Region 5 2021 Road Maintenance Specs.pdf
PDF 1 MB Posted
- Solicitation number
- 12363N23Q4035
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a solicitation for a California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement to be utilized by multiple federal agencies and forests across California. The agreement will cover both road maintenance and construction services from March 2023 through March 2033. Contractors shall provide all labor, equipment, materials, and incidentals to complete specified work in compliance with contract terms and specifications. Projects will cover 19 national forests and grasslands across California's varied terrain and soil conditions. Quotes are due by March 15, 2023 and work is estimated to begin on March 15, 2023. The NAICS code is 237310 with a small business size standard of $45 million. This project is set aside 100% for small businesses. Interested vendors must be registered in the System for Award Management and submit electronic quotes and technical documents to the specified email addresses by the stated deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1.pdf | ||
| Award Notice for SAM Updated V1.pdf | ||
| Award Notice for SAM.pdf | ||
| 840-2 INSTALL (1).pdf | ||
| WD Multi 2.pdf | ||
| Earthen Barricade Typical.pdf | ||
| WD Riverside.pdf | ||
| Rolling Dip Typical.pdf | ||
| WD Santa Barb.pdf | ||
| WD Orange.pdf | ||
| WD Tulare.pdf | ||
| Single Lane Gate Detail.pdf | ||
| WD Ventura.pdf | ||
| WD San Bern.pdf | ||
| WD DHLM.pdf | ||
| WD Multi 1.pdf | ||
| R5 FERM Spec Descriptions_Assumptions.pdf | ||
| 840-2 DRAWING.pdf | ||
| Pre Bid Inquiries.pdf | ||
| CA FERM BPA.pdf | ||
| WD Svc Statewide.pdf | ||
| CA FERM Quote Package.pdf | ||
| WD Imperial.pdf | ||
| Fire Plan 2022.pdf | ||
| WD LA.pdf | ||
| WD San Luis O.pdf | ||
| WD San Diego.pdf | ||
| WD Inyo Kern Mono.pdf |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Forest Service Pacific Southwest Region
Specifications for Maintenance of Roads Service Contracts
R5 Regional Office – USFS
01/2021
PREFACE
The Pacific Southwest Region of the Forest Service has developed this document for use in the preparation and administration of maintenance requirements included in Public Works Contracts.
Included are the Specifications for Maintenance of Roads that commonly apply in Public Works Contracts. Conditions and requirements specific to individual projects that requires the use of supplemental specifications shall be coordinated between Engineering and the Contracting Officer. Include Definitions, Abbreviations, Quantity Measurement Terms, and Contract Language sections in all contracts.
Supplemental Specifications, which do not change the intent of the parent section, may be approved jointly by the Forest Engineer and the Contracting Officer.
Road maintenance activities are covered under the McNamara-O’Hara Service Contract Act (SCA). SCA provisions are applicable to service contracts over the $2,500 threshold performed in the United States. A service contract directly engages the time and effort of a contractor whose primary purpose is to perform an identifiable task, rather than to furnish an end item of supply.
Road Maintenance activities covered under SCA are those that are routine and recurring in nature. These activities typically involve maintaining the infrastructure in a condition so that it may continually be utilized. Examples of activities covered under the SCA include:
• Brushing and mowing
• Grading
• Rock raking
• Removal of oversized materials
• Ditch cleaning and brushing
• Cleaning of culverts
• Decommissioning of roads (without construction of any new features or repair of any existing features)
Small repair activities may be appropriate under the SCA provided that the duration of all such work is less than 32 hours in the overall effort and these efforts are an integral part of the project.
Such activities include:
• Minor culvert and drainage repair
• Minor incidental patching done in conjunction with normal maintenance (pot holes)
• Minor aggregate spot surfacing
• Minor slump and slide removal
• Sign, cattleguard, gabion and guardrail repair
TYPICALS
801-1 Illustration of Road Maintenance Terms 5/97
834-1 Ditch Relief Culvert & Catch Basin Maintenance 5/97
835-1 Waterbar 10/16
837-1 Drainage Dip 5/97
838-1 Cross Ditch 5/97
838-3 Hazard Removal 5/97
838-4 Treatment of Slides and Slough 5/97
838-5 Treatment of Slumps and Roadbed Cracks 5/97
CONTRACT INFORMATION
Definitions 5/97
Abbreviations 5/97
Quantity Measurement Terms 5/97
Contract Language 5/97
SPECIFICATIONS
803 Snow Removal 10/16
805 Mobilization 5/97
806 Equipment Moving 5/97
807 Equipment Rental 5/97
808 Work Area Management 5/97
811 Blading 5/97
812 Dust Abatement 3/01
813 Spot Surfacing 5/97
814 Asphalt Pavement Patching 5/97
815 Paved Surface Cleaning 5/97
816 Maintenance of Unpaved Shoulders 5/97
818 Asphalt Crack Cleaning & Sealing 5/97
831 Ditch Maintenance 5/97
832 Remove & End Haul Materials 5/97
833 Culvert Replacement 5/97
834 Drainage Structure Maintenance 5/97
835 Roadway Drainage Maintenance 5/97
836 Roadway Obliteration 5/97
837 Drainage Dip Maintenance 5/97
838 Maintenance of Limited Use 5/97
841 Vegetation Establishment 5/97
842 Cutting Roadway Vegetation 5/97
851 Logging Out 5/97
854 Hazard Removal & Cleanup 5/97
861 Maintenance of Cattleguards 5/97
862 Maintenance of Traffic Gates 5/97
872 Sign Maintenance 5/97
881 Mobilization 5/97
882 Equipment Moving 5/97
891 Water Supply & Watering 5/97
892 Bituminous Products 5/97
893 Aggregate 5/97
DEFINITIONS
Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
1. Agreed or Approved - Official agreement or approval by use of a written document issued by the Government. Agreements also require signature of Contractor's Representative and are dated.
