 998023
CLEVELAND OH 44199
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR
PLANNING ENGINEERING DEVELOPMENT CO LTD
CHAIYOS TANGSUPONG
46/16-17 M.9 BANG PLA, BANG PHLI
SAMUTPRAKAN 10540
15. TELEPHONE NO. (Include area code) 6681-449-9996
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
X 29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract. REF: N6274224R67250002
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print) Rondel G. Williams / Contract Specialist
TEL: 66-2-287-1036 EMAIL: rondel.g.williams.civ@us.navy.mil
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY 16-Sep-2024
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N6274224C6725
Section 00 10 00 - Solicitation
CONTRACT NOTE
A. Items offered in the contractor’s proposal (e.g., key personnel, subcontractors, materials, etc.) are binding on the contractor and shall be provided for the duration of the contract. Substitutions will require prior Contracting Officer’s approval and shall be equal or better, in the judgment of the Contracting Officer, than the items originally proposed.
B. The offeror agrees to perform the work required by the solicitation issued on 22 July 2024, Amendment 0001 issued on 21 August 2024, Amendment 0002 issued on 23 August 2024, at the price proposed on 27 August 2024, in the total amount of $974,733.91 that was confirmed on 4 September 2024.
C. Award is made in U.S. Dollar in the total amount of $974,733.91. Award amount per each CLIN is listed below:
CLIN 0001 Single-Story Training Facility $116,193.66 CLIN 0002 ECM Storage $494,420.41 CLIN 0003 Renovation of Firing Range $364,119.84
D. Contract Completion Dates (CCD) (FAR 52.211-10), and Liquidated Damages (LD) (FAR 52.211-12) are as follows:
CLIN 0001 CCD is 20 March 2026, and LD - $45 per day CLIN 0002 CCD is 20 March 2026, and LD - $315 per day CLIN 0003 CCD is 20 March 2026, and LD - $140 per day
E. Part 2 through 6 were previously provided and hereby made part of this award.
F. The Contracting Officer Representative (COR) for this contract is Imjai Hirunmas, Email: imjai@state.gov. The Contract Specialist (CS) for this contract is Nitiwate Dissanont, email: nitiwate@state.gov.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Project $116,193.66 $116,193.66 Single-Story Training Facility
FFP
This is a Design-Build project. The contractor shall provide complete design and construction of a single-story training facility, located at Royal Thai Army Base, Lopburi, Thailand,in accordance with the Parts 2-6 attached here within.
FOB: Destination
PURCHASE REQUEST NUMBER: ACQR6066388
PSC CD: C1QA
NET AMT $116,193.66
000101 $0.00
FUND ACRN AA
FFP
Funding Doc. No. N6274224RC06050 Customer ACRN: AA
MILSTRIP: N6274224RC06050
NET AMT $0.00
ACRN AA
CIN: 000000000000000000000000000000
$116,193.66
0002 1 Project $494,420.41 $494,420.41 ECM Storage
FFP
This is a Design-Build project. The contractor shall provide complete design and construction of an Earth-Coverage Ammunition Magazines (ECM) storage, located at Royal Thai Army Base, Lopburi, Thailand,in accordance with the Parts 2-6 attached here within.
FOB: Destination
NET AMT $494,420.41
000201 $0.00
FUND ACRN AA
FFP
$494,420.41
0003 1 Project $364,119.84 $364,119.84 Renovation of Firing Range
FFP
This is a Design-Build project. The contractor shall provide complete design and renovation of an existing 25-meter firing range, located at Royal Thai Army Base, Lopburi, Thailand,in accordance with the Parts 2-6 attached here within.
