Recycling Services - PWS_DRAFT.pdf

PDF 2 MB Posted

Attached to
Solid Waste/Recycling Processing Management Services
Solicitation number
PANMCC-26-P-0000036089
Issued by

About this file

This is a Performance Work Statement (PWS) for Solid Waste/Recycling Processing Management Services at Fort Stewart and Hunter Army Airfield in Georgia. The contract requires a contractor to provide comprehensive recycling and solid waste management services, including collecting, transporting, processing, baling, and selling recyclable materials from multiple locations across the installations. Key objectives include diverting recyclable materials from landfills, processing a minimum of 350 tons of material monthly, and supporting various events and operational needs.

The contract covers three recycling facilities (two at Fort Stewart and one at Hunter Army Airfield) and involves collecting co-mingled recyclables, cardboard, paper, metal, glass, and other materials from various sources including military units, convenience centers, and community drop-off points. The contractor will be responsible for maintaining facilities, vehicles, and containers, preparing monthly reports, supporting special events, and ensuring compliance with environmental regulations. The contract includes provisions for detailed reporting, quality control, security requirements, and performance standards, with a focus on sustainable waste management practices.

View the file

Other files

File Type Posted
TE 1 - PRS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLID WASTE/RECYCLING PROCESSING MANAGEMENT

SERVICES

PERFORMANCE WORK STATEMENT (PWS)

FORT STEWART, GEORGIA

01 NOVEMBER 2026

DRAFT

Fort Stewart/Hunter Army Airfields Integrated Solid Waste Management/Recycling Processing Support Services Enterprise-wide Performance Work Statement (PWS) (Service 403 – Solid Waste Management Services) (U) i

Table of Contents

1.0 General

Description of Services/Introduction Background Objectives Scope Traffic Flow Restoration of Real Property Damage General Information

1.7.1 Quality Control

1.7.2 Quality Control Program

Quality Prevention Quality Assurance Reporting Facility Access Property Management System

1.7.3 Recognized Holidays

1.7.4 Hours of Operation

Installation Closures

1.7.5 Contractor Discrepancy Report

1.7.6 Security Requirements

Access and General Protection/Security Policy and Procedures Physical Security Other Qualification Security Training Key Control Lock Combinations

1.7.7 Post Award Conference/Periodic Progress Meetings

1.7.8 Government Roles and Responsibilities

Contracting Officer (KO) Contracting Officer’s Representative (COR)

1.7.9 Specific Contractor Requirements, Roles, and Responsibilities U.S. Residency Contractor Hiring Restrictions Contractor Identification ii

Standards of Conduct Contractor Key Personnel Phase In /Phase Out Period Emergency Services Accident Reporting Environment and OSHA

Asbestos Awareness

1.7.10 Environmental Compliance

1.7.11 Safety Data Sheets

2.0 Definitions and Acronyms

Definitions

2.1.1 Agricultural solid waste

2.1.2 AbilityOne Commission

2.1.3 Acceptable Quality Level (AQL)

2.1.4 Baler

2.1.5 Bulk container

2.1.6 Call Outs

2.1.7 Classified Waste

2.1.8 Cleaning

2.1.9 Collection

2.1.10 Compartmentalized Vehicle

2.1.11 Construction and Demolition (C&D) Waste

2.1.12 Contractor

2.1.13 Contractor Acquired Property (CAP)

2.1.14 Contracting Officer (KO)

2.1.15 Contracting Officer’s Representative (COR)

2.1.16 Corrugated Box

2.1.17 Cost Analysis

2.1.18 Deficient Service

2.1.19 Deliverable

2.1.20 Disinfect

2.1.21 Environmental Protection Agency (EPA)

2.1.22 Equipment

2.1.23 Food Waste

2.1.24 Generation

2.1.25 Government Furnished Property (GFP)

iii

2.1.26 Government Property

2.1.27 Government Project Manager

2.1.28 High-grade Paper

2.1.29 Industrial Solid Waste

2.1.30 Infectious Waste

2.1.31 Legal and Other Requirements (LOR)

2.1.32 Loss of Government Property

2.1.33 Material

2.1.34 Materials Recovery Guidelines

2.1.35 Municipal Solid Waste (MSW)

2.1.36 Non-hazardous solid waste (NHSW)

2.1.37 Non-Personal Services

2.1.38 Performance Requirements Summary (PRS)

2.1.39 Physical Security

2.1.40 Post-Consumer Waste (PCW)

2.1.41 Property

2.1.42 Property Records

2.1.43 Provide

2.1.44 Public Traffic Areas

2.1.45 Quality Assurance (QA)

2.1.46 Quality Assurance Surveillance Plan (QASP)

2.1.47 Quality Control (QC)

2.1.48 Real Property

2.1.49 Recoverable Resources

2.1.50 Recyclable Materials

2.1.51 Residential Solid Waste

2.1.52 Sensitive Property

2.1.53 Separate Collection

2.1.54 Service Calls

2.1.55 Sludge

2.1.56 Soil

2.1.57 Storage

2.1.58 Subcontractor

2.1.59 Wide Area Work Flow (WAWF)

2.1.60 Workday

2.1.61 Work Week

iv

ACRONYMS

3.0 Government Furnished Property, Equipment, and Services

General Property Data/Information Services:

