Amendment 0002 adds a mandatory qualfiication requirement for SECRET Clearance as follows Evidence of current SECRET facility clearance The design/build contractor and specific subcontractors shall possess current SECRET facility security clearances (FCLs) issued in accordance with the National Industrial Security Program to be considered for this effort. The specific subcontractors which must also possess current SECRET FCLs include the architectural/engineering firm the security consultant/designer.

View the file

Other files

File Type Posted
Name Brand Justification fedbizopps.pdf PDF
A0005.pdf PDF
DB Amendment 0005.pdf PDF
A0004.pdf PDF
A0003.pdf PDF
Questionnaire Team Member in Word Format.doc DOC document
Questionnaire Design-Builder in Word Format.doc DOC document
DB Questionnaire 10-01-09.pdf PDF
A0001.pdf PDF
RFQ DB Data Center.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation GS-08P-09-JA-C-0089 RECOVERY—Tier III Data Center Design/Build

1. The purpose of this amendment is to include an additional Phase I Mandatory Requirement as follows:

From:

Mandatory Requirements: The following evaluation factors will be evaluated on a “go/no-go” basis, i.e.; offerors not meeting all of the following criteria will be eliminated from further consideration. The Contracting Officer will make the initial determination as to offer responsibility/responsiveness, and submit only those offers to the SSEB for full evaluation.

a. Qualifications Statement conforms to the requirements of the Request For

Qualifcations (RFQ), including, but not limited to:

• Proof of CCR Registration

• Proof of bonding capacity to $80,000,000

To:

Mandatory Requirements: The following evaluation factors will be evaluated on a “go/no-go” basis, i.e.; offerors not meeting all of the following criteria will be eliminated from further consideration. The Contracting Officer will make the initial determination as to offer responsibility/responsiveness, and submit only those offers to the SSEB for full evaluation.

b. Qualifications Statement conforms to the requirements of the Request For

Qualifcations (RFQ), including, but not limited to:

• Proof of CCR Registration

• Proof of bonding capacity to $80,000,000

• Evidence of current SECRET facility clearance: The design/build contractor and specific subcontractors shall possess current SECRET facility security clearances (FCLs) issued in accordance with the National Industrial Security Program to be considered for this effort. The specific subcontractors which must also possess current SECRET FCLs include the architectural/engineering firm, the security consultant/designer and the security system installer. SECRET safeguarding may be required during contract performance, as well.

The design/build contractor must provide the applicable Commercial and Government Entity (CAGE) Codes as part of the RFQ process, so the Government can verify the current status of the FCLs.