FOB: Destination
NET AMT $364,119.84
000301 $0.00
FUND ACRN AA
FFP
$364,119.84
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 20-MAR-2026 1 NAVFAC ROICC THAILAND
IMJAI HIRUNMAS
7 SATHORN TAI ROAD
BANGKOK 10120
662-287-1036 EXT. 125
FOB: Destination
N62742
000101 N/A N/A N/A N/A
0002 20-MAR-2026 1 NAVFAC ROICC THAILAND
IMJAI HIRUNMAS
7 SATHORN TAI ROAD
BANGKOK 10120
662-287-1036 EXT. 125
000201 N/A N/A N/A N/A
0003 20-MAR-2026 1 NAVFAC ROICC THAILAND
IMJAI HIRUNMAS
7 SATHORN TAI ROAD
BANGKOK 10120
662-287-1036 EXT. 125
000301 N/A N/A N/A N/A
Section 00 70 00 - Conditions of the Contract
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 000101 N/A N/A N/A N/A 0002 Destination Government Destination Government 000201 N/A N/A N/A N/A 0003 N/A N/A N/A Government 000301 N/A N/A N/A N/A
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab Covered Entities
DEC 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.215-2 Audit and Records--Negotiation JUN 2020 52.215-21 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data -- Modifications
NOV 2021
52.222-50 Combating Trafficking in Persons NOV 2021 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission Outside the United States
MAY 2020
52.226-8 Encouraging Contractor Policies To Ban Text Messaging While Driving
MAY 2024
52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-15 Schedules for Construction Contracts APR 1984 52.236-16 Quantity Surveys APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Products and Commercial
Services
FEB 2024
52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2020 52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
JAN 2023
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
MAY 2024
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997 252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7048 Export-Controlled Items JUN 2013 252.227-7002 Readjustment Of Payments SEP 2019 252.227-7033 Rights in Shop Drawings APR 1966 252.231-7000 Supplemental Cost Principles DEC 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.232-7010 Levies on Contract Payments DEC 2006 252.233-7001 Choice of Law (Overseas) JUN 1997 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2022 252.247-7023 Transportation of Supplies by Sea JAN 2023
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Contract Award Document (SF1442), (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than Five Hundred Fifty (550) calendar days after Contract Award. The time stated for completion shall include final cleanup of the premises.
CLIN 0001 Single-Story Training Facility - Five Hundred Fifty (550) Calendar Days CLIN 0002 ECM Storage - Five Hundred Fifty (550) Calendar Days CLIN 0003 Renovation of Firing Range - Five Hundred Fifty (550) Calendar Days
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount for each calendar day of delay until the work is completed or accepted.
CLIN 0001 Single-Story Training Facility: $45 per day CLIN 0002 ECM Storage: $315 per day CLIN 0003 Renovation of Firing Range: $140 per day
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.211-13 TIME EXTENSIONS (SEP 2000)
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://acquisition.gov/ - or -https://www.acq.osd.mil/dpap/dars/about.html
252.225-7041 CORRESPONDENCE IN ENGLISH (JUNE 1997)
The Contractor shall ensure that all contract correspondence that is addressed to the United States Government is submitted in English or with an English translation.
252.229-7001 TAX RELIEF (APR 2020)
(a) Prices set forth in this contract are exclusive of all taxes and duties from which the United States Government is exempt by virtue of tax agreements between the United States Government and the Contractor's government. The following taxes or duties have been excluded from the contract price:
NAME OF TAX: (Offeror shall insert if tax is not included in offer)
RATE (PERCENTAGE): (Offeror shall insert if tax is not included in offer)
(b) Invoices submitted in accordance with the terms and conditions of this contract shall be exclusive of all taxes or duties for which relief is available. The Contractor's invoice shall list separately the gross price, amount of tax deducted, and net price charged.