Utilities Equipment

3.5.1 Equipment Inventory

3.5.2 Cell/Push-to Talk Phone

3.5.3 Fuel (Diesel and Mogas)

3.5.4 Containers

3.5.5 Serialized Containers

3.5.6 Container Inventory

3.5.7 Container Upkeep

3.5.8 Refuse Trucks

GFE Routine Maintenance & Repair:

Collection Stations Cubic Yard Capacity

4.0 Contractor Furnished Materials and Equipment

General

The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section 3 of this PWS

Materials Equipment

4.3.1 Personal Protective Equipment

4.3.2 Propane

Vehicles

4.4.1 Front Loader Truck

4.4.2 Roll-Off Truck

4.4.3 Fork Truck

4.4.4 Heavy Duty, Passenger Truck

4.4.5 Unserviceable Contractor Equipment

Vehicles Other Direct Cost (ODCs)

4.6.1 Base Period (12 months) NTE $67,800.00

4.6.2 Option Yr 1 (12 Months) NTE $69,834.00

v

4.6.3 Option Yr 2 (12 Months) NTE $71,929.00

4.6.4 Option Yr 3 (12 Months) NTE $74,087.00

4.6.5 Option Yr 4 (12 Months) NTE $76,310.00

5.0 Specific Tasks for General Solid Waste Management

Overview

5.1.1 Deliverables

5.1.2 Co-mingling Waste

Outside Normal Duty Hours Description of Services

5.2.1 Recycling Collection Operations

5.2.2 Scope

5.2.3 Volume

5.2.4 Container Quality

5.2.5 Events

American Recycles Day Bring One for the Chipper Other Morale, Welfare, and Recreation (MWR) and Belfort Beauty

Communities (BBC) Events National Guard Annual Training

5.2.6 Destinations of Collected Recyclables

5.2.7 Convenience Centers

5.2.8 165th Air Wing Command

5.2.9 Bulk Paper Collection

5.2.10 Construction and Demolition (C&D) Material

5.2.11 Personal Gain

5.2.12 Daily Routes

5.2.13 Maintaining Contril of Transported Materials

5.2.14 Recycling Containers

5.2.15 Recordkeeping

5.2.16 Ordinance

5.2.17 Hazardous Materials

5.2.18 Scavenging

5.2.19 Schedules

Recycle/Refuse Collection Schedule Specific Tasks Routes/Schedules Submittals

5.2.20 FS Processing Station Operations

vi

Sorting Operation Baling Operation Baling and Storage Procedures Sales of Recyclables Serviceable and Non-Serviceable Parts and Equipment from Military.

Disposal of Non-Marketable Recyclable Materials Accepting Materials Delivered to FS Processing Station Monthly Recycling Product Report

5.2.21 FS Recycling Center (Scrap Metal Yard) Operations

Brass Deforming Operations Accepting Materials Delivered to the FS Metal Yard Sales of Recyclables Serviceable Parts and Equipment

5.2.22 HAAF Recycling Center Operations

Baling and Storage Procedures Accepting Materials Delivered to the HAAF Recycling Center Sales of Recyclables Serviceable Parts and Equipment

5.2.23 Container Maintenance

Container Management Containers and Installation Access Containers in Field Training Areas HAZMAT in Containers Container Approval Serviceable Containers Container Lids Evaluating Containers Container Replacements

Container Spillage Condition Complaints Container Cleaning Schedule

5.2.24 Collection Vehicles

Vehicle Maintenance Unserviceable Vehicles Scales vii

5.2.25 Special Events/Tasks

Special Events Planning Additional Services

5.2.26 Other Events

Storms and Natural Disasters Inclement Weather Planning Inclement Weather Delay Unscheduled Clean-Ups Examples of Scheduled and Unscheduled Requirements Emergency Work Installation Closures

5.2.27 Facility Housekeeping/Appearance

5.2.28 Reports

Monthly Summary Report

5.2.29 Historical Data

5.2.30 Facility Tours

5.2.31 Reports

Contractor Management Reporting Other Reports Initial contract information Fiscal Year Reporting Final Contract Information

6.0 Applicable Publications (Current Editions)

Regulations, Publications, Manuals, Local Policies and Procedures Websites

6.2.1 Additional Training Links

7.0 Mandatory Records and Report Forms

8.0 Attachment/Technical Exhibits (TEs)

Technical Exhibit 1 – Performance Requirements Summary Technical Exhibit 2 – Deliverable Schedules

Unhealthy or Hazardous Condition Notification NLT 24 hour after Identification 1 electronic copy Telephonic followed by confirmation email

COR

Technical Exhibit 3 – Recycling Processing Station, Fort Stewart, GA viii

Technical Exhibit 4 – Recycling Scrap Metal Yard, Fort Stewart, GA Technical Exhibit 5 – Recycling Processing Station, Hunter Army Airfield, GA.

