REDACTED WIIN-12_W&WA replacement well permit VDH (1).pdf
PDF 10 MB Posted
- Solicitation number
- QQ-122031
- Issued by
- Patrick County, Virginia
About this file
This is a VDH Design Well Permit issued by the Pittsylvania County Health Department in Virginia for a replacement well installation at 236 Primitive Baptist Road, Dry Fork, VA 24549. The permit authorizes the installation of a private well and sewage disposal system with a system capacity of 300 GPD (2-bedroom) on the specified property, identified by Tax Map/GPIN 1461-74-2351/3373 and HDID 171-25-0119. The permit was issued on June 6, 2025, by Environmental Health Specialist Corey Sutphin and expires on December 9, 2026. Well and sewage contractors must notify the Health Department 48 hours prior to installation to arrange for inspection. The permit is transferrable until expiration or if deemed null and void, and becomes null and void if any substantial physical changes occur to soil or site conditions or if conditions differ from those shown on the application or attached construction drawings, specifications, and calculations.
To obtain the Operation Permit, the applicant must complete several requirements including submitting satisfactory well inspection results following installation, providing water sample test results demonstrating negative/satisfactory coliform bacteria results, and ensuring the well driller submits a Uniform Water Well Completion Statement or GW-2 form with documentation of any required well abandonment. All documentation must be clearly labeled with the property Tax Map/GPIN and HDID numbers. The Health Department allows five business days after receipt of the last piece of documentation to issue the Operation Permit. The permit is issued based on a site and soil evaluation report, and VDH is authorized to make minor adjustments to location or design at the time of construction with adequate documentation provided to the Pittsylvania County Health Department. The owner is responsible for complying with all applicable local, state, and federal laws and regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ARPA FUNDING-.docx | DOCX document | |
| Construction Terms and Conditions-.docx | DOCX document | |
| REDACTED WIIN-12_W&WA Well Abandonment Permit.pdf | ||
| WIIN-12_W&WA Well and Well Abandonment SOW (1).pdf | ||
| SPECIAL TERMS AND CONDITIONS.docx | DOCX document | |
| General_Terms_and_Conditions PIM 45 July 2025.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VDH Design Well Permit Well and Sewage Contractors: Please notify Health Department 48 hours prior to installation to arrange for inspection
RE: ___________________________________________
Tax Map/GPIN: _____________________________
HDID: _________________________ Reserve: _____ % reserve area provided
System Capacity: ______________________________
Dear Applicant :
This letter and the attached drawings, specifications, and calculations (___ pages) dated _____________, constitute your permit to install a sewage disposal system and well if applicable on the property referenced above.
The well location and construction were certified by __________________________________ as substantially complying with the Board of Health’s regulations (and local ordinances if the locality has authorized the local health department to accept private evaluations for compliance with local ordinances). This permit is issued in reliance upon that certification. VDH hereby recognizes that the site conditions acknowledged by this permit are suitable for the installation of a private well. The attached drawing shows the approved area for the private well; there are additional records on file with the Pittsylvania County Health Department pertaining to this permit, including the Site and Soil Evaluation Report. This construction permit is null and void if any substantial physical change in the soil or site conditions occurs where a sewage disposal system is to be located.
If modifications or revisions are necessary between now and when you construct your dwelling, please contact VDH who performed the evaluation and design on which this permit is based. Should revisions be necessary during construction, your contractor should consult with VDH that submitted the site evaluation or site evaluation and design. VDH is authorized to make minor adjustments in the location or design of the system at the time of construction provided adequate documentation is provided to the Pittsylvania County Health Department.
Level Review
Pittsylvania County Health Department Drawer 369
Chatham, Virginia 24531
(434) 433-3520 Voice
(434) 432-7764 Fax
Corey Sutphin, VDH EHS
6/9/2025
236 Primitive Baptist Road
Dry Fork, VA 24549
SWAP replacement well 236 Primitive Baptist Rd.
1461-74-2351/3373
171-25-0119 N/A
300GPD (2-bedroom)
6/6/2025
Tax Map/GPIN: ________________________ Page 2 of 3
HDID: ___________________________
This Construction Permit is null and void if conditions are changed from those shown on your application or if conditions are changed from those shown on the attached construction drawings, specifications, and calculations. VDH may revoke or modify any permit if, at a later date, it finds that the site and soil conditions and/or design do not substantially comply with the Private Well Regulations, 12 VAC 5-630-20 et seq., or if the system would threaten public health or the environment.
This permit approval has been issued in accordance with applicable regulations based on the information and materials provided at the time of application. There may be other local, state, or federal laws or regulations that apply to the proposed construction of this onsite sewage system. The owner is responsible at all times for complying with all applicable local, state, and federal laws and regulations.
This construction permit is transferrable until expired or deemed null and void. A permit transfer form may be found on the VDH website at http://www.vdh.virginia.gov/environmental-health/gmp-2015-01-forms/ .
If you have any questions, please contact me.
This permit expires: ____________________________
Sincerely, Corey Sutphin Environmental Health Specialist Pittsylvania County Health Department
CC: ____________________________ VDH
Corey Sutphin
1461-74-2351/3373
171-25-0119
12/9/2026
Tax Map/GPIN #: _____________________________ Page 3 of 3
HDID#: _______________________________
YOUR WELL PERMIT WILL ALSO NEED
Your well must have satisfactory inspection results after installation. Please give the Health Department several days notice to schedule this inspection before your Operation Permit will be requested.
The Health Department must receive a copy of your water sample test result being negative/satisfactory for coliform bacteria. You are responsible for performing this test and ensuring the results are received at the Health Department
Please ensure that your Well Driller submits a Uniform Water Well Completion Statement or GW-2 to the Health Department, including documentation of a proper well abandonment if required by permit Allow 5 business days after the last piece of documentation is received for the Operation Permit to be issued. To avoid delays, clearly label each piece of documentation with the property Tax Map/GPIN number and HDID number shown above and on your construction permit.
Please note that due to individual circumstances of your permit there may be additional required items not covered by this checklist.
If you have any questions about any of the items on this list, please do not hesitate to contact the Pittsylvania County Health Department at (434) 434-3520.
1461-74-2351/3373
171-25-0119