2. Base Course - The layer or layers of specified or selected material of designed thickness placed on a subbase or a subgrade to support a surface course. (See Drawing 801-1, Illustration of Road Maintenance Terms)
3. Berm - A curb or dike which controls roadway runoff water or delineates traffic direction. Berms are commonly placed parallel to road centerline; however, on Limited Use Roads (Section 838) may be placed diagonally across the roadbed. (See Drawing 801-1, Illustration of Road Maintenance Terms)
4. Channel - A natural waterway leading into or away from a culvert or bridge.
5. Contract Modification - A bilateral written supplemental agreement between the Government and the Contractor, documenting a modification outside the scope of the contract and establishing an equitable adjustment therefor.
6. Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract.
7. Culver - Any structure, not classified as a bridge that provides an opening under the roadway.
8. Cross Ditch - A shallow ditch placed across the roadbed to remove water from the roadbed surface which can be driven across by full-size pickups or other high clearance vehicles; usually placed diagonal to the centerline. (See Section Drawing 838-1, Cross Ditching of Limited use Roads)
9. Lead-off Ditch - A ditch used to remove water from roadside drainage ditches, the roadway, cattleguards, or drainage structures such as culverts and drainage dips.
10. Drainage Ditch - A relatively long narrow excavation placed to collect or disperse water, located parallel to and abutting the roadbed. (See Drawing 801-1, Illustration of Road Maintenance Terms)
11. Drainage Dip. A drainage structure that was previously constructed within the roadbed surface to form a uniform depression that allows routine passage of vehicles while diverting water from the traveled way.
12. Drainage Structure - A term identifying man-made devices placed to control water movements.
13. Drawings - Illustrations showing detailed maintenance required.
14. Equipment - All machinery, operating supplies and tools necessary for the proper performance and acceptable completion of the work.
15. Excess Material - Material from the roadway excess to that needed for maintenance of roadway.
16. Fore Slope - The slope of the ditch section nearest to the traveled way. (See Drawing 801-1, Illustration of Road Maintenance Terms)
17. Government - The Contracting Officer or the duly authorized Contracting Officer's Representative (COR) with authority to sign orders.
18. Grade - The vertical alignment of the top surface of the road.
19. Inspector - The Government's authorized representative designated in writing, assigned to make detailed inspections of contract performance, but not to sign orders to the Contractor.
20. Materials - Any substances specified for use in the performance of the work.
21. Measurement – The process of identifying the dimensions, quantity, or capacity of an item.
22. Nominal Dimensions or Weights - The numerical values shown on the drawings or in the specifications as measurements for the work.
23. Work Order - A written order by the Government directing fulfillment of work requirements under the terms of the contract.
24. Original Contract Quantities - Those estimated quantities shown in the Schedule of Items as awarded.
25. Patching - Minor repairs to the roadway surface.
26. Paved Surface or Pavement - Denotes asphalt, concrete, or other stabilized materials excluding natural aggregates. Dust palliative treatments are not considered as pavement.
27. Reasonably Close Conformity - Means compliance with customary maintenance tolerances where working tolerances are not specified.
28. Right-of-Way – A general term denoting land, property, or interest therein acquired for or devoted to a road. (See 801-1, Illustration of Road Maintenance Terms)
29. Roadbed - The portion of a road between the intersection of the subgrade and side slopes, excluding that portion of the ditch below the subgrade. (See Drawing 801-1, Illustration of Road Maintenance Terms)
30. Road Listing - A preliminary listing of road locations and any established work priorities.
31. Roadside – All area within the right-of-way excluding the traveled way and shoulders (See
Drawing 801-1, Illustration of Road Maintenance Terms)
32. Schedule of Items - Schedule containing a listing and description of maintenance items, quantities, units of measure, unit price, and amount.
33. Shoulder - As used in this contract, the term is restricted to roads having a paved surfacing. The portion of the roadway contiguous to the traveled way for the accommodation of stopped vehicles, for emergency use, and for lateral support of the pavement structure (See Drawing 801-1, Illustration of Road Maintenance Terms)
34. Slough or Slide - Material deposited on the roadway which may need to be repositioned or removed.
35. Slump - A localized portion of the roadbed which has slipped or otherwise become lower than that of the adjacent roadbed and constitutes a hazard to traffic.
36. Special Project Specifications - Specifications which detail conditions and requirements to a particular individual project.
37. Standard Specifications – Specifications for specific divisions of work.
38. Subgrade – Top Surface of roadbed upon which subbase, basecourse. or surface sit.
39. Subgrade - Top surface of roadbed upon which subbase, base course, or surface course was constructed. (See Drawing 801-1, Illustration of Road Maintenance Terms)
40. Traveled Way - The portion of the roadway for the movement of vehicles. For purpose of this contract, traveled way includes turnouts and curve widening. (See Drawing 801-1, Illustration of Road Maintenance Terms)
41. Turnouts - A short auxiliary lane on a one-lane road provided for passage of meeting vehicles.
42. Unit of Measure - The unit and fractions of units shown in the Schedule of Items.
43. Unsuitable Material - Material removed during maintenance which must be disposed of in designated locations. Includes material with substantial amounts of vegetation or other objectionable material.
