REBID_Plans_438101_South_St.pdf

PDF 781 KB Posted

Attached to
South Street Sidewalk Construction from US 41/Cleveland Avenue to SR 739/Fowler Street Rebid (FDOT 438101-2-58-01)
Solicitation number
ITB 26-001
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

Summary: South Street Sidewalk Construction Project Plans

This is a set of roadway construction plans prepared by Kisinger Campo & Associates Corporation for the City of Fort Myers Public Works Department in Lee County, Florida. The project involves the construction of a 6-inch thick, 5-foot wide concrete sidewalk extending 3,000 linear feet along the north side of South Street from US 41/Cleveland Avenue to SR 739/Fowler Street (FDOT Financial Project ID 438101-2-58-01). The scope of work includes clearing and grubbing approximately 0.65 acres, removal of 574 square yards of existing concrete, installation of 1,092 square yards of new sidewalk with detectable warnings, 152 linear feet of pipe handrail installation, 575 square yards of permanent driveway construction, performance turf installation of approximately 1,898 square yards, and modification of 17 existing mailboxes. The project also requires implementation of erosion and sediment control measures including inlet protection systems and sediment barriers. Construction activities are limited to Monday through Friday from 8:00 AM to 4:30 PM with no weekend work permitted. A non-mandatory pre-submittal meeting is scheduled for February 18, 2026, at 10:00 AM, with a question submission deadline of February 25, 2026, at 4:00 PM, and a virtual bid opening on March 16, 2026, at 2:00 PM. Work must be substantially completed within 180 calendar days and finally completed within 210 calendar days from the Notice to Proceed, with City Council approval proposed for April 6, 2026.

This is a federally funded project utilizing Safe Routes to School program funds, supplemented by Federal Emergency Management Agency Public Assistance and Florida Department of Transportation Local Agency Program funding. The project is subject to Davis-Bacon prevailing wage requirements, Buy America and Build America domestic preference requirements, E-Verify employment verification, and compliance with the Clean Air Act and Federal Water Pollution Control Act. Contractors must provide a 5 percent bid bond or certified cashier's check and are required to perform at least 40 percent of the total contract amount with their own organization if subcontracting. Minority Business Enterprise and disadvantaged business enterprise participation requirements apply to this federally funded project. Contractors must maintain comprehensive general liability insurance of at least $1,000,000 per occurrence and automobile liability insurance of at least $1,000,000 combined single limit. Liquidated damages are assessed on a daily basis with rates ranging from $904 per day for contracts under $299,999. Payment will be made monthly at 95 percent of completed work value with 5 percent retained until final acceptance.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10 11

13 15

19 20

26272930

23 24

9 10

J 13

M 13

North

Fort Myers

Negro

Head

Cove

Fourmile

Pt.

Fourmile

Palmetto Pt.

Negro

Head

Cove

Fourmile

Pt.

Fourmile

Ri ve r

Ca lo os ah at ch ee

W yom ig

FORT MYERS

PAGE FIELD

Daniels

T re el in e

A ve

S E

Luckett Rd.

P al am in o

R d.

Rest Area

O rt iz R oa d

S ix

M il e

P ar kw ay

Pa lm B eac h B lvd

AveAnderson

Colonial

Bl vd.

M cG re go r

Bl vd

C le ve la nd

A ve nu e

W A T E R

W A Y

OKE

EC

HOBE

E

W

AT

ER

W

AY

WARD

ISLAND

Pop. 48,208

C r.

78A

F S

FS

FS

FS

CP

S

FS

Palmetto Pt.

G

R ip pl e

P ar kw ay

M ik e

C yp re ss

R -2

-E

R -2

-E

T-44-S

T-45-S

TO CAPE CORAL

TO CAPE CORAL

TO LEHIGH ACRES

T O

S

N

C

R L

O S

P

A R

K

F T

M Y E R S

T O

N

O R T

H

T-44-S

T-45-S

R -2

-E

R -2

-E

TBD

c:\pww\kca_prod\d0168008\KEYSRD01.dgnnpinto 7/10/2025 10:14:25 AM Default

NO.

SHEET

YEAR

FISCAL

EXPRESSWAY

T U

R N P

IK

E

PENSACOLA FORT WALTON

BEACH

PANAMA

CITY

CHIPLEY

TALLAHASSEE

JACKSONVILLE

ST AUGUSTINE

GAINESVILLE

OCALA DAYTONA BEACH

DELAND

NEW PORT RICHEY

TAMPA

LAKELAND

MELBOURNE -

COCOA

ORLANDO

BARTOWST PETERSBURG

SARASOTA -

BRADENTON

FT PIERCE

FT MYERS

WEST PALM

BEACH

FT LAUDERDALE

MIAMI

NAPLES

KEY WEST

CITY

LAKE

F

LO

R

ID

A 'S

BEACH LINE

CONTRACT NO.

CONSTRUCTION

SHEET DESCRIPTIONSHEET NO.

INDEX OF ROADWAY PLANS

GOVERNING STANDARD SPECIFICATIONS:

CONTRACT PLANS COMPONENTS

ENGINEER OF RECORD:

ROADWAY PLANS

http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website:

Florida Department of Transportation, FY 2025-26 Standard Specifications

GOVERNING STANDARD PLANS:

FINANCIAL PROJECT ID 438101-2-58-01

T H

E

O F

F I

C I

L

C O

D

O

T

I

S

E E

T

T

E C

T R

O N

C

G I

T A

L

Y

G N

A L

U

D

U

L E

G

A

C

CONTRACT PLANS

ROADWAY PLANS

following website: http://www.fdot.gov/design/standardplans

Standard Plans for Road Construction and associated IRs are available at the

Bridge Construction and applicable Interim Revisions (IRs).

Florida Department of Transportation, FY 2025-2026 Standard Plans for Road and

CITY OF FORT MYERS PROJECT MANAGER:

CITY OF FORT MYERS

PUBLIC WORKS DEPARTMENT

SOUTH STREET SIDEWALK

STA. 102+86.09

BEGIN PROJECT

STA. 132+94.65

END PROJECT

NORTH SIDE OF SOUTH ST. FROM CLEVELAND AVE./US 41/SR 867 TO FOWLER ST./SR 739

LEE COUNTY (120000)

(FEDERAL FUNDS)

VENDOR NO.: 59-1677145

CONTRACT NO.: CAA44

PHONE: (239) 278-5999

FORT MYERS, FLORIDA 33912

13461 PARKER COMMONS BLVD., STE. 104

KISINGER CAMPO AND ASSOCIATES CORP.

P.E. NO.: 78492

ADRIENNE A. WISDOM, P.E.

KEY SHEET REVISIONS

07/10/2025

DATE DESCRIPTION

SUMMARY OF QUANTITIES

SIGNING AND PAVEMENT MARKING PLAN

UTILITY ADJUSTMENTS

TEMPORARY TRAFFIC CONTROL

STORMWATER POLLUTION PREVENTION PLAN

CROSS SECTIONS

DRAINAGE DETAIL

SPECIAL DETAILS

ROADWAY PLAN-PROFILE

GENERAL NOTES

PROJECT CONTROL

PROJECT LAYOUT

SUMMARY OF DRAINAGE STRUCTURES

TYPICAL SECTION

SUMMARY OF PAY ITEMS

SIGNATURE SHEET

SIGNATURE SHEET

KEY SHEET

SQ1-SQ8

45-47

39-44

36-37

19-35

17-18

15-16

9-14

2A

REVISIONS:

ROADWAY PLANS:

SHEETS 1, 2A

SUZANNE ACTON

UPDATED FY STANDARD SPECS YEAR

UPDATED FY STANDARD PLANS YEAR

PROJECT MANAGER UPDATE

REVISION 01, ADDED SHEET 2A

https://tinyurl.com/3y8nhwr6

LOCATION OF PROJECT

John Mazeres Misc Markups

FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.

THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE

SHEET NO. SHEET DESCRIPTION

SIGNATURE SHEET

c:\pww\kca_prod\d0168008\SIGNRD01.dgnnpinto 7/10/2025 10:46:46 AM Default

DATE DESCRIPTION

REVISIONS

DATE DESCRIPTION

NO.

SHEET

FINANCIAL PROJECT IDROAD NAME

LEE

COUNTY

438101-2-58-01

KISINGER CAMPO

& ASSOCIATES P.E. No.: 70943

CITY OF FORT MYERS

PUBLIC WORKS DEPARTMENT

SOUTH ST.

1 ADDED SHEET07/10/2025

SIGNATURE SHEET (REV. 1 ONLY)2A

KEY SHEET (REV. 1 ONLY)1

STATE OF

No 70943

ESNECI

L

A

DIROL

F

N

OS

WAL .R NI

R

E

R E

E

NI

G

NE LANOI

S S

E

F O

R P

ERIN R. LAWSON, P.E. NO.: 70943

TAMPA, FL 33602

201 N FRANKLIN ST, SUITE 900,

KISINGER CAMPO & ASSOCIATES CORP.

ON ANY ELECTRONIC COPIES.

SIGNATURE MUST BE VERIFIED

ON THE DATE ADJACENT TO THE SEAL

SIGNED AND SEALED BY

THIS ITEM HAS BEEN DIGITALLY

Engineer of Record: Erin R. Lawson

201 N Franklin St, Suite 900

Tampa, Florida 33602

2A

01_Keysheet-REV01
02_SignatureSheet-REV01
2025-07-30T16:58:52-0400
Erin Lawson

File details come from the government source that posted it. Updated .