(c) When items manufactured to United States Government specifications are being acquired, the Contractor shall identify the materials or components intended to be imported in order to ensure that relief from import duties is obtained. If the Contractor intends to use imported products from inventories on hand, the price of which includes a factor for import duties, the Contractor shall ensure the United States Government's exemption from these taxes. The Contractor may obtain a refund of the import duties from its government or request the duty-free import of an amount of supplies or components corresponding to that used from inventory for this contract.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
NAVCON
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N68732
Issue By DoDAAC N62742
Admin DoDAAC** N62742/THAI
Inspect By DoDAAC N62742/THAI
Ship To Code N62742/THAI
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N62742/THAI
Service Acceptor (DoDAAC) N62742/THAI
Accept at Other DoDAAC N/A
LPO DoDAAC N62742/THAI
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
NAVFAC_PAC_WAWF_THAI@us.navy.mil
Mr. Rondel Williams
Contracting Officer
Email: williamsrg@state.gov
Mr. Nitiwate Dissanont
Contract Specialist
Email: nitiwate@state.gov
Ms. Kannikar Pakkhunthot
Admin Associate
Email: Kannikar@state.gov
Ms. Imjai Hirunmas
Contracting Officer’s Representative
Email: imjai@state.gov
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
Mr. Jason Ho
Procurement Analyst jason.w.ho.civ@us.navy.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
Section 00 73 00 - Supplementary Conditions
PAPERLESS CONTRACTING
The U.S. Navy (hereafter referred to as the Government) intends to administer any contract awarded under this solicitation using paperless contracting methods to the greatest extent practicable. Paperless contracting involves the use of an electronic medium such as the Internet, computer diskettes, CDROM, DVDROM, or electronic mail (email) in place of paper documents to award, solicit, or administer a contract.
In order to facilitate the use of paperless contracting methods, the Contractor shall possess the capability to communicate and exchange authenticated documents with the Government electronically during the contract performance period. Such capability shall include the ability to receive, acknowledge, reply to, and send documents via electronic mail. Additionally, such capability shall not require or be contingent upon any modification or upgrade to existing Government software. The Contractor also agrees to maintain such capability notwithstanding any changes or modifications to existing Government software during the contract performance period so long as the Government provides reasonable notice and any equipment and/or software required to maintain such capability is commercially available.
The Contractor shall utilize the paperless contracting capability described above as directed by the contracting officer during the contract performance period. Documents, which may be required to be exchanged electronically, include, but are not limited to, task orders, modifications, requests for cost proposals, and other routine correspondence. Exceptions to the contracting officer's direction may be granted in unusual circumstances with the prior approval of the contracting officer.
Both the Contractor and the Government agree to share all such technical information as is necessary to facilitate efficient and reliable electronic communications during the period of contract performance. Such information may include such data as e-mail addresses, available software, and mutually agreed procedures, but shall not include any information the disclosure of which would violate any applicable licenses or other agreements. In case of any technical difficulties precluding the use of electronic communications, both the Government and the Contractor agree to work in good faith to resolve any such difficulties.
For informational purposes, the Government anticipates that its contracting personnel will utilize the following computer software programs during the administration of this contract: Microsoft Office (Excel, Word, and Project), Adobe Acrobat, and AutoCAD.
HOST NATION REQUIREMENTS
52.236-7 Permits and Responsibilities. (Nov 1991)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
Contractor Licensing and Hiring Requirements Contractors must be duly authorized to operate and conduct business in any host country and must fully comply with all laws, decrees, labor standards, and regulations of the host country during the performance of the contract. The United States has established international agreements with the Philippines that include provisions relating to the procurement of supplies, employment preferences and use of local and U.S. contractors, as well as restrictions on hiring of third country nationals or utilization of third country contractors. Offerors are expected to comply with all controlling international agreements and with the laws of host nations whether the United States Government provides notice of the existence of such requirements. The contractor will not be permitted use of third country personnel or contractors in the performance of this contract without a demonstration that reasonable efforts to employ citizens, nationals, and permanent residents of host nation and the United States, or contractors of the host nation and the United States, have been made and that wages competitive with or higher than those being paid for similar work performed in the host nation by citizens of the host nation or of the United States are being offered.
The contractor shall not employee third country personnel or contractors without written notification of United States approval from the Contracting Officer.
Permit Compliance The United States does not directly hold environmental permits in the host nation. The contractor shall comply with environmental permits held by the host nation for the benefit of a DoD project even if the contractor is not named in the permit. Contractor shall document general procedures and their implementation for compliance with permit conditions, Best Management Practices, and required mitigations. Contractor shall be responsible for any required corrective actions. Contractor shall provide permit compliance and corrective action documentation to the COR and any additional Government and Host Nation representatives as requested by the COR.
Temporary Construction Facilities Physical Appearance Be aware of local sensitivities and cultural values. Temporary facilities and visible components thereof shall be of solid color without visible markings, graphics, and/or text.