44. Waterbar - A deeper type cross ditch which is not intended for passage of standard passenger vehicles. This structure intercepts runoff from both the road surface and ditch adjacent to the roadbed.
45. Work Schedule - The Contractor's current schedule for work progression.
QUANTITY MEASUREMENT TERMS 1
ABBREVIATIONS
Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
(Reference to a specific standard or specification shall mean the latest addition or amendment thereto in effect on date of Invitation for Bids.)
1. AASHTO - American Association of State Highway and Transportation Officials.
2. CS - Commercial Standard Issued by U.S. Department of Commerce.
3. EPA - Environmental Protection Agency.
4. FAR - Federal Acquisition Regulation System.
5. FED SPEC - Federal Specifications.
6. FSS - Federal Specifications and Standards.
7. MSHA - Mine Safety Health Administration.
8. MUTCD - Manual of Uniform Traffic Control Devices.
9. NBS - National Bureau of Standards.
10. OSHA - Occupational Safety and Health Act.
11. PS - Product Standard issued by the U.S. Department of Commerce.
12. UL - Underwriter's Laboratories, Inc.
13. ASTM – American Society for Testing and Materials
QUANTITY MEASUREMENT TERMS 2
QUANTITY MEASUREMENT TERMS
Measurement under the contract shall be according to the United States standard measure. The methods of measurement and computation will be those necessary to accurately determine the quantities of materials furnished and work performed. Measurement will be made of each item or unit of work, as shown in the Schedule of Items, completed and accepted in accordance with the contract provisions, specifications, and drawing.
1. All items which are measured by the linear foot, will be measured parallel to its longitudinal centerline, unless otherwise shown on the drawings.
2. A station when used as a definition of term or measurement will be 100 linear feet or as identified in project plans.
3. Miles will, in the absence of known distances from existing plans or surveys, be determined by the Government using a calibrated survey odometer or equal substitute operated on the traveled way at or parallel to road centerline. Single lane mile measurement will mean the product of the road length in miles times the equivalent number of continuous traveled way lanes on the road. On two (2) lane roads, the lane miles will be twice the length of the road segment maintained. On one (1) lane roads, the added length of turnouts will be determined by using a factor that includes the cumulative length of the turnouts. Unless a different factor is established in Special Project Specifications or listed for each affected one (1) lane road in the Road Listing, forty percent (40%) of the road will be considered as having turnouts; this yields a factor of one point four (1.4) times the length in miles of the road segment maintained. This adjustment applies only to work performed under Section 811.
4. The term "ton" will mean the short ton consisting of 2,000 pounds avoirdupois. Trucks used to haul material measured by truck weight shall be weighed empty at least once daily, and each truck shall bear a plainly legible identification mark. Weigh tickets furnished by the Contractor from certified scales will be used to determine weight measurements.
5. Materials measured by the cubic yard in the hauling vehicle shall be measured therein at the point of delivery. Vehicles may be of any size or type, provided that the box is of such shape that the actual volume may be readily and accurately determined.
QUANTITY MEASUREMENT TERMS 3
6. Measurement by the acre will use the length and width treated. Measurement of width will approximate significant slope breaks, but will not include minor deviations along the slopes. The measured slope distance for width will be multiplied by the length treated and converted to a standard 43,560 square foot acreage value of the surface area treated.
7. Volume of bituminous products will be measured at 60° F, using ASTM D-1250 for asphalts except the quantity of emulsified asphalt will be determined by measuring the emulsified asphalt at a temperature of 60° F, or by converting the gallonage measured at another temperature to gallonage at 60° F by means of the following formula:
Gallons. at 60° F = Gallons at A° F
1+0.00025 (A° F − 60° F)
In which A° F is the temperature of the material at the time the gallonage is measured.
8. The term "lump sum" when used in the Schedule of Items will mean the complete unit as required by or described in the contract.
CONTRACT LANGUAGE 1
CONTRACT LANGUAGE
The following information is provided for inclusion in contracts as needed. This list is not complete, contact your Contracting Officer for all provisions.
1. INSPECTION AND ACCEPTANCE
a. Far 52.246 Inspection of Services – Fixed Price.
2. ACCEPTANCE OF BULK LIQUID PRODUCTS
The following certifications shall accompany shipments:
a. At the time of delivery of each load of products to be incorporated into the work, the Contractor shall furnish to the Government one copy of the Bill of Lading and a fully executed Certificate of Compliance conforming to the format established for the product in Section 892 and 894. A separate Certificate of Compliance will not be required if the standard Bill of Lading contains the information required by the certificate.
b. Sampling - Sampling of products may be required to validate certificates furnished by the Contractor. When sampling is directed by the Government, the actual samples will be taken by the Contractor in the presence of the Government. All delivery and distribution equipment shall be constructed to permit sampling in conformance with AASHTO T-40 test procedures.
Samples shall be obtained from hauling units at the point of delivery.
1) Final Acceptance - Final acceptance or rejection of the material will be in accordance with other clause(s).
3. PROSECUTION OF WORK
a. Work shall be scheduled to provide completion of segments on a daily basis unless otherwise herein provided.