Technical Exhibit 6 – Recycling Container Site Technical Exhibit 7 – Government Furnished Property Technical Exhibit 8 Collective Bargaining Agreement and Department of Labor

Wage Determination

8.8.1 Collective Bargaining Agreement (CBA)

8.8.2 U.S. Department of Labor Wage Determination

Technical Exhibit 9 Historical Workload Data

1.0 General.

This is a non-personal services contract to provide Solid Waste Management (Recycling Processing Services) at Fort Stewart (FSGA) and Hunter Army Airfield (HAAF), Georgia (GA). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor, who in turn is responsible to the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor personnel.

Description of Services/Introduction.

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items as well as non-personal services necessary to perform Solid Waste Management (Recycling Processing Services), as defined in this Performance Work Statement (PWS), except for those items specified as Government furnished property (GFP) and services. The Contractor shall perform in accordance with (IAW) the terms and conditions of the contract and consistently with the established standards in this PWS and contract.

Background.

The Fort Stewart/Hunter Army Airfield Directorate of Public Works (DPW) Environmental Division is responsible for environmental and engineering activities for the Installation of FSGA and HAAF and operates three recycling processing facilities.

Complex environmental regulations such as the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), Safe Drinking Water Act (SDWA), Clean Water Act (CWA), Clean Air Act (CAA), Toxic Substance Control Act (TSCA), Solid Waste Disposal Act, Emergency Planning and Community Right-to-Know Act (EPCRA), Natural Historic Preservation Act, and the National Environmental Policy Act (NEPA) place an increasing burden on the Installation to monitor the potential ramifications of these regulations on FSGA/HAAF. Additional regulations include Department of Defense Instructions (DODIs), Executive Orders, Integrated Solid Waste Management Plan, and the Qualified Recycling Program (QRP) handbook. The FSGA/HAAF Environmental Division addresses the demands of ever-changing environmental regulations and assesses the Installation's compliance with such regulations. The Environmental Division has responsibility for the environmental program management of a 279,270-acre Fort Stewart Military Reservation in the lower coastal plain of Georgia and a 5,370-acre installation at Hunter Army Airfield near Savannah, Georgia. The FSGA/HAAF Environmental Division is responsible for a broad span of environmental issues such as water resource management (inclusive of approximately 90,000 acres of wetlands); wastewater and stormwater (to include erosion and sedimentation control, treatment and distribution of potable water, and sewage systems); land resource management (to include numerous borrow pits); air and noise pollution (including installation compatible use zones (ICUZ)); waste resource management; hazardous and toxic materials management; solid waste disposal (including landfill operations and collection, treatment, and disposal of sewage); resource recovery/recycling; historical, cultural, and archaeological preservation; hazardous waste minimization; environmental education and awareness; and understanding, analyzing, reporting of the impacts the Installation has upon the socioeconomic environment of the surrounding local communities.

FSGA/HAAF manages solid waste disposal through its Land Use controls, to reduce solid waste disposal; to minimize waste and pollutant generation through source reduction. As such, FSGA/HAAF has developed an Integrated Solid Waste Management Plan that outlines measures to preserve the FSGA landfill’s capacity through source reduction and recycling. Additionally, FSGA/HAAF has established Qualified Recycling Program Standard Operating Procedures (SOPs) that requires widespread participation and support of the Recycling program objectives.

Objectives.

Provide technical and field assistance for the overall Recycling Management Services in support of FSGA/HAAF and the Environmental Division to facilitate the successful implementation of environmental management programs.

Divert recyclable materials from FSGA landfills to preserve the on-post landfill’s remaining capacity by extending its useful life.

The Contractor shall collect, transport, offload, separate, process, bale, warehouse, and weigh recyclable materials and raw materials from recycle containers and convenience drop-off centers on FSGA/HAAF to the FSGA Processing Station, FSGA Recycling Center (also known as the Scrap Metal Yard) or HAAF Recycling Center, in a manner that constitutes recycling as defined in and in compliance with the Resource Conservation and Recovery Act (RCRA), DODIs, Executive Orders, the ISWMP, and the QRP Handbook.

Recyclable materials shall be processed for resale through local/regional recycling markets, enabling these products to be reutilized in the production of future products, to meet the directives outlined in Executive Order 13834, or the latest version that supersedes as applicable. Collection and processing of recyclable materials shall be accomplished IAW the DoDI 4715.23 (or latest version that supersedes as applicable), as well as the most recent Integrated Recycling and Solid Waste Management (updated annually), and all QRP SOPs.