Biosecurity for Construction Contracts Invasive species can be purposefully or inadvertently moved with construction equipment, personal protective equipment and hand tools, foot traffic, vehicles and vessels, raw construction materials, and packing materials.
Invasive species can become pests and affect the economy, ecology, and human health. It is critically important to be aware of ways to prevent the movement of invasive species and implement best management practices. The Contractor shall take all practicable measures to prevent introduction or spread of invasive species in association with contract performance, including importation of supplies, equipment or personnel and movement of supplies, equipment, or personnel between locations. At a minimum, all activities shall comply with U.S. and host nation biosecurity laws and regulations, shall include 100 percent inspection of equipment and supplies. If the contract performance results in introduction or spread of invasive species, the contractor shall be responsible for taking appropriate measures, in consultation with appropriate authorities, to contain and prevent contract related spread of such species at no additional cost to the government. In addition, the Contractor shall:
a. Comply with all necessary inspections of raw construction materials, equipment, and vehicles for invasive and pest species prior to entering of the project site and prior to moving equipment offsite. The Contractor is responsible for any cleaning or inspection fees.
b. Non-native invasive species can be inadvertently moved with construction equipment, Personal protective equipment, hand tools, foot traffic, vehicles, vessels, raw construction materials, and packing materials.
c. Conduct vehicle washdown and inspection for soil and other material to prevent the inadvertent movement of invasive species from the project site to other locations. Establish appropriate facilities that comply with all environmental laws and regulations, and promptly take corrective or preventative actions for noncompliance. Include these details in a biosecurity/Hazard Analysis and Critical Control Point (HACCP) plan and environmental briefs.
d. Submit a biosecurity/HACCP Plan, prepared in accordance with USFWS HACCP Manual for all imported equipment and imported construction materials and supplies. The HACCP plan must address, as a minimum, the identification and control of invasive and non-native species in construction equipment and construction materials and supplies.
e. Implement and update the HACCP plan accordingly to reduce the risk of spreading invasive species. The HACCP development team should include at least two members, one member with biological expertise with invasive species and one member from the project team who has a clear understanding of the project activities and requirements. Contractor is responsible for training all personnel on the project specific HACCP requirements once the plan is approved by the Government.
f. The Contractor must compile all supporting documentation (e.g. reports, checklists and logs) required under their HACCP Plan and submit such documents to the Contracting Officer on a monthly basis. Once all HACCP plan activities are complete, bound hardcopies of the plan and all supporting documentation and submit to the Contracting Officer.
CONTRACTING OFFICER AUTHORITY
1. No person other than the Contracting Officer has authority to bind the Government with respect to this contract.
2. No action or omission of any government employee or representative other than the Contracting Officer shall increase or decrease the scope of this contract or shall otherwise modify the terms and conditions of this contract.
3. In no event shall any of the following be effective or binding on the Government or imputed to the Contracting Officer with respect to this contract:
(a) An understanding or agreement between the Contractor and anyone other than the Contracting Officer;
(b) A purported modification or change order issued by anyone other than the Contracting Officer;
(c) A promise by anyone other than the Contracting Officer to provide additional funding or make payments; or
(d) An order, direction, consent, or permission from anyone other than the Contracting Officer to:
(i) Incur costs in excess of a specified estimated cost, allotment of funds, or other ceiling; or
(ii) Expend hours in excess of a specified level of effort.
4. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed with the changes and shall immediately notify the Contracting Officer.
(End of NAVFAC language)
ACCOUNTING AND APPROPRIATION DATA
AA: 97X8242 28DT 000 74DT2 0 065916 2D PDTA45
COST CODE: 410160010LIB
AMOUNT: $974,733.91
ACRN CLIN/SLIN CIN AMOUNT
AA 000101 000000000000000000000000000000 $116,193.66
000201 000000000000000000000000000000 $494,420.41 000301 000000000000000000000000000000 $364,119.84
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N6274224R6725 D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
The amendment begins on the next page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6274224R6725
X 9B. DATED (SEE ITEM 11)
22-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Aug-2024
CODE
NAVFAC ROICC THAILAND (US EMBASSY)
7 SATHORN TAI ROAD
BANGKOK 10120
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274224R6725
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMD2 ANSWERS TO PPIS
Answers to Pre-Proposal Inquiries (PPIs) are provided in Attachment-01 Questions & Answers of this amendment.
