This is a Statement of Work detailing the repair and rodent remediation requirements for the Red Rock Canyon National Conservation Area Administration Building in Las Vegas, Nevada, managed by the Bureau of Land Management. The project includes several major components: rodent removal and decontamination throughout the building, replacement of approximately 4,000 sq ft of metal roofing with polyurethane foam roofing, replacement of the HVAC system including heat pumps and fan coil units, repair of water damage in a restroom and storage room, and installation of new ceiling/wall access doors for future inspections.
The work requires specialized contractors with minimum 5 years experience for both rodent remediation and roofing installation. Key technical requirements include installing 1.5-inch thick polyurethane foam roofing with 38 mil acrylic coating, replacing 15 interior fan coil units and 4 rooftop condensing units with minimum 23 SEER rated equipment, integrating new HVAC controls with the existing Johnson Controls Metasys system, and following EPA/CDC guidelines for rodent decontamination. The building must remain operational during repairs as it houses critical IT infrastructure, water systems, and other essential services. The contractor must coordinate with existing temporary power serving office trailers and protect NV Energy infrastructure during construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sources_Sought_25NOV2024_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Red Rock Canyon NCA Administration Building Building Repairs and Rodent Remediation
Southern Nevada District, Las Vegas, Nevada October 2024
Bureau of Land Management Nevada
Draf t
TABLE OF CONTENTS
1.0 BACKGROUND
2.0 PROJECT MANAGEMENT AND COORDINATION
2.1 Information Submittals
2.2 Coordination Procedures
2.3 Project Meetings
2.4 Requests For Interpretation (RFI)
3.0 BUILDING REPAIR CONCEPT
4.0 BUILDING DOCUMENTATION
5.0 SCOPE OF WORK SUMMARY
6.0 EXISTING CONDITIONS SUMMARY
6.1 Rodent Remediation and Building Architecture
6.2 Existing Metal Roof
6.3 Areas Underlying Metal Roof
6.4 Exterior Rodent Entry Points
6.5 Rodent Infestation
6.6 Water Damage
6.7 HVAC System
6.8 Existing Operations
7.0 EXECUTION OF FIELD WORK
7.1 Building Rodent Remediation
7.1.a Rodent Specialist Tools, Pesticides, Qualifications, and Waste Disposal 7.1.b Rodent Remediation - Initial Building Inspection and Work Plan 7.1.c Rodent Remediation - Building Interior 7.1.d Rodent Remediation - Areas Underlying Metal Roof 7.1.e Rodent Exclusion - Closure of Exterior Utility Entry Points 7.1.f Rodent Remediation - Cleanup Standard
7.2 Metal Roof Replacement
7.3 Building HVAC System
7.4 Repair Water Damaged Restroom
7.5 Repair Water Damaged Storage Room Wall Paneling
7.6 Repair Office Ceiling
7.7 Construct Ceiling and Wall Access Doors
7.8 Site and Building Cleanup
8.0 SITE MANAGEMENT
8.1 Disposal of Waste and Recyclable Materials
EXHIBITS AND PHOTOS
EXHIBITS
E1 Vicinity Map E9 Electrical Panel Board Locations E2 Building Locations E9a HVAC Mechanical Schedule E3 Roof Types and Areas E9b Mechanical HVAC Controls E4 Roof Leak and Feces Areas E10 Temporary Power and Trailers E5 Inspection Access Locations E11 NV Energy Infrastructure E6 Rodent Impacted Areas E12a Rodent Remediation – Interior Areas E7 Water Damage Repair Areas E12b Rodent Remediation – Exterior Areas E8 HVAC Units - Component Layout E13 Existing Metal Roof Areas
PHOTOS
P1 Roof – Deteriorated Foam P8 Restroom Water Damage P2 Roof – Deteriorated Ridge and Flashing P9 Rooftop HVAC Condenser P3 Roof - Damaged Decking P10 Temporary Power 1 P4 Roof – Deteriorated Fascia P11 Temporary Power 2 P5 IT Room P12 Temporary Power 3 P6 Hallway Ceiling Access P13 NV Energy Infrastructure P7 Interior Crawl Space Access P14 HVAC Refrigerant Branch Header
Red Rock Canyon NCA Administration Building Page 1 of 19
1.0 BACKGROUND
Red Rock Canyon National Conservation Area is located approximately 4 miles west of Sky Vista Blvd in the community of Summerlin. The Red Rock Administration building (Building) is located at latitude:
36.13567 / longitude: - 115.42731 (Exhibit 1).
The Building was originally designed in 1978 and constructed sometime in the early 1980’s and was approximately 1,935 sq. ft. Since that time the building has undergone expansion(s) the last being in 2007/2008. The interior first floor is 7,120 sq. ft. the second floor “mezzanine” is 164 sq. f.t. The exterior floor area under roof is 1,200 sq. ft. Total building square footage is 8,484 sq. ft. (Exhibit 2).
The Building also has 2,470 sq. ft. crawl space. Building occupancy is Group B, construction type is Type V-B (Not Rated).
The Building roof system is composed of two discrete materials; metal B-Decking and sprayed on polyurethane foam (Exhibit 3). Over the years the metal roof system has experienced significant deterioration and is thought to be a major cause of the rodent infestation as well as the water damage at specific interior building locations (Exhibit 4).
BLM closed the Building in February 2023 because of a severe rodent infestation. Rodent impacted areas include crawl spaces, ceiling spaces, rafters, attics, and unused spaces.
