This document is a project solicitation for the City of Santa Monica's Public Landscape Division, involving a Sports Field Lighting Repair contract. The project seeks a qualified contractor to furnish, deliver, and install components and perform repair work on sports field lighting systems at six citywide locations: Marine Park, Clover Park, Memorial Park, Airport Park, John Adams Middle School, Belmar Park, and Los Amigos Park. The contract is a Contractual Services Agreement with a total value of $250,000 over five years, requiring routine and as-needed repair services for sports field lighting, including installation and replacement of 1500 watt metal halide lamps, ballast kits, repair of electrical components, routine servicing of lighting controls, and proper waste disposal. The work is to be performed during standard weekday business hours, with an estimated three call-outs per year, and a required response time of within two weeks of the City's call-out.
The project is locally funded and requires the vendor to be available Monday through Friday from 7 AM to 5 PM, excluding holidays, with all work coordinated through the City of Santa Monica Public Works team. The contractor must ensure materials meet specifications and follow proper installation methods, with any additional repairs beyond the agreed scope requiring prior approval from the project manager. The lighting infrastructure involves specialized maintenance of poles reaching heights of 60-85 feet, necessitating advanced equipment and expertise. The contract emphasizes precise service requirements, including no weekend or holiday work, and orders placed on an as-needed basis by City staff.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sports_Field_Lighting_Repair.pdf | ||
| CSA_Insurance_Template.pdf | ||
| CSA_Template.docx | DOCX document | |
| Payment_Bond.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
From: Kim Morales To: Miles Friesen Cc: Leah Cornelius; Ariana Fernandez Subject: Re: Prevailing Wage Determination: Sports Field Lighting Repair - Santa Monica Date: Tuesday, June 3, 2025 2:39:37 PM Attachments: image001.png image002.png Outlook-Email with.png Outlook-Receiver w.png Outlook-nqhzxoe5.png Outlook-1vzmcwzm.png
EXTERNAL
Hi Miles, Yes, the scope of work would be covered under prevailing wage.
Thank you, Kim Morales Labor Compliance Analyst kmorales@gcapservices.com
(714) 406-5467 (Direct)
GCAP Services, Inc.
Business Solutions, Implemented.
3525 Hyland Avenue, Suite 140 Costa Mesa, CA 92626
(714) 800-1795 | www.gcapservices.com Connect with us on LinkedIn!
From: Miles Friesen <Miles.Friesen@santamonica.gov> Sent: Tuesday, June 3, 2025 2:27 PM To: Kim Morales <kmorales@gcapservices.com> Cc: Leah Cornelius <Leah.Cornelius@santamonica.gov> Subject: Prevailing Wage Determination: Sports Field Lighting Repair - Santa Monica
Hi Kim, We are going to bid on a project for our Sports Field Lighting Repair. Can you please take a look at the information below and confirm whether it is prevailing wage or not. Let me know if you have any questions and thank you!
mailto:kmorales@gcapservices.com mailto:Miles.Friesen@santamonica.gov mailto:Leah.Cornelius@santamonica.gov mailto:/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=d034c7c1b4f946d798d7f64d73781d33-5c7cb5a5-9e mailto:slinn@gcapservices.com https://urldefense.com/v3/__http://www.gcapservices.com/__;!!OfuUnHCITYtmmjM!q5bUa4T8e-suDO6oiw2bmd13dEoaG1fIXFKmcZrhnJrlOdcek5a9Ae3LVW9nglUiPIsE37j6PKky6TmDGc5bNQufDBQf7Ek$ https://urldefense.com/v3/__http://www.gcapservices.com/__;!!OfuUnHCITYtmmjM!q5bUa4T8e-suDO6oiw2bmd13dEoaG1fIXFKmcZrhnJrlOdcek5a9Ae3LVW9nglUiPIsE37j6PKky6TmDGc5bNQufDBQf7Ek$ https://urldefense.com/v3/__https://www.linkedin.com/company/gcapservices/__;!!OfuUnHCITYtmmjM!q5bUa4T8e-suDO6oiw2bmd13dEoaG1fIXFKmcZrhnJrlOdcek5a9Ae3LVW9nglUiPIsE37j6PKky6TmDGc5bNQuf3dVBxcQ$
• Project Name/Project Number: Sports Field Lighting Repair
• Project Manager Name: Miles Friesen
• Contract Type: Contractual Services Agreement
• Total Contract Value: $250,000 (over 5 years)
• Funding Source of the Project: Local
• Detailed Scope of Services: The City of Santa Monica, through its Public Landscape Division, is seeking qualified contractors to furnish, deliver, and install components and perform repair work on sports field lighting systems at six citywide locations: Marine Park, Clover Park, Memorial Park, Airport Park, John Adams Middle School, Belmar Park, and Los Amigos Park. These facilities include lighting poles reaching heights of 60-85 feet, which require specialized equipment and expertise to maintain.
Specifications:
The selected contractor will provide routine and as-needed repair services for the City’s sports field lighting, including but not limited to:
Installation and replacement of 1500 watt metal halide lamps and ballast kits Repair and replacement of related components (e.g., fuses, wiring, electrical connectors) Routine servicing of lighting controls and systems Safe and proper disposal of universal waste materials
Service Requirements:
Response time: Service must be scheduled within two weeks of City’s call-out Work is to be performed during standard weekday business hours;
no weekend, holiday, or after-hours work is required Estimated call-outs: 3 per year (subject to fluctuation) Orders will be placed on an as-needed basis by City staff
Additional Requirements:
· Vendor must be available for scheduled work Monday through Friday, 7 AM to 5 PM, excluding holidays.
· All work must be coordinated with the City of Santa Monica Public Works team.
· Vendor must ensure that materials meet or exceed specifications and that proper installation methods are followed.
· Any additional repairs required beyond the agreed scope must be approved by the project manager before proceeding.
Best, -Miles
Miles Friesen, MSW (he/they) Administrative Analyst
Public Landscape Division Public Works Department santamonica.gov https://www.santamonica.gov/arts/go-see-art
File details come from the government source that posted it. Updated .