As a result of the provided answers, Attachment-02, summarizing changes under Parts 3 & 6, Attachment -03 Revised Part 6 and Attachment – 04 Revised BOQ are incorporated into the solicitation.
The date set for receipt of proposals is unchanged and remains on August 27, 2024 at 1100am, Thailand Time.
All other paragraphs, provisions, and conditions remain unchanged.
The offeror must acknowledge receipt of this amendment.
(End of Summary of Changes)
Attachment 01 - Answers to PPIs Amendment 0002 - N6274224R6725
NO
Reference
(Sect/Para/Page)
QUESTIONS GOVERNMENT RESPONSE
1 Part 2, 22 b. Is there any known asbestos or lead in the buildings to be demolished?
No. See amendment 0001, Part 3, Section 5.2 CLIN 0002 Base Bid Item 0002: CONSTRUCT
AN EARTH-COVERAGE AMMUNITION
MAGAZINES (ECM) STORAGE, Section
5.2.3 ECM STORAGE, Add: e. There is no
known asbestos or lead in the buildings to be demolished.
2 Part 3, 5.1.1 b. “Vegetation shall be cleared around all structures to a distance of five meters.”
Contractor understands this provision applies to buildings and the ECM berm but not the firing range berm. Is this correct?
No. The provision applies to all buildings and structures including the firing range berms. Per Part 3, Section 5.1.1 CIVIL WORK, b:
Vegetation shall be cleared around all structures to a distance of five meters.
3 Part 3 (Parking)
5.1.3 b., 5.3 d.
“Provide…five (5) military trucks and five (5) cars” and “Provide… five (5) military trucks and ten (10) cars” for the Single-Story Training Facility and the Firing Range respectively. Since these two buildings are expected to be near each other does the parking requirement merge? Or is it cumulative? In other words, are spaces required for fifteen (15) cars and ten (10) military trucks for the complex?
Yes, it is cumulative. The total pavement parking space requires fifteen (15) cars and ten
(10) military trucks for the complex. Per Part 3, Section 5.1.3 TRAINING FACILITY, b.
Parking space and Section 5.3 RENOVATE AN EXISTING 25 METERS FIRING RANGE, d.
Parking space.
4 Part 3, 5.1.3 c. How many spares are desired in the electrical panel board? Without other information Contractor would consider providing two spare slots. Is this adequate?
The exact number of spares in the electrical panel board shall be determined based on the codes and standards specified in Part 3, Section
2.1, APPLICABLE CODES AND
STANDARDS.
5 Part 3, 5.2.3 ECM
STORAGE, 5.2.3
a.7
For ECM, Contractor understands the prescriptive information provided on the drawings in Part 6 are for ECM’s that have been successfully placed in service for similar purposes and is fit for purpose for this project. No blast analysis or design is required. Contractor understands the information on the drawings is “minimum required” and shall not, for instance, use wall thicknesses, roof thicknesses or door thicknesses less than shown.
Correct, blast analysis is not required. Yes, the information provided on the drawings in Part 6 is a minimum requirement per Part 3, Section 4.
PROJECT REQUIREMENTS: The RFP sets forth the minimum project requirements that the DB Contractor shall use to design, document, and construct a complete and usable facility.
Attachment 01 - Answers to PPIs Amendment 0002 - N6274224R6725
6 Part 3, 5.2.3 ECM
STORAGE
For ECM components not prescribed on the ECM drawings in Part 6, Contractor is responsible for analysis and design, e.g., the foundation.
Yes. The contractor is responsible for all analysis and design per Part 3, Section 4.
PROJECT REQUIREMENTS: The concept drawings in PART 6 of this RFP package are for information only and are not intended to be final, complete, and coordinated designs. As the Designer of Record (DOR), the DB Contractor shall provide a final, complete, and fully coordinated design by all applicable codes, regulations, and contract requirements.