This Statement of Work (SOW) details existing Building conditions (Section 6) and what the Government has determined are the minimum tasks needed to successfully complete this project (Section 7).
2.0 PROJECT MANAGEMENT AND COORDINATION
2.1 Information Submittals
Prepare and submit information for materials, products, procedures, etc. as noted in the specifications. Submit information with a titled cover sheet to allow for tracking of the submittal.
Submittals to be submitted and numbered sequentially starting with Submittal 001. Contractor to keep a running list of submittals which is to include, but not limited to, the submittal number, submittal date, returned date, and response of the Government in reviewing the information.
2.2 Coordination Procedures
Coordinate construction operations included in different sections of this Statement of Work to ensure efficient and orderly installation of each part of the work. Coordinate construction operations, included in different sections that depend on each other for proper installation, connection, and operation.
a) Schedule construction operations in sequence required to obtain the best results where installation of one part of the work depends on installation of other components, before or after its own installation.
Red Rock Canyon NCA Administration Building Page 2 of 19
b) Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service and repair.
c) Make adequate provisions to accommodate items scheduled for later installation.
d) Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components including mechanical and electrical.
2.3 Project Meetings
a) Schedule and conduct meetings and conferences at project site, unless otherwise indicated.
1) Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Government of scheduled meeting dates and times.
2) Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
3) Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Government, within
(7) days of meeting.
b) Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to the Government, but no later than 15 days after Notice to Proceed. Hold the conference at project site or another convenient location.
Conduct the meeting to review responsibilities and personnel assignments, review required work, project drawings, Statement of Work, construction schedules, payroll, payments, and administrative provisions of the contract. Be prepared to summarize and explain procedures planned for the project and present specified preconstruction submittals.
c) Preinstallation Meetings: Conduct a preinstallation meeting at the project site before each construction activity that requires coordination with other construction.
1) Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including; deliveries, submittals, review of mockups, time schedules, and weather limitations.
2) Record significant meeting discussions, agreements, and disagreements, including required corrective measures and actions.
3) Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present.
d) Progress Meetings: Conduct progress meetings at biweekly intervals. Hold the meetings at the project site. Coordinate dates of meetings with preparation of payment requests. Additional progress meetings may be requested by either the Government or Contractor.
Red Rock Canyon NCA Administration Building Page 3 of 19
1) Attendees: In addition to representatives of Government, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with the project and authorized to conclude matters relating to the work.
2) Agenda: Review and correct or approve minutes of previous progress meeting.
Review other items of significance that could affect project progress. Include topics for discussion as appropriate to status of project.
i. Interface requirements.
ii. Sequence of operations.
iii. Status of submittals.
iv. Deliveries.
v. Access.
vi. Site utilization.
vii. Temporary facilities and controls.
viii. Work hours.
ix. Hazards and risks.
x. Red Rock visitor safety.
xi. Progress cleaning.
xii. Field observations.
xiii. Requests for information/interpretation.
3) Minutes: Record the meeting minutes.
4) Reporting: Distribute minutes of the meeting to each party present and to parties that who should have been present.
5) Schedule Updating: Revise contractors construction schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.
2.4 Requests For Interpretation (RFI)
a) Procedure: Immediately on discovery of the need for interpretation of the contract documents, and if not possible to request interpretation at project meeting, prepare and submit an RFI in the form specified:
1) RFI’s shall originate with contractor. RFI’s submitted by entities other than contractor will be returned with no response.
2) Coordinate and submit RFI’s in a prompt manner to avoid delays in contractor’s work or work of subcontractors.
Red Rock Canyon NCA Administration Building Page 4 of 19
3.0 BUILDING REPAIR CONCEPT
Repair of the Building will be a multi-phase project. Phase 1 will accomplish the tasks outlined in this scope work.
BLM assumes the 2006/2008 Building remodel design was compliant with prevailing building codes at the time.
Except for HVAC equipment, and Batt insulation, BLM does not anticipate upgrading the Building exterior and interior as might typically be done with a tenant improvement. Therefore, a thorough Building inspection to determine what is and what is not in compliance with current codes is not within this scope of work.
4.0 BUILDING DOCUMENTATION
The Government has detailed as-built drawings of the Building that are from the 2006/2007 remodel and Building design drawings from 1978. Due to their large size, these files will be made available at the Contractor’s request using Contractors preferred method of large file electronic exchange.
5.0 SCOPE OF WORK SUMMARY
Listed below are the tasks associated with this project. Section 7 provides details on execution of each task.
1) Rodent Removal and Building Decontamination - Remove from Building, Rodents Feces, and Urine, Impacted Insultation. Deny Building Entry Opportunities to Rodent via Exterior Utility Openings (Section 7.0).
a) Perform initial Building inspection and prepare and obtain Governmental approval of Rodent removal and decontamination work plan (Section 7.1b).
b) Perform Building interior rodent removal and decontamination (Section 7.1c).
c) Perform Building rodent removal and decontamination of areas immediately underlying metal roof (Section 7.1.d).
d) Close Building exterior utility entry points (Section 7.1e).
2) Metal Roof Replacement - Remove all metal roof sections and underlying wood deck and replace with new wood decking and sprayed on polyurethane foam (Section 7.2).
3) HVAC System - Remove and replace existing Mitsubishi heat pumps, wall/ceiling mounted fan control units, and thermostats. Install master controller and connect units to existing Johnson Controls building automation system (Section 7.3).
4) Repair Water Damaged Restroom – Remove and replace all water damaged areas including ceiling, walls, insulation, and wall tile (Section 7.4).