CONTRACT LANGUAGE 2
b. A monthly Work Schedule shall be prepared by the Contractor based on priorities provided in the contract unless superseded by the Government in advance of work by Work Order. A copy of the Work Schedule shall be provided to the Government by the agreed day of each month.
c. The Government may require the Contractor to finish the portion in progress before additional work is started on any additional portion
4. PUBLIC OFFICIALS NOT PERSONALLY LIABLE
There shall be no personal liability upon the Government or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed of the exercise of any power or authority conferred upon them, by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.
5. PREW ORK CONFERENCE
Prior to commencement of work, the Contractor shall meet with the Government to discuss contract terms and work performance requirements, Work Progress Schedule, and Fire Prevention and Suppression Plans. The meeting will be held at the local Government District or Supervisor's Office, unless otherwise agreed.
6. EQUIPMENT REQUIREMENT
When the Contractor is paid for furnishing and operating equipment on an hourly or daily basis, it shall be operated at its design speed, or the maximum speed feasible under prevailing conditions.
7. STORAGE OF MATERIALS AND EQUIPMENT
Materials shall be stored to assure the preservation of their quality and fitness for work. Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.
8. USE OF PREMISES
CONTRACT LANGUAGE 3
a. General - The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform the contract in a manner that will not interrupt or interfere with the conduct of Government business.
b. Camps - Before any camp or storage site is opened or operated on National Forest land or lands administered by the Government, written permission shall be obtained through the Government. Camp is interpreted to include the campsite or trailer parking area of any employee or subcontractor working on the project. Such permission, if granted, will be without charge to the Contractor.
c. National Forest Road Rules applicable to the National Forest where the work is occurring are made a part of the contract by reference. Copies will be furnished on request.
9. LANDSCAPE PRESERVATION
The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements:
a. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or natural features unless specifically authorized by the Government. Unless otherwise provided in the Special Project Specifications, the Contractor shall confine contract operations to within the areas designated in contract documents. Unless otherwise provided in this contract, the Contractor shall gather rock which falls outside the roadway due to contract operations and dispose of it as directed by the Government.
b. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumen’s, dust palliatives, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Government.
10. LEGAL RELATIONS AND RESPONSIBILITIES
a. Government's Responsibility for Utilities
1) The Government will notify all utility companies or other parties affected and make arrangements for all necessary adjustments of the public or private utility fixtures, pipelines, and other appurtenances affected by work under the contract.
CONTRACT LANGUAGE 4
2) The Government will identify, in Special Project Specifications, known locations of underground installations other than culverts and drains the Contractor could encounter in the progress of work under the contract; typically telephone cables, water supply pipes and induction loops within the pavement.
b. Contractor's Responsibility for Utilities
1) In the event of interruption to utility services because of accidental breakage the Contractor shall promptly notify the utility authority and shall cooperate with that authority in the restoration of service.
c. Railway-Road Provision
1) The Government will make arrangements with the railway for any rights necessary to maintain roads across existing crossings
805 MOBILIZATION 1
803 SNOW REMOVAL (10/16)
1. DESCRIPTION
This Section provides for removal of snow from roads to facilitate logging operations and safe use.
2. MAINTENANCE REQUIREMENTS
a. Perform work in a manner to preserve and protect roads and appurtenances, and prevent erosion damage to roads, streams, and other Forest values.
b. Do not undercut banks. Do not blade gravel or other surfacing material off the road. A minimum of 2-4 inches of snow shall be left on roadbed for surface protection.
c. Keep roadbed drainage ditches, drain dips, and culverts functional when needed during operations and upon completion of operations.
d. Control snow removal to identify the usable traveled way having roadbed support. Reshape over-width plowing as necessary to define the usable width.
e. Space, construct, and maintain drainage holes in the dike of snow or berm caused by snow removal operations. Place drain holes to obtain surface drainage without discharging on erodible fills.
f. Snow removal for public access:
1) Remove snow from all of the traveled way (including turnouts) for safe and efficient use for public use. Remove intruding windfalls, debris, or slough and slide material for the full width of the traveled way and deposit out of drainage’s at locations designated by the Contracting Officer.
g. When directed by the Contracting Officer, replace in kind within sixty (60) days after the start of the Normal Operating Season, any surfacing material which has been bladed off the road, unless otherwise agreed. Contracting Officer will notify Contractor in writing as to the cubic yard equivalent of bladed off material by the start of the Normal Operating Season.
805 MOBILIZATION 2
3. EQUIPMENT
a. Contractor may use any type of equipment to remove snow, providing:
1) Equipment is of the size and type commonly used to remove snow and will not cause damage to the road.
2) The use of plows or dozers to remove snow requires written approval by the Contracting Officer. Equip plows or dozers to remove snow requires written approval by the Contracting Officer. Equip plows or dozers with shoes or runners to keep the dozer blade a minimum of 2 inches above the road surface unless otherwise approved by the Contracting Officer.
4. ICE CONTROL
a. Ice control may be performed by Contractor when approved by the Contracting Officer in writing.
Such approval will include ice control materials, application rates, and any specific requirements of use.
5. MEASUREMENT
a. Measurement for snow removal will be single-lane mile measured along the centerline of the roadway measured to the nearest one-tenth (0.1) miles including turnouts.
6. PAYMENT
a. The accepted quantities will be paid for at the contract unit prices shown in the Schedule of Items
b. Payment will be made under:
Pay Item Description Pay Unit
803 (1) Snow Removal Single-Lane Mile
805 MOBILIZATION 3
805 MOBILIZATION (5/97)
This Section consists of one or more mobilizations of personnel, equipment, supplies, and incidentals to the project site, or sites listed in the Schedule of Items.
