Redacted_TMPC_BOA_CJA.pdf

PDF 304 KB Posted

Attached to
TMPC FY25 Product Upgrades
Solicitation number
N00019-24-RFPREQ-WPM281-0070
Issued by

About this file

This Class Justification and Approval (CJ&A) authorizes sole source orders under a Basic Ordering Agreement with Perspecta Engineering Inc. for the Theater Mission Planning Center subsystems through September 30, 2026. The scope covers systems engineering, software engineering, system design, configuration management, operations support, software quality assurance, integration/testing, and maintenance support for multiple TMPC subsystems including Mission Distribution System, TMPC Communications System, TMPC Enterprise Database, Multi-Level Secured Guard, TMPC Operations and Status Tool, and Intelligence Situational Awareness Tool.

The total estimated value is $124.41M over FY2022-2026, funded through various appropriations including RDT&E ($36.11M), OPN ($40.98M), OMN ($32.48M), SCN ($1.14M) and FMS ($13.70M). The sole source justification cites Perspecta's unique expertise as the original developer since 1990, their cleared personnel, accredited development facilities, and integration experience with other TMPC subsystem vendors. Awarding to another source would cause unacceptable delays to critical milestones including TMPC 7.0 (FY2023), Conventional Prompt Strike capability (FY2023/2025), Mid-range Capability (FY2023) and TMPC 8.0 (FY2028). The Navy is pursuing a Small Business Innovation Research effort to develop a roadmap for potentially decomposing the Perspecta subsystems for future competition.

View the file

Other files

File Type Posted
Signed_TMPC BOA_CJA_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL AIR SYSTEMS COMMAND

RADM WILLIAM A. MOFFET BUILDING

47123 BUSE ROAD, BLDG 2272

PATUXENT RIVER, MARYLAND 20670-1547

IN REPLY REFER TO:

CJ&A 21-0027

CLASS JUSTIFICATION AND APPROVAL

FOR USE OF OTHER THAN FULL AND OPEN COMPETITION

1. Contracting Activity.

Naval Air Systems Command (NAVAIR) Headquarters

2. Description of the Action Being Approved.

This Class Justification and Approval (CJ&A) authorizes and approves the issuance of orders on a sole source basis under a Basic Ordering Agreement (BOA) with Perspecta Engineering

Incorporated; Santa Clara, California for continued development, delivery and sustainment of

Theater Mission Planning Center (TMPC) subsystems: Mission Distribution System (MDS), TMPC

Communications System (TCOMMS), TMPC Enterprise Database (TED), Multi-Level Secured

(MLS) Guard (MGUARD), TMPC Operations and Status Tool (TOST)/ Tasking Management

Service (TMS), and Intelligence Situational Awareness Tool (ISAT). The authority to award orders under this CJ&A expires on 30 September 2026.

3. Description of Supplies/Services.

This CJ&A will cover the procurement of systems engineering, software engineering, system design, configuration management, operations and management support, software quality and quality assurance, integration and test, integrated product support and operations and maintenance support for the aforementioned TMPC subsystems. NAVAIR anticipates acquiring these supplies and services to support United States Navy (USN) and Foreign Military Sale (FMS) requirements.

It is anticipated that orders in support of the TMPC program will be placed over the FY2022-

FY2026 timeframe. During this timeframe, Perspecta products will be delivered and tested numerous times in integration events. These integration events will drive fix-it builds that require rapid deliveries to meet TMPC and Tomahawk Weapon System (TWS) Initial

Operating Capability (IOC) dates that are crucial to maintaining a technological edge.

The estimated total value of orders placed against this BOA under this CJ&A is $124.41M and is anticipated to be funded by the fiscal years and appropriations as set forth in the table below.

Estimated Dollar Values in Millions

Appropriation FY22 FY23 FY24 FY25 FY26 Totals

RDT&E 8.85 8.13 6.85 6.55 5.73 36.11

OPN 7.90 8.02 8.20 8.35 8.51 40.98

OMN 6.47 6.60 6.47 6.47 6.47 32.48

SCN 0.22 0.23 0.23 0.23 0.23 1.14

FMS 0.37 6.71 0.00 0.00 6.62 13.70

Total 23.81 29.69 21.75 21.60 27.56 124.41

4. Statutory Authority Permitting Other Than Full and Open Competition.

10 U.S.C. Section 2304(c)(1), One source or limited sources.

5. Rationale Justifying Use of Cited Statutory Authority.

In accordance with FAR 6.302-1(a)(2)(ii)(B), award of this follow on requirement to any source other than Perspecta would result in unacceptable delays to planned and scheduled work already in progress for TMPC subsystems that must be accomplished to meet the below TMPC and TWS IOC milestones:

- TMPC 7.0 – FY2023

- TMPC Conventional Prompt Strike – FY2023 (Army)/FY2025 (Navy)

- TMPC Mid-range Capability – FY2023

- TMPC 8.0 – FY2028

Award to a contractor other than Perspecta would also cause unacceptable delays to the influx of

Tomahawk Rapid Deployment Capability requirements, other threat-pacing efforts, and the recent requirement in FY20 to integrate Conventional Prompt Strike (CPS) into TMPC, which is a Joint

Service effort that uses TMPC to close a major capability gap utilizing Army and Navy launch platforms. To meet the aggressive timelines for delivery of required TWS capabilities, schedule delays due to a new developer acquiring the necessary expertise to modernize and add new functionality to the Perspecta products are unacceptable.

Perspecta has been the sole developer and maintainer for multiple TMPC subsystems initially awarded pre-milestone II (B) in 1990 through a competitive selection as part of the TMPC upgrade program. Perspecta has been providing continued development, delivery and sustainment necessary to improve system reliability, responsiveness, usability, and incorporation of changes required to maintain compatibility with other systems (i.e. changes to imagery formats, geo-spatial databases, etc.).

The Perspecta team is currently staffed with qualified, uniquely experienced personnel who provide expert software development, maintenance and sustaining engineering, and modernization and modification of the TMPC at approximately 189 sites including: the Washington Planning Center

(WPC); Cruise Missile Support Activity Atlantic, Pacific and United Kingdom; Tomahawk Strike and Mission Planning Cells at all Maritime Component Commander Headquarters; Carrier Strike

Groups; approximately 145 surface and subsurface launch platforms; and, approximately 20 training commands and test labs. With TMPC products in excess of two million source lines of code, only Perspecta can continue development of the TMPC subsystems in a timely manner to support the required deliveries. Based on previous contracts, the typical time for a Systems

Engineering and Integration Agent (SEIA) contractor to acquire in depth knowledge of Controlled

Software Configuration Items and weapon system requirements is estimated to be 5 years. A contractor not possessing in depth knowledge of Controlled Software Configuration Items and weapon system requirements upon contract award would create a gap in the ability to deliver, operate, and maintain the systems already deployed. Perspecta has existing qualified and security cleared personnel who have a thorough understanding of the software architecture and structure, the requirements to be met, and the interfaces, as well as how Perspecta products interact with the interfaces.

Additionally, Perspecta produced systems are a critical subsystem of TMPC which must be integrated with two other subsystems, the Targeting and Navigation Toolset (TNT), developed by

BAE Systems Information and Electronic Systems Integration Inc., and the Tomahawk Planning

System (TPS), developed by Tapestry Solution, Inc., a Boeing Company. These three developers are interdependent on all changes and upgrades made to the TMPC system.

Further, Perspecta already has a Defense Counter-Intelligence and Security Agency accredited development lab to the Secret level and a SIPRNET connection in place to support TMPC. Based on previous contracts, accreditation of a new contractor could take up to 2 years. Awarding to a source other than Perspecta and having to go through the accreditation process could result in a failed commitment to deliver working weapon systems to the fleet by the required IOC milestones.

In addition, Perspecta personnel are cleared to Top Secret (TS) with Single Scope Background

Investigations (SSBI).

Introducing a replacement for Perspecta would be detrimental to the program’s ability to effectively continue development, delivery and sustainment of currently deployed systems at 189 sites worldwide. Due to the aforementioned factors discussed above, awarding to a source other than

Perspecta would result in unacceptable delays to the fleet.

6. Description of Efforts Made to Solicit Offers from as Many Offerors as Practicable.

A request for a waiver of DFARS PGI 206.302-1 Request for Information/Sources Sought requirement was approved (Ser AIR-244-21-022). A pre-award synopsis will be issued at the order level in accordance with FAR 5.201. In the event a contractor other than Perspecta expresses interest in a procurement, the Contracting Officer will review the contractor's qualifications and address accordingly. For reasons set forth in paragraph 5, no additional market research will be conducted because it is not practicable at the present time for any company other than Perspecta to provide the required supplies and/or services.

7. Determination of Fair and Reasonable Cost.

The Contracting Officer has determined the anticipated cost to the Government of the supplies/services covered by this CJ&A will be fair and reasonable.

8. Actions to Remove Barriers to Future Competition.

At this time, Perspecta is the only contractor with the experience and expertise of TMPC subsystems and integration with other vendor subsystems, requisite security clearances, and accreditation to meet the Government’s requirements without an unacceptable delay. However, PMA-281 is pursuing a Small Business Innovation Research (SBIR) effort to develop a roadmap detailing how to decompose the current Perspecta developed subsystems. Development of the roadmap and successful containerization of the software will allow NAVAIR to add new

49879785

Because this effort is a follow-on for supplies and services previously awarded on a non-competitive basis, in accordance with DFARS PGI 206.304(a)(i), the prior CJ&A number was provided to the approval authority for reference. Approval of this CJ&A signifies the approval authority has made the determination required by DFARS PGI 206.304(a)(ii).

CERTIFICATIONS AND APPROVAL

TECHNICAL/REQUIREMENTS CERTIFICATION

I certify that the facts and representations under my cognizance which are included in this

Justification and its supporting acquisition planning documents, except as noted herein are complete and accurate to the best of my knowledge and belief.

Technical Cognizance:

HANSON.REGAN.

GREGORY.124987

Digitally signed by

HANSON.REGAN.GREGORY.12

Date: 2021.06.01 14:13:21 -04'00' CDR Regan Hanson, USN 301-995-1977

Signature Name (Printed) Phone No.

Requirements Cognizance:

LEGAL SUFFICIENCY REVIEW

I have determined this Justification is legally sufficient.

CONTRACTING OFFICER CERTIFICATION

I certify that this Justification is accurate and complete to the best of my knowledge and belief.

MESSER.SAMUEL.

JOHN.1129608249 08249

CAPT S. J. Messer, USN 301-757-6765

HEBB.DAVID.JOS

EPH.1539747491

Dave Hebb 301-757-6034

LEITCH.JACOB Digitally signed by

Jacob Leitch 301-342-0542

SENIOR PROCUREMENT EXECUTIVE APPROVAL

Upon the basis of the above justification, I hereby approve, as Senior Procurement Executive of the

Navy, the solicitation of the proposed procurement described herein using other than full and open competition, pursuant to the authority of 10 U.S.C. 2304(c)(1), Only one responsible source and no other supplies or services will satisfy agency requirements.

STEFANY.FREDERICK. Digitally signed by

STEFANY.FREDERICK.J.III.1228931531

J.III.1228931531 Date: 2021.06.22 13:44:33 -04'00'

Frederick J. Stefany

Acting Assistant Secretary of the Navy (Research, Development and Acquisition)

ASN (RDA)

File details come from the government source that posted it. Updated .