Q A 2 Chet FB Pasadena PV.doc

DOC document 35 KB Posted

Attached to
RECOVERY-Chet Holified FB roof mounted PV system
Solicitation number
Not on record
Issued by

About this file

Q A Part 2

View the file

Other files

File Type Posted
CHET_PV_2ND_SITE_VISIT_SIGN_IN.pdf PDF
Pasadena roof asbestos sample test results.zip ZIP file
Q A Chet FB PV.doc DOC document
Electrical Drawings EP004 —
FEB 15 Pasadena PV Scope Schematic Drawings.zip ZIP file
FEB 15 MANDATORY REFERENCE FORM.doc DOC document
Feb 15 SF 1442.pdf PDF
FEB 15 CHFB PV-Solicitation instructions R1.doc DOC document
Feb 15 24000_PV - SOW_FINAL R1.doc DOC document
Subcontracting Plan as of 2009.doc DOC document
Additional_Solicitation_Docs.zip ZIP file
PV_CHET_SIGN_IN.pdf PDF
MANDATORY REFERENCE FORM.doc DOC document
LAGUNA ROOF.pdf PDF
Additional Solicitation Docs.zip ZIP file
Chet Polyglass 20 Yr Warranty.pdf PDF
Chet PV SITE PLAN.pdf PDF
Chet PV Single Line Electrical - Laguna.ZIP ZIP file
CHFB PV - Agreement.doc DOC document
CHFB PV-Solicitation instructions.doc DOC document
24000_PV - SOW_FINAL.doc DOC document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARRA Chet Holifield FB PV & Pasadena USCH Questions and Answers # 2 NOTE: This portion of the questions and answers is for the Pasadena USCH.

1. Regarding the objectives of the Pasadena US Court rooftop PV system that could be one (or more) of three ways:

a. To match the Nameplate (kW) rating of equipment identified in the spec and best utilize its potential. (least design intensive)

b. To Maximize roof (kWh) production. (highest yield)

c. To Maximize (kWh) production per (kW) unit of capacity (higher $/AC Watt but best investment)

These subtle differences will influence our design decisions and the results of your project. Could you please allow us the insight into your objectives?

ANSWER: The schematic drawings for Pasadena indicate the required system capacity. These required capacities are based on STC rating.

2. Regarding Chet Holifield: In reference to ASCE 7-05, Table 1-1, please specify the occupancy catergory to be used in developing calculations for loads. Refer for instance to ASCE 7-05, Table 6-1. Please confirm that this locale is not in a special wind region; refer to ASCE 7-05, Figure 6-1.

ANSWER: This building is Occupancy Category II.

With respect to wind design requirements per the local jurisdiction, the City of Laguna Niguel has the following design requirements, which can be viewed at the following URL: http://www.ci.laguna-niguel.ca.us/DocumentView.aspx?DID=723

File details come from the government source that posted it. Updated .