2. MEASUREMENT
When the contract establishes separate work periods within the contract time any additional mobilization included as a Bid Item will be retained until the actual work period.
3. PAYMENT
a. Progress payments will be made on the basis of the Bid Items contained in the Schedule of Items as follows:
1) When five (5) percent of the estimated contract amount in the work period is earned, fifty
(50) percent of the amount of mobilization will be paid.
2) When twenty-five (25) percent of the estimated contract amount in the work period is earned, one hundred (100) percent of the amount for mobilization will be paid.
3) The total sum of all payments under this Section shall not exceed 10% of the total contract amount
4) The contract amount for mobilization shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals involved in mobilization.
805 (1) Mobilization work period from __________ to _________ Each
805 MOBILIZATION 4
806 EQUIPMENT MOVING 1
806 EQUIPMENT MOVING (5/97)
This Section provides for the ordered movement of equipment under this contract to accomplish timely maintenance when needs develop outside the Work Schedule. Nothing herein shall conflict with Mobilization which may be provided for in the Contract.
2. REQUIREMENTS
a. The Contractor's current Work Schedule, will be the basis for equipment moving.
b. Equipment moving to accomplish the Work Schedule is considered incidental and separate payment, therefore, will not be made. Changes from the Work Schedule ordered by the Government will be paid in accordance with this Section. Moves made at the election of the Contractor will not be paid.
3. MEASUREMENT
a. Distance will be determined along the shortest feasible route. Moving will be measured to the nearest tenth (1/10) mile from the starting location of the move to the ordered work site.
b. Return of equipment will be measured to the nearest tenth (1/10) mile to the next location identified on the Work Schedule.
4. PAYMENT
a. Payment at the contract unit price for moving as ordered will be full compensation for movement of all equipment, personnel, and incidentals necessary to accomplish the work for the Sections included in the Schedule of Items.
b. Payment for moving equipment for different Sections (811, 832, etc.) are identified by numerical suffixes.
c. Payment will be made under:
806 (1) Equipment Moving for Section _____________ Miles
807 EQUIPMENT RENTAL 1
807 EQUIPMENT RENTAL (5/97)
This Section establishes the basis for the Government to order road maintenance work not otherwise under the contract.
2. PRE-W ORK REQUIREMENTS
Prior to the initial Start Work Notice to Proceed the Contractor shall provide the Government with a listing of equipment that will be available for work under this Section, proposed rental rate, and projected periods when the equipment is not otherwise obligated to contracts other than Government.
3. EQUIPMENT
a. Equipment shall be weed free before used on National Forest System Lands
b. Equipment under this Section, shall be provided fully operated by the Contractor and includes subcontractor equipment performing work under the contract. A competent qualified operator shall be provided by the Contractor; however, the rental rate shall not include operator's wages.
c. The Government will review the proposed rates and those common to the area for this type of use. Mutually agreed rates will be established and set forth by Modification. Work Orders may be issued as needed to obtain work under this Section.
4. DELIVERY OF EQUIPMENT TO SITE
The Government, in conjunction with the Contractor, will determine if equipment is to be moved onto and off the site by roading under its own power or by use of Contractor's truck transport. The Work Order will include the method of moving as roading or transport. Subsequent moving of equipment from one portion of the emergency job to another shall be by roading unless otherwise documented in the Work Order.
5. HOURS OF OPERATION
Hours of operation shall be the same as for the Contractor's regular work shift, unless otherwise directed in writing by the Government.
6. TIMEKEEPING AND COMPENSATION
807 EQUIPMENT RENTAL 2
a. The Government will maintain a daily record showing the actual hours, to the nearest half (1/2) hour, that the equipment is in operation performing work under this item.
b. Time for equipment roading will commence with the beginning of the move. Time will be counted for the operator during roading.
c. Time for equipment transported will be in accordance with the appropriate of the following:
1) When equipment is not being actively used on the contract at the time moving is ordered under this Section, time will be counted for the transporting vehicle, but not the equipment being transported.
2) Where work under this contract is interrupted for ordered performance under this Section, time will be counted for the transporting vehicle and the equipment that would otherwise have been operating.
d. The equipment hours recorded will be paid for at the agreed rate. Labor costs paid for under this Section will be those paid by the Contractor under this contract.
7. MEASUREMENTS
a. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the equipment is in operation.
b. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.
c. Hours of operation shall be the same as for the Service Provider’s regular work shift, unless otherwise directed in writing by the Contracting Officer.
d. Moving of equipment will be paid at the established hourly rate
8. PAYMENT
a. The quantities measured and accepted will be paid for at the contract unit price shown in the Schedule of Items.
807 (1) Equipment, Type ___________ Hour 807 (2) Excavator Hour
807 (3) Backhoe Hour
807 EQUIPMENT RENTAL 3
807 (4) Grader Hour
807 (5) Crawler Tractor Hour
807 (6) Dump Truck Hour
807 (7) Brush Cutter Hour
807 (8) Drilling Rig Hour
807 (9) Roller Hour
807 (10) Trailer Hour
808 WORK AREA MANAGEMENT 1
808 - W ORK AREA MANAGEMENT (5/97)
This Section establishes Contractor responsibilities for traffic control and equipment requirements in work areas.
