Attachment 2
Building summary scope of work from site walk thru 9 Mar 10 1033 - ANG hanger. Provide conduit and wire from gas meter to existing Alerton Controller cabinet. ANG will provide new controller. Connect to new controller and provide programming and graphic display.
1037- ANG hanger. Provide conduit and wire from gas meter to existing Alerton Controller cabinet. ANG will provide new controller. Connect to new controller and provide programming and graphic display.
2005 – Provide conduit and wire from meter thru the building into the control cabinet inside the Mechanical room. No connection required. Paint all conduit in rooms where exposed excluding the Mechanical room.
2007 – Provide conduit and wire from meter thru the building into the control cabinet inside the Mechanical room. No connection required. Paint all conduit in rooms where exposed excluding the Mechanical room.
2163 – Provide conduit and wire from meter thru the building into the control cabinet inside the Mechanical room. Add new controller, provide programming and graphic display.
2050 – Provide wiring from meter thru existing conduit to controller in hall approx. 200 feet. Connect to existing controller, provide programming and graphic display.
2170– Provide conduit and wire to existing OSA sensor jbox. Use existing conduit to pull wire to controller located in Mechanical room. Connect to existing controller, provide programming and graphic display.
2249- Provide conduit and wire from two (2) meters thru the building into the control cabinet inside the Mechanical room. No connection required.
2380 – Connect existing flex conduit up to new pulse meter. Replace existing wiring in existing conduit to the existing control cabinet in the Mechanical room.
2451– Provide conduit and wire from meter thru the building into the control cabinet inside the Mechanical room. No connection required.
2447 – Provide conduit and wire from meter into mechanical room and connect to Alerton controller. Provide programming and graphic display on EMCS computer.
2465 - Provide conduit and wire from meter into mechanical room and connect to Alerton controller. Provide programming and graphic display on EMCS computer.
2464- Provide conduit and wire from meter into 2nd floor boiler room control cabinet.
1409- Provide conduit and wire from new meter into mechanical room control cabinet on east wall.
2090- This building is cancelled due to metering already in place.
2040 - Provide conduit and wire from meter into mechanical room and connect to Alerton controller. Provide programming and graphic display on EMCS computer.
2045 –We missed this building however it is removed from this project.
2097 - Provide conduit and wire from meter thru the building into the control cabinet inside the Mechanical room. No connection required. Paint all conduit in rooms where exposed excluding the Mechanical room.
Reference FAR 52.236-3, “Site Investigations and Conditions Affecting the Work”