This is a Basis of Design document prepared by Interface Engineering, Inc. for the City of Camarillo City Hall Remodel and Addition project (Reference 2025-1094), dated July 8, 2026. The document provides comprehensive design criteria and specifications for mechanical, electrical, plumbing, and fire protection systems for the renovation and addition of Camarillo City Hall. The project scope includes modification and extension of existing fire sprinkler systems, plumbing systems serving remodeled restrooms and new breakrooms/pantries, heating, ventilation, and air-conditioning systems with four design options presented, electrical distribution and lighting systems, information and communications technology (ICT) infrastructure including telecommunications and security systems, and fire alarm systems. The document references compliance with 2025 California Building Code, California Mechanical Code, California Plumbing Code, California Fire Code, California Electrical Code, and California Energy Commission standards, along with numerous industry standards including NFPA, ASHRAE, UL, and ASTM specifications. Four distinct HVAC system options are detailed: air-cooled chiller with gas boiler serving four-pipe fan coil units; air-cooled heat recovery chillers serving four-pipe fan coil units; air-cooled heat recovery variable refrigerant flow (VRF) systems; and packaged rooftop units with VAV terminal units and hydronic reheat.
The design document establishes detailed technical specifications across all building systems without specifying pricing terms, cost estimates, or contract award information. The electrical system design indicates the existing 600-ampere service from Southern California Edison is sufficient for new loads, with provisions for a new 75-kilowatt transformer and additional panelboards. Lighting design requires LED sources throughout the project with tunable white luminaires in most spaces and automatic controls meeting California Title 24 requirements, including occupancy sensors and daylighting controls. The plumbing system design specifies high-efficiency, low-flow fixtures including 1.28-gallon-per-flush water closets, waterless urinals, and 0.5-gallon-per-minute lavatories. The ICT systems scope includes removal of existing horizontal cabling in demolished areas and installation of new Category 6A telecommunications infrastructure to centrally-located telecommunications rooms, electronic security systems, and audiovisual systems for three conference rooms. The document does not contain procurement timeline information, bid response dates, or contract award details, functioning instead as technical design guidance for the renovation project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEP Engineering | Fire/Life Safety | Lighting Design | Energy Consulting | Building Technologies | Commissioning
Interface Engineering, Inc.
601 South Figueroa Street, Suite 2750
Los Angeles, CA 90017
TEL 213.694.3434
www.interfaceengineering.com
Basis of Design
City of Camarillo City Hall Remodel and
Addition
2025-1094
Prepared for:
Andrew Goodwin Designs
July 8, 2026
Prepared by:
Eugene de Souza, PE, Principal
Hugh Kettler, PE, PM, Sr. Mechanical Engineer
Salim Demirel, Sr. Plumbing Designer
Haoyan Huang, Sr. Electrical Designer
Kristina Santi, LC, Assoc. IALD, Sr. Lighting Designer
Kayla Ahnen, Fire Alarm Designer
Ethan Brown, PE, M.Eng.FPE, Sr. Fire Protection Engineer
City of Camarillo City Hall Remodel and Addition
MEP Engineering | Fire/Life Safety | Lighting Design | Energy Consulting | Building Technologies | Commissioning
Table of Contents Division 21 – Fire Sprinkler System
Division 22 – Plumbing System
Division 23 – HVAC System
Division 26 – Electrical System
Division 27 – ICT/Technology System
Division 28 – Fire Alarm System
Appendix A / MEP Markups ......................................................................................................................................... i
Appendix B / Single Line Diagram ............................................................................................................................ ii
Fire Sprinkler Systems
PART 1 - Design Criteria
1.1 Codes
A. Systems shall be designed in accordance with the following codes:
1. 2025 California Building Code
2. 2025 California Mechanical Code
3. 2025 California Plumbing Code
4. 2025 California Fire Code
5. 2025 California Electrical Code
6. 2025 California Energy Commission
7. Local Amendments to above Codes.
1.2 Standards
A. The following reference standards shall be used for the design:
1. ANSI – American National Standards Institute.
2. ASCE – American Society of Civil Engineers.
a. ASCE 7, Minimum Design Loads for Buildings and Other Structures.
3. ASME – American Society of Mechanical Engineers.
4. ASTM – American Society for Testing and Materials.
5. AWS – American Welding Society.
6. AWWA – American Water Works Association.
7. FM Global Approval Guide.
8. ICC-ES – International Code Council Evaluation Service.
a. ICC-ES AC193 Mechanical Anchors in Concrete Elements.
b. ICC-ES AC308, Post-Installed Adhesive Anchors in Concrete Elements.
9. NEMA – National Electrical Manufacturer’s Association.
10. NFPA – National Fire Protection Association.
a. NFPA 13, Standard for the Installation of Sprinkler Systems, adopted edition.
11. OSHA – Occupational Safety and Health Administration.
12. UL – Underwriters’ Laboratory.
13. UL Fire Protection Equipment Directory.
14. UL Online Certifications Directory.
PART 2 - Scope of Work
2.1 Fire Sprinkler System
A. Provide modification/extension of the existing wet-pipe fire sprinkler system to accommodate the remodel.
B. Piping will be concealed above finished ceilings where possible, except when installed in areas exposed to structure. Corrosion resistant products will be provided in areas where sprinkler heads, piping, fittings, and hangers are subject to a corrosive environment. Main, low point, and auxiliary drains will be provided to drain the entire system.
C. System control valves, flow and pressure switches will be supervised by the fire alarm system.
D. Electrical connections and wiring will be provided as needed for a complete and operable fire protection system.
2.2 Fire Sprinkler System Equipment
A. General: Sprinklers, valves, switches, pipe, fittings, backflow preventers, hangers, sway braces and other fire protection system components will be UL listed or FM Global approved for fire protection.
B. Piping:
1. Aboveground Piping: Automatic Fire Sprinkler System
a. 1-inch diameter piping will be a minimum of Schedule 40 black steel.
b. Pipe sizes 1-1/4-inch to 2-inch diameter will be a minimum of Schedule 40 black steel when installed with threaded fittings and a minimum of Schedule 10 black steel when installed with grooved fittings.
c. Pipe sizes 2-1/2-inch diameter and larger will be a minimum of Schedule 10 black steel.
Piping will meet ASTM A53 or A795 standards.
C. Sprinkler Heads:
1. Sprinkler heads in finished ceilings will be concealed flat-plate style, and the architect will select from standard available finishes. Areas open to structure will utilize upright style sprinkler heads with brass finishes, or as coordinated with the architect. Quick response sprinklers will be provided in Light Hazard occupancy areas.
2. Sprinklers installed in acoustic ceiling tiles will be provided with braided, stainless steel flexible sprinkler connections in accordance with ASCE 7 seismic requirements.
END OF FIRE SPRINKLER SECTION
Plumbing Systems
PART 1 - Design Criteria
1.1 Codes
A. Systems shall be designed in accordance with the following codes:
1. 2025 California Building Code
2. 2025 California Mechanical Code
3. 2025 California Plumbing Code
4. 2025 California Fire Code
5. 2025 California Electrical Code
6. 2025 California Energy Commission
7. 2025 NFPA
8. 2025 National Electrical Code
9. Local Amendments to the above Code.
10. 2025 California Green Building Code
11. California Health & Safety Code, Section 116975 (known as AB1953).
B. Standards – The following reference standards shall be used for the design:
1. AGA – American Gas Association.
2. ANSI – American National Standards Institute.
3. ASHRAE – American Society of Heating, Refrigeration and Air Conditioning Engineers.
4. ASME – American Society of Mechanical Engineers.
5. ASPE – American Society of Plumbing Engineers
6. ASSE – American Society of Sanitary Engineering.
7. ASTM – American Society for Testing and Materials.
8. AWS – American Welding Society.
9. AWWA – American Water Work Association.
10. CISPI – Cast Iron Soil Pipe Institute.
11. CS – Commercial Standards.
12. EPA – Environmental Protection Agency.
13. NEMA – National Electrical Manufacturer’s Association.
14. NFPA – National Fire Protection Association.
15. NSF – National Sanitation Foundation.
16. PDI – Plumbing and Drainage Institute.
17. UL – Underwriters’ Laboratory.
PART 2 - Plumbing Systems
2.1 Summary of Work:
A. Design and construct a complete and operational plumbing system including the following:
1. Remodel existing common restrooms and upgrade plumbing fixtures to meet current codes.
2. Remodel/design new/existing staff breakrooms/pantries and upgrade plumbing fixtures.
2.2 Work Included:
A. Aboveground and underground sanitary waste and vent system.
B. Potable domestic cold water (DCW) system.
C. Potable domestic hot water (DHW) system.
D. Cooling coil condensate drain system for mechanical equipment.
E. Plumbing Fixtures.
F. Plumbing Equipment (Water Heaters).
2.3 Sanitary Waste and Vent System:
A. The sanitary waste system will convey waste from the plumbing fixtures and HVAC equipment by gravity to the existing sanitary waste system.
B. Aboveground and underground sanitary waste and vent piping shall be no-hub service weight, cast iron with no-hub fittings, and shall comply with ASTM A888 and CISPI 301.
C. Sanitary underground piping no-hub coupling shall be heavy duty type conforming to ASTM 888, shall be type 304 stainless steel; worm drive clamps shall be type 304 stainless steel, and sealing gasket shall be neoprene conforming to ASTM C-564. Couplings shall conform to Factory Mutual
Standard 1680, Class 1, and ASTM C-1540. Couplings shall be Anaco “Huskey SD4000-Orange
Shield,” or Clamp All Hi-Torque 125.
D. Aboveground sanitary waste and vent piping no-hub coupling shall be standard duty type conforming to ASTM C1277 or CISPI 310.
E. Trap priming of floor drains or floor sinks will be accomplished in one of the following methods:
1. Vacuum breaker flush valve trap primer, similar to Mifab M-500 (activates on 3 psi pressure drop).
2. Electronic trap primer valve assembly, recessed or surface mounted, similar to Precision
Plumbing Products Model PT or PTS, 120volt/1phase power supply, single point connection.
3. No automatic trap primer shall be used.
F. P-Trap insulation shall be TRUEBRO Model #102G trap cover. Installation shall be in a neat, workmanlike manner, and shall be approved by the Owner.
2.4 Domestic Cold Water System:
A. The existing domestic cold water system will be modified and distributed to the existing restrooms and new plumbing fixtures. Each restroom shall be provided with a branch shut-off valve (ball valve). Domestic water piping shall be as follows:
1. Underground: Type K soft temper copper tubing with flared bronze fittings. Pipe wrap will be provided for corrosion protection.
2. Aboveground: Type L drawn copper, 125 psi maximum service pressure, 250°F maximum service temperature.
B. Contractor shall ensure that no fixture has a pressure lower than 35 psi or higher than 80 psi.
C. System will be designed to prevent water hammer conditions by providing shock arrestors for fixtures, and shock arrestors for quick closing valves. Shock arrestors shall be Sioux Chief 650 series or equal.
D. The most remote fixture shall be provided with minimum supply pressure of 25 psi.
E. Water pressure shall not exceed 80 psi at any plumbing fixture inside the building.
F. Pipes shall be sized on the more stringent of:
a. 8 feet per second maximum flow velocity for cold water lines
G. Protection against backflow shall be maintained with Code approved backflow prevention devices.
H. Provide plumbing stops at every plumbing fixture connection.
2.5 Domestic Hot Water System:
A. Hot Water and circulation piping at the building shall be installed in copper and insulated.
B. Hot Water and circulation piping at the house shall be concealed and run above the ceiling.
C. The domestic hot water heating equipment to be sized in accordance with ASHRAE Handbook chapter on “Service Water Heating” using the predictive method utilizes demand per person and applicable demand and storage factors.
D. Domestic hot water distribution design criteria are outlined below:
1. Fixture unit values shall be per 2025 CPC Appendix A.
2. Pipes shall be sized on the more stringent of:
3. 5 feet per second maximum flow velocity for hot water lines
4. 3 feet per second maximum flow velocity for domestic water return lines
5. 1 psi per 100 feet minimum allowable pressure drop
6. The most remote fixture shall be provided with minimum supply pressure of 25 psi.
E. Water pressure shall not exceed 80 psi at any plumbing fixture inside the building.
F. Option 1: Provide point-of-use instantaneous electric water heaters at remote fixture locations.
G. Option 2: Provide floor mounted storage-type gas or hybrid heat pump water heater with a recurculation pump to serve the restroom and pantry areas.
H. Option 3: Provide a floor mounted gas or heat pump water heater on roof with a recirculation pump to serve all fixtures in building within the proximity.
2.6 Condensate Drain System:
A. The cooling coil condensate drain from any mechanical cooling equipment (coordinate with the mechanical contractor) shall drain by gravity or condensate pump. The primary condensate drain system will terminate into a rooftop receptor, service sink or lavatory/sink tailpiece with an air gap fitting.
2.7 Natural Gas System
A. Existing natural gas piping system to remain. Piping shall be modified to serve new mechanical and water heating equipment, or removed if not required. Where piping is removed, gas pipes shall be cut and capped close to the existing main gas line.
2.8 Plumbing Fixtures:
A. The plumbing fixtures will be high efficiency, and low flow type as required to meet current building codes.
B. Mounting height of plumbing fixtures, flush valve control location, etc., shall conform to the following:
1. As shown in the Architectural Drawings.
2. As required by ADA.
3. Industry Standards.
4. Subcontractor shall verify with Contractor if in doubt.
C. Plumbing Fixtures shall be equal to the following:
1. Water closets will be wall mounted, elongated front bowl, vitreous china, 1.28 gallon per flush used with high efficiency flushometer valve. Sensor hard wired flushometer valve.
2. Urinals will be wall-mounted, concealed integral trap, waterless design.
3. Lavatories will be sensor hardwired ADA compliant faucets and low-flow faucet (0.5 gpm flow).
4. Pantry sinks will be drop-in type, ADA compliant, with 1.5 gpm flow faucet.
D. Fixture Supports:
1. Support wall hung water closets, urinals, and lavatories on heavy duty, full size, concealed, commercial grade carriers mounted to floor structure.
2. Support other fixtures mounted on stud partitions on heavy concealed wall brackets bolted to a 1/4-inch thick by 5-inch high steel plate anchored firmly to studs with bolts (or welded to metal studs). Plate to extend one stud each way beyond fixture mounting point width.
2.9 Identification for Plumbing Piping and Equipment
A. Provide identification for all plumbing piping. All piping concealed or exposed shall have identification markers and flow arrows per ANSI A13.1-2007.
B. Pipe markers shall be pressure sensitive vinyl (self-sticking) material with 360 degree pipe flow arrows and fluid being conveyed. Locate pipe markers every 20 feet on horizontal pipe runs, one foot in front of each valve, thermometer or gauge, at each branch or riser take-off, each passage through walls and floors, at least twice in each room and each story traversed by the piping system.
C. Valve tags shall be attached to each line shutoff valve with a brass chain and color-coded plastic laminated tag. Engrave laminate tags with 1-inch designated numbers, in accordance with valve schedule to be provided by the contractor showing valve size, locations and service.
PART 3 - Execution
3.1 Installation:
A. Provide the following:
1. Supports, vibration isolation, and seismic bracing, for all plumbing piping and equipment.
2. Cleaning and flushing.
3. Chlorination of domestic water system.
4. Testing and adjusting.
B. Installation Practices:
1. Avoid interference with other trades.
2. Maintain access and clearance.
3. Maintain maximum headroom by offsetting as necessary.
4. Maintain ceiling height and coordinate work with other trades. No exposed piping unless approved by Architect.
5. Maintain a minimum 1" clearance from adjacent work, including insulation.
6. Provide shock absorbers in all flush valves, solenoid valves, and quick closing pressurized shut-off valves and where required by code.
7. Provide dielectric unions at all ferrous to copper connections.
8. All potable water systems shall be flushed and sterilized in a manner approved by the City of
Camarillo Health Department.
9. Provide all excavation, trenching, and backfill for all work done in this Section.
10. No cross connections between potable water and other water systems. Provide backflow preventer to water make-up to HVAC equipment.
11. Materials used shall not be likely to support microbial growth and shall not be degraded by cleaning materials.
12. Provide solid ring chrome plated escutcheons (for 2” and smaller) and split-ring (2-1/2” and larger) on piping passing through walls, floor, or partitions, etc., exposed to view.
13. Seal all void space where piping passes through fire rated walls with UL listed fire stopping material.
14. Seal all void space where piping passes through non-rated walls with fiberglass material.
15. Provide branch isolation valves servicing each toilet rooms.
16. Provide access panels in ceilings, partitions, enclosures, etc., as required in order to achieve easy access to all equipment and devices provided or installed under this section.
END OF PLUMBING SECTION
Heating, Ventilation, & Air Conditioning Systems
PART 1 - Design Criteria
1.1 Codes:
A. Systems shall be designed in accordance with the latest edition of the following codes:
1. 2025 California Building Code
2. 2025 California Mechanical Code
3. 2025 California Plumbing Code
4. 2025 California Fire Code
5. 2025 California Electrical Code
6. 2025 California Energy Commission
7. Local Amendments to above Codes
1.2 Standards:
A. The following reference standards shall be used for the design:
1. AMCA – Air Movement and Control Association International, Inc.
2. ANSI – American National Standards Institute
3. ARI – Air Conditioning and Refrigeration Institute
4. ASHRAE – American Society of Heating, Refrigeration, and Air Conditioning Engineers
5. SMACNA – Fire and Smoke Damper Installation Guide
6. SMACNA – Guidelines for Seismic Restraints of Mechanical Systems
7. SMACNA – Standards for Duct Construction
8. EPA – Environmental Protection Agency
9. NEMA – National Electrical Manufacturer’s Association
10. UL – Underwriters’ Laboratories
11. NFPA - National Fire Protection Association:
a. NFPA 90A – Air Conditioning and Ventilating Systems
b. NFPA 101 – Life Safety Code
1.3 Load Calculations – Outdoors Design Conditions:
A. System load calculations shall be based on the following outdoor design conditions. Project is located in Camarillo, California, Building Climate Zone 6:
1. Summer – 84°F DB / 68°F MCWB for airside system calculations (Cooling 0.5% Conditions per
Title 24 Appendix JA2)
2. Winter – 28°F DB for airside system calculations (Winter Median of Extremes per Title 24
Appendix JA2)
1.4 Load Calculations – Indoor Design Conditions
A. System will be designed to maintain the following temperature and humidity conditions:
Space Summer (°F) Winter (°F) Relative Humidity (%)
All Occupied Zones 75 2 70 2 30-70%
1.5 Load Calculations - Internal Air Conditioning Loads Assumptions:
A. Space lighting, equipment and ventilation loads are:
Space Type Occupancy
SF/OC
Light load
W/SF
Eq load.
W/SF
Ventilation load
CFM/SF
Conference 20 1.2 0.5 0.15
Office 100 0.8 0.5 0.15
Breakroom 30 0.8 1.5 0.15
Restroom 100 0.8 0 0.15
B. People
1. Office Spaces: 245 BTUH Sensible/155 BTUH Latent.
2. Number of people shall be based on ASHRAE standard 62.1-2025 and California Title 24.
C. Ventilation Rate – 15% above ASHRAE Std. 62.1-2022 / California Title 24 to meet Enhanced
Ventilation requirement.
1.6 Load Calculations - Envelope Load Assumptions:
A. System load calculations are based on envelope data provided by Architect for compliance with
California T-24 requirements. Fenestration U-values and SHGC values will be provided by the
Architect, general contractor, or Owner.
B. We would refer to Title 24, Part 6, Table 140.3-B for the values to use in our preliminary calculation:
1. Roof/Ceiling: U-value of 0.047 (Metal Building).
2. Wall insulation: U-value of 0.102 (Metal Building).
3. Floor and soffit insulation: U-value of 0.269 (Raised mass).
4. Fenestration: U-value of 0.36 and RSHGC of 0.25 (Fixed Window).
1.7 Acoustical Requirements
A. Sound generated by mechanical/plumbing systems in occupied zones of a treated space not to exceed noise criterion established by Acoustic Consultant, if applicable. Provide acoustical mounting for rooftop equipment as required by Acoustic Consultant.
B. Fan coils should be suspended using spring and neoprene hangers (Mason 30N or equal) with a minimum of 1-inch static deflection.
1.8 Ventilation
A. Outside air ventilation will be designed to provide ventilation per California Mechanical Code
(ASHRAE Std. 62.1) / California Title 24. Ventilation will include the following minimum requirements:
1. Conference: 0.15 CFM/sq. ft.
2. Breakrooms: 0.15 CFM/sq. ft.
3. Office Spaces: 0.15 cfm/sq. ft.
4. All sources of outside air require MERV 13 (or better) filtration before distribution to interior zones.
B. Exhaust systems will be designed to provide minimum exhaust rates per California Mechanical
Code (ASHRAE Std. 62.1) / California Title 24. Exhaust will include the following minimum requirements:
1. Janitor Closets: 1.0 CFM/sq. ft.
2. Toilets - Public: 75 CFM per fixture
1.9 Duct Design
A. System ductwork will be designed based on the following criteria:
1. Exhaust duct sized at 0.08-inch friction loss per 100 feet of duct.
2. Supply and return ductwork will be sized using the equal friction method at 0.08 inch of water per 100 feet of duct. Branch supply and return duct will not exceed 700 fpm.
3. Provide access panels or remote regulators for all manual balancing dampers located above hard lid ceilings. Coordinate with Architect.
1.10 Supply, Return and Exhaust Grille Sizing
A. Grilles will be sized based on manufacturer recommendations to achieve a maximum not to exceed room noise level.
B. Noise levels not to exceed NC 25 for libraries and private offices, not to exceed NC 30 for classrooms, dining rooms, and corridors.
PART 2 - Heating, Ventilating, and Air Conditioning Systems
2.1 Existing Conditions: The existing building is served by a set of packaged, air-cooled rooftop units.
Some are heat pumps and some have gas heat. On the interior, zone control is provided in some areas by shut-off VAV air terminal units. There is an existing Siemens building management system, installed in 2006.
2.2 Heating and Cooling: The HVAC design shall conform to one of the following options. Reference the attached Appendix A mechanical markup for layout of rooftop equipment, major ductwork, and a zone map.
A. Air cooled chiller and gas boiler serving 4-pipe fan coil system, with rooftop packaged DOAS units providing outside air.
1. This system includes horizontal, ducted above ceiling fan coils serving each zone. Chilled water and heating water piping provide heating and cooling, and ductwork from the DOAS units provides outdoor air.
2. System reduces the amount of equipment required on the roof to the chiller, boiler, chilled water and heating water pumps, and the DOAS units. Above ceiling ductwork is smaller, making equipment layout more flexible. High efficiency system.
3. Structural analysis or reinforcement will be required to confirm that the roof can support the new equipment. Requires piping for chilled and heating water throughout building.
B. Air cooled heat recovery chillers serving 4-pipe fan coil system, with rooftop packaged DOAS units providing outside air.
1. This system includes horizontal, ducted above ceiling fan coils serving each zone. Chilled water and heating water piping provide heating and cooling, and ductwork from the DOAS units provides outdoor air.
2. System reduces the amount of equipment required on the roof still further compared to alternative A, as chilled and heating water can be produced simultaneously as required by the modular heat recovery chiller. Requires only electricity, does not need natural gas. Very high efficiency system.
3. Higher equipment cost compared to alternative A. Structural analysis or reinforcement will be required to confirm that the roof can support the new equipment. Requires piping for chilled and heating water throughout building.
C. Air cooled heat recovery VRF, with rooftop packaged DOAS unit providing outside air.
1. This system includes horizontal, ducted above ceiling fan coils serving each zone. Refrigerant piping provides heating and cooling, and ductwork from the DOAS unit provides outdoor air.
2. System reduces the amount of equipment required on the roof to the VRF condensing units and the DOAS unit. VRF condensing units are smaller and lighter than alternative A&B equipment. Above ceiling ductwork is smaller, making equipment layout more flexible. Lower equipment cost, and VRF integral controls lower controls cost and complexity. High efficiency system.
3. Requires latest-generation A2L refrigerant distributed to fan coils throughout building, which has a low flammability risk. Basis of design is a 2-pipe system.
D. Packaged, air cooled rooftop units serving VAV air terminal units with hydronic reheat and gas boiler.
1. This system includes a set of rooftop units, similar to the current equipment layout, along with a gas boiler and pumps to distribute heating water within the building, and VAV boxes with hydronic reheat for local zone control.
2. System operates similarly to existing system, for familiarity of equipment. Lower cost than alternatives A and B, less centralized equipment lessens impact of equipment downtime.
3. Larger ductwork above ceiling, lower efficiency than other options. Requires heating water piping around building perimeter.
2.3 Exhaust Systems:
A. Each set of restrooms will be served by a rooftop exhaust fan located above the restroom group.
Makeup air will be provided with transfer air from adjacent space.
B. Janitor’s Closets will be exhausted to the roof by the nearest restroom fan or by a dedicated fan if not nearby.
C. Each Kitchen/Breakroom will be exhausted to the roof by a dedicated fan.
END OF HVAC SECTION
Electrical Systems
PART 1 - Design Criteria
1.1 Codes:
A. Systems shall be designed in accordance with the latest edition of the following codes:
1. 2025 California Building Code
2. 2025 California Mechanical Code
3. 2025 California Plumbing Code
4. 2025 California Fire Code
5. 2025 California Electrical Code
6. 2025 California Energy Commission
7. Local Amendments to above Codes
1.2 Standards:
A. The following reference standards shall be used for the design:
1. AMCA – Air Movement and Control Association International, Inc.
2. ANSI – American National Standards Institute
3. ARI – Air Conditioning and Refrigeration Institute
4. ASHRAE – American Society of Heating, Refrigeration, and Air Conditioning Engineers
5. SMACNA – Fire and Smoke Damper Installation Guide
6. SMACNA – Guidelines for Seismic Restraints of Mechanical Systems
7. SMACNA – Standards for Duct Construction
8. EPA – Environmental Protection Agency
9. NEMA – National Electrical Manufacturer’s Association
11. NFPA - National Fire Protection Association:
a. NFPA 90A – Air Conditioning and Ventilating Systems
b. NFPA 101 – Life Safety Code
PART 2 - Electrical Systems
2.1 Electrical Distribution System
A. Existing electrical service is obtained from underground Southern California Edison (SCE) service rated 600A, 480/277V, 3-phase, 4-wires.
B. Existing electrical service is sufficient for existing load and new load.
C. Existing electrical distribution consist of one 600A 480/277V, 3-phase, 4-wires main switchboard, one 150kVA, 480V-208/120V transformer, one 600A 208/120V, 3-phase, 4-wires distribution switchboard, and branch circuit panels fed from the two switchboards.
D. New 75kVA transformer and branch circuit panels will be added to support new loads.
E. New 480V panels will be provided for new load and free up breaker space in the existing 480V distribution switchboard.
2.2 Electrical Demolition
A. All existing switchboards to remain and re-use unless noted otherwise on drawing.
B. Existing branch circuit panels (panel LA, LB, A, B, C, FA, & FB) that serve the project area are at the end of their service life and will be replaced.
C. Existing panelboards serving the Council Chambers to remain.
D. Existing receptacle, lighting, and lighting control at in the Council Chambers to remain.
E. Demolish existing lighting, lighting control, and associated raceway and wiring at the interior of the city hall back to source panelboard, unless noted otherwise on drawing
F. Demolish receptacles, junction boxes, and associated raceway and wiring at the interior of the city hall back to source panelboard, unless noted otherwise on drawing
G. Disconnect power to existing HVAC and plumbing equipment to be removed, and remove disconnect switches, raceway and wiring back to source panelboard.
2.3 Emergency Power System
A. Standby power is provided for all electrical distribution systems in the city hall by an existing
200KW generator.
B. Emergency lighting will be power by integrated battery luminaire.
2.4 General Requirements
A. Provide 120V, 1-phase power for lighting, convenience receptacles, appliances, and motorized equipment at 3/4 HP or smaller.
B. Provide 208V, 3-phase for motorized equipment 1 HP and larger, unless otherwise noted.
C. All conduits will be concealed except in Mechanical and Electrical Rooms. Minimum size conduit will be 3/4 trade size for power system and 1-inch telecommunication system. Minimum 1 inch for power system will be used underground. EMT will be used in hung ceilings and non-masonry walls.
D. Grounding conductors will be provided in all feeder and branch circuits.
E. All conductors will be copper with THWN insulation for wet or underground and THHN for dry locations. Type XHHW will be used for sizes larger than #1/0. Conductor sizes will be No. 12 AWG minimum for power and No. 14 AWG for controls or signal.
F. All panel bussing shall be copper.
G. Branch circuit panelboards shall use bolt-on circuit breakers.
PART 3 - Lighting Systems
3.1 Interior Lighting
A. General Description: the lighting design shall provide a comfortable environment that blends with interior colors and textures. The lighting system will meet the light levels and control criteria for the task, minimum lighting levels shall be in accordance with the IESNA handbook 10th edition or latest IESNA RP publication at the time of design. Minimum levels shall be provided by fixed, permanently installed luminaires.
B. Luminaires will utilize LED sources to meet the design criteria while providing a system which is aesthetically pleasing and easy to maintain through the life of the design.
C. Provide a complete lighting system consisting of luminaires, lamps and controls for all building interior areas. New LED luminaires shall be used throughout the entire project scope, existing luminaires will not meet current Title 24 code requirements as renovations will trigger code requirements. Lighting and controls in the Council Chambers is to remain as that was modelled recently.
D. Design Lighting Levels: Average Maintained Footcandles
E. Illuminance uniformity shall not exceed 3 to 1 for task to immediately surrounding areas and 40 to 1 at any point in any space.
F. Color temperature in the back of house space shall be 3,500K with a CRI of >90. All other spaces shall be provided with tunable white luminaires with color temperature ranging from 2700K to
4000K CCT with a CRI of >90.
Area Recommended Lighting Level (Footcandles)
Electrical Room/amenity 25-30
Meeting/Conference Rooms 30 at table
Lobbies 15
Storage 15
Corridors 15
Offices 35-40
Restrooms 20
Lounge/Breakroom 15-20
* No point of exit and egress path shall be less than 1 footcandle at the floor.
3.2 Lighting Control
A. All lighting will be automatically controlled to meet the requirements of California Title 24.
B. All dimmers will be compatible with the controlled loads.
C. Daylighting/dimming controls will be provided in areas with skylights or exterior windows, where natural light is available.
D. Occupancy sensors will be provided in all office spaces, corridors, restrooms, electrical rooms, technology rooms and storage rooms. Occupancy sensors will be of the passive infrared or infrared/ultrasonic type.
E. Lighting control system shall be a new networked digital lighting control system (with astronomical time clock and photocell functions) and local occupancy/motion sensors
(ultrasonic/infrared type). Daylighting controls shall be provided in areas required and integrated into motion sensors where possible. Building lighting shall have automatic shutoff system in accordance with California Title 24 requirements. Provide demand response capability as required by CA title 24.
F. Lighting control system to match system recently installed in the Council Chambers, client to confirm that Current NX system was installed per As-Built Drawings. Or if the Acuity nLight lighting control system is preferred as this system have been installed in other building locations.
Area Lighting Control
Storage and Utility Local switch with Occupancy sensors
Corridors Partial on/off occupancy sensor with auto-off, dimming switch, timeclock
Exterior Lighting Existing timeclocks shall remain for all existing exterior lighting.
Not in scope.
Lobby Timeclock control set for lights to be on during building hours, motion sensors to turn lights on afterhours. Manual dimming
Area Lighting Control switches zoned by light fixture type. Dim to 30% after hours for security, onto 100% when someone walks into the space.
Small Offices Dimming switch at door and ceiling mounting occupancy sensors.
Open Offices Dimming switch a entry, timeclock for auto off after business hours with occupancy sensors to turn on lighting after hours.
Meeting and
Conference
Scene dimmable switch panel, timeclock controls and occupancy/photocell sensors.
Restrooms Occupancy/vacancy motion sensor, timeclock, remote switch not accessible to the public.
3.3 Emergency Lighting Systems
A. Egress lighting will be provided as required by code. The code-required alternate power source shall be via integrated battery within luminaire.
B. No point of exit and egress path shall be less than 1 footcandle minimum at the floor.
C. New exit lighting shall be LED Edgelit with green backlight and non-switched.
END OF DIVISION 26 – ELECTRICAL SECTION
ICT Systems
PART 1 - Design Criteria
1.1 Codes:
A. Systems shall be designed in accordance with the latest edition of the following codes:
1. 2025 California Building Code
2. 2025 California Mechanical Code
3. 2025 California Plumbing Code
4. 2025 California Fire Code
5. 2025 California Electrical Code
6. 2025 California Energy Commission
7. Local Amendments to above Codes
1.2 Standards:
A. The following reference standards shall be used for the design:
1. AMCA – Air Movement and Control Association International, Inc.
2. ANSI – American National Standards Institute
3. ARI – Air Conditioning and Refrigeration Institute
4. ASHRAE – American Society of Heating, Refrigeration, and Air Conditioning Engineers
5. SMACNA – Fire and Smoke Damper Installation Guide
6. SMACNA – Guidelines for Seismic Restraints of Mechanical Systems
7. SMACNA – Standards for Duct Construction
8. EPA – Environmental Protection Agency
9. NEMA – National Electrical Manufacturer’s Association
11. NFPA - National Fire Protection Association:
a. NFPA 90A – Air Conditioning and Ventilating Systems
b. NFPA 101 – Life Safety Code
PART 2 - Telecommunications Infrastructure, Security, and Audiovisual Systems
2.1 The ICT systems for this project includes telecommunications Infrastructure, Security, and Audiovisual
Systems pertaining to removal of the existing horizontal cabling system in demolished area and installation of new system in the construction area.
2.2 Telecommunications Demolition
A. Demolished cables must be removed from end to end.
2.3 General Requirements
A. Telecommunications infrastructure system – The scope includes the pathway and cabling system from the workstations to a new centrally-located telecommunications room (TR), the interior dimensions of which must be 10’W x 12’L, with the door opens out; the new TR will be connected to an existing MPOE Room, assumed to be Phone Room 112 on the as-built drawing. As the floor is approximately 34,000 square feet, two 10’W x 10’L telecommunications rooms may be provided if it is not possible to provide a larger, centrally located one. It is recommended that the new, centrally located telecommunications room be placed next to Information Services work areas, as depicted on the snippet below
The horizontal cabling from the new TR to each work/service area will be as follows:
1. A compliment of two Category 6A cables that emanate from the TR to each typical data outlet faceplate location and terminated on Category 6A jacks and the jacket rating per code requirements. Every workstation per architectural background will be provided with one compliment.
2. A compliment of one Category 6A cable and jack that emanate from each MTR and TR to security camera location and terminated on a Category 6A jack for security cameras: jacket rating per code requirements.
3. 48-port Patch Panel frames with openings for CAT 6A outlet inserts in the TR.
4. A compliment of two Category 6A cables and jacks will be provided at each access point location in the open offices, common areas and conference rooms based on wifi predictive survey (heatmap) to cover the entire project area.
B. Electronic security system – The physical security systems design in the scope pertains to the design of access control, intrusion detection, and video surveillance systems based on requirements of the city.
C. Audiovisual system – The audiovisual systems design for three conference rooms in scope include pathways system for display monitors, paging/intercom devices, speakers, and projectors;
presentation spaces; systems control integration; and amplification and sound reinforcement equipment specifications. More rooms may be included when the scope expansion is authorized.
END OF ICT SYSTEMS SECTION
Fire Alarm Systems
PART 1 - Design Criteria
1.1 Codes
A. Systems shall be designed in accordance with the latest edition of the following codes:
1. 2025 California Building Code
2. 2025 California Mechanical Code
3. 2025 California Plumbing Code
4. 2025 California Fire Code
5. 2025 California Electrical Code
6. 2025 California Energy Commission
7. Local Amendments to above Codes
1.2 Standards
A. The following reference standards shall be used for the design:
1. AMCA – Air Movement and Control Association International, Inc.
2. ANSI – American National Standards Institute
3. ARI – Air Conditioning and Refrigeration Institute
4. ASHRAE – American Society of Heating, Refrigeration, and Air Conditioning Engineers
5. EPA – Environmental Protection Agency
6. NEMA – National Electrical Manufacturer’s Association
7. NFPA - National Fire Protection Association
a. NFPA 90A – Air Conditioning and Ventilating Systems
b. NFPA 101 – Life Safety Code
8. SMACNA - Sheet Metal and Air Conditioning Contractors' National Association
a. SMACNA – Fire and Smoke Damper Installation Guide
b. SMACNA – Guidelines for Seismic Restraints of Mechanical Systems
c. SMACNA – Standards for Duct Construction
9. UL – Underwriters’ Laboratories
PART 2 - Fire Alarm System
2.1 Design Criteria
A. The fire alarm system will be contractor designed.
B. A modification and extension of the existing automatic, addressable, fire alarm system will be provided to meet the requirements of the adopted editions of the California Building Code, and
NFPA 72.
C. The fire alarm system will provide system alarm, supervisory, and trouble signal monitoring, and alarm notification for the building. The existing communicating transmitter will facilitate off-premises monitoring of the individual signals to a listed central station facility. Any power supplies will have batteries to provide a secondary power source in case of primary power loss to the control panel or any remote power supply.
D. Activation of system smoke detectors, manual pull stations, and fire sprinkler water flow switches will initiate alarm signals on the fire alarm control panel (FACP) and fire alarm annunciator (FAA) and activate the audible and visible notification appliances throughout the building. Activation of
HVAC duct mounted smoke detectors and fire sprinkler valve tamper switches will initiate supervisory signals, which will annunciate on the FACP and the FAA.
E. Manual pull stations will be provided as required by code.
F. Automatic smoke detection will be provided for protection of fire alarm control equipment and for activation of fire safety functions.
G. Audible and visual alarm notification appliances will be provided throughout the remodel area to meet the audible and the visual notification requirements of NFPA 72 and the ADA.
H. Control outputs will be provided for actuation of fire safety functions, such as air handler shut down, fire smoke damper closure, and fire door release.
2.2 Fire Alarm Equipment
A. Fire alarm equipment will be UL listed for fire alarm signaling systems.
B. Audible alarm appliances will be temporal coded horns and will be synchronized within the fire area.
C. Smoke detectors will be photoelectric type. Where installed for HVAC systems and smoke damper control, detectors will be either duct-mounted, or in-duct mounted.
D. Visible alarm appliances will have multi-candela settings for field adjustment to achieve ADA and
NFPA 72 visible signaling coverage area requirements for the protected spaces.
E. Manual pull stations will be single action type with red finish.
END OF FIRE ALARM SECTION
X:\LAX\2025\2025-1094\Correspondence\Design Reports\2026-07-08 Updated BOD\2026-07-08 Final BOD.docx
Page i
Appendix A
MEP Markups
WH
A2.11
A2.14
A2.16
A2.18
A2.15
A2.13
A2.12
A2.17 54 A2.10
A2.19
1/16" = 1'-0"55 PROPOSED OVERALL FLOOR PLAN
COMMUNITY DEVELOPMENT
AND BUILDING AND SAFETY
29 WORKSTATIONS
PUBLIC WORKS:
34 WORKSTATIONS
BUILDING
DEPARTMENT
10 WORKSTATIONS
FINANCE:
16 WORKSTATIONS
CITY MANAGER:
16 WORKSTATION
COUNCIL MEMBERS:
4 WORKSTATIONS
CLERK:
4 WORKSTATIONS
ASD AND
INFORMATION SERVICES:
23 WORKSTATIONS
NEW ENTRY COURTYARD
BREAKROOM &
RESTROOMS
NEW BREAKROOM
COURTYARD
LAND DEVELOPMENT
6 WORKSTATIONS
HUMAN RESOURCES:
5 WORKSTATIONS
SHEET TITLE
SHEET NUMBER
ANDREW GOODWIN DESIGNS
architect: andrew goodwin, aia
1238 MONTEREY STREET
SAN LUIS OBISPO, CA 93401
t: (805) 439-1611 www.andrewgoodwin.us
10 31 27C-34213
AMM
REVIEWED:
APPROVED:
REVIEWED:
REVIEWED:
REVIEWED:
REV. DESCRIPTION APP'D DATE
DEPARTMENT OF ADMINISTRATIVE SERVICES
CITY OF CAMARILLO
DRN BY: DES BY: CK'D BY:
RECOMMENDED BY:
SPEC. NUMBER PROJ. NUMBER
F.B. PG. SHEET OF C-
PREPARED BY:
DEPUTY DIRECTOR, LAND DEVELOPMENT
CITY ENGINEER DATE
DEPARTMENT OF PUBLIC WORKS
RCE 76459 EXPIRES: 12/31/2026
DIRECTOR of ADMINISTRATIVE SERVICES
REVIEWED:
MAINTENANCE SUPERINTENDENT
LICENSED ARCHITECT DATE
LICENSE NO. EXPIRES: / /
DEPUTY DIRECTOR, CAPITAL PROJECTS
REVIEWED:
DEPUTY DIRECTOR, ENVIRONMENTAL/STORMWATER
WATER SUPERINTENDENT DATE
WATER RECLAMATION SUPERINTENDENT DATE
DATE
DATE
DATE
DATE
DATE
DIRECTOR of COMMUNITY DEVELOPMENT DATE
A2.01
PROPOSED OVERALL FLOOR PLAN
05/15/2026
JL RT
0 5 10 20 40
HughK Text Box OPTION 1: AIR COOLED CHILLER AND GAS BOILER SERVING 4 PIPE FAN COIL UNITS, WITH ROOFTOP DOAS PROVIDING OUTSIDE AIR
HughK Rectangle Sketch to Scale
102.6 sf
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Rectangle Sketch to Scale
102.6 sf
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Callout
AIR COOLED CHILLER AND PUMPS ON ROOF
HughK Callout
GAS BOILER AND PUMPS ON ROOF
HughK Rectangle
HughK Rectangle
HughK Callout
DOAS ON ROOF FOR BUILDING WEST
HughK Callout
DOAS ON ROOF FOR BUILDING EAST
HughK PolyLine
HughK PolyLine
HughK Line
HughK Callout
DOAS DUCTWORK CAPPED HERE IN PHASE 1 TO BE EXTENDED IN PHASE 2
HughK Callout
DOAS DUCT MAIN TO DISTRIBUTE TO LOCAL FAN COILS
HughK PolyLine
HughK Line
HughK Callout
LOCATE FAN COIL UNITS SERVING COUNCIL CHAMBER IN LOBBY FOR EASE OF ACCESS
HughK PolyLine
HughK Callout
EQUIPMENT LOCATIONS CHOSEN BASED ON EXISTING SCREEN WALLS ON ROOF (TYP)
A2.14
A2.16
A2.18
A2.15
A2.13
A2.12
A2.17 54 A2.10
A2.19
1/16" = 1'-0"55 PROPOSED OVERALL FLOOR PLAN
COMMUNITY DEVELOPMENT
AND BUILDING AND SAFETY
29 WORKSTATIONS
PUBLIC WORKS:
34 WORKSTATIONS
BUILDING
DEPARTMENT
10 WORKSTATIONS
FINANCE:
16 WORKSTATIONS
CITY MANAGER:
16 WORKSTATION
COUNCIL MEMBERS:
4 WORKSTATIONS
CLERK:
4 WORKSTATIONS
ASD AND
INFORMATION SERVICES:
23 WORKSTATIONS
NEW ENTRY COURTYARD
BREAKROOM &
RESTROOMS
NEW BREAKROOM
COURTYARD
LAND DEVELOPMENT
6 WORKSTATIONS
HUMAN RESOURCES:
5 WORKSTATIONS
SHEET TITLE
SHEET NUMBER
ANDREW GOODWIN DESIGNS
architect: andrew goodwin, aia
1238 MONTEREY STREET
SAN LUIS OBISPO, CA 93401
t: (805) 439-1611 www.andrewgoodwin.us
10 31 27C-34213
AMM
REVIEWED:
APPROVED:
REVIEWED:
REVIEWED:
REVIEWED:
REV. DESCRIPTION APP'D DATE
DEPARTMENT OF ADMINISTRATIVE SERVICES
CITY OF CAMARILLO
DRN BY: DES BY: CK'D BY:
RECOMMENDED BY:
SPEC. NUMBER PROJ. NUMBER
F.B. PG. SHEET OF C-
PREPARED BY:
DEPUTY DIRECTOR, LAND DEVELOPMENT
CITY ENGINEER DATE
DEPARTMENT OF PUBLIC WORKS
RCE 76459 EXPIRES: 12/31/2026
DIRECTOR of ADMINISTRATIVE SERVICES
REVIEWED:
MAINTENANCE SUPERINTENDENT
LICENSED ARCHITECT DATE
LICENSE NO. EXPIRES: / /
DEPUTY DIRECTOR, CAPITAL PROJECTS
REVIEWED:
DEPUTY DIRECTOR, ENVIRONMENTAL/STORMWATER
WATER SUPERINTENDENT DATE
WATER RECLAMATION SUPERINTENDENT DATE
DATE
DATE
DATE
DATE
DATE
DIRECTOR of COMMUNITY DEVELOPMENT DATE
A2.01
PROPOSED OVERALL FLOOR PLAN
05/15/2026
JL RT
0 5 10 20 40
HughK Text Box OPTION 2: AIR COOLED HEAT RECOVERY CHILLERS SERVING 4 PIPE FAN COIL UNITS, WITH ROOFTOP DOAS PROVIDING OUTSIDE AIR
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Callout
AIR COOLED HEAT RECOVERY CHILLER AND PUMPS ON ROOF
HughK Rectangle
HughK Rectangle
HughK Callout
DOAS ON ROOF FOR BUILDING WEST
HughK Callout
DOAS ON ROOF FOR BUILDING EAST
HughK PolyLine
HughK PolyLine
HughK Line
HughK Callout
DOAS DUCTWORK TO BE EXTENDED IN PHASE 2
HughK Callout
DOAS DUCT MAIN TO DISTRIBUTE TO LOCAL FAN COILS
HughK PolyLine
HughK Line
HughK Callout
LOCATE FAN COIL UNITS SERVING COUNCIL CHAMBER IN LOBBY FOR EASE OF ACCESS
HughK PolyLine
HughK Rectangle Sketch to Scale 103 sf
HughK
A2.14
A2.16
A2.18
A2.15
A2.13
A2.12
A2.17 54 A2.10
A2.19
1/16" = 1'-0"55 PROPOSED OVERALL FLOOR PLAN
COMMUNITY DEVELOPMENT
AND BUILDING AND SAFETY
29 WORKSTATIONS
PUBLIC WORKS:
34 WORKSTATIONS
BUILDING
DEPARTMENT
10 WORKSTATIONS
FINANCE:
16 WORKSTATIONS
CITY MANAGER:
16 WORKSTATION
COUNCIL MEMBERS:
4 WORKSTATIONS
CLERK:
4 WORKSTATIONS
ASD AND
INFORMATION SERVICES:
23 WORKSTATIONS
NEW ENTRY COURTYARD
BREAKROOM &
RESTROOMS
NEW BREAKROOM
COURTYARD
LAND DEVELOPMENT
6 WORKSTATIONS
HUMAN RESOURCES:
5 WORKSTATIONS
SHEET TITLE
SHEET NUMBER
ANDREW GOODWIN DESIGNS
architect: andrew goodwin, aia
1238 MONTEREY STREET
SAN LUIS OBISPO, CA 93401
t: (805) 439-1611 www.andrewgoodwin.us
10 31 27C-34213
AMM
REVIEWED:
APPROVED:
REVIEWED:
REVIEWED:
REVIEWED:
REV. DESCRIPTION APP'D DATE
DEPARTMENT OF ADMINISTRATIVE SERVICES
CITY OF CAMARILLO
DRN BY: DES BY: CK'D BY:
RECOMMENDED BY:
SPEC. NUMBER PROJ. NUMBER
F.B. PG. SHEET OF C-
PREPARED BY:
DEPUTY DIRECTOR, LAND DEVELOPMENT
CITY ENGINEER DATE
DEPARTMENT OF PUBLIC WORKS
RCE 76459 EXPIRES: 12/31/2026
DIRECTOR of ADMINISTRATIVE SERVICES
REVIEWED:
MAINTENANCE SUPERINTENDENT
LICENSED ARCHITECT DATE
LICENSE NO. EXPIRES: / /
DEPUTY DIRECTOR, CAPITAL PROJECTS
REVIEWED:
DEPUTY DIRECTOR, ENVIRONMENTAL/STORMWATER
WATER SUPERINTENDENT DATE
WATER RECLAMATION SUPERINTENDENT DATE
DATE
DATE
DATE
DATE
DATE
DIRECTOR of COMMUNITY DEVELOPMENT DATE
A2.01
PROPOSED OVERALL FLOOR PLAN
05/15/2026
JL RT
0 5 10 20 40
HughK Text Box OPTION 3: AIR COOLED HEAT RECOVERY VRF SERVING DX FAN COIL UNITS WITH ROOFTOP DOAS PROVIDING OUTSIDE AIR
HughK Callout
VRF CONDENSING UNITS ON ROOF (TYP)
HughK Rectangle
HughK Rectangle
HughK Callout
DOAS ON ROOF FOR BUILDING WEST
HughK Callout
DOAS ON ROOF FOR BUILDING EAST
HughK PolyLine
HughK PolyLine
HughK Line
HughK Callout
DOAS DUCTWORK TO BE EXTENDED IN PHASE 2
HughK Callout
DOAS DUCT MAIN TO DISTRIBUTE TO LOCAL FAN COILS
HughK PolyLine
HughK Line
HughK Callout
LOCATE FAN COIL UNITS SERVING COUNCIL CHAMBER IN LOBBY FOR EASE OF ACCESS
HughK PolyLine
HughK Rectangle Sketch to Scale
9.79 sf
HughK Rectangle Sketch to Scale
9.79 sf
HughK Rectangle Sketch to Scale
9.79 sf
HughK Rectangle Sketch to Scale
9.79 sf
HughK Rectangle Sketch to Scale
9.79 sf
HughK Rectangle Sketch to Scale
9.79 sf
HughK Rectangle Sketch to Scale 15 sf
HughK Callout
BRANCH CONTROLLER ABOVE CEILING
HughK Rectangle Sketch to Scale 15 sf
HughK Rectangle Sketch to Scale 15 sf
HughK Rectangle Sketch to Scale 15 sf
HughK Rectangle Sketch to Scale 15 sf
HughK Rectangle Sketch to Scale 15 sf
HughK
A2.14
A2.16
A2.18
A2.15
A2.13
A2.12
A2.17 54 A2.10
A2.19
1/16" = 1'-0"55 PROPOSED OVERALL FLOOR PLAN
COMMUNITY DEVELOPMENT
AND BUILDING AND SAFETY
29 WORKSTATIONS
PUBLIC WORKS:
34 WORKSTATIONS
BUILDING
DEPARTMENT
10 WORKSTATIONS
FINANCE:
16 WORKSTATIONS
CITY MANAGER:
16 WORKSTATION
COUNCIL MEMBERS:
4 WORKSTATIONS
CLERK:
4 WORKSTATIONS
ASD AND
INFORMATION SERVICES:
23 WORKSTATIONS
NEW ENTRY COURTYARD
BREAKROOM &
RESTROOMS
NEW BREAKROOM
COURTYARD
LAND DEVELOPMENT
6 WORKSTATIONS
HUMAN RESOURCES:
5 WORKSTATIONS
SHEET TITLE
SHEET NUMBER
ANDREW GOODWIN DESIGNS
architect: andrew goodwin, aia
1238 MONTEREY STREET
SAN LUIS OBISPO, CA 93401
t: (805) 439-1611 www.andrewgoodwin.us
10 31 27C-34213
AMM
REVIEWED:
APPROVED:
REVIEWED:
REVIEWED:
REVIEWED:
REV. DESCRIPTION APP'D DATE
DEPARTMENT OF ADMINISTRATIVE SERVICES
CITY OF CAMARILLO
DRN BY: DES BY: CK'D BY:
RECOMMENDED BY:
SPEC. NUMBER PROJ. NUMBER
F.B. PG. SHEET OF C-
PREPARED BY:
DEPUTY DIRECTOR, LAND DEVELOPMENT
CITY ENGINEER DATE
DEPARTMENT OF PUBLIC WORKS
RCE 76459 EXPIRES: 12/31/2026
DIRECTOR of ADMINISTRATIVE SERVICES
REVIEWED:
MAINTENANCE SUPERINTENDENT
LICENSED ARCHITECT DATE
LICENSE NO. EXPIRES: / /
DEPUTY DIRECTOR, CAPITAL PROJECTS
REVIEWED:
DEPUTY DIRECTOR, ENVIRONMENTAL/STORMWATER
WATER SUPERINTENDENT DATE
WATER RECLAMATION SUPERINTENDENT DATE
DATE
DATE
DATE
DATE
DATE
DIRECTOR of COMMUNITY DEVELOPMENT DATE
A2.01
PROPOSED OVERALL FLOOR PLAN
05/15/2026
JL RT
0 5 10 20 40
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Rectangle
HughK Text Box
OPTION 4: VAV ROOFTOP UNITS WITH BOILER FOR HOT WATER TERMINAL REHEAT
HughK Callout
RTU ON ROOF ABOVE (TYP)
HughK PolyLine
HughK PolyLine
HughK Callout
RTU LOCATIONS CHOSEN BASED ON EXISTING SCREEN WALLS ON ROOF (TYP)
HughK PolyLine
HughK PolyLine
HughK Line
HughK Callout MEDIUM PRESSURE DUCTWORK AND HEATING WATER PIPING CAPPED HERE IN PHASE 1 TO BE EXTENDED IN PHASE 2
HughK PolyLine
HughK Line
HughK PolyLine
HughK Callout
LOCATE TERMINAL UNITS SERVING COUNCIL CHAMBER IN LOBBY FOR EASE OF ACCESS
HughK Callout
MEDIUM PRESSURE DUCTWORK (TYP)
HughK Rectangle
HughK
HEATING WATER BOILER ON ROOF
A2.14
A2.16
A2.18
A2.15
A2.13
A2.12
A2.17 54 A2.10
A2.19
1/16" = 1'-0"55 PROPOSED OVERALL FLOOR PLAN
COMMUNITY DEVELOPMENT
AND BUILDING AND SAFETY
29 WORKSTATIONS
PUBLIC WORKS:
34 WORKSTATIONS
BUILDING
DEPARTMENT
10 WORKSTATIONS
FINANCE:
16 WORKSTATIONS
CITY MANAGER:
16 WORKSTATION
COUNCIL MEMBERS:
4 WORKSTATIONS
CLERK:
4 WORKSTATIONS
ASD AND
INFORMATION SERVICES:
23 WORKSTATIONS
NEW ENTRY COURTYARD
BREAKROOM &
RESTROOMS
NEW BREAKROOM
COURTYARD
LAND DEVELOPMENT
6 WORKSTATIONS
HUMAN RESOURCES:
5 WORKSTATIONS
SHEET TITLE
SHEET NUMBER
ANDREW GOODWIN DESIGNS
architect: andrew goodwin, aia
1238 MONTEREY STREET
SAN LUIS OBISPO, CA 93401
t: (805) 439-1611 www.andrewgoodwin.us
10 31 27C-34213
AMM
REVIEWED:
APPROVED:
REVIEWED:
REVIEWED:
REVIEWED:
REV. DESCRIPTION APP'D DATE
DEPARTMENT OF ADMINISTRATIVE SERVICES
CITY OF CAMARILLO
DRN BY: DES BY: CK'D BY:
RECOMMENDED BY:
SPEC. NUMBER PROJ. NUMBER
F.B. PG. SHEET OF C-
PREPARED BY:
DEPUTY DIRECTOR, LAND DEVELOPMENT
CITY ENGINEER DATE
DEPARTMENT OF PUBLIC WORKS
RCE 76459 EXPIRES: 12/31/2026
DIRECTOR of ADMINISTRATIVE SERVICES
REVIEWED:
MAINTENANCE SUPERINTENDENT
LICENSED ARCHITECT DATE
LICENSE NO. EXPIRES: / /
DEPUTY DIRECTOR, CAPITAL PROJECTS
REVIEWED:
DEPUTY DIRECTOR, ENVIRONMENTAL/STORMWATER
WATER SUPERINTENDENT DATE
WATER RECLAMATION…