7 Part 3, 5.2.3 ECM
STORAGE
The SDZ is not critical for this facility. Yes. Per Part 3, Section 5.2.3 ECM STORAGE, the SDZ is not critical for this facility.
8 MIL-HDBK-1027
2.2.5.3, Part 2 Warranty
“Maintain vegetation on berms and drainageways.” Contractor understands that Contractor is not responsible for maintenance of vegetation at any time after Final Acceptance. In other words, the 12-month warranty does not apply to vegetation. Correct?
The Contractor will not be responsible for maintaining vegetation after the government's final acceptance. Additionally, vegetation is not included in the one-year warranty.
9 MIL-HDBK-1027
2.2.8.2 c.
What vehicles are expected to need to access the area within the berm for maintenance?
There are no requirements for vehicle access within the berm area for maintenance purposes.
10 MIL-HDBK-1027
Fig. 2.2-7
Transverse spacing: 2.75 cc for rifles, 1.50 for pistols and shotguns.
Yes. Per Part 6 Attachment, MIL-HDBK-1027, Fig. 2.2-7, the transverse spacing is 2.75 cc for rifles and 1.50 cc for pistols and shotguns.
11 MIL-HDBK-1027
2.2.11.2 a., Fig. 2.2-
“Top width of berm shall be 3 meters.”
Contractor understands the 1.5 m dimension on the typical berm detail in Part 6 takes precedence. Is this correct?
Correct. Top width of berm shall be 1.5 m per Part 3, Section 5.3 RENOVATE AN EXISTING 25 METERS FIRING RANGE, a.
Back berm and side berm improvement.
Part 3 takes precedence over Part 6 per part 2, Section 5. Design, k. Design-Build Contract - Order of Precedence.
12 Section 00 10 000, h, Could you please provide the slide presentation from the Pre-proposal Conference and site visit?
No, the government will not provide the PowerPoint presentation, including the meeting minutes from the pre-proposal site visit.
D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
Amendment 002 N6274224R6725 Attachment 02 Summary of Change
SUMMARY OF CHANGE
PART 3
STATEMENT OF WORK
Part 3, Section 3. SITE ANALYSIS, 3.1 EXISTING SITE CONDITIONS, Add:
Unexploded ordnance (UXO) Clearance: The Royal Thai Army will clear UXO, as needed, from the site locations before the contractor mobilizes.
Part 3, Section 1. PROJECT DESCRIPTION, Add:
All workers shall be of Thai nationality.
Part 3, Section 5.2 CLIN 0002 Base Bid Item 0002: CONSTRUCT AN EARTH-COVERAGE AMMUNITION MAGAZINES (ECM) STORAGE, 5.2.3 ECM STORAGE, Add:
e. Demolish existing building as shown in Part 6, attachment 6-1. The contractor shall return the removed materials from the existing building to the Royal Thai Army and remove the debris from the military base. There is no known asbestos or lead in the buildings to be demolished.
f. Construct a concrete access road from the front road to the ECM, with an approximate width of 6 m and a length of 80 m.
g. Construct a concrete road in front of the new ECM, with an approximate width of 6 m and a length of 360 m
Part 3, Section 5. 3 CLIN 0003 Base Bid Item 0003: RENOVATE AN EXISTING 25 METERS FIRING RANGE, a. Back berm and side berm improvement, 1), Change to:
1) Provide compacted soil and top the berms to construct the back and side berms to elevate the height to be approximately 6.00 m from ground for the back berm and 6.00 m high from ground for the side berms. The Royal Thai Army has permitted the contractor to cut down any trees that obstruct the work.
Part 3, Section 5. 3 CLIN 0003 Base Bid Item 0003: RENOVATE AN EXISTING 25 METERS FIRING RANGE, Add:
h. Road: Remove an existing road and construct a new access road for the 25 m Firing range.
Approximated road width is 4 m and length is100 m.
i. CCTV System
1) Provide and install a CCTV system for the shooting range training observation. The CCTV system is for training observation purposes to monitor training areas of the 25 m Firing range, display CCTV images to the training observer, record and store images for debriefing after training. The CCTV system shall meet the requirements as following:
a) Provide 10 (ten) day and night CCTV cameras. The cameras shall have infrared LEDs mounted on its housing or can accept the emission, produced by an infrared turret.