2. REQUIREMENTS
a. Traffic Conditions - Roads other than those listed for work under Section 835 shall be open to traffic with not more than fifteen (15) minutes maximum delay time unless otherwise provided in Special Project Specifications.
b. Work which interferes with use of traveled roadways shall not be initiated or performed until a plan for satisfactory handling of traffic has been approved by the Government.
3. TRAFFIC CONTROL DEVICES
a. The Contractor shall provide signs and other devices complying with National Standards as contained in Part VI of the Manual of Uniform Traffic Control Devices (MUTCD). Traffic control for occupied work areas shall be in accordance with these specifications. All signs and devices remain the property of the Contractor.
b. Traffic devices shall be kept current with maintenance operation and removed upon its completion.
c. Traffic approaching the work area from either direction and side accesses having standard Government rectangular -or trapezoidal- shaped route markers with horizontal numbering shall be warned by signing.
d. Required signs may be mounted on portable or temporary mountings. Standard MUTCD shapes, colors, sizes, and legends shall be used.
e. Hazards incidental to the work within or on the traveled way, shoulders, or turnouts shall be marked with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Work segments not completed on a daily basis shall be marked appropriately for night travel. Contractor shall obtain authorization before commencing work at night.
f. Advisory speed plates may be used to control traffic through the work area.
808 WORK AREA MANAGEMENT 2
1) Flaggers - Properly equipped flag person(s) shall be provided where the traffic is required to stop before proceeding. Traffic shall be stopped in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required.
4. CONTRACTOR’S EQUIPMENT
a. All vehicles and machinery operating on or from the traveled way or road shoulder shall have flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Truck headlights shall be on while operating. Back-up horns shall be required on all self-propelled equipment in excess of 10,000 lbs. gross weight.
b. Vehicles and machinery not currently used in the maintenance operation shall be parked off the traveled way at approved locations to minimize interference with normal use.
5. MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for meeting requirements of this Section. All work and materials shall be incidental to paid work in this contract.
6. CONTROL STAKES
The Contractor is responsible for the preservation of existing bench marks and other control points. The cost of replacing them may be charged against the Contractor and may be deducted from the payment for the work. If the Contractor finds a missing stake he will notify the Government who will replace the missing stake within two (2) days.
811 BLADING 1
811 BLADING (5/97)
This work consists of surface blading native or aggregate roadbed to a condition to facilitate traffic and provide proper drainage. Blading includes shaping the crown or slope of traveled way, berms, and drainage dips in accordance with this specification.
a. Timing
1) Surface blading shall be performed during the contract period as ordered by the Government. Contractor shall commence surface blading within two (2) contract days after receipt of written order unless otherwise stated in the order.
b. General
1) The existing traveled way and shoulders, including turnouts unless otherwise ordered, shall be bladed and shaped to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface unless otherwise shown in the Road Listing, to at least one half inch (1/2") per foot of width, but not more than three quarter inch (3/4") per foot of width. Surfacing materials shall be thoroughly loosened to no less than 2 inch depth or the depth of potholes or corrugations. Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected by the Contractor but will be considered incidental to blading. Scarification shall not go deep enough to cause contamination of the surfacing.
2) When Section 891 is included in the Road Listing, the Contractor shall apply water during blading when sufficient moisture is not present to prevent segregation. Water supply, hauling, and application shall be in accordance with Section 891 and shall be incidental to blading unless Pay Items for Section 891 are included in the Schedule of Items.
3) Existing native, rock or aggregate surfaced drainage dips shall be shaped incidental to blading to divert surface runoff to existing outlet devices, ditches and discharge locations.
4) The Contractor shall establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than two (2) inches above the adjacent surface unless otherwise provided in the contract.
Material not meeting this dimension shall be removed and placed outside the roadbed so as not to obstruct drainage ways or structures. This material may be scattered off the roadbed if there is free drainage.
c. Routine Blading
811 BLADING 2
1) Upon completion of blading, the surfaces shall conform to the dimensions shown in the Special Project Specifications 811-3.
2) Roadbed width in excess of the dimensions shown shall be shaped only as needed to provide drainage away from the traveled way. Established grasses and other vegetation shall not be removed from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.
d. Compaction
1) Roads requiring compaction will be included in the Road Listing. Compaction shall be performed in accordance with Special Project Specification 811-1.
e. Intrusions
1) Where the minimum width shown in the Special Project Specifications is not available, the Contractor will construct berms where ordered and marked on the ground. Material to provide berms will come from sources designated in the Special Project Specifications.
f. Undercutting
2) Roadway back slope shall not be undercut.
g. Intersections
1) At intersections, the roadbeds of side roads which are not closed or restricted from vehicular use shall be bladed to assure smooth transitions.
2) Field evidence of closure or restrictions shall be considered to be signing, cross ditching in the road surface (traveled way), earth berms or other devices placed to discourage or eliminate use by passenger cars, also roads listed for work under Sections 835 or 838 shall be considered restricted.
3) Side roads listed for work under this Section shall be considered as not restricted.
h. Cleaning of Structures
1) Materials resulting from work under this Section shall not be allowed to remain on or in structures, such as bridges, culverts, cattleguards, or drainage dips.
i. Berms
1) Existing berms shall be maintained to the condition of adjacent segments when ordered by the Government.
Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.