Red Rock Canyon NCA Administration Building Page 5 of 19
5) Repair Water Damage Storage Room Wall Paneling – Remove and replace specified wall panel (Section 7.5).
6) Repair Office Ceiling – Remove and replace the ceiling in Buildings largest office. (Section 7.6).
7) Construct Ceiling and Wall Access Doors– Construct (7) metal framed ceiling access doors, (1) metal framed wall access door and (1) metal or wood (metal hinged) wall door to allow for future visual inspections and if needed allow personnel and equipment to access spaces for cleaning (Section 7.7).
8) Site and Building Cleanup – Post repair work, ensure all interior and exterior areas are cleaned and free of construction debris. (Section 7.8).
6.0 EXISTING CONDITIONS SUMMARY
Most areas of the building have been inspected for the presence of rodents. That stated, there are several significant areas that have not been inspected. These include the area underlying the metal roof, certain interior ceiling areas, and unused architecturally closed off spaces.
6.1 Rodent Remediation and Building Architecture
One of the key challenges in executing the rodent remediation tasks is the building architecture. The building has multiple zones with varying access challenges. These zones include:
a) Crawl space.
b) Main floor.
c) Ceiling.
d) Mezzanine and attic area.
e) Unused spaces architecturally closed off to reduce Building energy consumption.
f) Rafter areas underlying metal roof.
g) Space between underlying roof deck and existing concrete roof.
Inspections performed by a rodent control contractor indicate that only a few additional relatively small openings need to be constructed to provide full access for the rodent remediation. Existing access openings to the ceiling, unused spaces and crawl spaces are shown on Exhibit 5.
6.2 Existing Metal Roof
BLM personnel typically access the roof via the mezzanine room. The metal roof portion as shown on Exhibit 3 is composed of two main areas and two much smaller areas. Inspections of the roof and other areas show that the roof and wood decking need to be removed and replaced.
Red Rock Canyon NCA Administration Building Page 6 of 19
Past visual inspections show the following:
a) Metal roof areas have loose screws, deteriorated sealant around screws, inadequate/deteriorated flashing, gaps between roof panels, and degraded stucco.
b) Gaps between roof panels are filled with a foam type material that appears to have shrunk and no longer serves its intended function (Photo 1).
c) A hip ridge composed of stucco is deteriorated and separating from the flashing (Photo 2).
d) The condition of the underlying wood deck at loose roof panel edges suggests multiple panels have been water damaged (Photo 3). Photo 4 shows a deteriorated glue laminate beam with large holes.
e) Roof drainage does not work well during heavy rainstorms. At roof edges during heavy rains, water cannot be removed fast enough so it backs up or “dams” on the roof instead of positively draining through down drains and to the ground. It is also likely that down drains are partially blocked. Collectively, this allows water to seep into the roof openings.
f) In the main BLM IT server room, a field engineered 5-foot-long run of roof gutter was installed over the main server rack to divert rainwater that passes through the roofing system (Photo 5).
Note: In late 2022, the Building’s polyurethane foam roof was inspected and found to be in generally good condition although the need for minor repairs was noted.
6.3 Areas Underlying Metal Roof
The condition of the metal roof, flashing, stucco, fascia, gutters, down drains is well known as the roof has been inspected at least three times by roofing contractors, at least twice by rodent remediation contractors, and numerous times by BLM staff. Other than certain wood deck edges, less is known about the overall condition of underlying wood decking as no visual inspections have been performed of areas immediately underlying the roof.
Other BLM inspections suggest that rodents and water have negatively impacted the underlying insulation.
6.4 Exterior Rodent Entry Points
In March 2024, the Government performed an inspection of the Building exterior skin and found numerous utility openings that need to be closed. (Photo 4).
BLM has also noted vegetation within 5 feet of the Building perimeter as well as permanent and temporary material/equipment storage areas adjacent to the building that appear to harbor rodents.
Removing vegetation and materials around the building will be performed by the Government under a separate contract.
6.5 Rodent Infestation
It’s not known how long the rodents have been present in the Building, but it is likely they’ve been present for years. In fact, well over a decade ago, the Building was closed due to the same type of infestation. Past BLM inspections in 2022 and 2023 found rodent feces and urine throughout the
Red Rock Canyon NCA Administration Building Page 7 of 19
Building including above an office, in hallway ceilings, within a large crawl space underlying the main staff workspace, an attic, the IT room floor, and on the floor of an unused closed off space.
Exhibit 6. provides details on where rodents and feces have been observed.
The building has one ceiling access door which is shown in Photo 6 and two crawl space openings, one of which is shown in Photo 7, Exhibit 5 shows the locations.
6.6 Water Damage
Visible water damage is limited to two building areas as shown on Exhibit 4 and Exhibit 7. One location is a restroom that is accessed using an exterior door. Water visibly streams down the south wall into the restroom during and immediately after heavy rainstorms. The top of this wall is below the edge of roof which contains a drainage gutter (Photo 8). The other location is a storage room that is accessed from two separate exterior doors.
6.7 HVAC System
The Building utilizes Mitsubishi City Multi R410A split system heat pumps and fan coli units. Staff have reported that the system has performed reasonably well and been able to provide adequate heat and cooling. Approximately two years ago, BLM evaluated the existing air tonnage and found it adequate to support a staff of 41 persons.
There are four condensers three of which are (4) ton units and one 0.75-ton unit. The 4-ton condensers are 15.5 SEER while the 0.7-ton is 13 SEER. The 0.75-ton unit is dedicated to the main IT room. Two 4-ton units are 16 years old, the third is 8 years old and the 0.75-ton unit is 18 years old.