The Contractor shall operate and manage the three (3) recycling facilities located on FSGA/HAAF and ensure that all recyclable materials are properly segregated, stored, and prepared for sale. There are two facilities at FSGA and one facility at

HAAF.

The Contractor shall provide technical support consistent with federal, state, and local regulatory requirements, as well as the Department of the Army and FSGA/HAAF Garrison policies, consistent with the FSGA DPW Environmental Division’s sustainability and environmental awareness objectives. All tasks must be performed in accordance with required legal, ethical, and professional standards as determined by the Contracting Officer’s Representative (COR) and their direct supervisor. The Contractor shall ensure accurate data collection, compile historical data, prepare all recycled materials, and shall submit all information as specified by the Deliverables presented in the contract to the COR. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.

Scope.

Services include providing all necessary labor to collect, transport, offload, separate, process, bale, warehouse, and weigh recyclable materials from various collection points throughout FSGA/HAAF, including but not limited to recycle containers and convenience drop-off centers for the entirety of FSGA and HAAF, as well as community outreach initiatives. The Contractor shall also provide all necessary labor to conduct facility assistance visits, as requested by the COR, in order to maintain compliance with Federal, State, Local, DoD, Army, and Garrison regulations/instructions Additionally, the Contractor will provide all labor necessary to collect accurate data, compile historical data as necessary, and prepare required reports which will be delivered to the COR for review, approval, and acceptance. In coordination with the COR, the Contractor will also facilitate the support of recurring special events on and off the installation, including but not limited to placement and pickup of containers and signage.

The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and local laws, regulations, instructions, and directives, to including, but not limited to, the publications in Section 7, Related Documents (Publications). The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Recycling Services, as defined in this Performance Work Statement (PWS), except for those items specified as Government Furnished Property (GFP).

The intent is to establish work requirements that are performance-based and results-oriented. The Contractor shall determine the best and most cost-effective ways to fulfill Solid Waste Management (Recycling Services) and their component needs, emphasizing innovation and best commercial practices. The Contractor shall ensure all work accomplished maintains and presents a healthy, clean, neat, and professional appearance to all Solid Waste Management (Recycling Services) included and covered by this contract in support of mission requirements for users, residents, and visitors.

Specific tasks are contained within Technical Exhibit (TE) 1, which is the Performance Requirement Summary. A summary of Deliverables is included within TE 2.

Traffic Flow.

The Contractor shall maintain the free flow of vehicular and pedestrian traffic while conducting Solid Waste Management (Recycling Services) tasks.

Restoration of Real Property Damage.

Any damage to Government Real Property by the Contractor’s operations shall be restored to the original state at no additional cost to the Government (e.g., structural damage, damage to landscape or fencing, etc.).

General Information.

The Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current certifications as indicated in PWS 1.7.6;

security requirements during the execution of this contract.

Contractor personnel performing work under this contract shall be able to read, write, speak, and understand the English language. They shall have a command of both the written and spoken English language to properly clearly and effectively communicate in person or via electronic devices (telephone or Email) with co-workers, customers, and the general public.

Contractor personnel performing work under this contract shall be U.S. citizens unless the provisions of Army Regulation (AR) 25-2, Information Assurance, have been fully completed, and approval has been granted by the Government for the non-U.S. citizen to perform the required support.

The Contractor shall have routine access to Government-controlled facilities. The work to be performed under this contract shall be accomplished throughout FSGA/HAAF.

Contractor personnel will be required to work on-site at the FSGA/HAAF DPW Environmental Division Recycling facilities. The Government shall provide facilities for the Contractor to perform administrative operations during regular hours of operation.

All recycling facilities (recycling processing center, the FSGA recycling center, the metal yard, and the HAAF recycling center) are “as is” and may or may not incur improvements, which are dependent upon the discretion of the DPW, and as, funding allows.

1.7.1 Quality Control

Quality Control is the responsibility of the Contractor. The Contractor is responsible for the delivery of quality services/supplies to the Government.

1.7.2 Quality Control Program

The Government is committed to a highly interactive relationship between quality control by the Contractor and quality assurance by the Government recipient of services. This relationship shall be achieved through an effective Prevention Based Quality Control Program dedicated to ensuring the best possible products and services to end users. The Contractor shall provide their final written Quality Control Plan (QCP) no later than (NLT) within 10 days of contract award and within five (5) days of any proposed changes to the Contracting Officer Representative (COR) and the Contracting Officer (KO).

Quality Prevention

The Contractor’s quality program shall demonstrate its prevention-based outlook by meeting the objectives stated in PWS throughout all areas of performance. The QCP shall be developed to specify the Contractor’s responsibility for management and quality control actions to meet the terms of the contract. The QCP as a minimum shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints.

Quality Assurance

The COR will evaluate the Contractor’s performance under this contract IAW the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the COR must do to ensure that the Contractor has performed IAW the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). When an observation indicates defective performance, the COR will require the Contractor or designated on-site representative to initial the observation to acknowledge the defective performance. The acknowledgement of the observation does not necessarily constitute Contractor concurrence with the observation, only that the Contractor has been made aware of the defective performance. If any of the services performed do not conform to contract requirements, the Contractor shall perform the services again at no additional cost to the Government.

Reporting

The Contractor shall provide the COR via email all reports generated as a result of the Contractor’s quality control efforts on the third (3rd) workday of each month (monthly report). This shall include any summary information, charts/graphs, etc., used to track quality control.

Facility Access

Contractor shall have routine access to Government-controlled facilities. The work to be performed under this contract shall be accomplished throughout FSGA/HAAF.

Contractor personnel will be required to work on-site at the FSGA/HAAF DPW Environmental Division Recycling facilities. The Government shall provide facilities for the Contractor to perform administrative operations during regular hours of operation.

All recycling facilities (recycling processing center, the FSGA recycling center, the metal yard, and the HAAF recycling center) are “as is” and may or may not incur improvements, which are dependent upon the discretion of the DPW, and as funding allows.

Property Management System

The Contractor shall establish a system to manage Government Furnished Property (GFP) in its possession to control, use, preserve, protect, repair and maintain. The Property Management System (PMS) must be adequate to satisfy the requirements of Property Management IAW FAR clause 52.245-1 Government Property.

1.7.3 Recognized Holidays.

The Contractor shall not be required to perform services on recognized federal holidays. The recognized federal holidays include:

New Year’s Day Labor Day Birthday of Martin Luther King Jr. Columbus Day Washington’s Birthday Veterans Day Memorial Day Thanksgiving Day Juneteenth National Independence Day Christmas Day Independence Day

When a holiday occurs on a Saturday, Federal employees are typically granted the previous Friday as the holiday observance. When a holiday occurs on a Sunday, Federal employees are usually given the following Monday as the holiday. The Contractor shall work on the days the Government is scheduled to work.

When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor will have the following options:

Reschedule the work so it is performed the following day, unless it falls on a weekend.

Reschedule the work on any day that is mutually satisfactory.

1.7.4 Hours of Operation.

The Contractor shall be responsible for providing services, between the hours of 7:30 AM – 4:00 PM. Monday through Friday, except federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings or similar Government directed facility closings. The Contractor shall always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential to successful performance under this contract.

No overtime (OT) or compensatory time (CT) is authorized.

Installation Closures.

When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a recognized Federal holiday, and when routine work is not scheduled for that day; or reschedule the work for the next business day following the closure.

1.7.5 Contractor Discrepancy Report.

When the Contractor's performance is unsatisfactory, a CDR will be issued. The Contractor shall reply in writing within five (5) workdays from the date of receipt of the

CDR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.

1.7.6 Security Requirements.

Contractor personnel shall maintain the level of security required for the duration of the contract. The security requirements are IAW the attached Department of Defense (DoD) Form 254, Contract Security Classification Specification. Contractor personnel shall comply with all applicable security and safety regulations, guidance, and procedures, including local, referenced in this PWS and in effect at the work sites. All personnel must meet requirements IAW DoD 8570.01-M, Information Assurance Workforce Improvement Program.

Access and General Protection/Security Policy and Procedures.

All Contractor personnel performing work under this contract shall comply with applicable installation, facility, and area commander installation/facility access, local security policies, and security procedures provided by the Security Manager Government representative. Contractor personnel shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office.

Contractor personnel shall comply with all personal identity verification requirements as directed by DoD, HQ Department of the Army (DA), or local policies. In addition to the changes otherwise authorized by this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor and subcontractor security matters or processes.

Physical Security.

The Contractor 1.7.6.2, be responsible for safeguarding all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

Other Qualification.

All contractor employees utilizing a CAC for Government information system access shall complete the DoD Information Assurance (IA)/Information Technology (IT) Training within (30) days of contract award in order to gain access to Government computer systems. Certificates of all the training required completion shall be uploaded into the Army Training Certification System.

Security Training.

In the event of a National Defense Emergency affecting FSGA/HAAF, the FSGA/HAAF POC will immediately notify the contract POC. At that time, the Contractor shall take immediate steps to cease all activities on the installation(s) and will cause all personnel to leave the installation(s) property until the installation and FSGA/HAAF give notice.

POC that National Defense Emergency conditions are no longer in effect.

1.7.6.4.1 Anti-Terrorism (AT) Level I Training.

Contractor personnel performing work under this contract that requires access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 30 calendar days after commencing performance under this contract and annually thereafter. The Contractor shall submit employee certificates of completion within (30) calendar days after completion of the training. AT Level I awareness training is available at the following website:

http://jko.jten.mil/courses/atl1/launch.html

• Suppose access to a computer is not available, the Government will provide AT Level I training to Contractor employees within 30 business days after contract start and maintain a copy of the attendance roster for one (1) year. Any Contractor hired after the contract start will be required to receive AT Level I training within 30 calendar days either online or as provided by the Government.

The Contractor must present the training certificate to the KO or designated Government representative/COR within 30 calendar days period.

1.7.6.4.2 Operational Security (OPSEC) Awareness Training.

For contracts that require OPSEC Training. All Contractor employees, to include subcontractor’s employees, requiring access to Army installation, facilities, controlled, access areas, and/or installation computers shall complete OPSEC Level I training within 30 days after the contract start date or the effective date of incorporation of this requirement into the contract. The Contractor shall provide certificates of completion from the Army Training Information System website for each affected Contractor employee and subcontractor employee to the COR, or to the Contracting Officer if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel. OPSEC training is available at the following website: https://www.lms.army.mil

1.7.6.4.3 Threat Awareness and Reporting Program Training.

For all DA contractors. Training will be completed within 30 days of assignment, or employment to an organization, and will undergo live environment TARP training.

Training will be completed annually, IAW AR 381-12 Threat Awareness and Reporting Program. The Contractor shall provide dates of in-person training for each affected contractor employee and subcontractor employee to the COR, or to the Contracting Officer if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel.

1.7.6.4.4 Unexploded Ordnance (UXO) Awareness Training

Unexploded Ordnance (UXO) Awareness Training shall be completed within (7) days upon Contract award. If the Contractor has taken a FSGA/HAAF UXO Awareness Training through the Installation Explosive Ordnance Detachment (EOD) Unit within 12 months of Contract award, the contractor may provide confirmation of this training

DRAFT

http://jko.jten.mil/courses/atl1/launch.html https://www.lms.army.mil/ during the Post Award Conference. Contractor must coordinate through the COR to attend annual refresher training.

1.7.6.4.5 Environmental Compliance Officers Course

All personnel assigned under this contract shall attend and pass the Environmental Compliance Officer (ECO) Course within (90) days after beginning their service on the Contract.

1.7.6.4.6 Local Health Protection Conditions

Contractor will comply with all national and DoD policies with regard to health protection issues, including pandemic outbreaks. Local Health Protection Conditions (HPCON) change based on risk levels in the surrounding area FSGA/HAAF, and in cooperation with local, state, and national guidance. The Contractor shall comply with installation, and higher headquarters policies aimed at mitigating the spread of dangerous communicable diseases.

Key Control.

The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall within (24) hours report any occurrences of lost or duplicate keys/key cards to the KO and COR.

1.7.6.5.1 Lost Keys.

In the event keys other than master keys are lost or duplicated, the Contractor shall, upon direction of the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying.

When the Government conducts the replacement of locks or re-keying, the total cost of re-keying or lock replacement shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.7.6.5.2 Prohibited use of Government provided keys or key cards.

The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s personnel. The Contractor shall prohibit the opening of locked areas by Contractor personnel to permit entrance of persons other than Contractor personnel engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR.

Lock Combinations.

The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons.

• Whenever the Contractor personnel who have access to the combination(s), no longer need to know such combination(s) the Contractor shall immediately notify the COR as soon as they become aware of the situation.

• These procedures shall be included in the Contractor’s Quality Control Plan.

1.7.7 Post Award Conference/Periodic Progress Meetings.

The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5. The post award conference will also be utilized to ensure Contractor understands all HSPD-12 requirements. The KO, COR (and other Government personnel) will hold a semi-annual progress meeting with the Contractor to review the Contractor's performance. At these meetings, the KO and COR will appraise the Contractor of how the Government views the Contractor's performance, and the Contractor will inform the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.7.8 Government Roles and Responsibilities.

Contracting Officer (KO).

The KO is the only person authorized to make any changes in any of the requirements listed on this PWS; notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO.

• In the event the Contractor makes any change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk and expense of the Contractor.

• All contract administration will be affected by the KO.

• Communications pertaining to contractual administrative matters shall be addressed to the KO.

• No changes in or deviations from the terms and conditions shall be made without a written modification to the contract, executed by the KO authorizing such changes.

• The KO will approve all Deliverables and plans required in this PWS.

Contracting Officer’s Representative (COR).

The COR will be identified by a separate letter of appointment. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: Assures that the Contractor performs the technical requirements of the contract; performs inspections necessary in connection with contract performance; maintains written and oral communications with the Contractor concerning technical aspects of the contract; issues written interpretations of technical requirements, including Government drawings, designs, specifications;

monitors Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinates availability of Government furnished property, and provides site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.

1.7.8.2.1 COR Authority.

A letter of designation will be issued to the COR by the KO.

• A copy of the letter will be sent to the Contractor.

• The letter of designation states the responsibilities and limitations of the COR, especially with regard to changes in cost, price estimates, or changes in delivery dates.

• The COR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.

1.7.8.2.2 COR or Designated Government Representative Functions.

The COR or designated Government representative shall monitor all technical aspects of the contract and assists in contract administration.

• The COR or designated Government representative is authorized to perform the following functions:

o assure the Contractor performs the technical requirements of the contract;

o perform inspections necessary in connection with contract performance;

o maintain written and oral communications with the Contractor concerning technical aspects of the contract;

o issue written interpretations of technical requirements;

o monitor, document, and report Contractor's performance and notify both the

KO and Contractor of any deficiencies;

o coordinate the availability of Government-Furnished Property and provides direction or assistance for site entry requests of Contractor personnel.

1.7.9 Specific Contractor Requirements, Roles, and Responsibilities.

U.S. Residency.

All CONUS Contractor employees shall be legal U.S. residents.

• The Contractor shall immediately remove any employee are are not a legal U.S.

resident.

• The Contractor personnel shall be able to communicate clearly in the English language.

Contractor Hiring Restrictions.

The Contractor shall not hire or subcontract with off-duty or former Government employees whose employment would result in a conflict of interest as defined in DOD

5500.7-R Joint Ethics Regulation 30 August 1993, to include change dated 17 November 2011.

Contractor Identification.

The Contractor shall ensure that personnel are identified as a Contractor to distinguish themselves (e.g., badge, company logo, and/or uniform) from Government employees.

• The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.

• Contractor-owned/leased vehicles and trailers shall be clearly identified.

Standards of Conduct.

Contractor personnel’s conduct shall not reflect discredit upon the Government.

The Contractor shall ensure all personnel present a professional appearance while working on the Government installation.

• The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substances.

• The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner.

• The Contractor shall remove, from the job site, any employee for reasons of misconduct or security.

• The Contractor shall ensure employee conduct complies with 41 USC §423, Procurement Integrity.

• The Contractor shall also ensure that no Contractor employees conduct politically related activities or events on the installation.

• The removal of such a person shall not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.

Contractor Key Personnel.

Key personnel shall not be added to or removed from the contract without express acknowledgement of the COR. Any changes to the working status of these key personnel shall be transmitted (in writing) to the KO/COR within ten (10) workdays of the proposed change. If, for any reason, any of the key personnel becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 workdays, the contractor shall promptly replace personnel with personnel who possess qualifications equal to or better than those of the original employee. The Contractor shall ensure all key personnel terminated or released from employment under this contract are replaced within ten (10) workdays of the termination.

These key personnel shall be available during normal duty hours.

These individuals designated as key personnel shall be able to understand, speak, read, and write the English language.

There are fourteen individual “Key Personnel” for this requirement:

1. Project Manager (PM)

2. Alternate Project Manager (APM)

3. Metal Yard Operator Lead/Recycling Driver

4. Recycling Specialist 1

5. Recycling Specialist 2

6. Recycling Specialist 3

7. Recycling Specialist 4

8. Recycling Driver 1

9. Recycling Driver 2

10. Recycling Driver 3

11. Processing Specialist 1

12. Processing Specialist 2

13. Processing Specialist 3

14. Processing Specialist 4

These ten individual positions shall be considered as “Key Personnel”. The names of these fourteen Key Personnel shall be designated in writing to the KO at the post award conference. The Contractor shall provide a PM and an APM who shall be responsible for the performance of the work under this contract. The PM or APM shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this contract. Either the PM, or APM shall be available between the hours of 7:30 AM to 4:00 PM, Monday through Friday, except federal holidays or when the government facility is closed for administrative or inclement weather reasons.

1.7.9.5.1 Project Manager (PM).

The PM shall meet or exceed the following minimum qualifications, as well as others specified throughout this PWS: The Contractor shall provide one Project Manager to oversee Contract operations throughout the Installation (i.e., FSGA and HAAF inclusive).

The Project Manager shall ensure that all specifications of the Contract are being met, shall be responsible for the competent performance of the other Contractor personnel (including other Key Personnel; Alternate Project Manager, Metal Yard Operator Lead/Recycling Driver, Recycling Specialists 1-3, Recycling Drivers 1-3, as well as Processing Specialist 1-4). ), and shall professionally coordinate with the Government (including the KO, COR, and their designated representatives) throughout the duration of the Contract. The Government will issue to the Contractor equipment to ensure that the Project Manager maintains constant communication with the COR during normal business hours. The PM shall also have and maintain the following certifications/licenses: Commercial Driver’s License (CDL) of a Class B or greater, Forklift, and OSHA HAZWOOPER.