811 BLADING 3
a. Measurement for blading will be single-lane mile measured along the centerline of the roadway (see quantity measurement terms). Two-lane roads will be measured as two (2) single-lane miles. Measurement will be measured to the nearest one-tenth (0.1) mile.
b. Each intersection bladed under 2.g. will be equivalent to one-tenth (0.1) single-lane mile;
however, when the intersecting side road is scheduled for subsequent blading under this Section, no measurement will be made.
c. Berm maintained or established will be measured by linear foot.
a. The quantities measured and accepted will be paid for at the contract unit price shown in the Schedule of Items.
811 (1) Blading Surfaced Roads Single-Lane Mile
811 (2) Blading Native and Pit Run Roads Single-Lane Mile
811 (3) Berm Maintained Linear Foot
811 (4) Establishing Berms Linear Foot
811-1 SPECIAL PROJECT SPECIFICATIONS, BLADING 1
SPECIAL PROJECT SPECIFICATION
811-1 BLADING (5/97)
Add the following:
Compaction is required when shown on the road listing.
d. Compaction - add the following:
2) Unless Compaction Method B is included in the Schedule of Items and Road Listing, all traveled ways requiring compaction shall be compacted by Method A.
Compaction shall commence immediately following blading. Compaction methods are:
a) Compaction Method A: By breaking track while operating equipment on the traveled way.
b) Compaction Method B: 8-10 ton pneumatic, steel or equivalent vibrating roller, operated to cover the full width two (2) times
No measurement will be made under this Section for Compaction Method A. Measurement for Compaction Method B will be the same as stated in 3.a for blading.
811 (5) Blading Compaction – Method B Single-Lane
811-2 SPECIAL PROJECT SPECIFICATIONS, BLADING 1
SPECIAL PROJECT SPECIFICATIONS
811-2 BLADING (5/97)
Smooth blading shall remove loose surfacing materials from the wheel paths and store the removed materials in a recoverable windrow.
b. Add the following:
5) Watering will not be required for smooth blading. Smooth blading shall be accomplished without distorting the existing cross-slope or crown of the traveled way.
Loose surfacing materials shall be moved and stored on the high side of super-elevated curves and sections with uniform inslope or outslopes. In crowned sections, the material shall be stored on either or both sides as elected. Stored materials shall be windrowed and shall be placed to provide not less than eleven (11) feet of smoothed traveled way on one- lane segments or twenty (20) feet of smoothed traveled way on two-lane or sections with turnouts. Windrows which may collect water on the road shall have holes cut through for drainage at least every 500 feet.
Measurement for smooth blading will be the same as stated for blading in 3.a.
811 (6) Smooth Blading Single-Lane
811-3 SPECIAL PROJECT SPECIFICATION, BLADING 1
SPECIAL PROJECT SPECIFICATIONS
811-3 BLADING (3/01)
Blading Dimensions
Road Number
Standard Width
Minimum Width
Maximum Width
Tangent Width
Curve Width
Turnout Width
Aggregate Edge Slope
812 DUST ABATEMENT 1
812 DUST ABATEMENT (3/01)
This work consists of furnishing and applying dust palliatives on roads shown in the Road Listing.
2. MATERIALS
The dust palliative materials shall be as shown in the road listing unless shown as Option (OPT) for Contractor's election from the following materials:
a. Water (H2O) for dust abatement will be incidental to hauling under this contract and shall be obtained from sources listed in Special Project Specification to Section 891 Water Supply, unless otherwise agreed.
b. Lignin Sulfonate (LIG S) shall be the chemical residue produced as a by-product of the acid sulfite pulping process, and supplied as a water solution. The base solution shall be ammonia, calcium, or sodium and shall be water soluble to allow field dilution. Contractor shall provide certification that:
1) Solids determination has been made in accordance with the modified Technical Association of the Pulp and Paper Industry Standard T629-M53 or by a specific gravity/percent solids versus temperature graph that correlates with the Standard.
2) The pH of the delivered material is at 4.5 minimum as determined by AASHTO-T200.
c. Magnesium Chloride (MgCl2) shall be the liquid residue of evaporative mineral recovery processes.
1) The chemical analysis shall meet the following requirements:
Chemical Percent by Weight of Brine
Magnesium (Mg) 7.0 minimum
Chloride (Cl2) 20.4 minimum
Sulfate (SO4) 3.5 maximum
Nitrate 5.0 maximum
The pH shall be between 4.5 and 10.0
812 DUST ABATEMENT 2
2) Solids determination shall be made from suppliers provided graph of specific gravity/percent solids versus temperature.
d. Petroleum derivatives shall be used only when shown in the Schedule of Items. Materials, equipment and maintenance requirements are specified in Section 892 and in Special Project Specifications. Materials shown for each listed road in the Road Listing shall be the only acceptable product(s).
3. WEATHER LIMITATIONS
a. Water applications are not limited by weather forecast or temperature.
b. Commercial petroleum palliatives, Lignin Sulfonate and Magnesium Chloride shall be applied only when atmospheric temperature in the shade is a minimum 45 degrees Fahrenheit, and steady or rising. The material shall not be applied when rain is anticipated within twenty-four (24) hours of treatment application.
4. EQUIPMENT
a. Application equipment for spreading commercial palliatives shall be so designed, equipped, maintained, and operated that the material is uniformly applied at the rate and traveled way widths shown in the Road Listing.
b. Dilution of commercial palliatives shall be accomplished within the application vehicle with the water source protected from contamination. The resulting mixture shall be circulated at least five
(5) minutes to assure uniform mixing prior to application.
5. MAINTENANCE REQUIREMENTS
a. Water applications shall be limited to abatement for hauling vehicles under this contract and shall be provided at a frequency and rate which controls dust such that vehicle tail lights and turn signals remain visible. Rates of application shall be varied as needed but shall be low enough to avoid forming rivulets. Frequency of application shall be sufficient to accomplish the abatement without saturating and softening the traveled way. Compacted or glazed road surface or wheel tracks may be loosened as needed for water penetration.
b. Commercial palliatives shall be applied at the rates determined by the Government to be appropriate at the time of application. The Road Listing shows the expected average application rate and may be varied to meet field conditions.
1) Lignin Sulfonate rates of application are shown in the Road Listing as gallons per square yard of the undiluted product at fifty percent (50%) solids.
2) Magnesium Chloride rates of application are shown in the Road Listing as gallons per square yard of the undiluted product at thirty-three percent (33%) solids.
3) Prior to initial application, when needed the road will be ordered bladed and shaped under Section 811, Blading.
812 DUST ABATEMENT 3
4) Required subsequent applications may be applied to the existing road surface without blading unless it is ordered.
5) Contractor shall not apply commercial palliatives in a manner that spatters or mars adjacent structures or trees. Palliatives shall not be placed on or across cattleguards or bridges. Dust abatement material shall be discharged only on roads approved by the Government.
6. MEASUREMENT
a. Lignin Sulfonate measurement shall be the tonnage of lignin sulfonate solids supplied as determined by manufacturer's certificate or by tests on job samples obtained during application.
b. Magnesium Chloride measurement shall be the undiluted tonnage (as corrected to 33 percent solids) as determined by manufacturer's certificate.
c. Bituminous material will be measured prior to any ordered dilution by the ton or gallon as provided in the Schedule of Items and the Special Project Specifications.
d. Addition of water to dilute commercial palliatives shall be incidental.
7. PAYMENT
a. The accepted quantities will be paid for at the contract unit price shown in the Schedule of Items.
812 (1) Dust Abatement – Lignin Sulfonate Solids Ton 812 (2) Dust Abatement – Magnesium Chloride Ton
813 SPOT SURFACING 1
813 SPOT SURFACING (5/97)
This work consists of placing surface aggregate as staked on the ground, or designated by the Government. It includes preparing the area, furnishing, hauling, and placing all necessary materials and other work necessary to blend with the adjacent road cross section.
a. Materials will be Government furnished when stated in Special Project Specifications.
b. Materials furnished by the Contractor shall conform to the gradation requirements shown in the Special Project Specifications and the quality requirements of Section 893.
3. MAINTENANCE REQUIREMENTS
a. The area to be spot surfaced shall be thoroughly loosened to a minimum depth of one inch (1") prior to placement of aggregate.
4. MIXING AND PLACING
a. When scheduled coincident with work under Section 811, spot surfacing and existing aggregate, when ordered, shall be mixed with water until a uniform mixture is obtained prior to final shaping and compaction.
b. The material shall otherwise be spread on the prepared area in layers no more than four (4) inches in depth. When more than one (1) layer is required, each layer shall be shaped and compacted before the succeeding layer is placed. Upon completion, the spot surfacing shall reasonably conform to the adjacent cross section and provide smooth transitions in the road profile.
c. Compaction shall be accomplished by breaking track while operating equipment on the traveled way
a. The quantity will be the number of cubic yards measured in the vehicles, or square yards of aggregate placed, whichever is shown in the Schedule of Items.
813 SPOT SURFACING 2
b. Hauling is considered incidental.
a. The accepted quantities will be paid for at the contract unit prices shown in the Schedule of Items
813 (1) Spot Surfacing, Grading Cubic Yard
813 (2) Spot Surfacing, Grading Square Yard
815 PAVED SURFACE CLEANING 1
814 ASPHALT PAVEMENT PATCHING (5/97)
This work consists of patching potholes and skin patching of asphalt surfaces. The work includes preparing the area to be patched, furnishing and placing all necessary materials and work. All areas to be patched will be marked by the Government.
Materials used for asphalt patching shall conform to the requirements in Sections 892 and 893.
Bituminous mixture material shall conform to requirements of Special Project Specifications.
a. Potholes
1) Existing materials shall be removed to a minimum of two (2) inches or as necessary to reach firm support, but limited to maximum twelve (12) inch depth. If firm support for a patch is not available, the hole shall be barricaded and the Government shall be notified.
Prior to Contractor placing any materials, Government will determine corrections to be made.
2) The edges of the prepared hole shall be extended to form a vertical face in un-fractured asphalt surfacing. The prepared hole shall generally be round or rectangular in shape and cleaned of all loose material. The bottom and sides shall be sprayed with an emulsified asphalt.
3) Prepared potholes shall be patched or barricaded immediately.
4) The bituminous mixture shall be placed in layers not exceeding four (4) inches. Each layer shall be compacted thoroughly with hand tampers, mechanical tampers, or rollers.
5) Finished surface shall, as a minimum, be compacted with a tamper or an 8- to 10-ton steel roller or comparable vibratory roller. Upon completion, the compacted pothole patch shall be flush with or not more than one quarter (1/4) inch above the level of the adjacent pavement.
b. Skin Patches
1) Prior to skin patching, potholes shall be patched.
2) Minor depressions, light raveling, or surface checking at scattered locations shown on the
Drawings or marked on the ground shall be treated by applying a skin patch.
3) Prior to skin patching, the surface shall be cleaned of loose and deleterious material, then sprayed with emulsified asphalt at the rate ordered by the Government.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .