This document is a Scope of Work for soil sample collection and analysis services for Region 1 of a state government. The services are requested by the State Department of Environmental Protection and are to be performed at various sites throughout the region. The contractor will be required to collect soil samples, perform laboratory analysis, and provide detailed reports on the findings. The total quantity of soil samples to be collected is 5,000. Responses to this solicitation are due by June 30, 2020, with a pre-bid conference scheduled for June 15, 2020. The contract is expected to be awarded by July 15, 2020 and will have an initial term of 1 year, with the possibility of 4 additional 1-year renewal options.

The pricing for this contract will be based on a fixed unit rate per soil sample collected and analyzed. There are no set-aside requirements, and the incumbent contractor is not identified. The project is funded through the state's general environmental protection budget, though the total contract value is not specified. Respondents must demonstrate experience in providing similar soil sampling and analysis services to government agencies.

View the file

Other files

File Type Posted
Soil Level Maintenance~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2020 Soil Sampling in Region 1 Soil sampling is an important component of properly ensuring that the soil health of agricultural systems is not depleted. In order to accomplish this, samples need to be taken at least every 5 acres. A minimum of 5 cores will be collected within 10 ft. of each sampling point. Samples will be taken in accordance with University of Illinois Agronomy Handbook standards (http://extension.cropsciences.illinois.edu/handbook/pdfs/chapter08.pdf).

The samples will be taken include the soil profile from 0-7 inches. No depths greater than 7 in is acceptable. Multiple profiles will be taken in each sampling location, mixed together, and put into a sampling bag that is labelled with Field number and sampling point. Sample ID numbers will be provided.

Samples will be sent off to the lab for analysis. The main levels that must be reported include soil pH, amount of Phosphorus (P), and amount of Potassium (K). Other micronutrients can be reported. Please see attached Minimum Nutrient Level below on this sheet. The majority of the fields are in row crop production, but some may be in hay fields or food plots.

A final nutrient report for each lease and recommendations will be submitted electronically to the contact below. Soil sampling location points have been predetermined. Hard maps or a GIS shapefile will be given to the winning bidder when the project starts. A spreadsheet on how sample results will be delivered to IDNR. Sheet provided is minimum fields required as well as any additional information.

Samples will be taken in the fall – September to October timeframe, after fall harvest has been completed on the sites. All samples are required back November 1st, 2020. Farm Lease meetings will then be taking place in November and December for IDNR farm leases.

Vendor is responsible for taking all samples, having them analyzed, and sending to the IDNR via email to DNR.Aglease@Illinois.gov, Mike.Chandler@Illinois.gov, and Bob.Caveny@Illinois.gov.

Location:

Lease #
Site
County
# Samples
Site Contact
2463
Anderson Lake SFWA
Fulton
19
309-759-4484
2378
Banner Marsh SFWA
Fulton
11
309-647-9184
2292
Franklin Creek NA
Lee
9
815-456-2878
2399
Rock Cut SP (Crows Foot)
Boone
20
815-885-3311
2011
Snakeden Hollow
Knox
25
309-879-2607
2012
Snakeden Hollow
Knox
51
2384
Spring Lake (Ilo Dillin)
Tazewell
3
309-968-7135
2068
Starved Rock SP/Mathiessen SP
Lasalle
101
815-667-5355

IDNR Ag Lease - Min Soil Test Levels for Ag Fields

Soil pH Maintenance Levels – 6.2 goal, 6.0 – 6.5 acceptable

Phosphorus (P) Maintenance Levels

Soil P Supplying Regions
Units
High
Medium
Low
Minimum Soil Level
30
40
45
lbs/ac
Recommended Levels Corn/Beans
40
45
50
lbs/ac
Recommended Levels Wheat/Oats
60
67.5
75
lbs/ac

Potassium (K) Maintenance Levels

Soil K Exchange Capacity Regions
Units
High (>12 mEq)
Low (<12 mEq)
Minimum Soil Level
300
260
lbs/ac
Above with No Addition
400
360
lbs/ac
Levels >100 lb. above Min
Replace Yield K
Replace Yield K
lbs/ac
Levels Below Minimum
Replace Yield K + Build to Min

· Adjustments needed based on location and timing of sampling. See Attachments.

Phosphorus (P) Maintenance Levels Illinois Agronomy Handbook (Ch 8, 100) Minimum soil test levels required to produce optimal crop yields vary depending on the crop to be grown and the soil’s P-supplying power. Near maximal yields of corn and soybeans are obtained when levels of available P are maintained at 30, 40, and 45 pounds per acre for soils in the high, medium, and low P-supplying regions, respectively. Since these are minimal values, to ensure soil P availability will not restrict crop yield it is recommended that soil test results be built up to 40, 45, and 50 pounds per acre for soils in the high, medium, and low P-supplying regions, respectively. This is a practical approach because P is not easily lost from the soil, other than through crop removal or soil erosion. To compensate for the higher P requirements of wheat and oats, it is suggested that 1.5 times the amount of expected P removal be applied prior to seeding these crops.

When soil test levels are between the minimum and 20 pounds above the minimum (40 to 60, 45 to 65, and 50 to 70 for the high, medium, and low P-supplying regions, respectively), apply enough to replace expected removal by the crop. When soil test levels are below the desired values (40, 45, and 50 for the high, medium, and low P-supplying regions, respectively), it is suggested that enough fertilizer be added to build the test to the desired goal and to replace what the crop will remove (as described in the previous paragraph). At this test level, the yield of the crop will be affected by the amount of P applied that year.

On average, Illinois soils require 9 pounds of P2 O5 per acre to increase the P1 soil test by 1 pound. The recommended rate of buildup for P is thus nine times the difference between the soil test goal and the actual soil test value. For a typical 4-year buildup program, divide the rate by 4 to determine the annual rate. Because the 9-pound rate is an average for Illinois soils, some soils will fail to reach the desired goal in 4 years with P2 O5 applied at this rate, and others will exceed the goal.

Potassium (K) Maintenance Levels Illinois Agronomy Handbook (Ch 8, 103) Soils with a CEC less than 12 milliequivalents per 100 grams are classified as having low capacity, while soils with values equal to or greater than 12 milliequivalents per 100 grams are considered to have high capacity. Tests on soil samples that are taken before May 1 or after September 30 should be adjusted downward as follows: subtract 30 for the dark-colored soils in central and northern Illinois; subtract 45 for the light-colored soils in central and northern Illinois and for fine-textured bottomland soils; subtract 60 for the medium- and light-colored soils in southern Illinois.

Minimum soil test levels required to produce optimal crop yields vary depending on the crop to be grown and the soil’s CEC. As with P, the only significant loss of soil-applied K is through crop removal or soil erosion, so to ensure that K availability will not limit crop yields it is recommended that soil test levels be slightly higher than that required for maximum yield. For corn and soybean, it is recommended to have 260 and 300 pounds of exchangeable K per acre for soils in the low and high CEC regions, respectively.

No K additions are suggested if test levels are above 360 and 400 for the low and high CEC regions, unless crops that remove large amounts of K (such as alfalfa or corn silage) are being grown. When soil test levels are between the minimum and 100 pounds above the minimum (260 to 360 and 300 to 400 for the low and high capacity, respectively), apply enough to replace what the crop to be grown is expected to remove using values from Table 8.6. When soil test levels are below the desired values (260 and 300 for the low and high capacity, respectively), it is suggested that enough fertilizer be added to build the test to the desired goal and to replace what the crop will remove (as described in the previous paragraph). On average most Illinois soils require 4 pounds of K2 O per acre to increase the K exchangeable soil test by 1 pound. The recommended rate of buildup for K is thus 4 times the difference between the soil test goal and the actual soil test value. For a typical 4-year buildup program, divide the rate by 4 to determine the annual rate.

image10.png image2.png image20.png image3.png image30.png image4.wmf image40.wmf image5.wmf image50.wmf image6.png image7.png image8.png image9.emf

2148-1-92148-1-82148-1-7

2148-1-62148-1-52148-1-42148-1-32148-1-22148-1-1

2148-1-19

2148-1-18

2148-1-17

2148-1-162148-1-152148-1-14

2148-1-132148-1-122148-1-112148-1-10

Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community, Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

0 0.07 0.140.035 Miles

IDNR Site Boundaries Ag Lease Soil_Samples

Anderson Lake SFWA - AL2463 - Fulton Co Date: 2/20/2020 image10.emf

1-80

1-791-78

1-771-761-75

1-741-73

1-721-711-70

0 0.035 0.070.0175 Miles

Banner Marsh SFWA - AL2378 - Fulton Co image11.emf

3047-1-43047-1-3

3047-1-23047-1-1

1762-6--2

1762-6--1

1762-5--1

1762-7--2

1762-7--1

0 0.065 0.130.0325 Miles

Franklin Creek NA - AL2292 - Lee Co image12.emf

7608-1-9

7608-1-87608-1-77608-1-67608-1-5

7608-1-47608-1-37608-1-2

7608-1-1

7608-1-20

7608-1-197608-1-187608-1-177608-1-16

7608-1-157608-1-147608-1-137608-1-12

7608-1-117608-1-10

0 0.045 0.090.0225 Miles

Soil Sample Point

Rock Cut SP (Crows Foot) - AL2399 - Boone Co image13.emf

2758-2A-2

2758-2A-1

2758-2B-62758-2B-5

2758-2B-4

2758-2B-32758-2B-22758-2B-1

2758-2C-42758-2C-3

2758-2C-2

2758-2C-1

2758-2D-22758-2D-1

2758-0B--32758-0B--22758-0B--1

2758-0A--32758-0A--22758-0A--1

2758-2D--4

2758-2D--3

2758-2C--72758-2C--62758-2C--5

0 0.065 0.130.0325 Miles

Snakeden Hollow - AL2011 - Knox Co image14.emf

6-44 6-43

S4-2 S4-1

7-66

7-65

7-64

7-63

7-62

7-61

7-60

7-59

7-58

7-57

2758-4-2

2758-4-1

2761-7-4

2761-7-3

2761-7-2

2761-7-1

2763-3-72763-3-6 2763-3-5

2763-3-42763-3-3

2763-3-22763-3-1

2763-0-1

2761-9--2

2761-9--1

2761-7-11

2761-7-10 2761-7--9

2761-7--8

2761-7--7

2761-7--6

2761-7--5

2758-2--1

2758-3--1

2763-5--2 2763-5--1

2763-4A-4

2763-4A-32763-4A-2

2763-4A-1

2763-4B-12763-4B--3

2763-4B--2

0 0.15 0.30.075 Miles

Snakeden Hollow - AL2012 - Knox Co image15.emf

S8--1

57PHA--257PHA--1

0 0.02 0.040.01 Miles

Snakeden Hollow - AL2012 (Satellite) - Knox Co image16.emf

2466-4-1

2466-3-22466-3-1

0 0.035 0.070.0175 Miles

Spring Lake (Ilo Dillin) - AL2384 - Tazewell Co image17.emf

4B-34B-24B-1 4A-34A-2

4A-1

11-3711-3611-35 11-3411-3311-32 11-3111-3011-29 2788-1-5

2788-1-42788-1-3 2788-1-22788-1-1

2788-2--7

2788-2--6 2788-2--5 2788-2--4 2788-2--3 2788-2--2 2788-2--1

0 0.2 0.40.1 Miles

Starved Rock East - AL2068 - Lasalle Co image18.emf

3B-23A-3

3B-13A-2

2B-4

2B-3

2B-21A-3

1B-91A-2

1B-81A-1

14-29

14-28

2A--8

2A--7

2A--6

15-5315-52

15-5115-50

15-4915-48

1B-11 1B-10

2776-3-82776-3-7

2776-3-6

2776-4-92776-4-82776-3-5

2776-4-72776-4-62776-3-42776-3-3 2776-4-5

2776-4-42776-4-32776-4-22776-3-22776-3-1 2776-4-1

2776-6-92776-6-82776-6-7

2776-6-62776-6-52776-6-4 2776-5-2

2776-6-32776-6-22776-6-1 2776-5-1

2765-7-1

2776-2--72776-2--6

2776-2--5 2776-2--4

2776-2--3

2776-2--2 2776-2--12776-1--6

2776-1--5 2776-1--4

2776-1--3

2776-1--2 2776-1--1

2776-6-10

2776-4-142776-4-13 2776-4-12

2776-4-112776-4-10

0 0.15 0.30.075 Miles

Starved Rock West - AL2068 - Lasalle Co image1.png

File details come from the government source that posted it. Updated .