A0002 SF30.pdf
PDF 122 KB Posted
- Attached to
- RECOVERY Solicitation GS-08P-09-JA-C-0089: Department of State Facility at the Denver Federal Center
- Solicitation number
- RECOVERY-GS-08P-10-JA-C-XXXX-DB
About this file
Amendment 0002 adds a mandatory qualfiication requirement for SECRET Clearance as follows Evidence of current SECRET facility clearance The design/build contractor and specific subcontractors shall possess current SECRET facility security clearances (FCLs) issued in accordance with the National Industrial Security Program to be considered for this effort. The specific subcontractors which must also possess current SECRET FCLs include the architectural/engineering firm the security consultant/designer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Name Brand Justification fedbizopps.pdf | ||
| A0005.pdf | ||
| DB Amendment 0005.pdf | ||
| A0004.pdf | ||
| A0003.pdf | ||
| Questionnaire Team Member in Word Format.doc | DOC document | |
| Questionnaire Design-Builder in Word Format.doc | DOC document | |
| DB Questionnaire 10-01-09.pdf | ||
| A0001.pdf | ||
| RFQ DB Data Center.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation GS-08P-09-JA-C-0089 RECOVERY—Tier III Data Center Design/Build
1. The purpose of this amendment is to include an additional Phase I Mandatory Requirement as follows:
From:
Mandatory Requirements: The following evaluation factors will be evaluated on a “go/no-go” basis, i.e.; offerors not meeting all of the following criteria will be eliminated from further consideration. The Contracting Officer will make the initial determination as to offer responsibility/responsiveness, and submit only those offers to the SSEB for full evaluation.
a. Qualifications Statement conforms to the requirements of the Request For
Qualifcations (RFQ), including, but not limited to:
• Proof of CCR Registration
• Proof of bonding capacity to $80,000,000
To:
Mandatory Requirements: The following evaluation factors will be evaluated on a “go/no-go” basis, i.e.; offerors not meeting all of the following criteria will be eliminated from further consideration. The Contracting Officer will make the initial determination as to offer responsibility/responsiveness, and submit only those offers to the SSEB for full evaluation.
b. Qualifications Statement conforms to the requirements of the Request For
Qualifcations (RFQ), including, but not limited to:
• Proof of CCR Registration
• Proof of bonding capacity to $80,000,000
• Evidence of current SECRET facility clearance: The design/build contractor and specific subcontractors shall possess current SECRET facility security clearances (FCLs) issued in accordance with the National Industrial Security Program to be considered for this effort. The specific subcontractors which must also possess current SECRET FCLs include the architectural/engineering firm, the security consultant/designer and the security system installer. SECRET safeguarding may be required during contract performance, as well.
The design/build contractor must provide the applicable Commercial and Government Entity (CAGE) Codes as part of the RFQ process, so the Government can verify the current status of the FCLs.
File details come from the government source that posted it. Updated .