D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
Amendment 002 N6274224R6725 Attachment 02 Summary of Change
b) The CCTV system shall operate full time to monitor the shooting training areas. For video training assessment, the appropriate cameras shall focus on the training area.
c) CCTV monitoring and controls shall provide monitoring and display control of live CCTV images from any CCTV camera. The CCTV system shall also provide controls to display and view recorded video imagery.
d) CCTV system shall provide digital video recording of all video imagery cameras 8 hours per day, seven days per week. The CCTV system shall be capable of storing up to fifteen
(15) days of video information of all connected CCTV cameras.
e) Provide and install cable supporting structures, including equipment racks, empty conduits with pull strings, junction boxes, outlet boxes, outlet connectors, and cover plates.
j. The contractor shall return the removed materials from the existing building to the Royal Thai Army and remove the debris from the military base.
PART 6
STATEMENT OF WORK
Add: Attachment 6-1
1. Photo: ECM building location/GPS: 14°48'25.0"N 100°41'16.4"E
2. Photo: Demolish existing buildings for the new ECM construction
3. Photo: Construct crush rock road in front of the new ECM, approximated length is 360 m
D/B Construct Training Facility, Earth Covered Magazine (ECM), Amendment 0002 - N6274224R6725 and Renovate Range, Lopburi Thailand Attachment 03 – Revised Part 6
Attachment 6-1
ECM building location/GPS: 14°48'25.0"N 100°41'16.4"E
ECM
ECM
D/B Construct Training Facility, Earth Covered Magazine (ECM), Amendment 0002 - N6274224R6725 and Renovate Range, Lopburi Thailand Attachment 03 – Revised Part 6
Remove the existing buildings for the new ECM construction
Construct a concrete road in front of the new ECM, approximated length is 360 m
REMOVE EXISTING BUILDINGS
CLIN 0001 CONSTRUCTION OF A SINGLE-STORY TRAINING FACILITY
CLIN 0002
CLIN 0003 RENOVATION OF AN EXISTING 25 METERS FIRING RANGE
GRAND TOTAL
CONSTRUCTION OF AN EARTH-COVERAGE AMMUNITION MAGAZINES (ECM) STORAGE
FOR OFFICIAL USE ONLY
Bill of Quantity Project Title N6274224R6725:D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
ITEM
DESCRIPTION TOTAL
# SENSITIVE BUT UNCLASSIFIED
D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand Amendment 0002
Attachment 04 - Revised BOQ
NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)
A SUBSTRUCTURE
A10 FOUNDATION
- Excavation & backfill m3
- Piling work EA
- Reinforcing & structure steel kg
- Concrete m3
- Other (If any)
B SHELL
B10 SUPERSTRUCTURE
STRUCTURAL FRAMES, FLOOR DECK/SLABS
- Reinforcing & structure steel kg
- Concrete m3
- Other (If any)
ROOF STRUCTURES
- Reinforcing & structure steel kg
- Watertight roof sealant EA
- Other (If any)
B30 ROOFING
- Corrugated metal roof panels m2
- Gutters & downspouts m
- Roof heat insulation m2
- Other (If any)
C INTERIORS
IDENTIFYING DEVICES
- Project plaque with accessories EA
- Building sign/logos with accessories and signage lighting EA
STAIR CONSTRUCTION
- Exterior stair construction EA
- Other (If any)
FLOOR FINISHS
- Trowel finished concrete floor m2
D SERVICE
D50 ELECTRICAL
EE SERVICES & DISTRIBUTION
- EE Panelboards completed with CB and all accessories EA
LIGHTING & BRANCH WIRING
- Cable & wiring EA
- Receptacle outlet with accessories EA
- Lighting switches with accessories EA
- Lighting Fixtures, linear LED tube EA
- Other (If any)
OTHER ELECTRICAL SERVICES
- Grounding system EA
- Lightning protection system EA
G BUILDING WORKS
G10 SITE CLEARINGS
- Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal LOT
SITE…