Exhibit 8 shows the system layout, Photo 9 shows a roof top condenser, there is a second condenser on the roof that is similarly installed.
4 ton condensing units are 230V, single phase units. A 60 amp, 2 pole switch is located next to each unit. Each condensing unit switch home runs to a 240V panel board in the mechanical room. There are
(15) interior fan coil units (FCU). (4) are ceiling mounted and (11) are wall mounted. Individual FCU groups are daisy chained and then homerun to a 240V panelboard. Panel board locations are shown on Exhibit 9. Mechanical schedules and controls are shown on Exhibits 9a and 9b.
The (3) four-ton Mitsubishi condensing units control (1) group of four and (2) groups of five FCU’s.
Refrigerant lines from each condensing unit terminate in a single branch header that is dedicated to the individual condensing unit. Like the condensing units, each branch header serves a grouping of either 4 or 5 FCU’s. Each FCU is served with two refrigerant lines – a high-pressure side and a low-pressure side.
FCU’s are controlled by temperature and time pre-sets within the master control panel. Temperature presets can be locally overridden for several hours but then automatically return to follow the preset programming. Exhibit 9b is an as-built drawing that shows how the FCU’s are manifolded to a single condenser.
Around the 2008/2009-time frame, BLM installed a Schneider Electric (SE) building automation system for both the Administration Building and the Visitor Center. The SE system appears to have utilized the BACnet protocol to send/receive data from energy recovery ventilator field sensors and controller. The
Red Rock Canyon NCA Administration Building Page 8 of 19 exception was the Mitsubishi equipment which utilizes the LonWorks protocol.
In 2015, BLM replaced SE with the Johnson Controls Metasys (Metasys) system to monitor systems in both the Administration Building and the Visitor Center. Metasys monitors the Building energy recovery unit, the potable water distribution system, a solar power generating system, and a solar hot water system. The only system that did not change and directly report to Metasys was the Mitsubishi air conditioning system. Currently that system forwards data to an SE Niagara controller which forwards the data to the Metasys network automation engine (NAE). BLM can “see” temperatures on Metasys but cannot adjust them. To change temperature settings, a laptop computer must be connected to the SE Niagara controller.
The Mitsubishi and SE network controllers are in wall mounted panels in the IT room.
6.8 Existing Operations
Certain Building floor areas contain equipment that provides critical services to multiple on-site facilities including restrooms, the fee station and visitor center. Critical systems include:
a) Potable water storage and distribution pumping.
b) Information technology equipment including phones, computer servers, building automation systems and communication antennas.
c) Hot water system.
d) Fire suppression system.
e) Electrical panel boards and service entry sections.
f) Building energy recovery systems.
Temporary power is provided to two office trailers located in the lower parking area approximately 325 feet south of the Building. The trailers are used as office space for BLM employees and a volunteer non-governmental organization. Power to the trailers is routed from the Building main power panels to a power pole located approximately 20 feet south of the Building and then overhead to the trailers. Trailers and the power poles and line are approximately shown on Exhibit 10 and Photos 10, 11, and 12.
Critical exterior equipment adjacent to the Building include NV energy transformers, a current transformer and meter cabinet and the sites photovoltaic main isolating disconnect Exhibit 11 and Photo 13.
All indicated equipment and systems must remain operational and be protected against damage during Building repair and rodent remediation operations. If any of these systems need to be temporarily shut down so repair work can proceed, provide Government a one week advance notice so adjustments to Government operations can be made.
Red Rock Canyon NCA Administration Building Page 9 of 19
7.0 EXECUTION OF FIELD WORK
The purpose of Section 7 is to describe what the Government needs done to remediate and repair the Building. Contractor and Government shall coordinate project efforts to ensure rapid and efficient completion of all work tasks.
Prior to Contractor commencing work, Government shall remove all personal belongings, books, documents – bound and unbound, furniture, office equipment – plotters, printers, etc, field equipment and cubicles prior to the start of the Contractors work.
Prior to beginning work, Contractor and Government shall perform a walk-through of the building interior to determine the adequacy of the Government’s efforts. If additional items need to be removed, Contractor shall provide a memorandum that describes what needs to be removed and the reasons why. Government shall review such request and will respond in writing either approving or rejecting the request and the reasons why.
Note: Laydown areas for material and equipment are shown on Figure 2, Appendix B of the Categorical Exclusion Documentation (pdf page 21). Project NEPA documents are in Appendix A.
7.1 Building Rodent Remediation
This section outlines the rodent remediation and exclusion tasks for this project and covers the following:
a) Rodent specialist tools, qualifications, pesticide use and waste disposal.
b) Initial Building inspection and work plan.
c) Building interior rodent remediation.
d) Remediation of areas underlying the metal roof.
e) Closure of exterior utility entry points.
f) Rodent remediation cleanup standard.
Note: This contract does not include control of wood destroying organisms, birds, snakes, bats, and mosquitoes – only rodents.
7.1.a Rodent Specialist Tools, Pesticides, Qualifications, and Waste Disposal
a) Contractor shall ensure rodent remediation specialists are equipped with proper tools, machines, pesticides, and any other materials/equipment that is necessary for all services specified in this Statement of Work.
b) Qualifications – The company and personnel that perform rodent remediation shall have a minimum of 5 years’ experience performing the services that are being requested.
c) All rodent remediation specialists used on-site shall have a current pesticide applicator
Red Rock Canyon NCA Administration Building Page 10 of 19 license issued by the State of Nevada Department of Agriculture.
d) Prior to commencing work, the rodent remediation specialists shall provide photocopies to Government of its business Pest Control License’s for every employee who will be performing on-site services. These licenses must be maintained throughout the life of the contract.
e) Prior to employing pesticides, Contractor to consult with Government on which pesticides, substances and techniques are the most effective at rapidly reducing rodent populations.
Pesticide use shall utilize the most precise application techniques.
f) Contractor shall provide labels and Safety Data Sheets (SDS) for every pesticide/chemical used on site. All pesticides/chemicals used on site must be approved by Government prior to their use.
g) Contractor to provide treatment using only materials that comply with the Federal Insecticide, Fungicide and Rodenticide Act as amended by the Federal Environmental Pesticide Control Act of 1972 and regulations issued there under and consistent with the Red Rock Canyon’s status as a National Conservation Area.
h) Dispose of all removed/waste materials including live and dead rodents off-site in accordance with Federal, State, and local regulations.
7.1.b Rodent Remediation - Initial Building Inspection and Work Plan
Following contract award and prior to initiating work, the Government and Contractor will perform a joint inspection of the Building’s interior and exterior (including all roof areas). The findings of these inspections will be used by the Contractor to develop and implement a Government and Contractor approved rodent remediation and exclusion work plan. The work plan shall only include the Building exterior and interior and the surrounding exterior areas located within 5-feet of the Building. The work plan must be approved by both entities before work begins.
The workplan shall outline the tasks needed to remove existing rodents, feces, and urine from the building, keep rodents away from the building during the project; describe the means and methods that will be used to remove all horizontally laid insulation in indicated areas of the building interior and those underlying the metal roof; and identify the methods to be used to close exterior openings. The work plan shall also include how the Contractor will document the Building’s initial conditions, Contractor remediation actions/efforts and post-remediation Building conditions.
Work plan tasks shall be carried out in accordance with standard industry practices and USA E.P.A. and Centers for Disease Control and Prevention guidelines.
7.1.c Rodent Remediation - Building Interior
Restore Building interior such that it can be safely used as a workspace by Government staff and volunteers to work typical work schedules and perform historical functions. Refer to Exhibit 12a
Red Rock Canyon NCA Administration Building Page 11 of 19 for interior areas that require inspection and remediation.
a) Inspect Building for rodents – live/dead, feces, and urine. Remove in accordance with approved work plan.
b) Inspect all identified ceiling areas, and unused spaces including “attic” type areas where Government has identified the presence of feces/urine. Clean as needed per recommended industry standards and Government approved work plan.
c) Removal all horizontally laid insulation impacted with rodent feces and urine in identified interior locations. Refer to Exhibit 12a
d) In ceiling, attic and crawl space areas, rafters, joints, etc., close utility openings that would otherwise be used as rodent pathways.
e) Install ceiling openings where indicated to allow for rodent inspection and remediation.
f) Disinfect rodent impacted surfaces that will not be removed. Do so in accordance with Centers for Disease Control, U.S. EPA Guidelines and standard industry practices.
g) Remediate rodent impacted crawl space as needed. Do so in accordance with Centers for Disease Control, U.S. EPA Guidelines and standard industry practices.
7.1.d Rodent Remediation - Areas Underlying Metal Roof
a) Inspect all underlying spaces for and live/dead rodents and mice, feces, and urine.
Remediate in accordance with Government approved work plan (Exhibit 12b)
b) Remove all horizontally installed insulation underlying metal roof.
c) Only remove as much roof as needed to achieve goals of inspection, rodent remediation, and insulation removal and replacement. Only remove roof segments when existing and forecasted weather permits this type of work. Coordinate roof removal timing with Government. Contractor is responsible for all weather-related damage underlying the roof.
d) Once the roofing contractor has completed their work, allow roof and appurtenant elements to be inspected by licensed rodent control professional (RCP) for any gaps one-quarter inch or larger. Gaps noted by rodent control professional shall be closed by Contractor.
e) Contractor to ensure all removed/waste materials are disposed of off-site in accordance with Federal, State, and local regulations.
7.1.e Rodent Exclusion - Closure of Exterior Utility Entry Points
a) This work is applicable to the entire building roof and all Building exterior sides.
b) Inspect exterior walls of Building and close all utility openings that would otherwise provide rodents and/or mice a potential location to enter the Building. This includes, water, electrical, sewer, and communication lines; and Building vents. Accomplish tasks in
Red Rock Canyon NCA Administration Building Page 12 of 19 accordance with the approved work plan and typical industry standards.
c) Inspect roof mounted Building HVAC roof fan. Install appropriate steel mesh screen to prevent rodent entry.
d) Contractor to inspect new polyurethane foam roof for potential openings that may allow rodent entry into building – this includes the roof, eaves, fascia. Contractor to close all openings found.
e) Exclusion materials shall include but not necessarily be limited to steel wool, woven hardware cloth, concrete mortar, plaster, concrete patch, bait stations, glue traps, etc.
Remediation materials can be chlorine solutions, fogging systems, etc.
7.1.f Rodent Remediation - Cleanup Standard
Government and Contractor to inspect exterior Building skin prior to and after rodent closure work. If all Building exterior openings identified in the pre-work inspection are closed in accordance with Government approved Contractor work plan, the Government will consider that the RRC-I has met its contractual obligations.
Relative to the Building interior and areas underlying the metal roof, there are no specific regulatory rodent remediation and cleanup standards, i.e. “what is the definition of clean?”.
The Government will perform visual inspections and/or review Contractor’s photographic evidence and reports of remediated areas. If no rodents or rodent feces and urine can be seen and/or the Contractor can verify that all tasks outlined in their approved work plan have been completed in accordance with the work plan, the work will be determined to have met contract requirements.
Relative to the Building exterior, Government and Contractor to inspect exterior Building skin after rodent closure work. If all Building exterior openings identified in the pre-work inspection are closed in accordance with Government approved Contractor work plan, the Government will consider that the Contractor has met its contractual obligations.
This section also describes how the Government will accept Contractor’s remediation and exclusion work.
7.2 Metal Roof Replacement
Metal roof shall be replaced with polyurethane sprayed on foam. Construct a water-proof roof, with no gaps that would allow water or rodents to enter (Exhibit 13).
a) Installing Contractor Qualifications - The Contractor removing the metal roof and installing the sprayed on foam roof system shall be regularly engaged in this type of work and have a minimum of 5-years’ experience performing similar type work and shall employ personnel experienced and skilled in removing metal roofing and installing sprayed on foam roof systems.
b) Remove metal roof and underlying wood decking. Replace all wood decking with new 5/8-inch OSB wood decking.
Red Rock Canyon NCA Administration Building Page 13 of 19
c) Install new sprayed on polyurethane foam roofing. Foam to be 1.5-inches thick with 38 mil high impact acrylic elastomeric coating with cementitious topcoat.
d) Install foam, acrylic coating and topcoat in accordance with material manufacturer instructions. Prevent foam overspray.
e) Clean and flash drains, vents, rooftop curbs and parapets. Test for proper drainage and repair.
f) North/south oriented glulam beam - close exterior openings.
g) Remove and replace stucco and/or sprayed foam on roof ridges, edges and parapets as needed per industry standard for existing construction.
h) Weather Limitations – Proceed with installation only when existing and forecasted weather permit roofing work to be performed according to manufactures written instructions and warranty requirements. Coordinate timing with Government.
i) Provide mockups to demonstrate aesthetic effects of foam roofing. Mockup shall be of sufficient size to allow aesthetic assessment.
j) Appearance of foam coated roof is crucial with high visibility of roof. Under “unfavorable” light conditions, roof must appear smooth with no visible ripples. Color to be established by Government prior to any material purchases.
k) Provide 10-year minimum roof warranty and 2-year installers guarantee.
l) Submittals – Provide in accordance with MasterSpec Division 7, Section 075700 or applicable CSI section. Provide flashing details for parapet wall.
m) Samples – Provide manufacturer samples of granular aggregate for selection of final roof surface.
n) Equipment storage and material laydown areas to be coordinated with the local staff and the NEPA Categorical Exclusion document.
o) Contractor to dispose of all removed roofing material in accordance with Federal, State, and local regulations.
p) Following sprayed on foam installation, allow rodent control specialist to inspect roofing system for potential openings ¼-inch or greater. Contractor responsible to close any roof openings identified by rodent control specialist.
q) At closeout, provide roof maintenance manual for coated foamed roofing.
Red Rock Canyon NCA Administration Building Page 14 of 19
7.3 Building HVAC System
Evacuate and purge all refrigerants then remove heat-pump condensing units (HP), fan coil units (FCU), central controllers and thermostats. Replace with new units to ensure long term reliable conditioned air service to support Building occupants.
a) Due to refrigerant phase out 1 January 2025, if the new system is not procured before the end of 2024, it will require the system to be updated to the new refrigerant. The new systems will be capable of utilizing the same linesets as the existing units if the sizing of those linesets are the same. However, miscellaneous piping accessories such as valves, filter dryers, etc. will need to be updated to ones that are capable of handling flammable refrigerants. The system must be installed before the end 31 December 2025 to get manufacturer support for the installation.
b) Replace heat-pump condensing units, fan coil units, thermostats and central controller.
c) Replacement units shall be Mitsubishi or TRANE Smart Multi or equal and the Central Controller shall be capable of integrating with a Johnson Controls Metasys SNE.
d) Existing Schneider Electric/Niagara controller to be removed from system.
e) New units shall be minimum 23 SEER.
f) Heat pump replacement to be Mitsubishi/Trane P-Series outdoor units, or approved equal.
g) Replacement fan coil units to be compatible with heat pumps and be Mitsubishi/Trane PKA- Series wall mounted indoor units and PLA-Series ceiling mounted indoor units or approved equal.
h) New heat-pump condensing units, fan coil units and thermostats shall be installed at the locations where existing units are located. Miscellaneous piping, controls wiring and valves may be necessary to complete this work.
i) Utilize existing condensate pumps and drain lines. Condensate lines shall be cleaned before connecting to new units.
j) Existing Mitsubishi and Niagara controllers shall be removed and replaced with a single Mitsubishi AE-200 centralized controller. AE-200 must be compatible with existing Building Johnson Controls Metasys SNE, or approved equal.
k) Thermostats, fan coil units and heat-pump condensing units shall be connected to building automation system (BAS) using existing wiring.
Contractor responsible for system integration with Johnson Controls Metasys (JC) system.
Contractor to coordinate with JC. JC to load all FCU’s, thermostats and condensers into Metasys such that BLM can remotely view system operations via Metasys.
Contractor is responsible to ensure JC appropriately installs all hardware and software
Red Rock Canyon NCA Administration Building Page 15 of 19 necessary for Metasys to detect, record, display, and allow modification of system operational presets via remote BLM terminals.
A JC representative shall be present during Contractor system startup and testing.
Contractor to provide 2-week advance notice to Government prior to startup/testing of Metasys.
l) Replace all thermostats with new units that are compatible with Mitsubishi AE-200 centralized controller or approved equal.
m) Governments intent is to reuse and have remain in place all electrical conductors between the condensing units and panel board, between the fan coils units and the panel board and between thermostats and fan coil units.
n) Condensing unit servicing the IT room shall be replaced with Mitsubishi MUY-GL09NA-U2 outdoor unit and compatible wall-mounted indoor unit or approved equal.
o) New HVAC units shall allow temporary user overrides. Allow Building occupants to adjust temperatures and flow using wall mounted thermostats and handheld units.
p) Avoid removing and replacing refrigerant line sets. Line sets to be cleaned as necessary and reused. Verify the line sets are airtight prior to use and make repairs if needed. Provide and install new couplings compatible with the new HVAC units.
q) Installing Contractor Qualifications - The installing Contractor for the heat pump system shall be factory trained, shall be regularly engaged in the design and installation of heat pump systems, shall have had successful installation experience on projects with systems similar to that required for this project and shall employ personnel experienced and skilled in installing, troubleshooting, and commissioning similar types of heat pump systems.
r) Startup and Testing – Before starting the new heat pump system for the first time, furnish start-up and testing services, performed by a qualified manufacturer’s representative. All start-up and testing procedure shall be in strict accordance with the heat pump system manufacturers startup and testing instructions. Start-up and testing shall be performed in the presence of Contractor and Government.
s) Demonstration and Training – Provide training on heat pump system functions, control functions, and routine maintenance procedures. Training shall be given to Government personnel at a time that is acceptable to Government.
t) Construction Submittals –
i. Heat-pump condensing units.
ii. Fan coil units.
iii. Thermostat controls.
iv. Central controller.
v. Wiring Diagram including connection to existing Metasys SNE
vi. Installers heat pump manufacturers factory qualifications.
Red Rock Canyon NCA Administration Building Page 16 of 19
u) Close Out Submittals – Operation and Maintenance Data
i. Heat-pump condensing units.
ii. Fan coil units.
iii. Thermostat controllers.
iv. Central controller
v. Equipment and installation warranty information.
v) After verifying that the system is fully operational, coordinate HVAC system presets with BLM SNDO staff, BLM National Operation Center staff and Johnson Controls.
w) Include one line item of 100’ of refrigerant line set.
x) BID OPTION A: include pricing to remove and replace linesets associated with split systems.
7.4 Repair Water Damaged Restroom
Restore specified walls, ceilings, counters, and shower with visible water damage.
a) Inspect/assess indicated areas for water damage.
b) Remove and replace sheetrock, wood and/or tile as needed in areas indicated.
c) Dispose of all demolished and unused material off-site in accordance with local, State and Federal regulations.
d) Tape, seal, paint, retile as needed. Match existing colors to extent possible.
e) To extent practicable, protect in-place existing electrical outlets, fans, shower casing, sink mirrors, fire sprinklers, etc. Remove and replace only with prior BLM approval.
f) Utilize water resistant gypsum backing board for shower area.
g) Utilize Glass mat water resistant gypsum at locations that are to receive tile. Comply with manufacturers installation and finish instructions.
h) In areas not subject to wetting, utilize 5/8-inch Type X gypsum.
i) Prefill open joints.
j) Apply joint tape over new gypsum board joints.
k) Protect installed products from damage from weather, condensation, construction, and other causes during remainder of the construction period.
7.5 Repair Water Damaged Storage Room Wall Paneling
Remove and replace existing 1/8-inch wood paneling and ½-inch OSB/plywood with equal (Exhibit 7).
Red Rock Canyon NCA Administration Building Page 17 of 19
7.6 Repair Office Ceiling
A significant portion of the ceiling in the Buildings largest office was removed during Governments initial inspection of the Building for rodents. This was the first interior location where rodents were found. Restore ceiling so office can be used by Government staff.
a) Remove and replace entire ceiling and insulation in indicated office (Exhibit 6).
b) Utilize Batt insulation and mechanically anchor as needed to prevent slumping.
c) Utilize 5/8-inch Type X gypsum board. Fill and tape joints and paint office ceiling. Paint color to match existing.
d) All ceiling devices including lights, fans, fire sprinklers, overhead speakers, etc. to be removed as needed and reinstalled.
e) With Government present, test all devices for operability prior to beginning work and after work. Replace with new, those existing devices that are inoperable because of age or existing damage prior to ceiling repair work.
f) GC to replace all devices damaged because of work at no cost to Government.
7.7 Construct Ceiling and Wall Access Doors
Ceiling and wall accesses shall be constructed to allow for inspection for rodents and assessment and testing of existing HVAC refrigerant branch headers. A total of (7) ceiling accesses and (2) wall accesses shall be constructed. Access locations are shown on Exhibit 5.
a) Formalize ceiling openings by installing 2.5 ft by 2.5 ft metal framed access doors with hinged lockable door. These are intended to allow for future inspections to detect the presence or absence of rodents and allow for future repair of refrigerant branch headers if needed.
b) Each metal framed access door constructed to allow access to refrigerant branch headers shall be centered on the branch headers. Contractor to verify final location with Government prior to installation.
c) Repair ceiling areas where doors are installed. Neatly cut out damaged areas around frame.
Install regular Type X gypsum board as needed to repair areas. Apply compound to joints, tape, seal, sand. Paint to match existing.
d) Formalize wall accesses by installing 2.5 ft by 2.5 ft metal framed access doors with hinged lockable door. The are intended to allow for future inspections to detect the presence or absence of rodents.
e) Repair wall areas where doors are installed. Neatly cut out damaged areas around frame.
Install regular Type X gypsum board as needed to repair areas. Apply compound to joints, tape, seal, sand. Paint to match existing.
Red Rock Canyon NCA Administration Building Page 18 of 19
7.8 Site and Building Cleanup
Provide final cleaning in accordance with ASTM E 1971. Leave premises “broom clean”. Perform general purpose cleaning and bathroom cleaning. Use only non-hazardous cleaning materials, including natural cleaning materials, in the final cleanup. Clean interior and exterior glass surfaces exposed to view; remove temporary labels, stains, and foreign substances’ polish transparent and glossy surfaces, vacuum carpeted and soft surfaces, sweep and vacuum kitchen floor. Clean equipment and fixtures to a sanitary condition.
Clean debris from roof, gutters, downspouts, and drainage systems. Sweep paved areas and rake clean landscaped areas. Do not allow removed material to accumulate on site.
This includes but is not limited to the following:
i) Metal roofing.
ii) Stucco.
iii) Roof decking.
iv) Insulation.
v) Removed rodents, rodent feces, material used to remediate/clean rodent impacted areas.
vi) Dry wall and tile.
vii) HVAC equipment.
a) Clean adjacent buildings and improvements of dust, dirt and debris caused by operations.
Return adjacent areas to condition existing before operations began.
b) Remove debris from elevated portions of building using method(s) that will convey debris to grade level in a controlled descent.
8.0 SITE MANAGEMENT
Red Rock Canyon National Conservation Area (RRNCA) attracts over 4 million visitors a year, a significant percentage of which come from countries other than the United States with many visitors not able to speak or read English. Daily, large tour busses, school busses and smaller touring vehicles stop at the front of the Building to drop off visitors so they can access the Red Rock Visitor Center.
a) Conduct site operations to ensure minimum interference with roads, walkways and other occupied and used facilities. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities.
8.1 Disposal of Waste and Recyclable Materials
a) Unless otherwise indicated, removed equipment and material (waste) becomes the property of Contractor.
b) Except for items or materials that might otherwise be reused and recycled, remove waste materials from site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.
Red Rock Canyon NCA Administration Building Page 19 of 19
c) Recycle items where possible including, but not limited to metal construction waste, removed metal roofing, packing materials, and general site and project generated materials.
d) Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
e) Remove waste and surplus materials, rubbish form the site. Promptly and legally transport and dispose of any trash. Do not burn, bury, or otherwise dispose of trash on the project site.
f) Transport waste materials off Government property and legally dispose of them.
g) Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
9.0 NATIONAL ENVIRONMENTAL POLICY ACT (NEPA)
Appendix A contains a signed Categorical Exclusion (CX) Memorandum and the supporting CX Documentation.
The CX Documentation contains stipulations that the Contractor shall follow. For this project the most important are migratory birds, noxious weeds and desert tortoise protection.
a) Information on migratory birds can be found in Appendix A – stipulations and Mitigation Measures – Section 6 Migratory Birds (Document pdf page 11).
b) Information on noxious weeds can be found in Appendix A – Stipulations and Mitigation Measures – Section 8 – Non-Native and Invasive Species and Noxious Weeds (Document pdf page 12).
c) Information on the Desert Tortoise can be found in Appendix B Biological Opinion Terms and
Conditions, Measure 32 (Document pdf page 28).
End of Document
EXHIBITS
PHOTOS
PHOTOS
Photo 1 – Deteriorated Blocking Foams
Photo 2 – Deteriorated Ridge and Flashing
Photo 3 – Damaged Wood Decking
Photo 4 – Deteriorated Fascia
Photo 5 – Informa on Technology Room – Rain Gu er over server Rack
Photo 6 – Hallway Ceiling Access
Photo 7 – Interior crawl Space Access
Photo 8 – Restroom Water Damage
Photo 9 – Roo op HVAC Condenser
Photo 10 – Temporary Power 1
Photo 11 – Temporary Power 2
Photo 12 – Temporary 3
Photo 13 – NV Energy Infrastructure
Photo 14 – HVAV Refrigerant Branch Header
| COVER PAGE |
| TABLE OF CONTENTS |
| EXHIBITS and PHOTOS |
| 1.0 BACKGROUND |
| 2.0 PROJECT MANAGEMENT AND COORDINATION |
| 3.0 BUILDING REPAIR CONCEPT |
| 4.0 BUILDING DOCUMENTATION |
| 5.0 SCOPE OF WORK SUMMARY |
| 6.0 EXISTING CONDITIONS SUMMARY |
| 7.0 EXECUTION OF FIELD WORK |
| 8.0 SITE MANAGEMENT |
| 9.0 NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) |
| EXHIBITS |
| E1 Vicinty Map |
| E2 Building Locations |
| E3 Roof Typea and Areas |
| E4 Roof Leak and Feces Areas |
| E5 Inspection Access Locations |
| E6 Rodent Impact Areas |
| E7 Water Damage Repair Areas |
| E8 HVAC Units - Component Layout |
| E9 Electrical Panel Board Locations |
| E09a HVAC Mechanical Schedule |
| E09b Mechanical HVAC Controls |
| E10 Temporary Power and Trailers |
| E11 NV Energy Infrastructure |
| E12a Rodent Remediation – Interior Areas |
| E12b Rodent Remediation – Exterior Areas |
| E13 Existing Metal Roof Areas |