1.7.9.5.2 Assistant Project Manager (APM).

The APM will have all of the abilities and responsibilities of the PM as needed, certifications/licenses, and lead operations at the Recycling Processing Center. The Government will issue to the Contractor equipment to ensure that the Alternate Project Manager maintains constant communication with the COR and PM during normal business hours. The APM shall also have and maintain the following certifications/licenses: Commercial Driver’s License (CDL) of a Class B or greater, Forklift, and OSHA HAZWOPER.

1.7.9.5.3 Metal Yard Operator Lead/Recycling Driver.

The Metal Yard Operator Lead/Recycling Driver: The Metal Yard Operator Lead/Recycling Driver will lead operations at the Metal Yard under the purview of the PM and APM including, but not limited to: segregating types of metal and other commodities in a clean and organized fashion, maintain and professionally conducting themselves to customers (ex. turn-in of materials), as well as ensuring a safe working environment (ex. clean as you go). The Metal Yard Operator Lead/Recycling Driver shall be acquainted with scale operations, and have, and maintain certification/licenses of a CDL Class B or greater and forklift. The Contractor shall ensure that the Metal Yard Operator Lead/Recycling Driver is equipped with the means to maintain constant communication with the PM/APM during business hours.

1.7.9.5.4 Recycling Drivers.

Recycling Drivers shall all have and maintain certification/license of a CDL Class B or greater, as well as be familiar with various vehicles utilized during recycling/solid waste operations (ex. Front-end loaders, roll-back trucks, etc.). The Contractor shall ensure that all Recycling Drivers are equipped with the means to maintain constant communication with the PM/APM during normal business hours.

1.7.9.5.5 Recycling Specialist.

Recycling Specialists shall all have and maintain certification/license for Forklift operations. Recycling Specialists shall all have and maintain annual UXO Training. A minimum of 1 Recycling Specialist shall maintain a duty station at HAAF. The Contractor shall ensure that all Recycling Specialists are equipped with the means to maintain constant communication with the PM/APM during normal business hours.

1.7.9.5.6 Processing Specialist.

Processing Specialists shall all have and maintain annual UXO Training. The Contractor shall ensure that all Processing Specialists are equipped with the means to maintain constant communication with the PM/APM during normal business hours.

1.7.9.5.7 Identification of Contractor Personnel.

All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not to third parties, are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials.

All Contractor personnel performing work under this contract shall obtain a DoD Common Access Card (CAC). Before CAC issuance, the Contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries

(NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The Contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management. The CAC shall be worn or in possession of the Contractor when performing work under this contract, attending Government meetings and conferences.

Contractor personnel shall be required to apply for a CAC within the first ten (10) workdays at the start of the base contract period or within ten (10) workdays of performance under this contract, whichever comes first.

The Contractor shall develop, maintain, and provide to the COR an updated roster which shall include names and positions of all Contractor personnel, as well as indicating which employees were issued CAC or other forms of Government identification cards. The Contractor shall submit an initial roster to the COR within ten

(10) calendar days after commencement of the base period of performance, a minimum of monthly, and if there are any changes.

The Contractor shall immediately (within 30 minutes) report any lost CAC or government issued identification cards to the COR and Military and/or DoD police agencies. The Contractor shall immediately collect the CAC and other government issued forms of identification upon termination of the employee, or at the end of the contract performance period. The CAC and other government issued forms of identification shall be returned to the COR within one (1) hour of employee termination, or at the end of Contract performance period, whichever comes first. Final payment may be delayed if the Contractor fails to comply with these requirements.

1.7.9.5.8 Contractor Personnel Appearance and Performance.

The Contractor personnel shall meet the highest standards of professionalism and personal integrity. The Contractor shall ensure their personnel do not perform work under the influence of alcohol, illegal prescribed drugs, or any other incapacitating agents. Contractor personnel shall be neatly groomed and dressed in business casual attire.

Phase In /Phase Out Period.

The Contractor shall prepare and submit (within ten (10) business days after contract award), a Phase In/Phase Out Plan to be implemented by the Contractor.

Phase-In: To minimize any decreases in productivity and to prevent possible negative impact on additional services, the Contractor shall have all key personnel on board during the 30-day phase-in period. The Contractor shall become familiar with all performance requirements during the phase-in period. The Government expects the

Contractor to be fully operational after the 30-day phase in period.

Phase-Out: Thirty (30) days prior to the completion of this contract, the management personnel of the incoming Contractor may observe operations. This will allow for orderly turnover of facilities, equipment, and records, and will help to ensure continuity of services. The outgoing Contractor is ultimately responsible for performing complete services IAW the contract, during the phase-out period, and shall not defer any requirements for the purpose of avoiding responsibility or of transferring such responsibility to the succeeding Contractor.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .