MANDATORY REFERENCE FORM.doc
DOC document 45 KB Posted
- Attached to
- RECOVERY - Fresno HVAS and BAS improvement
- Solicitation number
- RECOVERY-GS-09P-10-KS-C-0042
About this file
MANDATORY REFERENCE FORM
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Feb 15 Revised SF 1442.pdf | ||
| Agreement R1.doc | DOC document | |
| FRESNO_MECH_SIGN_IN.pdf | ||
| Energy Meter Spec 020910.doc | DOC document | |
| Feb 10 Revised SF 1442.pdf | ||
| Fresno - Solar DHW System Size Parameters.pdf | ||
| Subcontracting Plan as of 2009.doc | DOC document | |
| Standard for PBS CAD Deliverables.pdf | ||
| viledon_mv85.pdf | ||
| Specifications Fresno Mechanical 012510.docx | DOCX document | |
| Solar DHW Heating Installers.xlsx | XLSX spreadsheet | |
| SOWs specs etc.zip | ZIP file | |
| SF 1442.pdf | ||
| Solicitation instructions R1.doc | DOC document | |
| FBO Solicitation.zip | ZIP file | |
| SOWs specs etc.zip | ZIP file |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Services Administration
Pacific Rim Region
JOB REFERENCE FORM
Use of this format is mandatory.
OFFEROR NAME:____________________________________________________
PROJECT NAME:_____________________________________________________________
PROJECT LOCATION:_________________________________________________________
CLIENT NAME (Company or Agency)_____________________________________
CLIENT POC (Name, Phone):___________________________________________
DOLLAR VALUE OF OFFEROR'S CONTRACT: $___________________________
SIZE OF FACILITY(S) (GSF): _____________________________________________
ELEMENTS YOU CLAIM THIS REFERENCE SUPPORTS (check those that apply):
___HVAC installation ___Controls installation ___HVAC and controls design-build, develop of sequences of operation
DESCRIPTION OF WORK PERFORMED; SUPPORT ELEMENTS CLAIMED:
_1177752835.doc
File details come from the government source that posted it. Updated .